HomeMy WebLinkAboutPALP, INC DBA EXCEL PAVING COMPANY Recording Requested By, Recorded in Official Records, Orange County
And When Recorded Mail To: Hugh Nguyen, Clerk-Recorder
City of Santa Ana,Public Works Agency M22 1 III# 111]111 11141 11]Jill 111I 11111 1111 1111 NO FEE
20 Civic Center Plaza,P.O.Box 1988 * $ R 0 0 1 2 4 7 8 6 5 1 $ *
Santa Ana,CA 92702 2021000064986 9:58 am 01129121
363 RW11A N12 1
0.00 0.00 0.00 0.00 0.00 0.00 0.000.000.00 0.00
THIS SPACE FOR COUNTY RECORDERS USE ONLY
t°
M- :r ;
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation,with the address of Santa Ana City Hall,20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
c construction of THE BUSH STREET BICYCLE BOULEVARD AND BUSH STREET BIKEWAY
U WATER AND SEWER IMPROVEMENTS under contract entered into on JUNE 16, 2020, with
M
w PALP INC. DBA EXCEL PAVING COMPANY, on which contract FEDERAL INSURANCE
o COMPANY is surety. The property on which such work improvement was placed is in the City
c z of Santa Ana, County of Orange, State of California, and described as Project Nos. 18-9002, 2 1-
z 6442 & 21-6443 located at: BUSH STREET FROM 9TH STREET TO 16TU STREET. The work
c w improvement on said property was accepted as completed on JANUARY 29, 2021.
E o CITY OF SANTA ANA A MUNICIPAL CORPORATION
w O by
zF
Dated: Principal Ci 1 Engineer Mason Gabriel
TITLE
O � -------------------------------------------------------------------------------------------
CG
VERIFICATION
I, the undersigned, say: I am the City Engineer— Edwin "William" Galvez of the City of Santa
Ana, California; I executed the foregoing Notice of Completion acting on behalf of the owner of
the property therein described; I make this verification on behalf of said corporation by
authorization of the City Council of the City of Santa Ana; I have read said notice and know the
contents thereof; and I declare under penalty of perjury that the facts therein stated are true.
Executed on',�— L4 r 7"0 Z ,at Santa Ana,California
(signature of individual s nng that the
contents of Notice of Co pletion are true.)
THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN(10)DAYS AFTER COMPLETION
5745 JUN 2 3 2020
01I2-)?W-f ", EXHIBIT
M•,A CH CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT NO. 18-9002: BUSH STREET BICYCLE BOULEVARD
(CIVIC CENTER TO 17Tn ST)
PROJECT NO. 21-6442: BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO. 21-6443: BUSH STREET BIKEWAY SEWER IMPROVEMENTS
This CONSTRUCTION CONTRACT is made and entered into this 16' day of June, 2020 by and between
the City of Santa Ana, California, a charter city and municipal corporation organized and existing under
the Constitution and laws of the State of California (herehrafter "CITY'), and Palp, Inc DBA Excel Paving
Company (hereinafter "CONTRACTOR").
WPINESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Bush Street Bicycle Boulevard and Bush Street Bikeway Water
and Sewer Improvements Project (hereinafter referred to as the "WORK OF IMPROVEMENT")
identified in and in accordance with the Contract Documents prepared by the City's Public Works
Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed One Million Nine Hundred Twenty-seven
Thousand Two Hundred Eighty Dollars and No Cents ($1,927,280.00), as set forth and identified in
the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
=v. 09/01/2017 Page 1 of 3
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at:
hM;//www. santa-aua.org/nwa/documents/C WA. p
CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
b
Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ROR.0
5 #I
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
Assistant City Attorney
FOR APPROVAL:
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
//1�
IOUSTINE RIDGE
City Manager
CONTRACTOR:
Excel Paving Company
E:
TLE:
Curtis P. Brown III President
Page 3 of 3
City of Santa Ana
Page 1
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/26/2020
Bid Results
Bidder Details
Vendor Name
Excel Paving Cc
Address
2230 Lemon Ave
Long Beach, CA 90806
United States
Respondee
Dallas Daniels
Respondee Title
Estimator
Phone
562-599-5841 Ext. 242
Email
ddaniels@excelpaving.net
Vendor Type
CADIR
License #
688659
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
May 20, 2020 9:43:31 AM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
212427
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type
General Forms
Santa Ana General Forms Saved.pdf
General Forms
Ownership Affidavit
Ownership AffidaviLpdf
Ownership Affidavit (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond
Bid Bond.pdf
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non Collusion
Non Collusion.pdf
Non -Collusion Affidavit
(Notary Public) - REQ Original
Hard Copy Submittal in
Addition
Line Items
Type
Item Code UOM
city
Unit Price
Line Total Comment
PROJECT NO 18-9002 BUSH ST BICYLE BOULEVARD
1
Unclassified Excavation'
CY
600
$250.00
$150,000.00
2
Cold Milling*
SF
30700
$1.40
$42,980.00
3
Asphalt Rubber Hot Mix (ARHM)'
TN
370
$120.00
$44,400.00
Planet8ids, Inc.
City of Santa Ana
Page 2
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush
St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/26/2020
Bid Results
Type
Item Code UOM
City
Unit Price
Line Total Comment
4
Asphalt Concrete*
TN
470
$160.00
$75,200,00
5
Crushed Miscellaneous Base*
TN
4
$300.00
$1,200.00
6
6" PCC Pavement*
SF
7140
$13.00
$92,820.00
7
4" PCC Sidewalk*
SF
5750
$9.00
$51,750.00
8
A-2-6 PCC Curb and Gutter per CSA STD. Plan No 1101*
LF
1410
$50.00
$70,500.00
9
A-2-6 PCC Curb with 3' Gutter per CSA STD. Plan No 1101 *
LF
160
$60.00
$9,600.00
10
PCC Curb Ramp Per SPPWC STD. Plan 111-5, Case and Type as shown*
SF
3850
$15.00
$57,750.00
11
Remove Tree and Roots Complete
EA
1
$2,000.00
$2,000.00
12
Adjust Manhole Frame and Cover to Grade per CSA STD. Plan No. 1201
E4
3
$1,000.00
$3,000.00
13
Adjust Water Valve Frame and Cover to Grade Per CSA STD. Plan No. 1410/1411*
EA
1
$1,500.00
$1,500,00
14
Gutter Depression per CSA STD. Plan 305
LF
20
$50.00
$1,000.00
15
PCC Driveway Approach per CSA STD Plan No. 1112*
SF
450
$12.00
$5,400.00
16
Adjust Pullbox or Utility Cover to Grade
EA
7
$700.00
$4,900.00
17
Adjust Survey Monument to Finished Grade per CSA STD Plan No. 1117. Location to be Verged by CSA Survey Supervior Before and After
Construction
EA
5
$500.00
$2,500.00
18
Type D-6 Curb per Caltrans STD Plan A87A*
LF
320
$40.00
$12,800.00
19
10" Stamped Concrete (Red) with #4 Reber Spaced at 24" O.C.*
SF
1600
$27.00
$43,200.00
PlanetBids, Inc.
City of Santa Ana
Page 3
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements
(18-9002; 21-6442; 21- Printed 05/26/2020
Bid Results
Type
Item Code UOM city
Unit Price
Line Total Comment
20
Type B-1 Curb per GSA STD. Plan No. 1101•
LF 360
$40.00
$14,400.00
21
Variable Height Type B-1 Curb per CSA STD. Plan No. 1101`
LF 320
$41.00
$13,120.00
22
Fumish and Install Traffic Signal Pullbox with New No. 6 Pullbox per CSA STD.
Plan No. 1501 Adjust to
Finish Grade
EA 4
$925.00
$3,700.00
23
Furnish and Install New Water Meter Box per CSA STD. Plan 1401.
EA 1
$600.00
$600.00
24
8" PCC Cross Gutter Including Monolithic Curb per CSA STD. Plan 1109
SF 2800
$14.00
$39.200.00
25
Construct New Culvert per CSA STD. Plan No. 318 with a Type II Inlet
LF 28
$300.00
$8,400.00
26
Remove Existing Catch Basin Structure Complete and Protect Existing Connector Pipe in Place. Fill and
Compact Removal with Native
EA 1
$4,000.00
$4,000.00
27 Remove Esisting Parking Meter Complete
EA 1 $400.00
$400.00
28
Pour New Vent Foundation Per SCE STD. Plan AC 758 at Finish Grade. Protect Vent in Place
EA 4 $6,000.00
$24,000.00
29
Remove Exisiting Firehydrant and Valve, Install New Firehydranl and Valve per CSA STD. Plan 1405'
EA 1 $14,000.00
$14,000.00
30
Construct 12" PVC Water Main (3' min.)'
LF 15 $500.00
$7,500.00
31
Connect to Existing 12" ACP with 12" Long Body Flexible Transition Coupling'
EA 2 $2,300.00
$4,600.00
32
Remove Valve Box Frame and Cover. Cut Off PVC Riser 18" Below Grade, Back Fill w/ Sand Compact and Pave to Match Proposed
EA 3 $900.00
$2,700.00
33 Abandon Existing Water Service
EA 4 $1,200.00 $4,800.00
34 18" RCP. Trench, Bedding, and Back811 Requirements per City STD. Plan No. 1150
LF 31 $200.00 $6,200.00
35 18" Diameter Concrete Collar per CSA STD. Plan No. 320
EA 1 $1,000,00 $1,000.00
PlanetBids, Inc.
City of Santa Ana
Page 4
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 2 1 - Printed 05/26/2020
Bid Results
Type
Item Code
UOM
City
Unit Price
Line Total Comment
36
Catch Basin Type C per CSA STD. Plan No. 303, W=5.0' V=5.0'
EA
1
$9,000.00
$9,000,00
37
24" Box Jacaranda Tree
FA
2
$1,500.00
$3,000.00
38
5-GL Variegated Flax Lily'
EA
1000
$30.00
$30,000,00
39
8th St Irrigation
LS
1
$8,000.00
$8,000.00
40
9th St Irrigation
LS
1
$13,000.00
$13,000.00
41
10th St Irrigation
LS
1
$12,000.00
$12,000.00
42
16th St Irrigation
LS
1
$8,000.00
$8.000.00
43
60 Working Days Landscaping/Irrigation Maintenance }
LS
1
$3,000.00
$3.000.00
44
3" Thick Layer of Mulch"
SF
3300
$1.00
$3,300.00
45
Root Control Barrier'
LF
44
$10.00
$440.00
46
Project Advertisement Sign
EA
2
$600.00
$1,200.00
47
Signing and Striping t
LS
1
$86,000.00
$86,000.00
48
Labor Agreement Oversight
LS
1
$15,000.00
$16,000.00
Subtotal
$1,013,060.00
PROJECT NO's 21-6442 S, 21.6443 BUSH STREET WATER AND SEWER IMPROVEMENTS
49 8" Class 305 AW WA C900 P.V.C. Water Main
LF 300 $260.00 $78,000.00
50 12" Class 305 AW WA C900 P.V.C. Water Main
LF 1700 $265.00 $450,500.00
PlanetBids, Inc.
City Of Santa Ana
Page 5
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush
St Sewer Improvements
(18-9002; 21-6442; 21- Printed 05/26/2020
Bid Results
Type
Item Code UOM
City
Unit Price
Line Total Comment
51
Construct 1" Water Service and Connect to Existing Meter"
EA
5
$4,200.00
$21,000.00
52
Construct 2" Water Service and Connect to Existing Meter`
EA
2
$5,300.00
$10,600.00
53
New Fire Hydrant Assembly, (Including Gate Valve and Lateral Pipe)
EA
5
$13,000.00
$65,000.00
54
8" Resilient Wedge Gate Valve
EA
3
$2,000.00
$6.000.00
55
12" Resilient Wedge Gate Valve
EA
9
$3,000.00
$27,000.00
56
4" Fire Service Connection Including 4"RWGV
EA
1
$5,000.00
$5,000.00
57
6' Fire Service Connection Including 6" RWGV
EA
1
$5,000.00
$5,000.00
58
Remove Existing Manhole Structure
EA
3
$4,000.00
$12,000.00
59
Construct New P.C.C. Sewer Manhole
EA
3
$12,000.00
$36,000.00
60
Remove Existing Sewer Main and Construct 6" VCP Sewer Main
LF
40
$1,000.00
$40.000.00
61
CCTV Inspection of Existing Sewer Main
LF
2540
$3.00
$7.620.00
62
CCTV Inspection of Existing Sewer Laterals
EA
66
$400.00
$26,400.00
63
Vertical Offset (As -Needed)'
EA
5
$6,000.00
$25,000.00
64
2' Air Vacuum and Release Valve (As -Needed)'
EA
5
$7,300.00
$36,500.00
65
Additional Trenching Cost to Install Water Pipeline 18" — 30" Deeper (Total 54" to 66" cover) (As -Needed)'
LF
250
$30.00
$7,500.00
66
COLD MILLING'
SF
8500
$2.00
$17,000.00
PlanetBids, Inc.
City of Santa Ana Page 6
Bush Street Bicycle Boulevard; Bush St Bikeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/26/2020
Bid Results
Type Item Code UOM Qty Unit Price Line Total Comment
67 ASPHALT RUBBER HOTMIX (ARHM)-
TN 105 $220.00 $23,100.00
68 As-Builts
LS 1 $15,000.00 $15,000.00
Subtotal $914,220.00
Asterisk Notes (Per Section 3.2 of Standard Specifications) - NOT part of Total Bid Calculation
69 ' = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25V limit as stated in Section 3-2 of the
Standard Specifications. This bid item shall not be subject to the "25V limit as stated in Section 3-2 of the Standard Specifications. The actual amount for
this item will be dictated by the actual quantitiy used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly.
ea 0 $250.00 0
70 t = This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
ea 0 $250.00 0
Subtotal 0
Total $1,927,280.00
PlanetBids, Inc.
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
P-15 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of thethe C�
Signed:
Title: Luicci nader, Vice president
Nationwide Contracting Services, Inc. ➢BA
Firm: Nationwide General Construction Services.
Date: s-1e-2020
P-16 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amount to the California Apprenticeship Council.
Signed: 1-1 1—�
Title: Luicci nader, Vice president
Nationwide Contracting Services, Inc. DBA
Firm: Nationwide General Construction Services.
Date: 5-Ie-2020
P-17 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is othe 'see 'tied.
Signed:
Title:
Nationwide Contracting Services, Inc. DBA
Firm: Nationwide General Construction Services.
Date: 5-18-2020
P-18 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PUBLIC CONTRACT CODE SECTION 10162 OUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation?
Yes No x
If the answer is yes, explain the circumstances in the following space
P-19 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood
the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties
Building and Construction Trades Council, and the signatory Craft Councils and Local Unions,
effective as of September 1, 2017. The CWA is available at:
htto://www.santa-a-na.ore/Dwa/documents/CWA.t)df
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA,
and is capable of completing construction of the project continuously, and without interruptions
or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the
Letter of AssenKthattnnears as Attachment A to the CWA.
Signed:
Luicci nader, Vice president
Title:
Nationwide Contracting services, Inc. ➢BA
Title:
Date: 5-I8-2020
P-20 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
Nationwide Contracting Services, Inc. DHA
FROM: Nationwide General Constriction Services
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
CITY ESTIMATE
UNIT
ITEM
NO.
DESCRIPTION
UNIT
QTY.
PRICE
COST
UNCLASSIFIED
I
CY
600
$ $110.50
$ $66,300.00
EXCAVATION
2
COLD MILLING
SF
30,700
$ $0.65
$ $19, 955.00
ASPHHALT RUBBER HOT
3
MIX
TON
370
$ $227.50
$ $84,175.00
$
4
ASPHALT CONCRETE
TON
470
$ $188.50
$ $88,595.00
CRUSHED
5
MISCELLANEOUS BASE
TON
4
$ $104.00
$ $416.00
6
6"PCC PAVEMENT
SF
7,140
$ $26.00
$$185,640.00
7
4" PCC SIDEWALK
SF
5,750
$ $23.40
$ $134, 550. 00
A-2-6 PCC CURB AND
8
GUTTER PER CSA STD.
LF
1,410
$ $65.00
$ $91,650.00
PLAN NO. I101.
A-2-6 PCC CURB WITH 3'
9
GUTTER PER CSA STD.
LF
160
$
$ $11,440.00
PLAN NO. 1101.
$71.50
P-1 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
CITY ESTIMATE
UNIT
ITEM
NO.
DESCRIPTION
UNIT
QTY.
PRICE
COST
PCC CURB RAMP PER
10
SPPWC STD. PLAN 111-5,
SF
3,850
$ $26 00
$ $100,100.00
CASE AND TYPE AS
SHOWN.
REMOVE TREE AND ROOTS
11
EA
1
$ $6,500.00
$ $6,500.00
COMPLETE.
ADJUST MANHOLE FRAME
12
AND COVER TO GRADE
EA
6
$ $2,600.00
$ $15, 600. 00
PER CSA STD. PLAN NO.
1201.
ADJUST WATER VALVE
FRAME AND COVER TO
13
GRADE PER CSA STD. PLAN
EA
20
$ $325.o0
$ $6,500.00
NO. 1410/1411.
14
GUTTER DEPRESSION PER
LF
20
$ $390.00
$ $7, 100.00
CSA STD. PLAN 305.
PCC DRIVEWAY
15
APPROACH PER CSA STD
SF
450
$ $46.80
$ $21, 060.00
PLAN NO 1112,
16
ADJUST PULLBOX OR
EA
7
$$1,9so.o0
$ $13,650.00
UTILITY COVER TO GRADE.
ADJUST SURVEY
MONUMENT TO FINISHED
GRADE PER CSA STD PLAN
$2,600.00
$13, 000. 00
17
NO. 1117. LOCATION TO BE
EA
5
$
$
VERIFIED BY CSA SURVEY
SUPERVISOR BEFORE AND
AFTER CONSTRUCTION.
18
TYPE D-6 CURB PER
LF
320
$97•50
$
$31,200.00
$
CALTRANS STD PLAN A87A
10" STAMPED CONCRETE
19
(RED) WITH #4 REBAR
SF
1,600
$ $45.50
$ $72, 800.00
SPACED AT 24" O.C.
20
TYPE B-I CURB PER CSA
LF
360
$104.00
$
$37,440.00
$
STD. PLAN NO. 1101 W/ CMB
VARIABLE HEIGHT TYPE B-
21
1 CURB PER CSA STD. PLAN
LF
320
$ $104.00
$ $33, 280. 00
NO. 1101.
P-2 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
CITY ESTIMATE
UNIT
ITEM
NO.
DESCRIPTION
UNIT
QTY.
PRICE
COST
FURNISH AND INSTALL
TRAFFIC SIGNAL PULLBOX
WITH NEW NO. 6 PULLBOX
22
PER CSA STD. PLAN NO.
EA
4
$ $3, 250. 00
$ $13, 000. 00
1501. ADJUST TO FINISH
GRADE
FURNISH AND INSTALL
$3,250.00
23
NEW WATER METER BOX
EA
2
$
$ $6, 500. 00
PER CSA STD. PLAN 1401.
8" PCC CROSS GUTTER
INCLUDING MONOLITHIC
$26. 00
24
SF
2,800
$
$ $ 7z, eoo. oa
CURB PER CSA STD. PLAN
1109
CONSTRUCT NEW
CULVERT PER CSA STD.
25
PLAN NO.318 WITH ATYPE
EA
1
$ $1,300.00
$ $1,300.00
II INLET.
REMOVE EXISTING CATCH
BASIN STRUCTURE
COMPLETE AND PROTECT
26
EXISTING CONNECTOR
EA
1
$$1,950.00
$ $1,950.00
PIPE IN PLACE. FILL AND
COMPACT REMOVAL WITH
NATIVE.
REMOVE EXISTING
27
PARKING METER
EA
1
$ $1,300.00
$ $1,300.00
COMPLETE.
POUR NEW VENT
FOUNDATION PER SCE STD.
28
PLAN AC 758 AT FINISH
EA
4
$ $650.00
$ $2,600.00
GRADE. PROTECT VENT IN
PLACE.
REMOVE EXISTING
FIREHYDRANT AND
29
VALVE, INSTALL NEW FIRE
EA
2
$ $650.00
$ $1,300.00
HYDRANT AND VALVE PER
CSA STD. PLAN 1405.
30
CONSTRUCT 12" PVC
LF
30
$76.00
$
$ $z, 3aa. o0
WATER MAIN (3- MIN.)
P-3 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
CITY ESTIMATE
UNIT
ITEM
NO.
DESCRIPTION
UNIT
QTY.
PRICE
COST
CONNECT TO EXISTING 12"
31
ACP WITH 12" LONG BODY
EA
4
$$sso.00
$ s2,600.00
FLEXIBLE TRANSITION
COUPLING.
REMOVE VALVE BOX
FRAME AND COVER. CUT
OFF PVC RISER 18" BELOW
32
GRADE, BACK FILL
EA
3
$ $520.00
$ $1, 560.00
W/SAND, COMPACT AND
PAVE TO MATCH
PROPOSED.
ABANDON EXISTING
33
WATER AT THE MAIN PER
EA
1
$ $650.00
$ $650.00
CSA STD. PLAN 1430.
18" RCP. TRENCH,
34
BEDDING, AND BACKFILL
LF
31
$ $65.00
$ $z, 015.00
REQUIREMENTS PER CITY
STD. PLAN NO. 1150.
18" DIAMETER CONCRETE
35
COLLAR PER CSA STD.
EA
1
$ $975.00
$ $975.00
PLAN NO. 320.
CATCH BASIN TYPE C PER
36
CSA STD. PLAN NO. 303,
EA
1
$ $6,500.00
$ $6,500.00
W=5.0' V=5.0'
37
24" BOX JACARANDA TREE
EA
2
$ $650. 00
$ $1, 300.00
38
5-GL VARIEGATED FLAX
EA
1000
$$19.50
$ $19,500.00
LILY
39
8TH ST IRRIGATION
LS
1
$ $2,600.00
$ $2,600.00
40
9TH ST IRRIGATION
LS
1
$ $2,600.00
$ $2,600.00
41
1 OTH ST IRRIGATION
LS
1
$ $2,600.00
$ $2,600.00
42
16TH ST IRRIGATION
LS
I
$ $2,600.00
$ $2,600.00
60 WORKING DAYS
43
LANDSCAPING/IRRIGATION
LS
1
$ $6,500.00
$ $6,500.00
MAINTENANCE
P-4 of P-20
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
UNIT
ITEM
NO.
DESCRIPTION
QTY.
UNIT
PRICE
COST
44
3" THICK LAYER OF
3,300
SF
$ $0.39
$$1,287.00
MULCH*
45
ROOT CONTROL BARRIER*
44
LF
$ $390.00
$ $17, 160.00
46
PROJECT ADVERTISEMENT
2
EA
$$3,250.00
$ $6,500.00
SIGN
$5,200.00
$5,200.00
47
SIGNING AND STRIPING j
1
LS
$
$
48
LABOR AGREEMENT
1
LS
$ 15,000
$ 15,000
OVERSIGHT
PROJECT NO's 21-6442 & 216443
BUSH STREET WATER AND SEWER IMPROVEMENTS
49
8" Class 305 AWWA C900
300
LF
$ $162.50
$ $48,750.00
P.V.C. Water Main
12" Class 305 AWWA C900
50
1,700
LF
$ s195.00
$ $331, 500.00
P.V.C. Water Main
Construct 1" Water Service and
51
Connect to Existing Meter*
5
EA
$ $3,900.00
$ $19,500.00
52
Construct 2" Water Service and
2
EA
$ $5,200.00
$ $10,400.00
Connect to Existing Meter*
New Fire Hydrant Assembly,
53
(Including Gate Valve and
5
EA
$ $13, 000.00
$ $65, 000.00
Lateral Pipe)
54
8" Resilient Wedge Gate Valve
3
EA
$ $3, 250.00
$ $9, 750.00
55
12" Resilient Wedge Gate Valve
9
EA
$ $300 . 900 ,
$ $35,100.00
56
4" Fire Service Connection
1
EA
$7,800.00
$
$ $7,800.00
Including 4" RWGV
57
6" Fire Service Connection
1
EA
$ $10,400.0
$ $10,400.00
Including 6" RWGV
58
Remove Existing Manhole
3
EA
$650.00
$
$
Structure
$1, 950.00
P-5 of P-22
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
UNIT
ITEM
NO.
DESCRIPTION
QTY.
UNIT
PRICE
COST
59
Construct New P.C.C. Sewer
3
EA
$ $3,250.00
$9,750.00
Manhole
$
Remove Existing Sewer Main
60
and Construct 6" VCP Sewer
40
LF
$ $195.00
$ $7, 800.00
Main
61
CCTV Inspection of Existing
2,540
LF
$ $2.60
$ $6 , 6 04.00
Sewer Main
62
CCTV Inspection of Existing
66
EA
$ $130.00
$ $a, 580.00
Sewer Laterals
63
Vertical Offset (As -Needed)*
5
EA
$ $1, 300.00
$ $6, 500.00
64
2" Air Vacuum and Release
5
EA
1,300.00
$
$6,500.00
$
Valve (As -Needed)*
Additional Trenching Cost to
65
Install Water Pipeline 18" — 30"
250
LF
$ $130.00
$ $32,500.00
Deeper (Total 54" to 66" cover)
As -Needed *
66
COLD MILLING*
8,500
SF
$ $2.60
$ $22,100.00
67
ASPHALT RUBBER HOT
105
TN
$
$ $24,570.00
MIX (ARHM)*
$234.00
68
As-Builts
1
LS
$ 15,000
$ 15,000
P-6 of P-22
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
ADDENDUM TWO
BUSH STREET BICYCLE BOULEVARD
PROJECT NO.: 21-6442
BUSH STREET BIKEWAY WATER IMPROVEMENTS
PROJECT NO.: 21-6443
BUSH STREET BIKEWAY SEWER IMPROVEMENTS
TOTAL BASE BID I - 1 $1,90/,44/.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above within 165 working days after the commencement date stated in the Notice to Proceed. The
first 105 working days of which is for construction, and the last 60 working days for the
landscaping and irrigation maintenance period. The project commencement date shall start on July
1, 2020.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $2,285 per calendar day. Nationwide Contracting Services, Inc. oEA
Name of Firm Nationwide General Construction Services
Signature of BIDDER
Title Elie Nader. President, Secretary, treasurer. Luicci nader, Vice president
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-7 of P-22
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
:iI1]0]A:7161IT:Y0O A I
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to famish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Nationwide Contracting Services, Inc. ➢BA
Name of Firm Nationwide General Q--S 'J— Aery
Signature of BIDDER
Title Elie Nader. President, Secretary, treasurer. Luicci nader, Vice president
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-6 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Nationwide Contracting Services, Inc. ➢BA
Contractor's Name: Nationwide General Construction Services
Business Address: 10725 Ellis Ave. Unit i. Fountain Valley, Ca 92708
Luicci@nationwidegcs.com
E-Mail Address: uicci®nationwidegcs.com
Telephone: 949-500-0894
State Contractor's License No. and Class: CSLB 1031246 A,B,CS,C12,C20,C2I,C36
License Expiration Date:
09/30/2021
State Dept. of Industrial Relations (DIR)
Registration No.:
State Dept. of Industrial Relations (DIR)
Registration Expiration Date:
Signed:
1000057872
exp: 6-30-2022
Title: Elie Nader. President, Secretary, treasurer. Luicci nader, Vice president
P-7 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or Type of worker needed to execute the services available
to interested parties upon request, and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Nationwide Contracting Services, Inc. DBA
Name of Firm Nationwide General Construction services
Signature of BIDDER
Title Luicci nader, Vice president
(if an individual, so state)
P-8 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA
)
COUNTY OF ORANGE
) SS:
CITY OF SANTA ANA
)
being duly swom, deposes and says:
❑ INDIVIDUAL
That he/she is the party making the foregoing proposal:
❑ PARTNERSHIP
That he/she is a member of the co -partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
❑ CORPORATION
That he is of:
a corporation which is making the foregoing proposal:
❑ JOINT VENTURE
That he is of:
one of the parties making the foregoing proposal as ajoint venture, and the he/she has been
and is duly vested with the authority to execute instruments for an on behalf of the parties
making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion
to secure any advantage against the City of Santa Ana or any person interested in the proposed
contract, for himself or any other person.
Signature of Bidder
Subscribed and sworn to before me this day of 20
Signature of officer Administering Oath (Notary Public)
P-9 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
KNOW ALL PRESENT that,
, as BIDDER, and
, as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of _
Dollars ($ ), which is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time specified,
then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor
of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
day of 20_.
BIDDER*
SURETY*
Subscribed and sworn to before me this day of
, 20_
Signature:
Notary Public in and for the County of State of
* Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
P-10 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: V2% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: %% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name MARINA LANDSCAPE, INC
License #/Exp. 492862 6/30/2022
DIR Reg. #/Exp. 1000000079 6-30-22
Location Anaheim, Ca
Phone 714-939-6600
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Signature of Bidder
Landscape
15,000
Name
License #/Exp.
DIR Reg. #/Exp.
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
P-1 I of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
1. LACED Bonita Elementary School.
Name and Address of Owner.
Paul Comes. AOR. 310-483-3682
Name and Telephone Number of person familiar with project.
1,130,000 AnA Barrier Remnvs1
Contract Amount Type of Work
2. LAUSD Los Angeles academy Middle School
Name and Address of owner.
Paul Comes. AOR 310-483-3682
4-15-2020
Date Completed
Name and Telephone Number of person familiar with project.
2,200,000 ADA Barrier Removal 4-25-2020
Contract Amount Type of Work Date Completed
3, LACED Robert Hill Lane School.
Name and Address of owner.
George Milonopoulos 323-513-8565
Name and Telephone Number of person familiar with project.
1,350,000
Contract Amount
ADA Barrier Removal
Type of Work
5-10-2020
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Argo Surety 20335 Ventura Blvd. ste 426. Woodland Hills 91364 811-667-7656
P-12 of P-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
1. Woodrow Wilson High School LAUSD
Name and Address of Owner.
Jerry Stoddard 213-479-2656
Name and Telephone Number of person familiar with project.
1,800,000 ADA Barrier Removal
5-10-2020
Contract Amount Type of Work
Date Completed
LAUSD Robert Hill Lane School.
2.
Name and Address of owner.
George Milonopoulos 323-513-8565
Name and Telephone Number of person familiar with project.
1,350,000 ADA Barrier Removal
5-10-2020
Contract Amount Type of Work
Date Completed
3, Woodrow Wilson High School
Name and Address of owner.
Paul Gomes. AOR 310-483-3682
Name and Telephone Number of person familiar with project.
$1,200,000 ADA Barrier Removal 4-20-2020
Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Argo Surety 20335 Ventura Blvd. ste 426. Woodland Hills 91364 811-667-7656
P-13 ofP-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-9002
BUSH STREET BICYCLE BOULEVARD
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine and
not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other
BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned
that making a false certification may subject the certifier to criminal prosecution.
Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of , 20_, by
proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me
Notary Public Signature Notary Public Seal
P-14 of P-20
The Orange County Register
2190 S. Towne Centre Place Suite 100
Anaheim, CA 92806
714-796-2209
5211379
CNSB / CNSB-ACCOMMODATIONS
915E1STST
ORDER EXPEDITING
LOSANGELES, CA 90012-4050
FILE NO..3356434
AFFIDAVIT OF PUBLICATION
STATE OF CALIFORNIA, l
J} SS.
County of Orange
I am a citizen of the United States and a resident of the
County aforesaid; I am over the age of eighteen years, and
not a party to or interested in the above entitled matter. I
am the principal clerk of The Orange County Register, a
newspaper of general circulation, published in the city of
Santa Ana, County of Orange, and which newspaper has
been adjudged to be a newspaper of general circulation by
the Superior Court of the County of Orange, State of
California, under the date of November 19, 1905, Case No.
A-21046, that the notice, of which the annexed is a true
printed copy, has been published in each regular and
entire issue of said newspaper and not in any supplement
thereof on the following dates, to wit:
03/2612020, 04/02/2020
I certify (or declare) under the penalty of perjury under the
laws of the State of California that the foregoing is true
and correct:
Executed atAnaheim, Orange County, California, on
Date: April 02, 2020.
Signature
IIII IIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII IIII
• A 0 0 0 0 0 5 3 8 9 3 4 6.
PROOF OF PUBLICATION
Legal No. 0011375476
�L°°1-0Pi1596
FILEDHuff h Nguyryryen, Clerk•Racerder
I� I� � II�N�I�I� NO FE
OCT 0 1 2 201885001019 1124 am 10/01/18
ORANGE DEPUTY
COUN LE R OR R DEPARTMENT 370 OR03 Z01
BY:
0'00 50.00 000 "0 O'CO 0.00 0.00 O.Oo
ai
MAYOR CITY MANAGER
Mlgue A. Pulido Raul Godinez II
MAYOR PRO TEM CITY ATTORNEY
MicheleMartinez,-' 1 Sonia R. Carvalha
COUNC L MEMBERS CLERK OF THE COUNCIL
P. Da Id Benavides ...,,- Marie 0. Huizar
Vicent Sarmiento
Jose E Zno
Sal TI sero
Juan llegas CITY OF SANTA ANA
�J\ PLANNING & BUILDING AGENCY
20 Canter Plaza (M
P.O. BOX 1988 988. Santa Ana, Californiarnl
92702
(714) 667-2700 • Fax (714) 973-1461
www.santa-ano.org
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act (CEQA)
Fee Exemption per California Government Code Section 6103
To: COUNTY CLERK From, City of Santa Ana
County of Orange Planning & Building Agency
P.D. Box 238 20 Civic Center Plaza M-20
S nta Ana, CA 02702 Santa Ana, CA 92702
Project Title: Bush Street Bicycle Boulevard PIB-9002 Date of Approval: 10/05/2018
Project Numb r(s); PWA-2018-1440-CITY
Project Locati n: 1 CltyWide (Partial)
City: Santa . na County; Orange ER Number: ER-2018-107
Project Description: Installation of bicycle boulevard treatment along Bush Street from Civic Center to 17th St. and along
15th St. from Sycamore St to Bush St. Treatment includes the installation of traffic circles along the
corridor, signage, and roadway markings.
Applicant Name: Kenny Nguyen, City of Santa Ana Public Works Agency
Applicant AddIress: Ross Annex, 20 Civic Center Plaza, 3rd Floor M-36
SANTA ANA, CA 92702
Name of Public Agency Approving Project: City Council POSTED
Name of Person or Agency Carrying Out Project: Nguyen, Kenny
Exempt Status: OCT 01 2
❑ Ministerial (Sec, 15268)
❑ Declared E nergency (Sec. 15269 (a))
❑ Emergency, Project (Sec. 15269 (b through e)) HUGN N L K- CORDER
f� General Rl (Sec. 15061(b)(3)1(5)) tyY; ___� _ _„_ ' Vll
❑ Statutory E emption:
10 Categorical Exemption: 15301(c)
Reason(s) Whil, Project is Exempt From CEQA:
16301(c) consists of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails and similar facilities
City Contact Min y Telephone: (714) 647-5665
Signature: _ Title: P ¢ b 4 Intro' Date: f 0 �r
�w�ii A• MKS SANTA ANA CITY COUNCIL
Miguel A. Pulido MkMla MaNnex Vinoenta Sannlenta Joea soli P. David Br idea Juan village, Sal Til
Mayor Mayor Pro TeM,Wardz Wardi Ward Ward Words Ward
M oul19gIDaWtanacm IDIa7irfin@z QtsanWnaem vsarmlontonsonL no oro i9 �lodotdlsanh.ana om dtlenavides,tflu un•nm' a � �m
tM.
CONTRACT CHANGE ORDER
Project Number Project Nos.18-9002: BUSH ST. BICYCLE BOULEVARD _Change Order Number 1
To ExceLPavinft Co. Contractor
You are hereby directed to make the raisin changes from the plans and specifications or do the following descdbed work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such Ome as equipment Is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
EXTRA WORK AT AGREED PRICE
COP No. 03 R1 10th STREET EXTRA WOR
Cost associated with T&M work done on 101h Street.
In accordance too waterline design plans and specifications, Excel Paving marked, saw cut paving
and exposed existing utilities (marked & unmarked) throughout 101h and Bush St. Existing utility
elevations and alignments are in direct conflict with the new mainline design. The City provided
revised plans to Excel paving for a Cost proposal. Excel Paving provided a lump surn price of
$54,000.00 to complete the work in accordance to the revised plans. New issues surfaced, causing
additional plan revisions. Therefore, in order to keep the project moving, the City provided approval
for the contractor to proceed with the work on a time and material basis. Additional work was
completed 40 percent below original cost proposal.
FINAL COST: $31,472.54
Page 1 of 2
3,S
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project Nos.18-9002: BUSH ST. BICYCLE BOULEVARD Change Order Number 1
To Excel Paving Co. Contractor
xr
You are hereby directed to make the herein changes from the plans and specifications or do the fallowing described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation set forth in this change order comprises the total amount due to contractor
for the scope of work authorized herein based on estimated quantities. The total final amount
due for this change order will be based on actual quantities of work performed per the
described and itemized listing of work that this change order is based upon. Compensation for
work performed by this change order shall cover all costs including work by Contractor, all
Subcontractors, and all Suppliers. By signing this change order, the Contractor acknowledges
and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated
compensation includes payment for all work contained in this change order, plus all payment
for interruption of schedules, extended field overhead, home office overhead, profit, delay, and
all impact, ripple effect or cumulative impact on all other work under this Contract. The signing
of this change order constitutes full mutual accord and satisfaction for all changes and work
performed on this project, and that the time and cost paid per this change order constitutes the
total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all
work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all
Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file
any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ INCREASE $ 31,472.54
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Zero (0) working days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor the p y own above_
Acce e j I /Contractor Excel Paving Co.
' • �/ Title By
Approval redo mendbtf b Date
U!@!1C WORXS AGENCY EXECLTNE OIREC70R
Approved by / Date N
CITYMANAGER
Page 2 of 2
CONTRACT CHANGE ORDER
Project Number Project No. 18-9002: Bush St. Bicycle Blvd., Water Improvements Change Order Number
To Excel Pavino Co. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of oquipment cover only such time as equipment is actually used and no allowance will be made for idle, time.
Change requested by EXCEL PAVING CO.
COP NO.2.1 REVISED DELI 1 CHANGE
1. Requesting additional four (4) Working Days and cost associated with revised drawings and T&M
work.
FINAL COST: $22,476.00
Additional saw cutting per revised drawings. Additional potholing for water and utility services. Install casing
around 12" water main on 10th St. Install cap and plugs at existing 4" water main. Remove and dispose of
existing 4" water main. Additional material for MJ Couplings at connections.
COP No. 05 EXTRA WORK ON 19th & 120, ST.
2. Requesting additional four (4) Working Days and cost associated with T&M Extra Work done on 11rh
&121 Street.
FINAL COST: $4,603.95
Additional saw cutting per revised drawings at Bush and 8th and 9" St. Backfill with 1-sack slurry due to
vertical offset per direction from City. Backfill with 1-sack slurry due to shallow 12" water main per direction
from City. Pothole and expose unforeseen utility line to install 12" water main.
COP No. 061It' St. WATER HICaHLINE
3. Requesting additional one (1) Working Days and cost associated with T&M Extra Work done on Ill,
&121 Street.
FINAL COST: $2,200,00
Install Highline from Fire Hydrant to Federal Building per City of Santa Ana Water Department:
COP No. 08 OVER EX &NATION 101 St.
4. Requesting additional one (1) Working Days and cost associated with T&M Extra Work done on 11th
&12"' Street.
FINAL COST: $12,705.00
Page 1 of 2
��`�I3
Included over excavation of PCC pavement located under the AC section on 1 Oth St. The plans for the over
excavation were provided by the City.
COP No. 09 REMAINING T&M
5. Requesting additional nine (9) Working Days and cost associated with remaining T&M work.
FINAL COST: $23,467.05
Additional items include: Slurry backfill, Abandon unforeseen utility. Resurvey and layout per revised plans.
Remove and replace local. Resurvey 10'h, 111h, and 121h St. Remove and replace AC 11th & 121h St. Set
revised elevations. AC pave 101. Remove additional SW panel.
TOTAL COST THIS CHANGE ORDER: DECREASE $ ___— ---------- MCREASE $ 65,452.00
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Nineteen (19) Working Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above. and perform all service necessary for the work above specified,. and vAll accept as full
payment Vthe1e1111/1n"Hc,0shown above.
Acpt r ( Contractor Excel Paving Co.
By Title MAyl
1 n
Approval recommended by f-t �� 4 � Date
PUBLIC WORKS AGENCY EXECUTNEDIRECTOR
Approved by ` i Date
CITYMANAGER
Page 2 of 2