Loading...
HomeMy WebLinkAbout23A - AMEND CONTRACT FOR PARK LOT IMPROVEMENTSREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: MARCH 17, 2020 TITLE: AMEND THE CONSTRUCTION CONTRACT WITH HARDY & HARPER, INC. BY $62,499, FOR A NEW CONTRACT TOTAL AMOUNT OF $295,099, TO CONSTRUCT THE THORNTON PARK PARKING LOT IMPROVEMENTS WITH NO CHANGE TO THE ESTIMATED TOTAL PROJECT COST OF $320,000 (PROJECT NO. 18-7530) CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 1" Reading ❑ Ordinance on 2i1 Reading ❑ Implementing Resolution ❑ Set Public Hearing For_ CONTINUED TO /s/Kristine Ridge FILE NUMBER CITY MANAGER RECOMMENDED ACTION 1. Authorize the City Manager to amend the construction contract with Hardy & Harper, Inc. via change order, by an increase of $62,499, resulting in a revised construction contract total of $295,099. 2. Approve a revised Project Cost Analysis authorizing the reclassification of the approved project contingency of $23,260 and reducing project administration, testing, and inspection costs in the amount of $39,239 for a net zero change in the original approved Community Development Block Grant (CDBG) project funding of $320,000. DISCUSSION The existing Thornton Park parking lot (Exhibit 1), servicing the park and sports fields, is in need of renovation and has been identified as a high priority facility in need of rehabilitation. The scope of work includes removing and replacing failed asphalt pavement, damaged concrete curb and gutter, concrete curb ramps, and painting stripes and markings. The project was included in the City Council -approved Capital Improvement Program for Fiscal Year 2017-18. On June 18, 2019, the City Manager authorized a construction contract with Hardy & Harper, Inc. in the amount of $232,600 for construction of the Thornton Park Parking Lot Improvements Project (Exhibit 2). During removal of the pavement, moisture intrusion into the subsoil was discovered, which has caused the subsoil to become unstable. After considering several options to address the moisture intrusion, the least costly option that would yield permanent, long-term benefits was to over -excavate, remove undesirable subgrade, and perform cement subsoil treatment. This unforeseen work is not a part of the original construction contract. Therefore, staff recommends reclassification of the contract funds through approval of a contract change order to accommodate the extra costs related to mitigating the effects of the moisture intrusion in the subsoil. The table 23A-1 Amend Construction Contract with Hardy & Harper, Inc. Thornton Park Parking Lot Improvements March 17, 2020 Page 2 below summarizes the originally authorized expenditures and the reclassification of the funds, which yields a net zero cost to the project: EXPENDITURE CATEGORY I ORIGINAL AMOUNT CHANGE NEW TOTAL Design Engineering $23,725 $23,725 Construction Contract $232,600 $62,499 $295,099 Construction Administration $19,568 ($18,392) $1,176 Inspection & Testing $20,847 $20,847 $0 Contingencies $23,260 $23,260 $0 TOTAL $320,000 $0 $320,000 STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy C (invest resources to extend the service life of existing infrastructure to protect the City's investment and support a high quality of life standard). ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption Environmental Review No. ER-2019-17 was filed for the project. FISCAL IMPACT The contract change order will reclassify contract funds to accommodate the extra costs related to the unforeseen soil issues. As indicated in the Cost Analysis (Exhibit 3) and in the table above, the estimated total construction delivery cost of the project remains at the originally budgeted amount of $320,000. Funding for the project was provided from the Community Development Block Grant Fund. The following table summarizes the approved funds budgeted for expenditure to deliver construction of this project. Fiscal Accounting Unit— Fund Accounting Unit -Account No. Amount Year Account No. (Prof No.) Description Description FY 19-20 13518783-66220 CDBG CDBG Programs, Improvements $320,000 July -June 18-7530 Other Than Building TOTAL FUNDING: $320,000 23A-2 Amend Construction Contract with Hardy & Harper, Inc. Thornton Park Parking Lot Improvements March 17, 2020 Page 3 Nabil Saba, PE Acting Executive Director Public Works Agency Steven Mendoza Executive Director Community Development Agency NS/WEG/MO/VS Exhibits: 1. Location Map 2. Construction Contract 3. Cost Analysis APPROVED AS TO FUNDS & ACCOUNTS: Kathryn Downs, CPA Executive Director Finance and Management Services Agency Lisa Rudloff Executive Director Parks, Rec & Community Services 23A-3 PROJECT LOCATION SANTA ANA Project No. 18-7530: Pl Thornton Park Parking Lot PUBLIC WORMS AGENCY Improvements Project IPdSJ` ANCE NOT ON FILE vtiu;o; MAY NOT PROCEED EXHIBIT 2 �LERK OF COUNCIL CITY OF SANTA ANA DATE: a-,29—/9 CONSTRUCTION CONTRACT ' PWO(0) PROJECT 18-7530 Ckw(� THORNTON PARK PARKING LOT IMPROVEMENTS (REBID) PROJECT This CONSTRUCTION CONTRACT is made and entered into this 181h day of June, 2019 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Hardy & Harper, Inc. (hereinafter "CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Thomton Park Parking Lot Improvements (Rebid) Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed Two Hundred Thirty-two Thousand Six Hundred Dollars and No Cents ($232,600.00), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A." The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. rev. 09/012017 23A-5 Page I of 3 EXHIBIT 2 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: http://www.santa-ana.org/pwa/documents/CWA.pd CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials famished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. // 23A-6 Page 2 of 3 iNa:110-11 a IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: L wag am rmown, Im" APPROVED AS TO FORM: SONIA R. CARVALI-10 City Attorney By: D/W 74" -f�4, J -IN FUNK Assistant City Attorney FOR APPROVAL: FUAD S EISS, PE, PLS Executive Virector Public Wokks Agency CITY OF SANTA ANA KRISTINE RIDGE City Manager CONTRACTOR: Hardy & Harper, Inc. NAME: Kristen Paulino TITLE: Corporate secretary 23A-7 Page 3 of 3 City of Santa Ana Thornton Park Parking Lot Improvements (REBID) (16.7530), bidding on May 21, 2019 2:00 PM (Pacific) Bid Results Bidder Details Vendor Name Hardy & Harper, Inc. Address 1312 E. Warner Avenue Santa Ana, CA 92705 United States Respondve Ashlie Blanchard Respondve Title Bid Coordinator Phone 714-444.1851 Ext. Email ablanchard@hardyandharper.wm Vendor Typo CADIR,Local License # 216952 CA DIR Bid Detail Bid Format Electronic Submitted May 21, 2019 12:26:24 PM (Pacific) Delivery Method Bid Responsive Bid Status Submitted Conflrmatlon # 179088 Ranking 0 Respondee Comment Buyer Comment Attachments File Title General Attachments Ownership Affidavit Bid Bond Non -Collusion Affidavit Line Items Type Item Code Section 1 1 Unclassified Excavation 2 Asphalt Concrete (AC) File Name Bid Documents to be uploaded.pdf Santa Ana Thorton Park Re-Bld Ownership Affidavit To Upload.pdf Santa Ana Thorton Park Re -Bid Bid Bond To Upload.pdf Santa Ana Thorton Park Re -Bid Non Collusion Affidavit To Upload.pdf U0M City CY 800 TN 1100 PlanetBids, Inc. 23A-8 Unit Price $67.00 $95.00 EXHIBITPge, Printed 05/21/2019 File Type General Forms Ownership Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition Bid Bond Guaranty (Notary Public) - REQ Original Hard Copy Submittal in Addition Non -Collusion. Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition Line7otal Comment $45,600.00 $104500.00 City of Santa Ana EXHIBIT 1&12 Thornton Park Parking Lot Improvements (REBID) (18-7530), bidding on May 21, 2019 2:00 PM (Pacific) Pflmed 05/21/2019 Bid Results EXHIBIT A Type Item Code UOM Qty Unit Price Line Total Comment 3 Asphalt Rubber Hot Mix (ARHM) TN 600 $108.00 $53,000,00 4 PCC Curb Ramp" SF 200 $25.00 $0,000,00 5 PCC Cross -Gutter* SF 300 $25.00 $7,600.00 6 PCC Curb & Gutter (A-2-6)* LF 100 $40.00 $4,000.00 7 Slgnage & Stripping LS 1 $3,000,00 $3,000.00 8 Labor Agreement Oversight LS 1 $10,000.00 $101000.00 Subtotal $232,000.00 Asterisk Notes (per P-2 of P-16) 9 "The quantity for this bid Item Is shown for bid comparison only. This bid Item shall not be sulboot to the "25W limit as stated In Section 3.2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to Increase or decrease the quantity of this item accordingly, as i 0 0 Subtotal 0 Total $232,600.00 PlanetBids, Inc. 23A-9 EXHIBIT 2 CITY OF SANTA ANA PROPOSAL EXHIBIT A PROJECT NO.: 18-7530 THORNTON PARK PARKING LOT IMPROVEMENTS (REBID) TOTAL BASE BID $ _L3 r lrl The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only, This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within fifteen (15) working days after the commencement date stated in the Notice to Proceed. damages amount, in lieu of the amount specified in Subsection 6-9 of the nations, shall be $1,000 per calendar day. t'� 1 Hardy &.Harper, Inc. 1 @vo Kirschner -Vice President r (If an individual, so state, If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager; thereof.) Hardy& Harper, Inc, S Corporation Fred T. Maas, Jr. — President / Treasurer Steve Kirschner - Vice President Kristen S. Paulino -Corporate Secretary Dan T. Maas . CEO P-2 of P-16 23A-10 EXHIBIT 3 COST ANALYSIS PROJECT NO. 18-7530: THORTON PARK PARKING LOT IMPROVEMENTS EXPENDITURE CATEGORY ORIGINAL AMOUNT CHANGE NEW TOTAL Design Engineering $23,725 $23,725 Construction Contract $232,600 $62,499.00 $295,099 Construction Administration $19,568 $18,392 $1,176 Inspection and Testing $20,847 $20,847 $0 Contingencies $23 260 $23,260 $0 TOTAL $320,000 $0 $320,000 23A-11