HomeMy WebLinkAbout20A - AA BUSH ST BICYCLE BLVDREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
JUNE 16, 2020
TITLE:
APPROVE TWO APPROPRIATION
ADJUSTMENTS AND AWARD A
CONSTRUCTION CONTRACT TO EXCEL
PAVING COMPANY FOR THE BUSH STREET
BICYCLE BOULEVARD, WATER, AND
SEWER IMPROVEMENTS, IN THE AMOUNT
OF $1,927,280, FOR A TOTAL ESTIMATED
DELIVERY COST OF $2,522,280
(PROJECT NOS. 18-9002, 21-6442, 21-6443)
(NON -GENERAL FUND)
/s/ Kristine Ridge
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on 1" Reading
❑ Ordinance on 2i1 Reading
❑ Implementing Resolution
❑ Set Public Hearing For_
CONTINUED TO
1�1��►1�1i!1:3q:7
1. Approve an appropriation adjustment to recognize $1,278,080 in the Water Fund, Public Works
Water Revenue, Prior Year Carry Forward account and appropriate the same amount to the
Acquisition & Construction, Water Utility Capital Projects, Water Capital Project expenditure
account.
2. Approve an appropriation adjustment to recognize $124,200 from prior year fund balance in
the Sanitary Sewer Capital Fund, and appropriate the same amount to the Capital Recovery
Charges, Improvements Other than Buildings expenditure account.
3. Approve an amendment to the Fiscal Year 2019-20 Capital Improvement Program to include
$1,278,080 in construction funds for the Bush Street Water Improvements Project, and
$124,200 in construction funds for the Bush Street Sewer Improvements Project.
4. Award a construction contract to Excel Paving Company, the lowest responsible bidder, in
accordance with the base bid in the amount of $1,927,280, for construction of the Bush Street
Bicycle Boulevard, Water, and Sewer Improvements, for the term beginning upon execution of
the contract and ending upon project completion, and authorize the City Manager to execute
the contract subject to non -substantive changes approved by the City Manager and the City
Attorney.
5. Approve the Project Delivery Cost for a total estimated construction cost of $2,522,280, which
includes $1,927,280 for the construction contract, $290,000 for contract administration,
inspection and testing, and a $305,000 project contingency.
20A-1
Appropriation Adjustments and Contract for Bush St. Bicycle Blvd. Water and Sewer Improvements
June 16, 2020
Page 2
DISCUSSION
On June 7, 2016, the City Council adopted a resolution authorizing submittal of a funding
application as a joint application with Meta Housing Corporation for the Affordable Housing and
Sustainable Communities Program (AHSC). A grant in the amount of $1,288,000 was requested
for a Sustainable Transportation Infrastructure Program for the Santa Ana Arts Collective Project.
As a result, Bush Street from Civic Center to 17th Street was selected for a bicycle boulevard
treatment project.
The Bush Street Bicycle Boulevard Project incorporates bicycle enhancements and traffic calming
measures intended to connect neighborhoods to the Civic Center using complete street and Bike
Boulevard concepts. The improvements will include landscaping and updated signage and
roadway markings. The Complete Streets concept transforms roadways originally designed to
primarily serve vehicles into streets that equitably serve pedestrians and bicyclists, provide
aesthetically pleasing public areas, and result in community enhancements that help to establish
vibrant neighborhoods.
Staff coordinated these major street renovations with the Public Works Agency Water Resources
Division, who is responsible for monitoring the condition of water and sewer main pipeline systems.
The water and sewer systems were evaluated based on several critical factors, such as pipe
breaks, sewer spills, pipe size, alignment location, system redundancy and resiliency to determine
replacement priorities. The existing 4-inch-diameter and 8-inch-diameter cast iron water mains
located within Bush Street were installed in the 1950s and 1960s, and are a priority for replacement.
In addition, the existing sewer maintenance holes in this area were constructed in the 1920s, and
also need replacement.
The project comprises a bicycle boulevard stretching along Bush Street from Civic Center to 17th
Street, and water and sewer improvements from 8th Street to 11th Street (Exhibit 1). In addition to
the replacement of the water main and sewer maintenance holes, the street enhancement consists
of traffic circles and/or bulb -outs at seven street intersections, along with landscaping, and updated
signs, striping, and markings. The addition of the curb bulb outs as traffic calming feature
enhancements will result in the loss of a minimal number of parking spaces.
An amendment to the Fiscal Year 2019-20 Capital Improvement Program is needed in order to add
the Bush Street Bikeway Water Improvements ($1,278,080) and Bush Street Bikeway Sewer
Improvements ($124,200) projects (Exhibit 2). This amendment will increase the Fiscal Year 2019-
20 CIP by a total of $1,402,280.
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in
the Orange County Register newspaper on April 28 and May 5, 2020. Bids were received
electronically via the City's web -based electronic bidding system, PlanetBids, on May 20, 2020.
Through the PlanetBids online portal, vendors may register to receive notifications on all current
and future City projects, as well as download contract documents, receive project updates and
submit bids electronically.
20A-2
Appropriation Adjustments and Contract for Bush St. Bicycle Blvd. Water and Sewer Improvements
June 16, 2020
Page 3
A total of 807 vendors, including 37 located in the City of Santa Ana, were notified of the project
via PlanetBids. A total of 60 vendors requested bidding documents and four bids were received,
with none from a Santa Ana contractor.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Excel Paving Company
Long Beach
$1,927,280
2
Hardy & Harper, Inc.
Lake Forest
$2,077,000
3
EBS General Engineering, Inc.
Corona
$2,296,159
No Rank
Nationwide Contracting Services, Inc.
Fountain Valley
Non -responsive
The City received four bids; three were deemed responsive. Excel Paving Company submitted the
lowest responsive bid in the amount of $1,927,280 (Exhibit 3). Nationwide Contracting Services,
Inc., failed to sign certain documents in the bid package and proposal was deemed non -responsive.
Based on the bid analysis and a contractor's reference check, staff recommends awarding the
construction contract to Excel Paving Company in the amount bid (Exhibit 4).
Protect Delivery Costs
To deliver a complete project, in addition to the construction contract, the estimated total
construction delivery cost includes construction administration, inspection, and testing, along with
an allowance for contingencies to account for unexpected or unforeseen conditions. Construction
administration and inspection encompasses construction management; implementation of the
City's Community Workforce Agreement requirements; inspection of the Contractor's work to
ensure contract compliance, workmanship, and quality; and material testing. As summarized in
the table below, the estimated total construction delivery cost is $2,522,280.
Construction Contract
$1,927,280
Construction Administration, Inspection, and Testing
$290,000
Contingencies
$305,000
ESTIMATED CONSTRUCTION DELIVERY COST
$2,522,280
Project funds will cover all staffing costs for delivery of this capital project. No additional or separate
funding will be used.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy C (invest resources and technology to extend the service life of existing
infrastructure to protect the City's investment and support a high quality of life standard); and
Strategy G (develop and implement the City's Capital Improvement Program in coordination with
the Community Investment Plan).
ENVIRONMENTAL IMPACT
20A-3
Appropriation Adjustments and Contract for Bush St. Bicycle Blvd. Water and Sewer Improvements
June 16, 2020
Page 4
In accordance with the California Environmental Quality Act, the recommended actions are exempt
from further review. Categorical Exemption Environmental Review No. ER-2018-107 and ER-
2020-34 were filed for the projects.
FISCAL IMPACT
As indicated in the Project Delivery Costs, construction delivery is estimated to be $2,522,280.
Approval of the requested Appropriation Adjustments will provide for the following:
Recognize $1,278,080 in the Water Fund, Public Works Water Revenue, Prior Year Carry
Forward account (No. 06017002-50001) and appropriate the same amount to the
Acquisition & Construction Fund, Water Utility Capital Projects, Water Capital Project
expenditure account (No. 06617647-66301); and
Recognize $124,200 Sanitary Sewer Capital Fund, Prior Year Carry Forward account (No.
05417002-50001) and appropriate the same amount to the Capital Recovery Charges,
Improvements Other than Buildings expenditure account (No. 05417647-66220).
The following table shows the funds budgeted to deliver this project:
Fiscal
Accounting Unit -
Accounting Unit
Year
Y
Account No.
Fund Description
Account No. Description
Amount
Project No.
APPROPRIATION ADJUSTMENTS
FY 2019-
06617647-66301
Acquisition &
Water Utility Capital
Projects; Water Capital
$1,278,080
20
(21-6442)
Construction
Project
FY 2019-
05417647-66220
Sanitary Sewer
Capital Recovery
Charges; Improvement
$124,200
20
(21-6443)
Capital
Other Than Building
EXISTING PROJECT FUNDING
Affordable Housing
FY 2019-
41818832-66220
CDA Capital
AHSC Program;
$1,120,000
20
(18-9002)
Projects
Improvement Other Than
Building
Total
$2,522,280
NS/EWG/JG/KN
Exhibits: 1. Location Map
2. CIP FY 19/20 Sheets
3. Bid
4. Construction Contract
20A-4
Exhibit 1
SANTA ANA Project No. 18-9002, 21-6442, 21-6443
BUSH STREET BICYCLE BOULEVARD
Pir i (FROM CIVIC CENTER TO 17TH STREET)
BUSH STREET WATER IMPROVEMENTS
`UB°`�KS AGENCY
BUSH STREET SEWER IMPROVEMENTS
20A-5
/
}
k
#
)
!
/
/
co
2
of
§{
�*
§\
«�
�e
oy
�-
wz
o!
o-
LU ±
LU
G=
G »!
IL )
IL
0
q
H2
rrE
U, Lu z
I'0 LU
IL
Q
CII
S
ul
02,
(L
1
4�
co
04GI 4
Co
uj
co
LU
0
0 Z
R
IL co
0:
IL
MAYOR
Miguel A. Pulldo
MAYOR PRO TEM
Juan Villages.
COUNCILMEMBERS
Phil Became
Cecilia Iglesias
David Panaloza
Vicente Sarmiento
Jose Salado
CITY OF SANTA ANA
Public Works Agency —Design Engineering
20 Civic Center Plaza, M-36 * P.O. Box 1988
Santa Ana, Caliiomia 92702
www.santa-ana.oro
4 I 1
ADDENDUM No. ONE
EXHIBIT 3
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Daisy Gomez
SUBJECT: PROJECT NO. 18-9002: BUSH STREET BICYCLE BOULEVARD
The following changes have been made to Plans and Specifications for the subject project:
Plans
1. Sheets 2, 4, 5, 6, 10, and 11: Replace with the attached sheets 2, 4, 5, 6, 10, and 11.
Specifications
1. Pages P-1 to P-5 of 20: Replace with the attached Pages P-1 to P-5 of 30.
2. Appendix A — page 7 of 10: Replace with the attached page 7 of 10 of Appendix A.
3. Appendix 1- Community Workforce Agreement (CWA): Add Appendix I to the end of
the Appendix section.
CONTRACTOR MUST ACKNOWLEDGE PROJECT CWA REQUIREMENTS AS PART OF
BID SUBMITTAL
This addendum includes 61 pages (including this page).
All other terms and conditions remain the same.
FOR THE CITY OF S ANA
Edwin "William" Galvez
City Engineer
SANTA ANA CITY COUNCIL
Mguel A. Pulido Juan whigas !.m. Sunni.= David Penalon Jose Sdddo Phd Sam. cedlie Iglesias
Meyer Mayor Pro Tom, Ward a Word WaN2 Ward Wand W"N6
modidary."a-ane.ara Mileonsftede-anaav vamdenfxftanla,ena oro dosnaloiaftanaaana.aro WmnaftsaMaaoore aalml �xanla-ana.wo
20A-8
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juan Villages
COUNCILMEMBERS
Phil Bacerra
Cecilia Iglesias
David Penaloza
Vicente Sarmiento
Jose Solorlo
May 11, 2020
CITY OF 5ANTA ANA
Public Works Agency— Design Engineering
20 Civic Center Plaza, M-36 • P.O. Box 1988
Santa Ana, California 92702
v .santa-ana.ora
ADDENDUM No. i
SUBJECT: PROJECT 18-9002 BUSH STREET BICYCLE BOULEVARD
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Daisy Gomez
The following changes have been made to Plans and Specifications for the subject project:
Plans
1. Add new Water and Sewer Improvement projects (attached Addendum Two —4 shts).
o Project No. 21-6442 Bush Street Bikeway Water Improvements
Project No. 21-6443 Bush Street Bikeway Sewer Improvements
Replace sheets 04, 05, and 06 of 19 from Addendum No. 1 with the attached sheets 04, 05
and 06 of 19 Addendum Two.
3. Replace sheets 03 and 07 of 19 from original plans with the attached sheets 03 and 07
of 19 Addendum Two (labeled Addendum No. 2).
Specifications
1. Replace all Specifications with the attached Specifications Addendum Two.
Attachments:
Water and Sewer Plans — 4 Pages
Street Improvements Plans — 5 Pages
Specifications — 310 Pages
Total pages for Addendum No. 2 (including these 2 pages) = 321
SANTA ANA CITY COUNCIL
Miguel A. Pulido Juan Villegas Vicente Sarmianto David Penaloza Jose Selono Phil BP.nd Cecilia Iglesias
Mayor Mayor Pro Tom, Ward 5 Ward Ward Ward Ward Word
moulidogsantaanaom Iyillegaspeanto-ana.om vsarmiento.S saMa-ans.org doenal..Aa.dta-ana.org solgn.0santaane.oro pbacerraQsantaana.orq oig esias®santaana ore
20A-9
PROJECT 18-9002 BUSH STREET BICYCLE BOULEVARD
ADDENDUM No. 2
Page 2
CONTRACTOR MUST ACKNOWLEDGE PROJECT CWA REQUIREMENTS AS PART OF
BID SUBMITTAL
ALL OTHER TERMS AND CODITIONS REMAIN THE SAME.
F iTY OF �ANA
Edwin "William" Galve . .
City Engineer
20A-10
City of Santa Ana
Page 1
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/28/2020
Bid Results
Bidder Details
Vendor Name
Excel Paving Co
Address
2230 Lemon Ave
Long Beach, CA 90806
United States
Respondee
Dallas Daniels
Respondee Title
Estimator
Phone
562-599-5841 Ext. 242
Email
ddaniels@excelpaving.net
Vendor Type
CADIR
License #
688659
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
May 20, 2020 9:43:31 AM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
212427
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type
General Forms
Santa Ana General Forms Saved.pdf
General Forms
Ownership Affidavit
Ownership Affidavit.pdf
Ownership Affidavit (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond
Bid Bond.pdf
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non Collusion
Non Collusion.pdf
Non -Collusion Affidavit
(Notary Public) - REQ Original
Hard Copy Submittal in
Addition
Line Items
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
PROJECT NO 18-9002 BUSH ST BICYLE BOULEVARD
1
Unclassified Excavation*
CY
600
$250.00
$150,000.00
2
Cold Milling'
SF
30700
51.40
$42,980.00
3
Asphalt Rubber Hot Mix (ARHM)'
TN
370
$120.00
$44,400.00
20A-11
City of Santa Ana
Page 2
Bush Street
Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush
St Sewer Improvements (18-9002; 21-6442;
21- Printed 05/28/2020
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
4
Asphalt Concrete*
TN
470
$160.00
$75,200.00
5
Crushed Miscellaneous Base*
TN
4
$300.00
$1,200.00
6
6" PCC Pavement*
SF
7140
$13.00
$92,820.00
7
4" PCC Sidewalk*
SF
5750
59.00
$51,750.00
8
A-2-6 PCC Curb and Gutter per CSA STD. Plan No 1101*
LF
1410
$50.00
$70,500.00
9
A-2-6 PCC Curb with 3' Gutter per CSA STD. Plan No 1101*
LF
160
$60.00
$9,600.00
10
PCC Curb Ramp Per SPPWC STD. Plan 111-5, Case and Type as shown*
SF
3850
$15.00
$57,750.00
11
Remove Tree and Roots Complete
EA
1
$2,000.00
$2,000.00
12
Adjust Manhole Frame and Cover to Grade per CSA STD. Plan No. 1201
EA
3
$1,000.00
$3,000.00
13
Adjust Water Valve Frame and Cover to Grade Per CSA STD. Plan
No. 1410/1411*
EA
1
$1,500.00
$1,500.00
14
Gutter Depression per CSA STD. Plan 305
LF
20
$50.00
$1,000.00
15
PCC Driveway Approach per CSA STD Plan No. 1112*
SF
450
$12.00
$5,400.00
16
Adjust Pullbox or Utility Cover to Grade
EA
7
$700.00
$4,900.00
17
Adjust Survey Monument to Finished Grade per CSA STD Plan No. 1117. Location to be Verified by CSA Survey Supervior Before and After
Construction
EA
5
$500.00
$2,500.00
18
Type D-6 Curb per Calirans STD Plan A87A*
LF
320
$40.00
$12,800.00
19
10" Stamped Concrete (Red) with #4 Reber Spaced at 24" O.C.*
SF
1600
$27.00
$43,200.00
City of Santa Ana
Page 3
Bush Street
Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements
(18-9002; 21-6442; 21- Printed 05/28/2020
Bid Results
Type
Item Code UOM Qty
Unit Price
Line Total Comment
20
Type B-1 Curb per CSA STD. Plan No. 1101 *
LF 360
$40.00
$14,400.00
21
Variable Height Type B-1 Curb per CSA STD. Plan No. 1101*
LF 320
$41.00
$13,120.00
22
Furnish and Install Traffic Signal Pullbox with New No. 6 Pullbox per CSA STD.
Plan No. 1501 Adjust to Finish
Grade
EA 4
$925.00
$3,700.00
23
Furnish and Install New Water Meter Box per CSA STD. Plan 1401.
EA 1
$600.00
$600.00
24
8" PCC Cross Gutter Including Monolithic Curb per CSA STD. Plan 1109
SF 2800
$14.00
$39,200.00
25
Construct New Culvert per CSA STD. Plan No. 318 with a Type II Inlet
LF 28
$300.00
$8,400.00
26
Remove Existing Catch Basin Structure Complete and Protect Existing Connector
Pipe in Place. Fill and Compact Removal with Native
EA 1
$4,000.00
$4,000.00
27
Remove Esisting Parking Meter Complete
EA 1
$400.00
$400.00
28
Pour New Vent Foundation Per SCE STD. Plan AC 758 at Finish Grade. Protect
Vent in Place
EA 4
$6,000.00
$24,000.00
29
Remove Exisiting Firehydrant and Valve, Install New Firehydrant and Valve per
CSA STD. Plan 1405*
EA 1
$14,000.00
$14,000.00
30 Construct 12" PVC Water Main (S min.)*
LF 15
$500.00
$7,500.00
31
Connect to Existing 12" ACP with 12" Long Body Flexible Transition Coupling*
EA 2
$2,300.00
$4,600.00
32
Remove Valve Box Frame and Cover. Cut Off PVC Riser 18" Below Grade, Back Fill
w/ Sand Compact and Pave to Match Proposed
EA 3
$900.00
$2,700.00
33
Abandon Existing Water Service
EA 4
$1,200.00
$4,800.00
34
18" RCP. Trench, Bedding, and Backfill Requirements per City STD. Plan No. 1150
LF 31
$200.00
$6,200.00
35
18" Diameter Concrete Collar per CSA STD. Plan No. 320
EA 1
$1,000.00
$1,000.00
20A-13
City of Santa Ana Page 4
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/28/2020
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
36
Catch Basin Type C per CSA STD. Plan No. 303, W=5.0' V=5.0'
EA
1
$9,000.00
$9,000.00
37
24" Box Jacaranda Tree
EA
2
$1,500.00
$3,000.00
38
5-GL Variegated Flax Lily`
EA
1000
$30.00
$30,000.00
39
8th St Irrigation
LS
1
$8,000.00
$8,000.00
40
91h St Irrigation
LS
1
$13,000.00
$13,000.00
41
10th St Irrigation
LS
1
$12,000.00
$12,000.00
42
16th St Irrigation
LS
1
$8,000.00
$8,000.00
43
60 Working Days Landscaping/Irrigation Maintenance t
LS
1
$3,000.00
$3,000.00
44
3" Thick Layer of Mulch`
SF
3300
51.00
$3,300.00
45
Root Control Barrier'
LF
44
$10.00
$440.00
46
Project Advertisement Sign
EA
2
$600.00
$1,200.00
47 Signing and Striping t
LS
1 $86,000.00
$86,000.00
48 Labor Agreement Oversight
LS
1 $15,000.00
$15,000.00
Subtotal
$1,013,060.00
PROJECT NO's 21-6442 & 21-6443 BUSH STREET WATER AND SEWER IMPROVEMENTS
49 8" Class 305 AWWA C900 P.V.C. Water Main
LF
300 $260.00
$78,000.00
50 12" Class 305 AWWA C900 P.V.C. Water Main
LF
1700 $265.00
$450,500.00
20A-14
City of Santa Ana
Page 5
Bush Street
Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush
St Sewer Improvements
(18-9002; 21-6442; 21- Printed 05/28/2020
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
51
Construct 1" Water Service and Connect to Existing Meter*
EA
5
$4,200.00
$21,000.00
52
Construct 2" Water Service and Connect to Existing Meter*
EA
2
$5,300.00
$10,600.00
53
New Fire Hydrant Assembly, (Including Gate Valve and Lateral Pipe)
EA
5
$13,000.00
$65,000.00
54
8" Resilient Wedge Gate Valve
EA
3
$2,000.00
$6,000.00
55
12" Resilient Wedge Gate Valve
EA
9
$3,000.00
$27,000.00
56
4" Fire Service Connection Including 4" RWGV
EA
1
$5,000.00
$5,000.00
57
6" Fire Service Connection Including 6" RWGV
EA
1
$5,000.00
$5,000.00
58
Remove Existing Manhole Structure
EA
3
$4,000.00
$12,000.00
59
Construct New P.C.C. Sewer Manhole
EA
3
$12,000.00
$36,000.00
60
Remove Existing Sewer Main and Construct 6" VCP Sewer Main
LF
40
$1,000.00
$40,000.00
61
CCTV Inspection of Existing Sewer Main
LF
2540
53.00
$7,620.00
62
CCTV Inspection of Existing Sewer Laterals
EA
66
$400.00
$26,400.00
63
Vertical Offset (As -Needed)*
EA
5
$5,000.00
$25,000.00
64
2" Air Vacuum and Release Valve (As -Needed)*
EA
5
$7,300.00
$36,500.00
65
Additional Trenching Cost to Install Water Pipeline 18"-30" Deeper (Total 54" to
66" cover) (As -Needed)*
LF
250
$30.00
$7,500.00
66
COLD MILLING*
SF
8500
52.00
$17,000.00
20A-15
City of Santa Ana Page 6
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/28/2020
Bid Results
Type Item Code UOM Qty Unit Price Line Total Comment
67 ASPHALT RUBBER HOTMIX (ARHM)*
TN 105 $220.00 $23,100.00
68 As-Builts
LS 1 $15,000.00 $15,000.00
Subtotal $914,220.00
Asterisk Notes (Per Section 3.2 of Standard Specifications) - NOT part of Total Bid Calculation
69 ' = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the
Standard Specifications. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for
this item will be dictated by the actual quantitiy used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly.
ea 0 $250.00 0
70 t _ This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
ea 0 $250.00 0
Subtotal 0
Total $1,927,280.00
20A-16
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
PALP. !NC DBA
FROM: EXCEL PAVING CO%TANY
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
,7F
k wl
NO.DESCRIl'1'IOly
P
I
l
UNCLASSIFIED
600
CY
$
$
EXCAVATION*
2
COLD MILLING*
30,700
SF
$
$
3
ASPHALT RUBBER HOT
370
TN
$
$
MIX (ARHM)*
4
ASPHALT CONCRETE*
470
TN
$
$
5
CRUSHED
4
.IN
$
$
MISCELLANEOUS BASE*
6
6" PCC PAVEMENT*
7,140
SF
$
$
7
4" PCC SIDEWALK*
5,750
SF
$
$
A-2-6 PCC CURB AND
8
GUTTER PER CSA STD.
1,410
LF
$
$
PLAN NO.1101 *
A-2-6 PCC CURB WITH 3'
9
GUTTER PER CSA STD.
160
LF
$
$
PLAN NO. 1101 *
20A-17
P-1 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
-- — - —
-
-
UNIT
NO.
DESCRIPTION _
7'Y.
UNIT
PRICE
AMOUNT
PCC CURB RAMP PER
10
SPPWC STD. PLAN 111-51
3,850
SF
$
$
CASE AND TYPE AS
SHOWN*
11
REMOVE TREE AND ROOTS
1
EA
$
$
COMPLETE
ADJUST MANHOLE FRAME
12
AND COVER TO GRADE
3
EA
$
$
PER GSA STD. PLAN NO.
1201
ADJUST WATER VALVE
13
FRAME AND COVER TO
I
EA
$
$
GRADE PER CSA STD. PLAN
NO. 1410/1411 *
14
GUTTER DEPRESSION PER
20
LF
$
$
CSA STD. PLAN 305
PCC DRIVEWAY
15
APPROACH PER CSA STD
450
SF
$
$
PLAN NO 1112*
16
ADJUST PULLBOX OR
7
EA
$
$
UTILITY COVER TO GRADE
ADJUST SURVEY
MONUMENT TO FINISHED
GRADE PER CSA STD PLAN
17
NO. 1117. LOCATION TO BE
5
EA
$
$
VERIFIED BY CSA SURVEY
SUPERVISOR BEFORE AND
AFTER CONSTRUCTION
TYPE D-6 CURB PER
18
CALTRANS STD PLAN
320
LF
$
$
A87A*
10" STAMPED CONCRETE
19
(RED) WITH #4 REBAR
1,600
SF
$
$
SPACED AT 24" O.C.*
20
TYPE B-1 CURB PER CSA
360
LF
$
$
STD. PLAN NO. 1101 *
VARIABLE HEIGHT TYPE B-
21
1 CURB PER CSA STD. PLAN
320
LF
$
$
NO. 1101*
20A-18
P-2 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
UNIT
"
NO.
DESCRIPTION
QTY.
UNIT
PRICE
AM+iT. ,
FURNISH AND INSTALL
TRAFFIC SIGNAL PULLBOX
22
WITH NEW NO.6 PULLBOX
4
EA
$
$
PER CSA STD. PLAN NO.
1501. ADJUST TO FINISH
GRADE
FURNISH AND INSTALL
23
NEW WATER METER BOX
1
EA
$
$
PER CSA STD. PLAN 1401.
8" PCC CROSS GUTTER
24
INCLUDING MONOLITHIC
2,800
SF
$
$
CURB PER CSA STD. PLAN
1109
CONSTRUCT NEW
25
CULVERT PER CSA STD.
28
LF
$
$
PLAN NO. 318 WITH A TYPE
II INLET
REMOVE EXISTING CATCH
BASIN STRUCTURE
COMPLETE AND PROTECT
26
EXISTING CONNECTOR
1
EA
$
$
PIPE IN PLACE. FILL AND
COMPACT REMOVAL WITH
NATIVE
REMOVE EXISTING
27
PARKING METER
1
EA
$
$
COMPLETE
POUR NEW VENT
FOUNDATION PER SCE STD.
28
PLAN AC 758 AT FINISH
4
EA
$
$
GRADE. PROTECT VENT IN
PLACE
REMOVE EXISTING
FIREHYDRANT AND
29
VALVE, INSTALL NEW FIRE
I
EA
$
$
HYDRANT AND VALVE PER
CSA STD. PLAN 1405*
30
CONSTRUCT 12" PVC
15
LF
$
$
WATER MAIN (3' MIN.)*
20A-19
P-3 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
UNIT
ITEM
NO.
DESCRIPTION
QTY-
UNllr`
PRICE
COST
CONNECT TO EXISTING 12"
31
ACP WITH 12" LONG BODY
2
EA
$
$
FLEXIBLE TRANSITION
COUPLING*
REMOVE VALVE BOX
FRAME AND COVER. CUT
OFF PVC RISER 18" BELOW
32
GRADE, BACK FILL
3
EA
$
$
W/SAND, COMPACT AND
PAVE TO MATCH
,PROPOSED
33
ABANDON EXISTING
4
EA
$
$
WATER SERVICE
18" RCP. TRENCH,
34
BEDDING, AND BACKFILL
31
LF
$
$
REQUIREMENTS PER CITY
STD. PLAN NO. 1150
18" DIAMETER CONCRETE
35
COLLAR PER CSA STD.
I
EA
$
$
PLAN NO. 320
CATCH BASIN TYPE C PER
36
CSA STD. PLAN NO. 303,
1
EA
$
$
W=5.0' V=5.0'
37
24" BOX JACARANDA TREE
2
EA
$
$
38
5-GL VARIEGATED FLAX
1,000
EA
$
$
LILY*
39
8TH ST IRRIGATION
I
LS
$
$
40
9TH ST IRRIGATION
I
LS
$
$
41
IOTH ST IRRIGATION
I
LS
$
$
42
16TH ST IRRIGATION
I
LS
$
$
60 WORKING DAYS
43
LANDSCAPINGARRIGATION
I
LS
$
$
MAINTENANCE t
20A-20
P-4 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
III T
ItEI4I.-..
NO.
DESCRIPTION
TY.
UNIT
� `X-RICE
!$sT
44
33" THICKLAYER OF
3,300
SF
$
$
MULCH45
ROOT CONTROL BARRIER*
44
LF
$
$
PROJECT ADVERTISEMENT
2
EA
$
$
46
SIGN
47
SIGNING AND STRIPING f
1
LS
$
$
48
LABOR AGREEMENT
1
LS
$ 15,000
$ 15,000
OVERSIGHT
PROJECT NO's 21-6442 & 216443
BUSH STREET WATER AND SEWER IMPROVEMENTS
49
8" Class 305 AWWA C900
300
LF
$
$
P.V.C. Water Main
50
12" Class 305 AWWA C900
1,700
LF
$
$
P.V.C. Water Main
Construct 1" Water Service and
5
EA
$
$
51
Connect to Existing Meter*
Construct 2" Water Service and
2
EA
$
$
52
Connect to Existing Meter*
New Fire Hydrant Assembly,
53
(Including Gate Valve and
5
EA
$
$
Lateral Pipe)
54
8" Resilient Wedge Gate Valve
3
EA
$
$
55
12" Resilient Wedge Gate Valve
9
EA
$
$
56
4" Fire Service Connection
1
EA
$
$
Including 4" RWGV
57
6" Fire Service Connection
1
EA
$
$
Including 6" RWGV
58
Remove Existing Manhole
3
EA
$
$
Structure
20A-21
P-5 of P-22
CITTOF SAATA
` /1_`1CU f
PROPOSAL
PROJECT• : '11
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
impM t
NQ
D SCI SP1 {
4TY }
? Pt
kpjtE'
..
;., .
59
Construct New P.C.C. Sewer
3
EA
$
$
Manhole
Remove Existing Sewer Main
60
and Construct 6" VCP Sewer
40
LF
$
$
Main
61
CCTV Inspection of Existing
2,540
LF
$
$
Sewer Main
62
CCTV Inspection of Existing
66
EA
$
$
Sewer Laterals
63
Vertical Offset (As -Needed)*
5
EA
$
$
64
2" Air Vacuum and Release
5
EA
$
$
Valve (As -Needed)*
Additional Trenching Cost to
65
Install Water Pipeline 18" — 30"
250
LF
$
$
Deeper (Total 54" to 66" cover)
As -Needed *
66
COLD MILLING*
8,500
SF
$
$
67
ASPHALT RUBBER HOT
105
TN
$
$
MIX (A.RHM)*
68
As-Builts
1
LS
$ 15,000
$ 15,000
20A-22
P-6 ofP-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25oto" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above within 165 working days after the commencement date stated in the Notice to Proceed. The
first 105 working days of which is for construction, and the last 60 working days for the
landscaping and irrigation maintenance period. The project commencement date shall start on July
1, 2020.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $2,285 per calendar dayPALP, Itiv 09A
Name of Firm 14 EXCEL PAVING COMPANY
Signature of BIDDER
Title Cudtis P. Brown ill
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Curtis P. Brown III
President and Chief Executive Officer
PALP, INC CBA David A. Drukker
Vice President and Chief Financial O(feer
EXCEL PM/ING COMPANY Marcia S. Miller
Secratary
Crissa A. Phillips
Asst. Secretary
20A-23
P-7 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7029.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
FALP INC 0
Name of Firm EXCEL PA /Il p COMPANY
Signature of BIDDER /!��—CWI--
Title Curtis R 19Kown 111 President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
FALP, NZ DBA Curtis P. Bmwn 111 President and Chief Exacutine officer
EXCEL PAVINGCONIPANY DavidA.Drukkar Vito ftasidentand Chlaffinancialofficer
Marcia S. Miller 8servieti
Cdssa A. WHO Aig.. 4h bbiv
20A-24
P-8 of P-22
PROPOSAL
•FC NO.: : 900
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: PALP, INC DBA EXCEL PAVING
2<_
JO LEMON AVE
Business Address: LONG BEACH, CA 90806
Business E-Mail Address: Vattm�laf�rzcotnavana net
Telephone: 562) 599-5841
STATE LIC# 688659
State Contractor's License No. and Class: A. CIZ C31
License Expiration Date:
U Z2-
State Dept. of Industrial Relations (DIR)
Registration No.: 100 ()()() 3M )
State Dept. of Industrial Relations (DIR)
Registration Expiin Date: (0
Signed:
Title: //turtts P. Brown III President
20A-25
P-9 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or type of worker needed to execute the services available
to interested parties upon request, and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certif PAt�tl eAgoing is true and correct.
Name of Firm EXCEL PAi'ING CCti1?.ANY
Signature of BIDDER
Title f Curtis R Brown 111 President
(if an individual, so state)
20A-26
P-10 of P-22
CITY OF SANTA ANA ADDENDUM
.. O.!
PROJECT NO.: 18-4002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA j
COUNTY OF ORANGE ) SS:
CITY OF SANTA ANA )
Ourtls R Brown III
, being duly sworn, deposes and says:
❑ INDIVIDUAL That he/she is the party making the foregoing proposal:
❑ PARTNERSHIP That he/she is a member of the co -partnership firm designated as:
u CORPORATION
❑ JOINT VENTURE
and who has been and is duly vested with Tc authority to make and execute instruments
for the co -partnership by:
who constitute the other members
a corporation which is
That he is of
co -partnership.
proposal:
one of the parties making the foregoing proposal as ajoint venture, and the he/she has been
and is duly vested with the authority to execute instruments for an on behalf of the parties
making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion
to secure any advantage against the City of Santa Ana or any person interested in the proposed
cont:5Z'CL
himself or any other person. Curtis P. Brown III
W-- President
Si tature of Bidder
Subscribed and sworn to before miePs MAY 141020day of 20
Signature of officer Administering Oath (Notary Public)
CALIFORNIA ALL- PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity
of the individual who signed the document to which this certificate is attached,
and not the truthfulness, accuracy, or validity of that document.
State of California
County of Los Angeles }
On MAY i. 31020 before me, R. Covington, Notary Public
re acre damaa arson,
personally appeared Curtis P. Brown III
,
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) istace subscribed to the within instrument and acknowledged to me that
he/*aiitaey executed the same in hislk%d&§ir authorized capacity(ies), and that by
his/hemlti it signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that
the foregoing paragraph is true and correct.
.arrurnunronuuuunuuuara e .
WITNESS m hand d official seal
. l. R. COVINGTON
my anCOMM. #2157907
NOTARY PUSUC-CALIFORNIA
i LOS ANGELES COUNTY
My Commeeion FNlre s 06/2412020
Notary Public Signature (Notary Public Seal)
)ESCRIPTION OF THE ATTACHED DOCUMENT
(retie or description of attached document)
(Title or description of attached document continued)
Pages _ Document Date
CAPACITY CLAIMED BY THE SIGNER
❑ Individual (s)
XX Cc orate Officer
President
(Title)
❑ Partner(s)
❑ Attorney -in -Fact
❑ Trustee(s)
❑ Other
2015 Version www.NmaryClasses.com 800-873-9885
INSTRUCTIONS FOR COMPLETING THIS FORM
Thikjorm compeas with current Cal{forme statutes regarding notary wording and
ifneeded should be completed and attached to the document. Acknowledgments
from otherstates may be completed fordocumewt being sent to that staterso long
as the wording does not reQuire the California notary to violate Caltfomfa notary
law.
• State and County information must be the State and County where the document
signer{s)personally appeared before the notary public for acknowledgment.
• Date of notarization must be the data that the sigrear(s) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must print his or he name as it appears within his a her
commission followed by a comma and tied your tide (notary public).
• Print the nareca) of document signer(s) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forte by creasing off incorrect forms (i.e.
he/shatiLey,—ls ;era) eroimling the correct fame. Failure to correctly indicate this
infotmatitw may lead to rejection of document recording.
• The notary seal impression meat be clear and photographically reproducible.
Impression must not cove laid or limas. If seat impression smudges, re -seal if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public meat match the signature on file with the office of
the county clerk.
6 Additional information is not required but could help to ensure this
adcamledgment is not misused or attached to a difeeent document
A Indicate title a type of attached document, number of pages and date.
9 Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate office, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document with a staple.
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: l 8-4002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
KNOW ALL PRESENT that,
.. f?ALP Inp;_dba, Excel Paving CompaOY..._..._.,_............._...__._,_,..,,m....,.,_,_,,._.....,,,,,._.._.: as BIDDER, and
_Federal Insurance Comp
an as SURETY,
1...
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal suns of _
_Tert_percent of the total amount of the bidDollars{$_.,_10"10,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ), which is ten percent {] 0 /)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents,
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time specified,
then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor
of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
12th day of May , 20 2� .
BIDDER*
PALP Inc. dba Excel Paving Company 2230 Lemon Avenue long beach, CA 90806
562-599-5841
Halls Mill Road, Whitehouse Station, NJ
Douglas A. pp, Attorney in F2Ct
Rapp Surea Ins. Services, Inc., 120 Vantis Dr., Suite 300, Aliso Viejo, CA 92656 949-540-6770
Subscribed and sworn to before me ......... _ ........ this ..... _... _�....- day of
20 _ . utlrtis-P.."'8'rown 111
President
Signature: ✓
CAW MMIA
Notary Pablic in and for the County o£_ _ __ ' _-_,,State of
* Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of e Orange )
On May 12, 2020 before me, Debra Swanson Notary Public
(insert name and title of the officer)
personally appeared Douglas A. Rapp ,
who proved to me on the basis of satisfactory evidence to be the person(+) whose name(&) isMm
subscribed to the within instrument and acknowledged to me that heADWS gay executed the same in
hisM m0*Pa4 authorized capacityo@"}, and that by hisltewiarri►signature(r) on the instrument the
person!*, or the entity upon behalf of which the personh) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal. DEBRgSa ; ON`-x
N COMM. # 2170759 ;0
o $NOTARY PUBLIC•CAUFORNIA CO,
ORANGE COUNTY
Signature Set(Seat) MY COMM. EXP. NOV 10, 202O
20A-30
1CChubb POWER Federal Insurance Company Attn: Surety Department
OF Vigilant Insurance Company 15 Mountain View Road
Surety ATTORNEY Padfic Indemnity Company Warren, NJ 07059
d�ra
Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE
COMPANY, a New York corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and
appoint Douglas A. Rapp and Timothy D. Rapp of Aliso Viejo, California-------- --
won as their true and lawful Attorney- in, Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety
therewi or otherwise, bonds and undertakings and other writings obligatory In the nature thereof (other than beg bonds) given or executed In the course of business, and any
instruments amending or altering the same, and connaents to the modification or ateraton of any instrument referred to in said bonds or obligations.
In witness whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSU
these presents and affixed their corponne seals on this 1Sth day of
INDEMNITY COMPANY have each executed and attested
C
Kenneth C. Wende , Assistant Secretary Nords, Jr., Vise Preside/nt
STATE OF NEW JERSEY
as.
County of Somerset
On this 15th day of December, 2011 before me, a Notary Public of New Jersey, personalty came Kenneth C. Wendel, to me
known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which
executed the foregoing Power of Attorney, and the said Kenneth C. Werde, being by me duly sworn, did depose and say that he is Asestam Secretary of FEDERAL
INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affixed to the
foregoing Power of Attorney are such corporate basks and were thereto affixed by authority of the By- Laws of mid Companies; and that he signed said Power of Attorney as
Assistant Secretary of said Companies by like authority; and that he is aoquakded with David B. Norris, Jr., and knows him to be Vice Presidentof mid Companies; and that the
Signature of Davit! B. Norris, Jr., subscribed to said Power of Attorney is In the genuine handwriting of David S. Nords, Jr, and was thereto subscribed by authority of said By -
Laws and in deponents presence.
.Notarial Seal KATHERINE 1. ADELAAR
(4m
NOTAiIY PUBUC 16 NEW 1FRSF1Zz�tut•.2316bSS�uContrtwriOn &PimJuly 14.2014
Notary Publib
J8'
CERTIFICATION
Exhaotlrom the By- Leas of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY:
'AIL powers of attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Company, ether by the Chairman or the
Presider a a Vice President or an Assistant Vice President jointly with the Secretary or an Assistant Secretary, under their respective designations. The
signature of such officers may be engraved, printed or lithographed. The signature of each of the forowing officers: Chairman, President, any Vice President, any
Assistant Vice President, any Secretary, any Assistant Secretary and the seal of the Company may be affixed by facsimile to any Power of attorney or to any
certificate relating thereto appointing Assistant Secretaries or Attorneys- in- Fact for purposes only of executlng and attesting bonds and undertakings and other
vdidngs migstory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or faban its seal Shall be valid and binding
upon the Company and any such power so executed and'ceuffed by such facsimile signature and facsimile seal shall be wild and binding upon the Company
with respect to any bad or underbidding to which it is attached.*
I, Kenneth C. Wendel, Assistant Secretary of FEDERAL. INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY
(the'Compamesy do hereby certify that
(1) the foregoing expect ofthe By- Laws of the companies is due and correct,
Or) the Companies are duly licensed and authorized to bansaG Surety business in all 60 of the United Stafea ofAmerica and the DISH of Columbia and are
authorized by the U.S. Treasury Department; further, Federal and Vigiant are licensed in Puerto Ries and the U.S. Virgin Islands, and Federal is licensed in
American Samoa, Guam, and each of the Provinces of Canada except Prince Edward Island; and
(lid the foregoing Power ofAttorney is We, correct and in full face and effect
Given under my hand and seats of said Companies at Warren, NJ this 12th day of May, 2020
597P,111111111010i7A
IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER
MATTER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY Telephone (908) 903- 3493 Fax (908) 903. 3656
e-mail: surety@chubb.com
Form 15-10.02258-U (Ed.5-03) CONSENT 20A-3 1
i
CERTIFICATE OF ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity
of the individual who signed the document to which this certificate is attached,
and not the truthfulness, accuracy, or validity of that document.
State of California
County of Los Angeles }
On MAY 13 7070 before me, R. Covington, Notary Public
are nse rearms an ea ifie N�cai�'
personally appeared Curtis P. Brown III
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/sKe subscribed to the within instrument and acknowledged to me that
he/xhaitfty executed the same in his/k%"r authorized capacity(ies), and that by
his/boottlstir signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that
the foregoing paragraph is true and correct.
annununnnuuuaunnnmuR
my anoffisea
WITNESS m hand d official l.
=
�
TON
�~- COMM. #212157807 �
NOTARY PUBLIC - CALIFORNIA
I.OS ANGELPS COUNTY
-
M�r 0t3/2M2020
Notary Public Signature y (Notary Public Seal)
�uw
Kill 111Expires
rnuuuuwtonennrratotrr
ADDITIONAL OPTIONAL INFORMATION
OF THE ATTACHED DOCUMENT
(Title or deseipdon of attached document)
(Tide or description of attached document continued)
of Pages _ Document Date
CAPACITY CLAIMED BY THE SIGNER
❑ Individual (s)
XX Cc orate Officer
?resident
(Title)
❑ Partner(s)
❑ Attomey-in-Fact
❑ Trustee(s)
❑ Other
2015 Version www.NotaryClasses.wrn 800-873-8865
INSTRITCt'IONS FOR COMPLETING THIS FORM
nisform compiles with current California statutes regarding notary wording and,
(fneedad, should be completed andattached to the document Achwsvledgments
from other states may he completed for doct memo beingsent to that state so long
as the wording deal not require the California notary to violate Caltforaia notary
law.
• State and County information must be the State and County where the document
sigaer(s) personally appeared before thenotarypablic for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeared which
must also be the some date the acknowledgment is completed.
• The notary public must print his or her came as it appears within his m her
connotation followed by a commit, and then your title (notary public).
• print the names) of document sigin(s) who personally appear at the time of
notarization.
• Indicate the comet singular or plural forma by crossing off incorrect forma (i.e.
heisheliheyt- is tart) ar circling the correct forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression most be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re -seal if a
sufficiem area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public most match the stgnahrrc on fide with the office of
the county clerk.
$ Additional information is not required but could help to create this
acknowledgment is not misused or attached to a different documeat.
h Indicate title or type of attached docurnen; number of pages and date.
4& Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document in the signed docmnentwith a staple.
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: t % of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: 'YM of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name Kato Landscape Inc
License #/Exp. 806122 3/31/21
DIR Reg. #/Exp. 1000000086 6/30/22
Location Fountain Valley, CA 92708
Phone 714-963_-4615
Type Of Work Landscape & Irrigation
Amount $ 78,740.60
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location
Name Chrisp Company
License #/Exp. 374600 5/31/21
DIR Reg. #/Exp. r nnnnnn-ina 6/ tnm
Location Bloomington, CA 92316
Phone 909-946-0356
Type Of Work striping
Amount $ $48,800.00
Name A.M. Concrete Inc.
License #/Exp. 446850 9/30/21
DIR Reg. #/Exp. tnnnnnfi525 rwinnn
License # 446850
Location Corona, CA
Phone Phone 951-279-6869
Type Of Work Type Of Work Concrete
Amount $ Amount $ $291,170.00
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
9. Curtis P. Brown III
President
Si ature of Bidder
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9402
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
SSE ATTACHZD
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
1.
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount
2.
Name and Address
Name and Televho
3.
Contract Amount
Type of Work
owner.
Number of person familiar with project.
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
9W cw-f
oVl�y
P V Sd
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER 1WROVEMENTS
;;"A ATtACASD
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
I.
2.
3.
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount
Type of Work
Date Completed
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
l� `1anti k Air-
"�'u \J\tp C&
0�qq Flo vro
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine and
not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other
BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BID➢ER or any
other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned
thatpaking a false certification may subject the certifier to criminal prosecution.
Signed
Curtis P. Brown III
State of California
Countyof 1S,ANGS ES
Subscribed and sworn to (or affirmed) before me on this day of Mpy 20_ by
Curtis P. Brown III proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me
sKS1NO-"
Notary Public Signature Notary Public Seal
Ri`
CALIFORNIAALL- PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity
of the individual who signed the document to which this certificate is attached,
and not the truthfulness, accuracy, or validity of that document.
State of California
County of Los Angeles }
On 3117tj
before me, R. Covington, Notary Public
ere nsen Hems a , el—ciih�oiiwer r
personally appeared Curtis P. Brown III
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/axe subscribed to the within instrument and acknowledged to me that
he/sit" executed the same in his/N§60§ it authorized capacity(ies), and that by
his/ham milr signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
certify under PENALTY OF PERJURY under the laws of the State of California that
the foregoing paragraph is true and correct.
�uuum w uuumnuuuunuaa.
R. COVINGTON
WITNESS my hand and official seal. COMM. #2157907
NOTARYPUBLIC - CALIFORNIA
Rr
LOS ANGELES COUNTY
- Expires 06124/2020
ACommission
4aannmNouua II Noll Noll
OF THE ATTACHED DOCUMENT
(Tide or description of attached document)
of Pages —Document Date _
CAPACITY CLAIMED BY THE SIGNER
❑ Individual (a)
XX Cor orate Officer
President
itle)
❑ Partner(s)
❑ Attomey-in-Fact
❑ Trustee(s)
❑ Other
2015 Version www.NotaryClasses.com 800-873-9865
(Notary Public Seal)
INSTRUCTIONS FOR COMPLETING THIS FORM
7hisjorm complies with currant Calfornia atomics regarding notary wording and
if needed, should be complded and attached to the document Aclosowledgments
from other stares may be completed for documents being seat to that state so long
as the wording does not require the Calfornia notary to violate California notary
law.
• State and County information must be the State and County where the document
sigoer(s)pmcnally appeared before the notarypublic for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must prim his or her name as it appears within his or her
commission followed by a comma and than your title (notary public).
• Print the name(a) of document signers) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (i.e.
he/sheithey,, is /are) or circling the conect forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression must be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re -seal if a
sufficient areapemrins otherwise complete a different acknowledgment form.
• Signature of the notary public most match the signature on file with the office of
the county clerk.
d Additional infomration is not required but could help to enema this
acknowledgment is not misused or attached to a different docr®ent.
$ Indicate title of type of attacbed doc uncut, number of pages and date.
4 Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document with a staple.
CITY OF ii i
PVOPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
tY f
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
S. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stars. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Ch Ater.
Signed: sa--
Title: urtis P. Brown III President
PALP. NC DBA
Firm: FXf'FI PAVih!C; C OkIPANY
Date: MAY I A 707f1
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-4002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amountV the California Apprenticeship Council.
Signed:
Title:
PALP, NC DBA
Firm: EXCEL PAVING COh9PANY
Date:
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherw'e enttitled.
Signed: /� --- a -
Title: C is P. Brown III President
PALP. NC i3BA
Firm: EXCEL PA\'ING CO%IPANY
Date: MAY 14 207V
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation? j
Yes No
If the answer is yes, explain the circumstances in the following space.
W.
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-4002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT CWA
REQUIREMENTS
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood
the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties
Building and Construction Trades Council, and the signatory Craft Councils and Local Unions,
effective as of September 1, 2017. The CWA is available at:
http://www.Santa-ana.orp/pwa/documents/C WA.pdf
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA,
and is capable of completing construction of the project continuously, and without interruptions
or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the
Letter of Assent at appears as Attachment A to the CWA.
Signed:
Title: urtis P. Brown III President
FAEP, N,- SBA
Title: EXCEL MI NG COMPANY
Date: lily j ^ 71
°n_ r`mR�B`oN.�`wF"_ `tim �om
mR i � am m.29 wnRA 9A 9
f9 W W. W W... N. N.... W W N W. W.... fA ........M
�3 ma�F m mN m �' uw3o C'Qo m'-o m m iF2 C^!.
. �.
m W m. m m m m W W m rn W w w W w w w
W6 _ w W w W rn a+W W rn rn o
za�z a�a�a a- 5;; o as
o_ _
21 8w8'rn'8 �S' m�m a W o88ZL+ 088
�E E 50�p . .j'1� 5'0�
m E " g o t0J ` r8 g0 _ a E' '& S 0 rnts
d �p
V � 3
m mw m
mE
2N O d C y W C CF m aN6 0 i pj _ LL O C G.N
0.0
M � }CNV O p Q_i W S S ONi O� Qa � Ot 62 R ['4i Q+ G�� `CND' �+ m m (m0 a C'� pN Cam! [f2
8j Oa O� W
b
OE d
c 'm a g
4= 6 0 4 b m O v a� G 8 �j y E
.02
02 c c a c c
39in r`�n3 rg inm0 m g'� mvtOirwmm "smm
� � a
N E2- N
S a Q a j,�.Eav KK
'c g
mmm �zin=i Smr��,m u`4.o..a^in
S S Q
si
Ea
�` �. w.b. mm+3 a ci "'gui W ui r�•:ir
t2 �tO Fi tSc oar Na ��'g�mI
m
O] NN t � a � 'dj ��Nm Ng Nlflm
ELL1 "gym w w �ga� ui W W 3 oN�So So mmvwi �n
md' R tmOC ;z rrN
C
N E
c Em
�9in 3ci0ino¢ w�m0�inms ginminm�n ��� wz�o 033mm rla¢ 00�
C
m
E E E2_
65
Ea �.
zWS�ci�E ^a`s�H�Sc�EwN
�w»�i
506
57y5
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT NO. 18-9002: BUSH STREET BICYCLE BOULEVARD
(CIVIC CENTER TO 17Tn ST)
PROJECT NO. 21-6442: BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO. 21-6443: BUSH STREET BIKEWAY SEWER IMPROVEMENTS
This CONSTRUCTION CONTRACT is made and entered into this 16' day of June, 2020 by and between
the City of Santa Ana, California, a charter city and municipal corporation organized and existing under
the Constitution and laws of the State of California (hereinafter "CITY"), and Palp, Inc DBA Excel Paving
Company (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
I. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Bush Street Bicycle Boulevard and Bush Street Bikeway Water
and Sewer Improvements Project (hereinafter referred to as the "WORK OF IMPROVEMENT")
identified in and in accordance with the Contract Documents prepared by the City's Public Works
Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed One Million Nine Hundred Twenty-seven
Thousand Two Hundred Eighty Dollars and No Cents ($1,927,280.00), as set forth and identified in
the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
rev. 09r01,,2017
20A-45 Page I of
The BID PROPOSAL contains a schedule of unit price(s) or lump sums) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
4. CONTRACTOR agrees to complete the WORD OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at:
bM://www.santa-ana.orgZpwa/documents/CWA.pdf
CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, famish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
11
20A-46 Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:.
J HN FUNK
Assistant City Attorney
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
Excel Paving Company
'ter----,..
TLE:
Curtis P. Brown 111
President
20A-47
Page 3 of 3
CALIFORNIA ALL- PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
Lnotary public or other officer completing this certificate verifies only the identity
individual who signed the document'to which this certificate is attached,
t the truthfulness, accuracy, or validity of that document.
State of California
County of Los Angeles }
go
before me, R. Covington, Notary Public
-- - re nsn items en a ry
personally appeared _ Curtis P. Brown III
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/axe subscribed to the within instrument and acknowledged to me that
he/six Aiwy executed the same in his/W' M*r authorized capacity(ies), and that by
his/bealmdr signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that
the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
(Notary Public Seal)
A IIOI IIIIII IO/ III IIIIII 11Sol Niglio 916
"a R. COVINCaTON
COMM.OVIN 67907
TON
NOTARY PUBLIC - CALIFORNIA
LOS ANGELES COUNTY
My Commission Expires 06/24/2020
711UIIIIaO1111tl UII IIIIIIH NI OIIP
ADDITIONAL OPTIONAL INFORMATION INSTRUCTIONS FOR COMPLETING THIS FORM
7wisform complias with current California sramaes regarding notary wording and,
DESCRIPTION OF THE ATTACHED DOCUMENT Ifneeded should be completed andanached to the document. Acknowledgments
from other states may be completed for documents being sent to that state so long
as the wording does not require the Catbibrafa notary to violate California notary
law.
Mile or description of attached document) • State and County information most be the State and County where the document
signer(s) personally appeared before thermury public for acknowledgment
• Date of notarization must be the date that the signer(s) personally appeared which
(rue ordesclipodon of attached document continued) must also be the same date the acknowledgment is completed.
• The notary public must print his or ha name as it appears within his or her
Number Of Pages — Document Dates commission followed by a mamma and then your title (notary public).
• Print the name(s) of document signer(s) who personally appear at the tune of
notarisation
CAPACITY CLAIMED BY THE SIGNER
❑ Individual (s)
)D( Cc orate Officer
?resident
(Title)
❑ Partner(s)
❑ Attorney -in -Fact
❑ Trustee(s)
❑ Other
• Indicate the correct singular or plural forms by crossing off incorrect forms (Le.
he/shelWey;- is /we ) or circling the correct fours. Failure to correctly indicate this
information may lead to rejcetion of document recording.
• The notary seal impression most be clear and photographically reproducible.
Impression most not coca tent or lines. If seal impression smudges, re -seal if a
sufficient area pertains, otherwise complete a diffawt aclmowledgment form.
• Signatum of the notary public most match the signature on file with the office of
the county clarlL
A Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document
{ Indicate title or type of attached docurnent, number of pages and date.
q- Indicate the capacity claimed by the signer. If the claimed capacity is a
M ' di at th titl CEO CFO S
corporate o cer, m c e e a (r.e. ecntary).
2015 Version www.NotaryClssses,com 800-873-9865 __ _Securely attach this document to the signed document with a stapla.
City of Santa Ana
EXHIBIT A Page 1
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (1B-9002: 21-6442:21- Printed 0512612020
Bid Results
Bidder Details
Vendor Name
Excel Paving Cc
Address
2230 Lemon Ave
Long Beach, CA 90806
United States
Respondee
Dallas Daniels
Respondee Title
Estimator
Phone
562-599-5841 Ext. 242
Email
ddaniels@excelpaving.net
Vendor Type
CADIR
License #
688659
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
May 20, 2020 9:43:31 AM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
212427
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type
General Forms
Santa Ana General Forms
Saved.pdf
General Forms
Ownership Affidavit
Ownership Affidavit.pdf
Ownership Affidavit (Notary
Public) - REG Original Hard
Copy Submittal in Addition
Bid Bond
Bid Bond.pdf
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non Collusion
Non Collusion.pdf
Non -Collusion Affidavit
(Notary Public) - REQ Original
Hard Copy Submittal in
Addition
Line Items
Type Item Code
UOM
city
Unit Price
Line Total Comment
PROJECT NO 1&5002 BUSH ST BICYLE BOULEVARD
1 Unclassified Excavation'
CY
600
$250.00
$150,000.00
2 Cold Milling'
SF
30700
$1.40
$42,980.00
3 Asphalt Rubber Hot Ma (ARHM)'
TN
370
$120,00
$44,400.00
fffe
City of Santa Ana
Page 2
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush
St Sewer Improvements (18-9002; 21-6442;
21- Printed 0512e12020
Bid Results
Type
Item Code UOM
City
Unit Price
Line Total Comment
4
Asphalt Concrete*
TN
470
$160.00
$75,200.00
5
Crushed Miscellaneous Base*
TN
4
$300.00
$1,200.00
6
6" PCC Pavement*
SF
7140
$13.00
$92,820.00
7
4" PCC Sidewalk*
SF
5750
$9.00
$51,750.00
8
A-2-6 PCG Curb and Gutter per GSA STD. Plan No 1101'
LF
1410
$50.00
$70,500.00
9
A-2-6 POO Curb with 3' Gutter per CSA STD. Plan No 1101`
LF
160
$60.00
$9,600.00
10
FCC Curb Ramp Per SPPWC STD. Plan 111-5, Case and Type as Shawn"
SF
3850
$15.00
$57,750.00
11
Remove Tree and Roots Complete
EA
1
$2,000.00
$2,000.00
12
Adjust Manhole Frame and Cover to Grade per CSA STD. Plan No. 1201
EA
3
$1,000.00
$3,000.00
13
Adjust Water Valve Frame and Cover to Grade Per CSA STD. Plan No. 141011411*
EA
1
$1,500.00
$1,500.00
14
Gutter Depression per CSA STD. Plan 305
LF
20
$50.00
$1,000.00
15
PCC Driveway Approach per CSA STD Plan No. 1112*
SF
450
$12.00
$5,400.00
16
Adjust Pullbox or Utility Cover to Grade
EA
7
$700.00
$4,900.00
17
Adjust Survey Monument to Finished Grade per CSA STD Plan No.
1117. Location to be Verified by CSA Survey Supervior Before and After
Construction
EA
5
$500.00
$2,500.00
18
Type D-6 Curb per Caltrans STD Plan A87A'
LF
320
$40.00
$12,800.00
19
10" Stamped Concrete (Red) with #4 Reber Spaced at 24" O.C.*
SF
1600
$27.00
S43,200.00
2M'50
City of Santa Ana
Page 3
Bush Street Bicycle Boulevard: Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442;
21- Printed 0512612020
Bid Results
Type
Item Code UOM aty
Unit Price
Line Total Comment
20
Type B-1 Curb per CSA STD. Plan No. 1101*
LF 360
$40.00
$14A00.00
21
Variable Height Type B-1 Curb per GSA STD. Plan No. 1101"
LF 320
$41.00
$13,120.00
22
Furnish and Install Traffic Signal Pulibox with New No, 6 Pullbox per CSA STD. Plan No. 1501 Adjust to Finish Grade
EA 4
$925.00
$3,700.00
23
Furnish and install New Water Meter Box per CSA STD. Plan 1401
EA 1
$600.00
$600.00
24
8" PCC Gross Gutter Including Monolithic Curb per CSA STD. Plan 1109
SF 2800
$14.00
$39,200.00
25
Construct New Culvert per GSA STD. Plan No. 318 with a Type II Inlet
LF 28
$300.00
$8,400.00
26
Remove Existing Catch Basin Structure Complete and Protect Existing Connector Pipe In Place. Fill and
Compact Removal with Native
EA 1
$4,000.00
$4,000.00
27 Remove Esisting Parking Meter Complete
EA 1 $400.00 $400.00
28 Pour New Vent Foundation Per SCE STD. Plan AC 758 at Finish Grade. Protect Vent in Place
EA 4 $6,000.00 $24,000.00
29 Remove Exisiting Firehydrant and Valve, Install New Firehydrant and Valve per CSA STD. Plan 1405'
EA 1 $14,000.00 $14,000.00
30 Construct 12" PVC Water Main (T minJ"
LF 15 $500.00 $7,500.00
31 Connect to Existing 12" ACP with 12" Long Body Flexible Transition Coupling'
EA 2 $2,300,00 $4,600.00
32 Remove Valve Box Frame and Cover. Cut Off PVC Riser 18" Below Grade, Back Fill wl Sand Compact and Pave to Match Proposed
EA 3 $900.00 $2,700.00
33 Abandon Existing Water Service
EA 4 $1,200.00 $4,800.00
34 18" RCP. Trench, Bedding, and Backfll Requirements per City STD. Plan No. 1150
LF 31 $200.00 $6,200.00
35 18" Diameter Concrete Collar per CSA STD. Plan No. 320
EA 1 $1,000.00 $1,000.00
12TA-1 1
City of Santa Ana
Page 4
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush
St Sewer Improvements (18-9002;
21-6442; 21- Printed 0512612020
Bid Results
Type
Item Code
UOM
Qty
Unit Price
Line Total Comment
36
Catch Basin Type C per CSA STD. Plan No. 303, W=S.0' V=5.0'
EA
1
$9,000.00
$9,000.00
37
24" Box Jacaranda Tree
EA
2
$1,500.00
$3,000.00
36
5-GL Variegated Flax Lily`
EA
1000
$30.00
$30,000.00
39
8th St irrigation
LS
1
$8,000.00
$8,000.00
40
9th St irrigation
LS
1
$13,000.00
$13,000.00
41
10th St Irrigation
LS
1
$12,000.00
$12,000.00
42
16th St Irrigation
LS
1
$8,000.00
58,000.00
43
60 Working Days Landscaping/Irrigation Maintenance t
LS
1
$3,000.00
$3,000.00
44
3" Thick Layer of Mulch'
SF
3300
51.00
$3,300.00
45
Root Control Banner'
LF
44
$10.00
$440.00
46
Project Advertisement Sign
-
EA
2
$600.00
$1,200.00
47
Signing and Striping t
LS
1
$86,000.00
$86,000.00
48
Labor Agreement Oversight
LS
1
$15,000.00
$15,000,00
Subtotal
$1,013,060.00
PROJECT NO's 21-6442 & 21.6443 BUSH STREET WATER AND SEWER IMPROVEMENTS
49 8" Class 305 AW WA C900 P.V.C. Water Main
LF 300 $260.00 578,000.00
50 12" Class 305 AW WA C900 P.V.C. Water Main
LF 1700 $265.00 $450,500.00
"152
City of Santa Ana
Page 6
Bush Street
Bicycle Boulevard; Bush St Blkeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/2612020
Bid Results
Type
Item Code UCM
Qty
Unit Price
Line Total Comment
51
Construct 1" Water Service and Connect to Existing Melee
EA
5
$4,200.00
$21,000.00
52
Construct 2" Water Service and Connect to Existing Meter*
EA
2
$5,300.00
$10,600.00
53
New Fire Hydrant Assembly, (Including Gate Valve and Lateral Pipe)
EA
5
$13,000.00
$65,000.00
64
8" Resilient Wedge Gate Valve
EA
3
$2,000,00
$6,000.00
55
12" Resilient Wedge Gate Valve
EA
9
$3,000.00
$27,000.00
56
4" Fire Service Connection Including 4"RWGV
EA
1
$5,000.00
$5,000.OD
57
6" Fire Service Connection Including 6" RWGV
EA
1
$5,000.00
$5,000.00
58
Remove Existing Manhole Structure
EA
3
$4,000.00
$12,000.00
59
Construct New P.C.C. Sewer Manhole
EA
3
$12,000.00
$36,000.00
60
Remove Existing Sewer Main and Construct 6" VCP Sewer Main
LF
40
$1,000.00
$40,000,00
61
CCTV Inspection of Existing Sewer Main
LF
2540
$3.00
$7,62D.00
62
CCTV Inspection of Existing Sewer Laterals
EA
66
$400.00
$26,400.00
63
Vertical Offset (As -Needed)*
EA
5
$5,000.00
$25,000.00
64
2'Air Vacuum and Release Valve (As-Neededp
EA
5
$7,300.00
$36,500.00
65
Additional Trenching Cost to Install Water Pipeline 18" — 30" Deeper (Total 54" to 66" cover) (As -Needed)*
LF
250
$30.00
$7,500.00
66
COLD MILLING`
SF
8500
$2.00
$17,000.00
` i�5 M
City of Santa Ana Page 6
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-64442; 21- Printed 06126/2020
Bid Results
Type Item Code UOM City Unit Price Line Total Comment
67 ASPHALT RUBBER HOTMIX(ARHM)*
TN 105 $220.00 $23,100.00
68 As-Builts
LS 1 $15,000.00 $1500.00
Subtotal $914,220.00
Asterisk Notes (Per Section 3.2 of Standard Specifications) " NOT part of Total Bid Calculation
69 ' = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25 h" limit as stated in Section 3-2 of the
Standard Specifications. This bid item shall not be subject to the "25l" limit as stated In Section 3-2 of the Standard Specifications. The actual amount for
this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly.
ea 0 $250.00 0
70 t = This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
ea 0 $250.00 0
Subtotal 0
Total $1,927,280.00
till'='S4
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.:18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "251/o" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above within 165 working days after the commencement date stated in the Notice to Proceed. The
first 105 working days of which is for construction, and the last 60 working days for the
landscaping and irrigation maintenance period. The project commencement date shall start on July
1, 2020.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $2,285 per calendar dayPALR INC 09A
Name of Firm EXCEL PALING COMPANY
r
Signature of BIDDER p
Title Cuhis P. Brown
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Curtis P. Brown lil President and Chief Executive officer
PALIY ii }�� YC DSA David A. Drukker Vice President and Chief Financial officer
EXCEL PAVING COMPANY Marcia S. Miller secretary
Crime A. Phillips Asst. Secretary