Loading...
HomeMy WebLinkAboutAppendix A Noise Abatement Decision ReportFairview Street Improvements from 9th Street to NADR 16th Street and Bridge Replacement Project �I. N Fairview St F D D Buena St Mar les W Mar les Dr N Huron Dr N rNim G (n N Sullivan St � ` F Ci r N Clara St r tit II o, a s rn 9 St N Rawley St n � � Sunset St n (n � m English St ^ ?� p N Daisy Ave 7,�» RI IS 131100 a DJetty S o < �o a a �5 u3piy Noise Abatement Decision Report Santa Ana, California Federal Project No. BRLS 5063(184) June 2019 CALIFORNIA DEPARTMENT OF TRANSPORTATION This page intentionally left blank Noise Abatement Decision Report Fairview Street Improvements from 9th Street to 16th Street Prepared By: and Bridge Replacement Project Santa Ana, California Federal Project No. BRLS 5063(184) June 2019 iete Specialist ME4 200 QA/QC By: Aut� 444� Amy risher, rincipal LSA Associates, Inc. 7086 N. Maple, Suite 104 Fresno, California 93720 (559) 490-1210 Lam✓ Approved By:� Dan Weddell, P.E. WKE, Inc. 1851 E. First Street, Suite 1400 Santa Ana, California 92705 (714) 953-1020 Date: 6/12/19 Date: 6/12/19 No.COb9834 EXP 1213112019 Date: 6/12/19 ��;\, clvl�- Concurred By: � _ Date: Rez Aurasteh, Ph.D., P.E. Chief, Environmental Engineering Branch California Department of Transportation District 12 1750 East 4th Street, Suite 100 Santa Ana, California 92705 (657)328-6138 This page intentionally left blank Table of Contents Tableof Contents........................................................................................................................i Listof Figures.......................................................................................................................... iii Listof Tables.............................................................................................................................v Listof Abbreviated Terms...................................................................................................... vii Chapter1. Introduction....................................................................................................1 1.1. Noise Abatement Assessment Requirements............................................................1 1.2. Purpose of the Noise Abatement Decision Report ....................................................2 1.3. Project Description....................................................................................................3 1.3.1. No Build Alternative....................................................................................3 1.3.2. Build Alternative..........................................................................................4 1.4. Affected Land Uses...................................................................................................9 Chapter 2. Results of the Noise Study Report ...............................................................11 2.1. Noise Impact Locations...........................................................................................11 2.2. Locations for Evaluated Noise Abatement..............................................................18 2.3. Feasible Noise Barriers............................................................................................23 Chapter 3. Preliminary Noise Abatement Decision.......................................................25 3.1. Summary of Key Information..................................................................................25 3.2. Non -Acoustical Factors Relating to Feasibility.......................................................27 3.2.1. Build Alternative........................................................................................27 3.3. Preliminary Recommendation and Decision...........................................................27 Chapter 4. Secondary Effects of Abatement..................................................................29 Chapter5. References....................................................................................................31 Appendix A. Noise Barrier Construction Cost Estimate...................................................33 Fairview Street Improvements from 9th Street to 16th Street i and Bridge Replacement Project Noise Abatement Decision Report Table of Contents This page intentionally left blank Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report List of Figures Figure 1-1. Regional Location and Project Area.......................................................................5 Figure 1-2. Proposed Project......................................................................................................7 Figure 2-1. Monitoring and Modeled Receptor Locations......................................................13 Figure 2-2. Modeled Noise Barrier and Receptor Locations...................................................19 Fairview Street Improvements from 9th Street to 16th Street iii and Bridge Replacement Project Noise Abatement Decision Report List of This page intentionally left blank Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report List of Tables Table 2.1: Summary of Feasible Noise Barriers from the Noise Study Report .......................24 Table 3.1: Summary of Abatement Key Information for the Build Alternative ......................26 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report List of Tables This page intentionally left blank Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report List of Abbreviated Terms 23 CFR 772 Title 23, Code of Federal Regulations, Part 772 APE Area of Potential Effect APN Assessor's Parcel Number BMPs best management practices Caltrans California Department of Transportation CEQA California Environmental Quality Act City City of Santa Ana dB decibels dBA A -weighted decibels ED Environmental Document EW Existing Wall FHWA Federal Highway Administration ft foot/feet HRER Historical Resources Evaluation Report Leq equivalent continuous sound level LOS level(s) of service LSA LSA Associates, Inc. NAC Noise Abatement Criteria NADR Noise Abatement Decision Report NB Noise Barrier NSR Noise Study Report PDT Project Development Team Protocol Traffic Noise Analysis Protocol for New Highway Construction, Reconstruction, and Retrofit Barrier Projects PS&E Plans, Specifications, and Estimates SART Santa Ana River Trail TNM Traffic Noise Model vplph vehicles per lane per hour Fairview Street Improvements from 9th Street to 16th Street vii and Bridge Replacement Project Noise Abatement Decision Report List of Abbreviated Terms This page intentionally left blank viii Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 1. Introduction The Noise Abatement Decision Report (NADR) presents the preliminary noise abatement decision as defined in the California Department of Transportation (Caltrans) Traffic Noise Analysis Protocol for New Highway Construction, Reconstruction, and Retrofit Barrier Projects (Protocol). This report has been approved by a California licensed professional civil engineer. The Noise Study Report (NSR) for the Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project, was approved in January 2019 and is hereby incorporated by reference. 1.1. Noise Abatement Assessment Requirements Title 23, Code of Federal Regulations, Part 772 (23 CFR 772) of the Federal Highway Administration (FHWA) standards and the Protocol require that noise abatement be considered for projects that are predicted to result in traffic noise impacts. A traffic noise impact is considered to occur when future predicted design -year noise levels with the project "approach or exceed" the Noise Abatement Criteria (NAC) defined in 23 CFR 772 or when the predicted design -year noise levels with the project substantially exceed existing noise levels. A predicted design -year noise level is considered to "approach" the NAC when it is within 1 decibel (dB) of the NAC. A substantial increase is defined as being 12 A -weighted decibels (dBA) or more over the corresponding existing noise level. The FHWA standards (23 CFR 772) require that noise abatement measures that are reasonable and feasible and are likely to be incorporated into the project be identified before completion of the environmental review process. The Protocol establishes a process for assessing the reasonableness and feasibility of noise abatement. A preliminary noise abatement decision is made based on the feasibility of evaluated abatement and the preliminary reasonableness determination. Noise abatement is considered to be acoustically feasible if it provides a noise reduction of 5 dBA or more at receptors subject to noise impacts. Other non - acoustical factors relating to geometric standards (e.g., sight distances), safety, maintenance, and security can also affect feasibility. For a noise barrier to be considered reasonable, the noise level reduction design goal of 7 dBA must be achieved at one or more benefited receptors. Once it is determined Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report ter 1. Introduction that one or more receptors satisfy the minimum noise reduction required, the preliminary reasonableness determination is made by calculating an allowance that is considered to be a reasonable amount of money, per benefited residence, to spend on abatement. This reasonable allowance is then compared to the engineer's cost estimate for the abatement. If the engineer's cost estimate is less than the allowance, the preliminary determination is that the abatement is reasonable. If the cost estimate is higher than the allowance, the preliminary determination is that abatement is not reasonable. The NADR presents the preliminary noise abatement decision based on acoustical and non -acoustical feasibility factors and the relationship between noise abatement allowances and the engineer's cost estimate. The NADR does not present the final decision regarding noise abatement; rather, it presents key information on abatement to be considered throughout the environmental review process that is based on the best available information at the time. The final overall reasonableness decision will take this information into account, along with other reasonableness factors identified during the environmental review process. These factors may include: • The noise reduction design goal; • The cost of noise abatement; and • The viewpoints of the benefited receptors (including property owners and residents of the benefited receptors). The preliminary noise abatement decision will become the final noise abatement decision unless compelling information received during the environmental review process indicates that it should be changed. 1.2. Purpose of the Noise Abatement Decision Report The purpose of the NADR is to: • Summarize the conclusions of the NSR relating to acoustical feasibility and the reasonable allowances for abatement evaluated; • Present the engineer's cost estimate for evaluated abatement; • Present the engineer's evaluation of non -acoustical feasibility issues; • Present the preliminary noise abatement decision; and • Present preliminary information on the secondary effects of abatement (impacts on cultural resources, scenic views, hazardous materials, and biological resources, etc.). ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report 1. Introduction The NADR does not address noise barriers or other noise -reducing treatments required as mitigation for significant adverse environmental effects identified under the California Environmental Quality Act (CEQA). 1.3. Project Description The City of Santa Ana (City), in conjunction with Caltrans District 12 proposes widening Fairview Street between 9th Street and 16th Street, including replacing the Fairview Street bridge crossing over the Santa Ana River (proposed project) in Santa Ana, California. The purpose of the project is to reduce congestion and improve pedestrian and bicyclist safety on Fairview Street between 9th Street and 16th Street, consistent with the Orange County Master Plan of Arterial Highways and the City's General Plan Circulation Element. South of 9th Street, Fairview Street provides three lanes in each direction that are reduced to two lanes in each direction north of 9th Street, across the existing four - lane bridge, to 16th Street. The Fairview Street segment between 9th Street and 16th Street is the only constraint for Fairview Street to be built out to its planned width of six lanes. This condition causes a traffic "bottleneck" during peak hours. In addition, there are no sidewalks, bikeways, or lighting on the existing bridge. Pedestrians and bicyclists currently use the roadway shoulder to cross the bridge. Two alternatives, including the No Build Alternative, were developed to meet the identified purpose and need of the proposed project while avoiding or minimizing environmental impacts. The project alternatives are described below. 1.3.1. No Build Alternative The No Build Alternative assumes that no improvements are made to Fairview Street. The No Build Alternative would maintain the existing conditions and provides a baseline for comparison of the impacts under the Build Alternative. Under the No Build Alternative, the performance of the roadway would continue to deteriorate with the forecasted increase in traffic on the bridge and the non-standard shoulders would remain with no sidewalk. Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report ter 1. Introduction 1.3.2. Build Alternative The proposed project includes widening Fairview Street between 9th Street and 16th Street, including replacing the Fairview Street bridge crossing over the Santa Ana River. The proposed project would widen Fairview Street from two lanes in each direction to three lanes in each direction, as shown on Figures 1-1 and 1-2. The Fairview Street bridge would be replaced with a new six -lane bridge (three lanes in each direction), including a complete bridge deck with barrier rails, sidewalks, bicycle lanes, a raised median, and lighting. The proposed bridge would be expanded from approximately 52 feet (ft) to 100 ft in width, and would have the same roadway profile as the existing bridge. The eight pier walls that support the existing bridge would be removed, and four new pier walls would be constructed to support the new bridge. The proposed project would partially acquire right-of-way take from three parcels (two commercial parcels [Assessor's Parcel Numbers (APNs) 405-213-02 and 405- 213-01] and one single-family residence [APN 405-213-14]), as shown on Figure 1-2. Although not known at this time, there is the potential for one full take at the single- family residence (APN 405-213-14) if the property owner is concerned about the loss of a portion of the side yard; this will be determined during final design in consultation with the property owner. An existing 12-inch-diameter water line and a bank of 12 phone conduits are suspended under the deck of the existing bridge and span the Santa Ana River. These utilities would need to be temporarily relocated during construction, after which they would be permanently relocated to the new bridge. Water quality best management practices (BMPs) would be included to treat stormwater runoff such as a vegetated swale adjacent to Fairview Street in the Fairview Triangle rest area. Fairview Street would remain open during the construction period with two nouhbound lanes and one northbound lane, with lanes shifted to one side of the bridge while the other side is replaced. Therefore, no detours would be required for vehicles traveling along Fairview Street. Access to properties would be maintained. -------------------------------------------------------------------------------------------------------------------------------------------- Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report rAL,A f VC i 7sa:l4t ?- L fT*Iaila 0 LIP rvee3,TRp tenter ND i rai{er I OL ■� h i �w si ti �■/ Yam•. _• 4!� f �fato,r !t ram. 4 I� E MP v R.rr i` VAm R;vcrdale 'triva 0 in ff A It �'y as ^ice MIT r �� - - -�-w. •41,1110 Santiago~'� w ■ high Sch 3 +Cad OR �/ .r. a '- P i railer x �'0 ew t [- - i Par I LL ■� � .. OVA R6 ■ � ta? `' F! OS v 1�1 Wit �6 �� Irrtr f wrs Ceaecf •s7r Fi Sta _ L �r �' ' a '.'I % 2 _ I rail, k@r=•eD11 , �`_ ►rEEf. ,a�arN195 i`a� l; '� gigot• ho AYEYrXTA ANA Wilson �� -��• - .* Y ark- Ar-^` _ _ _ -- wa +r.a r ..is u .._.■ r■r,r srZi a:ry N. 1 a't Garden Crcre 4' f. ,/ +durrrr �; IF ''riCiPil [iO'f �puru +(•__ 73 ( � � I Iradod � •w:i 4re p Park , Haxa,d=} r P c Radio Uwers !+ t 4\ ■ railer al Golf _we] ;rse_ Park - -9T•. 7 ■ COU[�r 1 �'i' '�� -- _ 5- a [�1 • Ik-; ■I - • Tra�ier E �, $ C• _ ItrRin!� FIRS r S T ' � 4] r� _� yam- - .[ • •• - r8 T � ..- 3 Pa". s r ■[ r 7 - Cw►NfaE �.T ..i. _ rant Rirrdl. �arK z v S A N T A -151 Sr I• . { .'. a Monte ` - 7A - z • Dr`r�.rn 7 ] '-0- % R;s FI Nr a.v.7 O x f i _ P` as . �- n•hf+ilE - ■ : ( . A y • 4 �6L - _kc FA0Aka. - 7■ .4 VFW ,.A Immse a1R ! i3Nrt rV of. ry S[h 16` �I'•:.NanE LEGEND FIGURE 1-1 Project Location N Fairview Street Improvements from 9th Street to 16th Street and 0 1000 2000 Bridge Replacement Project FEET Regional Location and Project Area SOURCE: USGS 7.5' Quad - Anaheim (1981) & Newport Beach (1981) Federal Project No.: BRLS 5063(184) I:\WKE1702\GIS\Noise\NADR_ProjectLocation.mxd (1/14/2019) 1. Introduction This page intentionally left blank Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report J, 10 A de 110 WA 4051 Till 198-132-07 , - ' w ��r 1�0-1»-mil 198-1'32-20 405-2.11� F 198-132-08 ' 405-011-01 ` 198-132-09 i; T 19813s02 -- 40s-2.11-07 40s-2.13-04 405-011-03 40� 5�213'-12r �r - 405-213-14 405-213-01 405-011-12 ' 405-213-02-. 405=213-13� 4 004-153-18 w ��� } 198-133-09, 19&133-12 Yyi 405-012-20 405-012-11 " 405=012-12 4. 198-133-01' 004-1s3;01 198-133;14j 198-133-11 —Y., I -� 1Z 98-133=02' 40s-012-24 405-012-19 ?� 405-02-1-37 198-133=10 198-133-03 ,,, 004-1s2v14 405-214-01 405-214 40s-013-23 198-133-07 198-133-04 ■ a " " " Y ' r 405;2�T4=02 * / PP � ooa-ls2-o1 aos-21a oa OQ 63 198=133-Os _� !e i • �o �'_ �Q 198-133-06 7- Abld `_ 031-06 ! ii -' �� LEGEND QProject Area Reconstruction of Access Road Proposed Construction Access ® Proposed Right of Way 0 Potential Detour in River Proposed Roadway Widening 0 Grading / Revegetation / BMPS 0 100 zoo Proposed Roadway Modifications Construction Staging Area FEET Proposed Bridge Piers SOURCE: WKE (3/2018); Google (2016) FIGURE 1-2 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Proposed Project Federal Project No.: BRLS 5063(184) I:\WKE1702\GIS\NADR_ProposedProject.mxd (1/14/2019) 1. Introduction This page intentionally left blank Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report 1. Introduction During construction, pedestrians and bikes would be detoured away from the Fairview Street bridge to the 17th Street bridge to cross the Santa Ana River by way of the Santa Ana River Trail (SART) between the hours of 9:00 a.m. and 7:00 p.m. while the gates to the SART are open and unlocked. After hours, pedestrians and bicyclists who wish to cross the Santa Ana River would be detoured to adjacent city streets such as King Street. Construction of the proposed Project would require temporary closure of a portion of the SART for the demolition and placement of the bridge superstructure. The SART includes a Class I bike path on the eastern side and a regional riding and hiking trail on the western side. The portion of the SART affected by project construction would need to be temporarily closed four times for approximately 8 hours each during two summer periods for the placement of precast concrete girders. During these periods, SART users would be detoured and signage would be provided to display the dates of the closures and identify the detour routes. Work on the north and south sides of the bridge would be completed during separate periods so that SART users can be detoured to the trail on the opposite side of the Santa Ana River at 5th Street. There are gates and ramps located on both sides of the SART at 5th Street that provide access to bicyclists and pedestrians for these detours. Details regarding the detours are being coordinated with Orange County Parks. Other short-term closures of up to 15 minutes would be allowed with flagmen. A temporary detour within the river bed may be required as a contingency. This would involve construction of dirt and gravel ramps with asphalt topping to and from the SART and the river bed. Construction vehicles would access the Santa Ana River from the gate and ramp at the County of Orange access road at the northwest corner of the bridge, and would use the existing concrete access ramp into the river approximately 250 ft west of the project area. All access roads to the SART that are utilized by construction vehicles or for detour routes would be reconstructed and restored to pre -construction conditions or better prior to project completion. 1.4. Affected Land Uses Developed and undeveloped land uses in the project vicinity were identified through land use maps, aerial photography, and site inspection. Receptors were identified in each land use category. Existing land uses in the project area include single-family and multifamily residences, a medical office, a trailside rest area (Fairview Triangle), Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report ter 1. Introduction the Santa Ana River Trail (SART), vacant land, and commercial and light industrial uses. Existing land uses in the project area and surrounding vicinity are described in further detail as follows: • East of Fairview Street and South of the Santa Ana River (Receptors R-2 through R-7, R-11, R-12, R-13, R-17, R-18, R-24 through R-30, R-37 through R-45, R-48 through R-50, and R-53 through R-67): Land uses in this area include single- family and multifamily residences, commercial uses, and vacant land. Land uses in this area range from 3 ft higher in elevation than Fairview Street to 7 ft lower in elevation than Fairview Street. Currently, 4 ft to 13.5 ft high existing walls along the private property lines shield the single-family residences. • West of Fairview Street and South of the Santa Ana River (Receptors R-1, R-8 through R-10, R-14 through R-16, R-19 through R-23, R-31 through R-36, R-46, R-47, R-51, and R-52): Land uses in this area include single-family and multifamily residences, a medical office, Fairview Triangle, SART, and office uses. Land uses in this area range from 2 ft higher in elevation than Fairview Street to 5 ft lower in elevation than Fairview Street. Currently, 2.7 ft to 9.3 ft high existing walls along the private property lines shield the single-family and multifamily residences. • East of Fairview Street and North of the Santa Ana River (Receptors R-85 through R-92): Land uses in this area include single-family residences and commercial and light industrial uses. Land uses in this area range from 2 ft higher in elevation than Fairview Street to approximately the same elevation as Fairview Street. Currently, a 6.7 ft high existing wall along the private property line shields the commercial use. • West of Fairview Street and North of the Santa Ana River (Receptors R-68 through R-84): Land uses in this area include single-family residences, vacant land, and commercial and light industrial uses. Land uses in this area range from 2 ft higher in elevation than Fairview Street to 9 ft lower in elevation than Fairview Street. Currently, 6.7 ft to 10.7 ft high existing walls along the private property lines shield the single-family residences. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 10 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 2. Results of the Noise Study Report The NSR for this project was approved in January 2019. 2.1. Noise Impact Locations Potential long-term noise impacts associated with project operations are solely from traffic noise. Traffic noise was evaluated for the worst -case traffic condition. Using coordinates obtained from the topographic maps, 92 receptor locations associated with existing single- and multifamily residences, a medical office, Fairview Triangle, SART, vacant land, and commercial and light industrial uses were identified as receptors within the study area. Figure 2-1 shows these receptor locations. Future traffic noise levels at all 92 receptor locations were determined using either the worst -case traffic operations (prior to speed degradation) or the 2040 a.m. peak -hour traffic volumes, whichever were lower. The worst -case traffic condition is assumed to be level of service (LOS) C and is generally loudest when vehicles on a given roadway travel at free -flowing traffic conditions. Accordingly, the worst -case traffic volume assumptions are based on the maximum number of vehicles that can typically travel in a given lane while still resulting in free -flowing traffic conditions. The worst -case traffic condition is assumed to be 750 vehicles per lane per hour (vplph) on Fairview Street and other local roadways. The a.m. peak -hour traffic volume was selected over the p.m. peak -hour traffic volume because the worst -hour noise levels based on the long-term (24-hour) noise level measurements occur during the a.m. hour. The a.m. and p.m. peak -hour traffic volumes were obtained from the Traffic Impact Analysis (LSA 2018). The modeled future noise levels with the project were compared to the modeled existing noise levels (after calibration) from Traffic Noise Model (TNM) 2.5 to determine whether a substantial noise increase would occur. The modeled future noise levels were also compared to the NAC to determine whether a traffic noise impact would occur. Fairview Street Improvements from 9th Street to 16th Street 11 and Bridge Replacement Project Noise Abatement Decision Report Chapter 2. Results of the Noise Study Report This page intentionally left blank 12 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report ,t m mac, • ! Z or 0 • +t r s Q� � Rai — �► Q��% �� . �.: , G%� hL W, 4"14�C'� 1. ■,j t 1 _ a' R,�lt �i A s �_ �_� ss sa 08 P. ID- i� �n ,f N / -• QUA+ '7 - - — — — — �Cl'fiV3 06 90 y wpm � \ 90 ° i � � f, 7 P.90 O . ` r � � \•.. �\ �� m + `ate — — —-��[-�a._— � —+60 Y � / -_ - =i, �� I �t� ,■ `°..u'a�=���"��'������NN°O°011TTTTiO Ji- _ MW IL ►' •f K. yw AIL �ANNE& Ian It LEGEND FIGURE 2-1 Sheet 1 of 2 A Short -Term Monitoring Locations Proposed Improvements L_ Long -Term Monitoring Locations Existing Right of Way -0-40- O Modeled Receptors Existing Walls Fairview Street Improvements 0 75 150 ® proposed Right of Way Acquisition from 9t1 Street to 16th Street and Bridge Replacement Project FEET Monitoring and Modeled Receptor Locations SOURCE: Google Aerial (12/2017); WKE (2017) Federal Project No.: BRLS 5063(184) I:\WKE1702\GIS\NADR_MonitoringModeledReceptorLocations.mxd (6/4/2019) Chapter 2. Results of the Noise Study Report This page intentionally left blank 14 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report low- r VP 1! f AbRONKRIR 6I. R'74 • R75 + . �r �y.�' r �. - -r••• yam: ,+a.r.. • r �,. • ' - R 7 Qr R-80 _ R-47 R-52 ! .t ter. y # y * r -8» R-82 U81 I 7 I, r "'• R-72 _ y •ter► *+ R-46 - R-71 •_� _ . �R=79' EWNo.11 01 -- •� •. .a .ra n F'AIWVIE�" ST --- F - - _ - - - ,--, - - Fri`• — — .mot ti ;,��.,.. �r F\\ `a R=42 1 R 4} R-54 R-62 �2. R-85 R-86 R-44� * - t•a 7 RE45 r R-55 lops`40 R-90 R-92 ` PARK GLEN R i r :"N R-50 �• ." - - - U , ►. � z � R-66r' �y ��� _ ►' + r . `.�4 ARK G�gE:N CIR' j� LEGEND FIGURE 2-1 Sheet 2 of 2 ♦ Short -Term Monitoring Locations Proposed Improvements ■ Long -Term Monitoring Locations Existing Right of Way z�1 O Modeled Receptors Existing Walls Fairview Street Improvements 0 75 150 ® proposed Right of Way Acquisition from 9th Street to 16th Street and Bridge Replacement Project FEET Monitoring and Modeled Receptor Locations SOURCE: Google Aerial (12/2017); WKE (2017) Federal Project No.: BRLS 5063(184) I:\WKE1702\GIS\NADR_MonitoringModeledReceptorLocations.mxd (6/4/2019) Chapter 2. Results of the Noise Study Report This page intentionally left blank 16 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 2 Results of the Noise Study Report ........................................ .................. ............ Of the 92 modeled receptors, 9 receptors under the Future Build condition would approach or exceed the NAC. No receptor would experience a substantial noise increase of 12 dBA or more over its corresponding modeled existing noise level under any scenario. The receptor locations listed below would be or would continue to be exposed to noise levels that either approach or exceed the NAC under Future Build conditions: • Receptor R-5: This receptor location represents an existing single-family residence on the northbound side of Fairview Street between Civic Center Drive and West 9th Street. Currently, a 4.7 ft high existing wall (Existing Wall [EW] No. 1) shields the residence. One noise barrier (NB No. 1) was modeled along the private property line on the northbound side of Fairview Street to shield this residence. • Receptor R-8: This receptor location represents an existing single-family residence on the southbound side of Fairview Street between Civic Center Drive and West 9th Street. Currently, a 2.7 ft to 6 ft high existing wall (EW No. 2) shields this residence. One noise barrier (NB No. 2) was modeled along the private property line on the southbound side of Fairview Street to shield this residence. • Receptor R-14: This receptor location represents an existing single-family residence on the southbound side of Fairview Street between West 9th Street and West 12th Street. Currently, a 5.3 ft high existing wall (EW No. 4) shields this residence. One noise barrier (NB No. 3) was modeled along the private property line on the southbound side of Fairview Street to shield this residence. • Receptor R-23: This receptor location represents existing multifamily residences on the southbound side of Fairview Street between West 9th Street and West 12th Street. Existing wood fences along the private property line would not provide effective noise attenuation at these residences. One noise barrier (NB No. 4) was modeled along the private property line on the southbound side of Fairview Street to shield these residences. • Receptors R-24, R-25, and R-40: These receptor locations represent existing single-family residences on the northbound side of Fairview Street between West 9th Street and West 12th Street. Currently, a 4 ft to 6 ft high wall (EW No. 5) shields these residences. One noise barrier (NB No. 5) was modeled along the private property line on the northbound side of Fairview Street to shield these residences. Fairview Street Improvements from 9th Street to 16th Street 17 and Bridge Replacement Project Noise Abatement Decision Report ter 2. Results of the Noise • Receptor R-46: This receptor location represents an existing single-family residence on the southbound side of Fairview Street between West 12th Street and the Santa Ana River. Currently, a 5.7 ft high existing wall (EW No. 9) shields this residence. One noise barrier (NB No. 6) was modeled along the private property line on the southbound side of Fairview Street to shield this residence. • Receptor R-51: This receptor location represents Fairview Triangle on the southbound side of Fairview Street between West 12th Street and the Santa Ana River. Currently, no wall shields Fairview Triangle. Because there is a driveway and pedestrian access onto Fairview Street, it is not feasible to abate traffic noise from Fairview Street with noise barriers. 2.2. Locations for Evaluated Noise Abatement Noise abatement measures such as noise barriers were considered in order to shield receptors within the study area that would become or would continue to be exposed to traffic noise levels approaching or exceeding the NAC. Noise barriers were analyzed for each of these receptor locations. Depending on the location of the potential barrier and existing barrier height, noise barrier heights from 6 to 16 ft were analyzed at 2 ft increments. The location of the modeled noise barrier is shown on Figure 2-2. The following noise barriers were analyzed to shield receptor locations that would be exposed to traffic noise levels approaching or exceeding the NAC for the Future Build conditions: • NB No. 1: A 169 ft long barrier along the right-of-way and private property line on the northbound side of Fairview Street between Civic Center Drive and 9th Street was analyzed to shield Receptor R-5. • NB No. 2: A 129 ft long barrier along the right-of-way and private property line on the southbound side of Fairview Street between Civic Center Drive and 9th Street was analyzed to shield Receptor R-8. • NB No. 3: A 113 ft long barrier along the right-of-way and private property line on the southbound side of Fairview Street between West 9th Street and West 12th Street was analyzed to shield Receptor R-14. • NB No. 4: A 171 ft long barrier along the right-of-way and private property line on the southbound side of Fairview Street between West 9th Street and West 12th Street was analyzed to shield Receptor R-23. ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 18 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report -- , ■ O * O �• , � 0 CA�. i i �� 1 GAB 4 'j'�•�+ . G#�f3 IN- 10 tirJ `' �� 3S �� w/ o� •. � - '' y � i ��j..-'� � _� O - - m = u`°i � A o o ✓ � � co a _ � JS rn J J coo s6 0s <n S808 M >AM!!� z 00 53 90� 777 ,,0 90 l 0677� co .o o r o .(W-qb�� 90 • J °' y��°'�� \ +Ln - - .w��-4 � _ io U ��N • y� N � "�1 � IL tD I1J c0 O UpyJ l•l ...� _ n lfFl.C7 COD rn � .'�� O_ c0 O Of Ow _:a sYFAr ITE ih 74 ■ � � � � _, 'n * r I e>� "ram .a/ ; `'� !' . •,� i - It 3 dp. op tr+ilk P. ARrti! - - 'fir j ■, '*�, - ti 'h LEGEND FIGURE 2-2 Sheet 1 of 2 O Modeled Receptors Proposed Improvements ® Proposed Right of Way Acquisition Existing Right of Way —13-40- Existing Walls Fairview Street Improvements 0 75 150 Modeled Noise Barriers from 9th Street to 16th Street and Bridge Replacement Project FEET Modeled Noise Barrier and Receptor Locations SOURCE: Google Aerial (12/2017); WKE (2017) Federal Project No.: BRLS 5063(184) I:\WKE1702\GIS\NADR_ModeledNoiseBarriers.mxd (6/4/2019) Chapter 2. Results of the Noise Study Report This page intentionally left blank 20 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report low- H'URON DRY. R-73 l �. •A .1 R � F—( � �� r•1 R-76 . R-77 n -� 68 - Lf _ •� t. B � � �� t R-84 ' � . • U �o g R 69 �sT i AN&; VO4r `V rin�J - - ' kP G _ KAM /CyJ�7 II��J�� CO CO (O J J JLo cD I (D A J J U, J A W �O O = + J O '�4 r- `' CO •2U WL- N A 0 95 � ss s ssos � � _ a �',L r � j�� �•��� 1 co W w •_.—� _ w CA + + 5 60 r Leo W Fri `yi - ♦ 96 co cn a cn^, • cn OS J \ N ` \" 90 gS 70 w .- 9y A —i c� y - -_ UiTYT �y �4 0 A fl A w //////� m m •o co "' m A J J m A co gs '96, co w ^� - u r. f. • CO Vl A Q IV cn cP J A"l!1 J J A y �. ■ _ .10 ,�� lfF..11 A w O — 4O ,- It ova .� Nk fk� •fir#� t� �.. * '.i , ��; .A;64 LEGEND FIGURE 2-2 Sheet 2 of 2 O Modeled Receptors Proposed Improvements ® Proposed Right of Way Acquisition Existing Right of Way Existing Walls Fairview Street Improvements 0 75 150 Modeled Noise Barriers from 9th Street to 16th Street and Bridge Replacement Project FEET Modeled Noise Barrier and Receptor Locations SOURCE: Google Aerial (12/2017); WKE (2017) Federal Project No.: BRLS 5063(184) I:\WKE1702\GIS\NADR_ModeledNoiseBarriers.mxd (6/4/2019) Chapter 2. Results of the Noise Study Report This page intentionally left blank 22 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 2 Results of the Noise Study Report .................. ................... • NB No. 5: A 705 ft long barrier along the right-of-way on the northbound side of Fairview Street between West 9th Street and West 12th Street was analyzed to shield Receptors R-24, R-25, and R-40. • NB No. 6: A 184 ft long barrier along the right-of-way and private property line on the southbound side of Fairview Street between West 12th Street and the Santa Ana River was analyzed to shield Receptor R-46. 2.3. Feasible Noise Barriers Section 3 of the Protocol states that a minimum noise reduction of 5 dBA must be achieved at the impacted receptors in order for the proposed noise abatement measure to be considered feasible. Greater noise reductions are encouraged if they can be reasonably achieved. Feasibility may also be restricted by the following factors: (1) topography, (2) access requirement for driveways, (3) presence of local cross - streets, (4) underground utilities, (5) other noise sources in the area, and (6) safety considerations. Table 2.1 summarizes the feasibility of the modeled noise barriers and lists the noise barrier heights, approximate lengths, the noise attenuation, the number of benefited units/receptors, the total reasonable allowance, beginning and ending station number, and the beginning and ending top of wall elevation under the Future Build conditions. Of the six modeled noise barriers evaluated for the Future Build conditions, all noise barriers were determined to be feasible. Fairview Street Improvements from 9th Street to 16th Street 23 and Bridge Replacement Project Noise Abatement Decision Report Chapter 2. Results of the Noise Study Report Table 2.1: Summary of Feasible Noise Barriers from the Noise Study Report Noise Barrier No. Height (ft) Approximate Length (ft) Noise Attenuation (dBA) Number of Benefited Receptors/Units' Total Reasonable z Allowance Noise Barrier Location Noise Barrier Station Number Top of Wall Elevation (ft) Begin End Begin End 1 8 169 5 1 $95,000 ROW/PL 36+55 37+31 96.97 96.35 10 169 7 1 $95,000 98.97 98.35 12 169 8 1 $95,000 100.97 100.35 14 169 9 1 $95,000 102.97 102.35 16 169 10 1 $95,000 104.97 104.35 2 8 129 6 1 $95,000 ROW/PL 36+30 37+07 96.46 96.00 10 129 8 1 $95,000 98.46 98.00 12 129 9 1 $95,000 100.46 100.00 14 129 10 1 $95,000 102.46 102.00 16 129 11 1 $95,000 104.46 104.00 3 8 113 6 1 $95,000 ROW/PL 38+70 39+22 96.74 98.00 161 113 7 1 $95,000 98.74 100.00 12 113 7 1 $95,000 100.74 102.00 14 113 8 1 $95,000 102.74 104.00 16 113 8 1 $95,000 104.74 106.00 4 6 171 7 2 $190,000 ROW/PL 43+45 45+15 96.23 96.00 8 171 10 2 $190,000 98.23 98.00 10 171 12 2 $190,000 100.23 100.00 12 171 14 2 $190,000 102.23 102.00 14 171 15 2 $190,000 104.23 104.00 16 171 16 2 $190,000 106.23 106.00 5 6 705 6 2 $190,000 ROW 40+45 42+14 100.25 95.00 8 705 9 3 $285,000 102.25 97.00 10 705 11 3 $285,000 104.25 99.00 12 705 13 5 $475,000 106.25 101.00 14 705 14 7 $665,000 108.25 103.00 16 705 16 7 $665,000 110.25 105.00 6 10 184 7 1 $95,000 ROW/PL 47+16 48+57 103.45 101.01 12 184 8 1 $95,000 105.45 103.01 14 184 9 1 $95,000 107.45 105.01 16 184 10 1 $95,000 109.45 107.01 Source: Compiled by LSA Associates, Inc. (2019). ' Number of receptors/units that are attenuated by 5 dBA or more by the modeled barrier. 2 Calculated by multiplying the number of benefited receptors by $95,000 (the dollar amount per benefited receptor/unit). 3 Denotes the minimum wall height required to break the line -of -sight between the receptor and a truck exhaust stack. dBA = A -weighted decibels PL = property line ft = foot/feet ROW = right-of-way 24 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 3. Preliminary Noise Abatement Decision 3.1. Summary of Key Information Utilizing the information in Chapter 2, barriers considered to be feasible are analyzed to determine their reasonableness. As stated in Section 5.4 of the NSR, the overall reasonableness of noise abatement is determined by considering factors such as the noise reduction design goal and the construction cost of the barrier. For a noise barrier to be considered reasonable, the noise level reduction design goal of 7 dBA must be achieved at one or more of the benefited receptors. For any noise barrier to be considered reasonable from a cost perspective, the estimated construction cost of the noise barrier would be equal to or less than the total cost allowance calculated for the barrier. The total reasonable allowance was determined based on the number of benefited receptors multiplied by the reasonable allowance per residence. The estimated noise barrier construction costs for each barrier were developed by WKE, Inc. in December 2018 and are shown in Table 3.1 as well as in Appendix A. If the estimated noise barrier construction cost exceeds the total reasonable allowance, the noise barrier is determined to be not reasonable. However, if the estimated noise barrier construction cost is within the total reasonable allowance, the noise barrier is determined to be reasonable. A summary of abatement information in Table 3.1 lists all the feasible noise barriers under the Future Build conditions, along with their locations, heights, approximate lengths, the noise attenuation levels, the number of benefited units/receptors, the total reasonable allowance per barrier, the estimated construction costs, and whether the barriers are reasonable. As shown in Table 3.1, NB Nos. 2 through 5 were determined to be reasonable and NB Nos. 1 and 6 were determined to be not reasonable because the estimated construction cost exceeded the total reasonable allowance. It should be noted that NB Nos. 2, 3 (at 12 ft and 14 ft high), 4, and 5 require the property owner to donate their right-of-way (permanent and temporary easement) in order to achieve reasonableness. Fairview Street Improvements from 9th Street to 16th Street 25 and Bridge Replacement Project Noise Abatement Decision Report Chapter 3. Preliminary Noise Abatement Decision Table 3.1: Summary of Abatement Key Information for the Build Alternative Noise Barrier No. Noise Barrier Location Height (ft) Approximate Length (ft) Noise Attenuation Level (dBA) Number of Benefited , Receptors/Units Total Reasonable 2 Allowance Estimated Construction Cost (Without ROW Donation' Reasonable ? Estimated Construction Cost (With ROW Donation)' Reasonable ? 8 169 5 1 $95,000 No - No 10 169 7 1 $95,000 $225,898 No $207,758 No 1 ROW/PL 12 169 8 1 $95,000 $242,676 No $224,536 No 14 169 9 1 $95,000 $261,270 No $243,130 No 16 169 10 1 $95,000 $275,138 No $256,998 No 8 129 6 1 $95,000 No - No 10 129 8 1 $95,000 $103,251 No $86,701 Yes 2 ROW/PL 12 129 9 1 $95,000 $116,218 No $99,668 No 14 129 10 1 $95,000 $129,533 No $112,983 No 16 129 11 1 $95,000 $140,126 No $123,576 No 8 113 6 1 $95,000 -- No No 10 113 7 1 $95,000 $86,910 Yes $69,880 Yes 3 ROW/PL 12 113 7 1 $95,000 $98,299 No $81,269 Yes 14 113 8 1 $95,000 $110,192 No $93,162 Yes 16 113 8 1 $95,000 $119,492 No $102,462 No 6 171 7 2 $190,000 $208,301 No $184,391 Yes 8 171 10 2 $190,000 $223,396 No $199,486 No 10 171 12 2 $190,000 $237,517 No $213,607 No 4 ROW/PL 12 171 14 2 $190,000 $254,459 No $230,549 No 14 171 15 2 $190,000 $273,220 No $249,310 No 16 171 16 2 $190,000 $289,097 No $265,187 No 6 705 6 2 $190,000 No - No 8 705 9 3 $285,000 $461,186 No $412,536 No 10 705 11 3 $285,000 $520,938 No $472,288 No 5 ROW 12 705 13 5 $475,000 $593,082 No $544,432 No 14 705 14 7 $665,000 $669,344 No $620,694 Yes 16 705 16 7 $665,000 $736,731 No $688,081 No 10 184 7 1 $95,000 $130,841 No $119,941 No 12 184 8 1 $95,000 $149,114 No $138,214 No 6 ROW/PL 14 184 9 1 $95,000 $169,047 No $158,147 No 16 184 10 1 $95,000 $185,990 No $175,090 No Source: Compiled by LSA Associates, Inc. (2019). Number of receptors/units that are attenuated by 5 dBA or more by the modeled barrier. 2 Calculated by multiplying the number of benefited receptors by $95,000 (the dollar amount per benefited receptor/unit). 3 Construction cost estimate provided by WKE, Inc. (2018). 4 Shaded area represents barrier heights that have been determined to be not reasonable because the barrier would not reduce noise levels by 7 dBA or more. 5 Denotes the minimum wall height required to break the line of sight between the receptor and a truck exhaust stack. dBA = A -weighted decibels ft = foot/feet ROW = right-of-way 26 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 3. Preliminary Noise Abatement Decision ........................................................................................................ 3.2. Non -Acoustical Factors Relating to Feasibility Nonacoustical factors relating to feasibility that must be considered during the construction of noise barriers include: geometric standards, safety, maintenance, security, drainage, geotechnical considerations, and utility relocations. 3.2.1. Build Alternative The nonacoustical factors relating to the feasibility of NB Nos. 2 through 5 are: • Geometric Standards: NB Nos. 2 through 5 would not affect the geometric standards of adjacent roadways. • Safety: NB Nos. 2 through 5 would not affect sight distance for vehicular or pedestrian traffic. • Maintenance: Temporary construction easements would be required for NB Nos. 2 through 5. The property owner would be responsible for maintaining the private side of the barrier while the City would be responsible for maintaining the public side of the barrier. • Security: NB Nos. 2 through 5 would be in the same alignment as an existing wall and would not change the security conditions of the site. • Drainage: NB Nos. 2 through 5 would not affect the existing and proposed drainage system. • Geotechnical Considerations: NB Nos. 2 through 5 would be constructed at a similar grade to the existing condition. • Utility Relocations: Construction of NB No. 2 would not have the potential to interfere with existing utilities. However, the construction of NB Nos. 3, 4, and 5 have the potential to interfere with existing utilities because there are overhead electrical lines in the area. Installation of piles during the construction of NB Nos. 3, 4, and 5 may require temporary bypass power lines to be constructed. Although utility relocations are not anticipated, further investigation would be required during the Plans, Specifications, and Estimates (PS&E) phase. 3.3. Preliminary Recommendation and Decision The preliminary noise abatement decision presented in this report is based on preliminary project alignments and profiles, which may be subject to change. As such, the physical characteristics of noise abatement described herein may also be subject to change. If pertinent parameters change substantially during the final project design, the preliminary noise abatement decision may be changed or eliminated from the final project design. A final decision to construct noise abatement will be made by Fairview Street Improvements from 9th Street to 16th Street 27 and Bridge Replacement Project Noise Abatement Decision Report ter 3. Preliminary Noise Abatement Decision the Project Development Team (PDT) upon completion of the project design and public input. The property owners and non -owner occupants will be sent a noise barrier survey letter during the public review period to request each owner's or occupant's opinion on whether or not they would prefer a noise barrier and what height they would prefer the barrier to be based on the range of feasible and reasonable heights listed in Table 3.1. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 28 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 4. Secondary Effects of Abatement The secondary effects of noise abatement were considered as part of this NADR. The proposed project includes avoidance, minimization, and/or mitigation measures that lessen potential environmental effects. Noise abatement is a part of the overall project footprint, and most secondary effects would be addressed by these measures. NB Nos. 2 through 5 are feasible and reasonable and do not have any secondary effects that require additional project features or avoidance, minimization, and/or mitigation measures. Fairview Street Improvements from 9th Street to 16th Street 29 and Bridge Replacement Project Noise Abatement Decision Report Effects of Abatement This page intentionally left blank 30 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Chapter 5. References California Department of Transportation (Caltrans). 2011. Traffic Noise Analysis Protocol for New Highway Construction, Reconstruction, and Retrofit Barrier Projects. May. Website: http://www.dot.ca.gov/hq/env/noise/pub/ ca tnap_ nay20l I.pdf (accessed May 2019). LSA Associates, Inc. 2019. Noise Study Report. January. .. 2018. Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Traffic Impact Analysis. June. WKE, Inc. 2018. Noise Barrier Construction Cost Estimate. December. Fairview Street Improvements from 9th Street to 16th Street 31 and Bridge Replacement Project Noise Abatement Decision Report 5. References This page intentionally left blank 32 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Appendix A Noise Barrier Construction Cost Estimate ................................................................................................................. Appendix A. Noise Barrier Construction Cost Estimate ....................................................................................................................................................................................................................... . Fairview Street Improvements from 9th Street to 16th Street 33 and Bridge Replacement Project Noise Abatement Decision Report A Noise Barrier Construction Cost Estimate This page intentionally left blank 34 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Table A-1. Noise Barrier Construction Cost Estimate Noise Barrier No. Noise Barrier Location Height (ft) Approximate Length (ft) Noise Attenuation Level (dBA) Number oBenefited Units/Receptors Total Reasonable Allowance Cost of Demolition Cost of Sound Wall Cost of Retaining Wall Misc Construction Costs' Job Site Management Traffic Control Cost Utility 34 Relocation , Landscaping for Graffitti Abatement Cost (Arch %5) Total ROW Costs (TCE) ROW Support Costs Mobilization (10 %) Contingency (10 %) Estimated Construction Cost (Without ROW Donation) Reasonable? Estimatedf Construction Cost (With ROW Donation) Reasonable? 8 169 5 1 $95,000 - - - - - - - No 10 169 7 1 $95,000 $ 8,399 $ 77,818 $ - $ 5,000 $ 75,000 $ 3,891 $ 18,140 $ 18,825 $ 18,825 $ 225,898 No $ 207,758 No 1 ROW/PL 12 169 8 1 $95,000 $ 8,399 $ 91,134 $ - $ 5,000 $ 75,000 $ 4,557 $ 18,140 $ 20,223 $ 20,223 $ 242,676 No $ 224,536 No 14 169 9 1 $95,000 $ 8,399 $ 105,891 $ - $ 5,000 $ 75,000 $ 5,295 $ 18,140 $ 21,773 $ 21,773 $ 261,270 No $ 243,130 No 16 169 10 1 $95,000 $ 8,399 $ 116,898 $ - $ 5,000 $ 75,000 $ 5,845 $ 18,140 $ 22,928 $ 22,928 $ 275,138 No $ 256,998 No 8 129 6 1 $95,000 - - - - - - - - - - - No 10 129 8 1 $95,000 $ 6,411 $ 60,078 1 $ 1 $ 3,004 $ 16,550 1 $ 8,604 1 $ 8,604 1 $ 103,251 No $ 86,701 Yes 2 ROW/PL 12 129 9 1 $95,000 $ 6,411 $ 70,369 $ - $ 3,518 $ 16,550 $ 9,685 $ 9,685 $ 116,218 No $ 99,668 No 14 129 10 1 $95,000 j $ 6,411 $ 80,936 $ - $ 4,047 $ 16,550 $ 10,794 $ 10,794 $ 129,533 No $ 112,983 No 16 8 10 129 113 113 11 6 7 1 1 1 $95,000 $95,000 $95,000 $ 6,411 - $ - $ 89,343 $ 52,757 $ - $ - - $ 4,467 $ 2,638 $ 16,550 $ 17,030 $ 11,677 $ 7,242 $ 11,677 $ 7,242 $ 140,126 $ 86,910 No Yes $ 123,576 $ 69,880 No No Yes 3 ROW/PL 12 113 7 1 $95,000 $ - $ 61,796 $ $ 3,090 $ 17,030 $ 8,192 $ 8,192 $ 98,299 No $ 81,269 Yes 14 113 8 1 $95,000 $ - $ 71,235 $ $ 3,562 $ 17,030 $ 9,183 $ 9,183 $ 110,192 No $ 93,162 Yes 16 113 8 1 $95,000 $ - $ 78,616 $ $ 3,931 $ 17,030 $ 9,958 $ 9,958 $ 119,492 No S 102,462 No 6 1171 7 2 $190,000 $ 8,499 $ 55,405 $ - $ 8,000 $ 75,000 $ 2,770 $ 23,910 $ 17,358 $ 17,358 $ 208,301 No $ 184,391 Yes 8 171 10 2 $190,000 $ 8,499 $ 67,385 $ - $ 8,000 $ 75,000 $ 3,369 $ 23,910 $ 18,616 $ 18,616 $ 223,396 No $ 199,486 No 10 171 12 2 $190,000 $ 8,499 $ 78,593 $ - $ 8,000 $ 75,0001 $ 3,930 $ 23,910 1 $ 19,7931 $ 19,793 1 $ 237,517 No $ 213,6071 No 4 ROW/PL 12 171 14 2 $190,000 $ 8,499 $ 92,039 $ - $ 8,000 $ 75,000 $ 4,602 $ 23,910 $ 21,205 $ 21,205 $ 254,459 No $ 230,549 No 14 171 15 2 $190,000 $ 8,499 $ 106,928 $ - $ 8,000 $ 75,000 $ 5.346 $ 23,9101 $ 22,768 $ 22,768 $ 273,220 1 No $ 249,310 No 16 6 171 1705 16 6 9 2 2 3 $190,000 $190,000 $285,000 $ 8,499 $ 35,039 $ 119,529 $ 286,317 $ - $ - $ 8,000 $ 75,000 $ 5,976 $ 14,316 $ 23,910 $ 48,650 $ 24,091 $ 38,432 $ 24,091 $ 38,432 $ 289,097 $ 461,186 No No $ 265,187 $ 412,536 No No No 8 705 ROW 10 705 11 3 $285,000 $ 35,039 $ 333,740 $ $ 16,687 $ 48,650 $ 43,412 $ 43,412 $ 520,938 No S 472,288 No 5 12 705 13 5 $475,000 $ 35,039 $ 390,997 $ - $ 19,550 $ 48,650 $ 49,424 $ 49,424 $ 593,082 No S 544,432 No 14 705 14 7 $665,000 $ 35,039 $ 451,522 $ - $ 22,576 $ 48,650 $ 55,779 $ 55,779 $ 669,344 No S 620,694 Yes 16 705 16 7 $665,000 $ 35,039 $ 505,004 $ - $ 25,250 $ 48,650 $ 61,394 $ 61,394 $ 736,731 No $ 688,081 No 10 184 7 1 $95,000 $ 9,145 $ 84,752 $ - $ 4,238 $ 10,900 $ 10,903 $ 10,903 $ 130,841 No $ 119,941 No 12 184 8 1 $95,000 $ 9,145 $ 99,254 $ - $ 4,963 $ 10,900 $ 12,426 $ 12,426 $ 149,114 No $ 138,214 No 6 ROW/PL 14 184 9 1 $95,000 $ 9,145 $ 115,074 $ - $ 5,754 $ 10,900 $ 14,087 $ 14,087 $ 169,047 No $ 158,147 No 16 184 10 1 $95,000 $ 9,145 $ 128,521 1 $ - $ 6,426 $ 10,900 $ 15,499 $ 15,499 1 $ 185,990 No $ 175,090 No ' The Miscellaneous Construction Cost for NB No. 1 is to reconstruct the adjacent trash bin enclosure The Miscellaneous Construction Cost for NB No. 4 is for landscape repair to the adjacent property 3 Utility Relocation Cost for NB No. 1 is for the relocation of a power pole with transformer. ° Utility Relocation Cost for NB No. 4 is for the relocation of a power pole and underground conduits. dBA = A -weighted decibels ft = feet Misc = miscellaneous PL= property line ROW = right-of-way 6/18/2019 1 of 1