Loading...
HomeMy WebLinkAboutPLACEWORKS, INC. (4)INSUR ANCE NOT ON FILE WORK NIP QT PROCEED CLERK OF COUNCIL DATE: 1)=Qb`o)SOv161 Moor-AdlanIk' A-2020-077 EXHIBIT 1 N ENVIRONMENTAL SERVICES FOR THE GENERAL PLAN UPDATE 0 N co THIS FIRST AMENDMENT to the above -referenced agreement is entered into on April 21, 2020, o by and between PlaceWorks, Inc. ("Consultant'), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ("City"), collectively referred to as the "Parties". RECITALS A. The Parties entered into Agreement No. A-2018-263, dated November 20, 2018, by which Consultant agreed to prepare environmental documents for the comprehensive general plan updates ("Agreement"). The original term of the Agreement was for a two-year term until November 19, 2020, with an option to extend the term of the Agreement. The Agreement is current and in effect. B. In January 2020, the parties determined that additional data should be incorporated into the General Plan Update requiring an amendment to the Agreement. C. The Parties now wish to amend the scope of service for this data, increase the amount to be expended under the Agreement, and extend the term of the Agreement. The Parties therefore agree: 1. Section 1, Scope of Services, is amended to include the Scope of Services updated on April 9, 2020, attached hereto to this First Amendment and identified as Exhibit A-1. 2. Section 2, Compensation, is amended to increase the not -to -exceed amount by $91,947, per the costs and rates identified in Exhibit A-i to this First Amendment. The total amount to be expended under the Term of this Agreement shall not exceed $699,831. 3. Section 3, Term, is amended to extend the time period of the Agreement through March 31, 2021. The Term of the Agreement may still be extended for up to an additional one (1) year period upon a writing executed by the City Manager and the City Attorney. 4. Except as modified by this First Amendment, all terms and conditions of the Agreement shall remain in full force and effect. [signature page to follow] #34657v3 IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the Agreement on the date and year first written above. ATTEST aisy Gomez,! / Clerk of the Council APPROVED AS TO FORM Sonia R. Carvalho City Attomey CITY OF SANTA ANA nrtsTine Ridge� City Manager CONSULTANT tXsSlstam e,ny titcorney t IItes�j /� RECOMMENDED FOR APPROVAL a L Minh Thai Executive Director Planning and Building Agency #3465Tu3 February 7, 2020 (updated April 9, 2020) Verny Carvajal, Principal Planner Melanie McCann, Senior Planner City of Santa Ana, Planning Department 20 Civic Center Plaza, M-20 Santa Ana, CA 92702 Subject: Request for Contract Amendment No. 1 for the Technical Studies and Associated Environmental Impact Report for the Santa Ana General Plan (SNT-20.0) Dear Mr. Carvajal and Ms. McCann This letter is to request Contract Amendment No. 1 to Agreement No. A-2018-263, approved by the City November 20, 2018. Per our ongoing discussions, this amendment details the tasks required to expand the scope of the General Plan Update Environmental Impact Report (GPU EIR) to include the Circulation Element. Merging the Circulation Element with the overall GPU will also eliminate the duplication and overlap of processing separate EIRs. This amendment assumes that remaining budget within the Circulation Element and FIR contract (A-2011-198) with IBI Group would be transferred to the GPU EIR. Included in the scope of work are IBI's efforts to combine the analysis for both the Circulation Element and GPU and ensure that analysis sufficiently addresses the combined potential traffic impacts of the projects. The scope of work that follows details the PlaceWorks and IBI Group efforts covered in this amendment. Our Cost Estimate is attached. Note that assuming that the remaining budget in the Circulation Element contract is transferred to the GPU FIR contract, no additional fees are requested. PlaceWorks » Supplementing the GPU EIR to cover the Circulation Element, including expanded project description, impact analyses, and potential alternative focused on circulation modifications. » Minimal increase in Notice of Preparation (NOP), Scoping Meeting, and Final EIR related to expanded project description, graphics, and potential comments related to the Circulation Element. » Expanded project management and coordination due to extended schedule (+36 weeks in comparison to original schedule). IBI Group » Preparing a combined traffic analysis report for the Circulation Element and GPU that includes additional intersections and roadways, as well as City -requested modifications to some roadway reclassifications. » Ongoing coordination and meetings with OCTA to facilitate expedited schedule and IBI's use of OCTAM model. » OCTAM modeling of two land use scenarios. » Update of existing conditions analysis upon finalization of land use plan. February 7, 2020 (revised April 9, 2020 1 Page 1 Scope of Work The following scope of work details the additional work covered in this contract amendment and is organized per the tasks in our original approved contract with the City dated November 20, 2018. TASK 1 TECHNICAL STUDIES FOR THE GENERAL PLAN UPDATE Task 1.1 Traffic Analysis The City of Santa Ana has proposed to merge the contracts for the Circulation Element Update and the GPU EIR. In terms of the respective traffic study scopes of work, merging the two projects creates efficiency related to the production of a single traffic study, but does require additional work to ensure that the scope of the combined traffic studies —in terms of study intersection and study roadway segments —is sufficient to adequately analyze the combined potential traffic impacts of the two projects. IBI Group's scope of work under PlaceWorks' GPU EIR contract includes analyzing existing and forecast traffic conditions at up to 40 intersections and 60 roadway segments. 181 Group previously completed the Existing Conditions analysis portion of the traffic study for the GPU EIR. The Circulation Element Update traffic study includes analysis of 84 intersections and 52 roadway segments. Additionally, the locations analyzed for the Circulation Element Update and GPU EIR do not necessarily overlap. This is a result of these documents proposing changes —either roadway or land use —in different locations in the city. The Circulation Element analysis locations also reflect input from OCTA, Caltrans, and adjacent cities regarding analysis locations related to the proposed roadway reclassifications. In comparing the scopes of work for the two studies, IBI has identified the need to analyze up to 110 intersections and 85 roadway segments for the combined Circulation Element and General Plan Update. This combined set of locations considers the original 40 intersections and 60 roadway segments in the base contract, incorporates additional intersections and roadway segments for the Circulation Element, and includes further additional locations outside of Santa Ana in Costa Mesa and Irvine that IBI believes are prudent to analyze given the location and magnitude of the proposed land use changes in selected portions of the city. This updated analysis would also incorporate removal of the following proposed roadway reclassifications per the City of Santa Ana's request: » 5th Street » 1st Street » The PE Right -of -Way » Plaza Drive Based on these changes, IBI Group's remaining budget under the GPU EIR contract is not sufficient to accommodate the modeling, LOS, and VMT analysis required for a combined document. IBI's proposed additional scope of work is detailed below. OCTA Coordination With the proposed MPAH roadway reclassifications still requiring OCTA approval, ongoing coordination with OCTA will be required during the preparation of the traffic study for the combined Circulation Element Update and General February 7, 2020 (revised April 9, 2020 1 Page 2 Plan Update EIR. This coordination will include coordination with OCTA on producing OCTAM traffic model forecasts and in the MPAH amendment process. To support the traffic modeling, IBI Group will coordinate with OCTA and be responsible for providing details regarding the roadway reclassification and land use/socioeconomic data for use in two model runs. OCTA will be responsible for updating the OCTAM model to include MPAH reclassifications, and IBI will be responsible for inputting land use changes and running the model for the new land use. IBI Group will lead the coordination effort with OCTA during the review of the traffic study results, including meetings (up to 4 meetings) with OCTA and adjacent cities, working with the City of Santa Ana to draft and receive letters of support from adjacent cities, and attending the OCTA Board meeting for review of the proposed MPAH reclassifications. Traffic Modeling and Analysis Tfafflc Modeling This task will involve a review of the City -proposed land uses changes in the General Plan Update (Scenarios 1 and 2), including any special transportation needs or considerations. IBI Group will coordinate with OCTA to obtain a new OCTAM model forecast of future traffic conditions in the study area. The coordination will include providing OCTA with the proposed land use mix (land use type and size) for each of the two scenarios proposed by the City. Per discussions with OCTA, IBI Group will be responsible for incorporating socioeconomic data forecasts associated with the future land use scenario into OCTAM. IBI Group will also be responsible for running the OCTAM model to develop forecasts for trafficvolumes with the proposed land use changes. OCTAwill input all proposed MPAH roadway reclassifications into OCTAM. IBI Group will be responsible for running OCTAM to generate forecasts for two land use scenarios. Once the forecast for the higher land use scenario is generated, IBI Group will conduct an initial analysis and review to determine the potential magnitude and number of significant traffic impacts. The purpose of this initial review will be to determine if the second model run with the lower -intensity land use is required. Only a single future General Plan Update land use scenario will be carried forward through the full traffic analysis and VMT analysis. The purpose of this preliminary, new review is to determine the scenario that will proceed. For both scenarios, IBI Group will post -process forecast intersection volumes using a procedure based on the Transportation Research Board methodology to generate future forecast turning movements at intersections. Post - processing refines the model link level forecasts to produce reasonable turning movement volumes at the intersections. Future roadway segment volumes will be forecast based on growth rates obtained from the model. IBI Group has assumed that this scope does not include the development of a second VMT forecast. Only one VMT forecast, consistent with the selected land use scenario, would be generated, consistent with the base scope of work. Update Existing ConditlonsAnalgis The Existing Conditions Analysis for the General Plan Update FIR was previously completed by IBI Group. This document includes analysis of 30 intersections and 50 roadway segments, leaving 10locations of each type available for future analysis once planned land use changes were known. With the finalization of the land use plan and incorporation of the Circulation Element Update roadway changes and study locations, the Existing Conditions February 7, 2020 (revised April 9, 2020 1 Page 3 1 Analysis will require updating to ensure consistency with the future conditions traffic analysis. IBI Group will prepare a draft and final version of the updated Existing Conditions Analysis for review by Place Works and the City of Santa Ana. Expanded Future Condldons TraffcAnalysis The original traffic study scope of work assumed IBI Group would analyze up to 40 intersections and 60 roadway segments. With the expanded list of study intersections resulting from the geographic spread of areas with proposed land use changes in the General Plan Update coupled with the study area included as part of the Circulation Element Update, the proposed number of study intersections has expanded to a minimum of 110 locations. This Is an increase of 70 intersections above the base scope of work. The scope for this amendment task assumes the additional work efforts associated with analyzing 70 more intersections (110 total) and 25 more roadway segments (85 total) as part of the traffic study conducted for the General Plan Update EIR. IBI Group has also assumed that only one of the two land use alternatives will be fully analyzed and documented in the traffic study. After obtaining and processing the model data, a level of service (LOS) analysis at the additional study area intersections and roadway segments will be conducted and summarized. IBI Group will identify areas that would not achieve the City's LOS standards and will determine necessary improvements to achieve those standards. The intersections will be field reviewed to verify the preliminary feasibility of the proposed improvements, and the resulting level of service at the impact locations will be quantified. Expanded rrafficStudy Report IBI Group's original scope of work assumed preparation of draft and final traffic studies in support of the EIR. With the expanded number of study intersections and roadway segments, this analysis will require additional effort to prepare and complete the draft and final versions of the traffic study, including additional text and figures. Task 1.2 Air Quality/GHG Analysis No additional scope is required for this task. Task 1.3 Cultural Resources Analysis No additional scope is required for this task. Task 1.4 Noise Analysis No additional scope is required for this task. Task 1.5 Hydrology, Water Quality, and Infrastructure No additional scope is required for this task. Task 1.6 Potable Water and Sanitary Sewer No additional scope is required for this task. February 7, 2020 (revised April 9, 2020 1 Page 4 Task 1.7 Service Level Study for Fire and Police No additional scope is required for this task. Task 1.8 Geology, Soils, and Natural Hazards No additional scope is required for this task. Task 1.9 Biological Resources No additional scope is required for this task. TASK 2 ENVIRONMENTAL DOCUMENTATION (PROGRAM EIR) Task 2.1 Project Initiation No additional scope is required forthis task. Task 2.2 Preparation of Project Description Supplement the project description to address the Circulation Element, including appropriate graphics. Task 2.3 Notice of Preparation and Scoping Meeting Scoping Meeting materials will be supplemented to include a description of the Circulation Element. Task 2.4 Prepare Screencheck Administrative Draft EIR In comparison to our original scope of work, the Screencheck Administrative Draft EIR will need to be supplemented to address the Circulation Element (including appropriate graphics). Technical analysis will be supplemented as appropriate to discuss the Circulation Element related to air quality, greenhouse gas emissions, land use and planning, noise, and transportation/traffic. Project alternatives may be modified to consider potential modifications to the Circulation Element (roadway classifications, etc.) Task 2.5 Prepare Second Screencheck Draft EIR This task has not been initiated and no additional scope is required. Task 2.6 Prepare Draft EIR This task has not been initiated and no additional scope is required. Task 2.7 Public Notification This task has not been initiated and no additional scope is required. Task 2.8 Prepare Screencheck Final EIR This task has not been initiated and no additional scope is required. February 7, 2020 (revised April 9, 2020 1 Page 5 Task 2.9 Prepare Final EIR This task has not been initiated and no additional scope is required. Task 2.10 Prepare Findings and Statement of Overriding Considerations This task has not been initiated and no additional scope is required. Task 2.11 Prepare Notice of Determination This task has not been initiated and no additional scope is required. Task 2.12 Meeting Attendance Remaining meeting attendance is based on two progress meetings per month through a projected General Plan Update approval date in November 2020. It is anticipated that our project manager, JoAnn Hadfield, and assistant project manager, Dina El Chammas Gass will attend the progress meetings. Our attendance/participation in up to three public hearings is included (per our original scope of work). Remaining budget is available in this task to accommodate our meeting and public hearing attendance. Task 2.13 Management and Coordination The project's original schedule has been extended by 36 weeks, resulting in the need for additional management and coordination fees. The additional fees are based on 1.5 hours/week forJoAnn Hadfield and 1.0 hour per week for Dina El Chammas Gass. We appreciate your consideration of this requested contract amendment. Please let us know if you need any additional information to assist you in expediting this request. Sincerely, PLACEWORKS JoAnn C. Hadfield Principal, Environmental Services Attachment: Cost Estimate February 7, 2020 (revised April 9, 2020 1 Page 6 Cost Estimate CONTRACT AMENDMENT No. 1 - Cost Total Contract I Contract#1 Request Contingency with Total Total Contract Task Description Original Contract 1 Contingencyl PlaceWorks IBI Amend? w/Amend#1 '. TASK 1. TECHNICAI. STIIDIFS FOR TRF OPNFRAI PI AN I lOnATF 1.1 Traffic Analysis IBI General Plan EIR Original Scope $72,426 $72,426 $0 $0 $0 $72,426 OCTA Coordination 10160 11,176 11,176 Traffic Modeling and Analysis 36,660 40,326 40,326 Expanded Traffic Report 6,120 6,732 6,732 1.2 Air Quali /GHG Analysis 21,191 21,191 0 0 0 21,191 1.3 Cultural heritage Resource Stud Chattel 43,428 43,428 0 0 0 43,428 1.4 Noise Analysis 20,528 20,528 0 0 0 20,528 1.5 Hydrology, Water Quality, and Infrastructure FUSCOE 26,118 1,980 28,098 0 0 0 28,098 1.6 Potable Water and SanitarySewer 28,897 1,320 30,217 0 0 0 30,217 1.7 Service Level Study for Fire and Police 0 0 0 0 0 0 1.8 Geology, Soils, and Natural Hazards 7,711 7,711 0 0 0 7,711 1.9 Biological Resources (Carlson) 13,332 1,738 15,070 0 0 0 15,070 Task Subtotal 233,631 5,038 238,669 0 52,940 58,234 269,903 TASK 2. ENVIRONMENTAL DOCUMENTATION (PROGRAM EIR) ' -i February 7, 2020 (revised April 9, 2020) I Page i CONTRACT AMENDMENT No. 1 - Cost Total Contract Contract#1 Regoast Contingency with Total Total Contract Task Description original Contract 1 Contingency 1 I PlaceWorks IBI Amend 1 wlAmend #1 TASK 2.3 NOTICE OF PREPARATION AND SCOPING MEETING 2.3.1 Notice of Pre amlion (expanded, no Initial Slud $4508 $4,508 $0 $0 $0 $4.508 2.3.2 Sco in Meeting attendance and re materials 4,916 4,916 205 0 205 1 5,121 Task 2.3 Subtotal 9,425 9,425 205 0 205 1 9630 TASK 2.4 PREPARE SCREENCHECK ADMINISTRATIVE DRAFT EIR 2.4.1 Screencheck Administrative Draft FIR $13,260 $13,260 $0 $13260 Chapters 1-0 (except Project Descri tion 6,712 6,712 550 550 7,262 Project Description (Chapter 3 1,408 1,408 2990 2,990 4,398 Aesthetics 5,345 5.345 0 0 5,345 Agriculture and Forestry Resourcesr 2,672 2,672 0 0 2,672 Alr Quality 3,213 3,213 390 390 3,603 Biol ical Resources 2,672 2,672 0 0 2672 Cultural Resources 3.611 3.611 0 0 3,611 Geology and Soils 3142 3,142 0 0 3,142 Greenhouse Gas Emissions 3,213 3,213 105 195 3,408 Hazards and Hazardous Materials 4,457 1 4.457 0 0 4,457 Hydrology and Water Quality 4,692 4,692 0 0 4,692 Land Use and Planning 4,366 4,366 230 230 4,596 Mineral Resources 2,815 2,815 0 0 2,815 Noise 3,550 3,550 360 360 3.910 Population and Housing 3,774 3,774 0 0 3,774 Public Services 11546 11,546 0 0 11,546 Recreation 3,774 3,774 0 0 3,774 Transportation and Traffic 6,365 6,365 920 920 7,285 Tribal Cultural Resources 2,672 2,672 0 0 2,672 Utilities and Service Systems 5,630 5,630 0 1 0 5,630 February 7, 2020 (revised Apri 19, 2020) [Page ii CONTRACT AMENDMENT No. 1 - Cost Estimate 2/7/20, u dated 4/9/20 Task Description Ori inal Contract Contingency 1 Total Contract with Contingency 1 Contract #1 Request Total Contract wlAmend #1 PlaceWorksl ISI Total Amend 1 Chapters 6-12 (except Alternatives) 3,284 3,264 0 0 3,284 Alternatives (Chapter 7 15,953 15,953 1,035 1,035 16,988 Task 2.4.1 Subtotal 118,126 118,126 6670 0 6,670 124,796 TOTAL TASK 2.4 118,126 0 118,126 6,670 52,946 64,904 183,030 TASK 2.8 PREPARE SCREENCHECK FINAL EIR 2.8.1 Pre are 8creencheck Final EIR $16,218 $16,218 $1,360 $0 $1,380 $17,598 2.8.2 1 Prepare Somencheck MMRP 1173 1 1,173 1 0 0 1 0 1 1,173 Task 2.8 Subtotal 17,3911 17,3911 1,380 0 1 1,380 1 18,771 TASK 2.9 PREPARE FINAL EIR 29.1 Final EIR $3,244 $3,244 $0 $0 $0 $3244 2,92 1 Final MMRP 546 546 0 0 0 546 Task 2.9 Subtotal 3,789 3,789 0 01 0 3,789 February 7, 2020 (revised April 9, 2020) 1 Page III ENDMENT No. 1 - Cost Estimate Total Contract Contract 91 Request Contingency with Total Total Contract Task _ _._ Description Original Contract I 7 I Contingencv l I PlaceWorks IBI Amend t wlAman I Al TASK 2.12 MEETING ATTENDANCE 2.13.1 Progress Meetings 38 in -person meetings and 38 conference calls $43145 1 $43,145 $0 $0 $0 $43,145 2.13.2 Public Meetings/Hearings 3, Prop and Attendance 7,390 7,390 0 0 0 7,390 Task 2.12 Subtotal 50535 50535 0 0 0 Snsns TASK 2.13 MANAGEMENT AND COORDINATION 2.13.1 PM and Coordination 37,536 37,536 15,965 0 15,985 53,527 Task 2.13 Subtotal 37,536 37,536 15,985 0 15,985 53,521 LABORTOTAL 509.391 5.038 514.429 28515 52,940 84.749 599.178 Subconsultants Reimbursable Expenses $14,300 $14300 $0 $0 $0 $14,300 PlaceWorks Reimbursable Expenses 4904 4,904 0 0 0 4.904 REIMBURSABLE EXPENSES TOTAL 19,204 19,204 0 0 0 19.204 2% of Labor for Office Expenses 6,078 15%Contingency 79,289 •5,038 74,251 GRAND TOTAL $607,804 0 $607,884 $692,633 Remaining Contract IBI2011-198,9113111 91,947 Total Contract Existing Contract wIlSl Transfer 699,831 $699,831 February 7, 2020 (revised April 9, 2020) i Page Iv