NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
construction of CITYWIDE EWER MAIN IMPROVEMENTS PHASE II under contract
entered into on JULY 7,2020, with LUCAS.BUILDERS,INC., on which contract EVER EST
N 1
U a REINSURANCE COMPANY is surety. The property on which such work improvement was
placed is in the City of Santa Ana, County of Orange, State of California, and described as
Project No, 19-6 2G located at: VARIOUS L( QA.TIONS The work improvement on
said property was accepted as completed on JUNE 09 2022
p°a �
CITY OF SANT.A.ANA,A MUNIMAL CORPORATION
By
Dated; Z0 2%- Principal Civil n in=—Jason Gabriel
Trl'IX
pi ------........-----------_•-------------------------- ------,-•---------------_------•-------•----_-
VERIFICATYON
I, the undersigned, say; I am the Acting City Engineer—Taig Higgins of the City of Santa Ana,
California, I executed the foregoing Notice of Completion acting on behalf of the owner of the
property therein described;I malce this verification,on behalf of said corporation by authorization
of the City Council of the City of Santa Ana; I have read said notice and know the contents
thereof; and I declap under penalty of perjury that the facts therein stated are true.
Executed oa ,at Santa Ana,California
Acting City Engineer--Taig Higgins
THIS NOTICE OF COMPLETION MUST,BE RECORDED WITHIN TEN(10)(JAYS AFTER COMPLETION
Ckp �2J
&JO i (N-0-u � 0r_v3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
JUL 3 1 2020 PROJECT 1-9-6426_-
CITYWIDE SEWER MAIN IMPROVEMENTS PHASE II
This CONSTRUCTION CONTRACT is made and entered into this 7th day of July, 2020 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Lucas
$LlldarsIne (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Citywide Sewer Main Improvements Phase II
Project- (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in
accordance with the Contract Documents prepared by the City's Public Works Agency and approved
by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed;One Million-Three>HundredNinty Nine
-Thousand Two Hundred -and Eight Dollars and No Cents ($1 399,20800), as set forth and identified
in.the BID PROPOSAL; which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or tc omit portions of the work as may be deemed necessary or
advisable.
rev. 0910112017 Page 1 of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at:
httn://www santa-ana.ora/nwa/documents/CWA.Ddf
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faith al
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
//
Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
Jerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: lam. T'--h'
7 FUNK
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
t�lG �G Zrr„
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
`:�9.��
KIUSTINE RIDGE -4r
City Manager
CONTRACTOR:
Lucas Builders, Inc.
-Z� W
SAMAN'
President
Page 3 of 3
City of Santa Ana
Page 1
E /V� H A
Cltywide Sewer Main Improvements
Phase II (19-6426), bidding on March 31, 2020 4100 PM (Pacific) "' "IBIT
Bid Results
Bidder Details
Vendor Name
Lucas Builders, Inc
Address
510 E Jamie Ave
La Habra, CA 90631
United States
Respondee
Saman Silva
Respondee Title
President
Phone
714-888-8468 Ext. 808
Email
sam@lucascompany.com
Vendor Type
License #
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
March 31, 2020 3:09:47 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
206692
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type '..
General Forms
Bid Doc -General Forms.pdf
General Forms
Ownership Affidavit
Ownership Affidavitpdf
Ownership Affidavit (Notary '..
_
Public) - REQ Original Hard
Copy Submittal in Addition '..
Bid Bond
Bid Bond.pdf
Bid Bond Guaranty (Notary '..
Public) -REQ Original Hard
Copy Submittal in Addition '..
Non -Collusion Affidavit
Non -Collusion Affidavit.pdf
Non -Collusion Affidavit
(Notary Public)- REQ
Original Hard Copy Submittal
in Addition
Line Items
Type Item Code UOM
City Unit Price
Line Total Comment
Base Bid Proposal
1 Mobilization/Demobilization (No More than 5%total bid)
LS
1 $64,185.00
$64,186.00
2 Constmct 6" PVC SDR-26 Sewer Main
LF 15 $459.00 $6,885.00
3 Remove Existing Sewer Main and Construct 8" PVC SDR-26 Sewer Main
- -LF 1800 $183.00 $329,400,00 -
PlanatBids, Inc.
City of Santa Ana -
2
j1y�f y`�P''age
EX 3 t S 3 A
Citywide
Sewer Main Improvements Phase II (19-6426), bidding on March 31,
2020 4:00
PM (Pacific)
A -
Bid Results
Type
Item Code UOM
Cty
Unit Price
Line Total Comment
4
Remove Existing Sewer Main and Construct 10" PVC SDR-26 Sewer Main
LF
800
$191.00
$152,800.00
5
Remove Existing Manhole Structure
EA
13
$2,657.00
$34,541.00
6
Construct New P.C.C. Sewer Manhole
EA
15
$9,023.00
$135,345.00
7
Construct 4" or 6" PVC Sewer Lateral and Cleanout (Open Trench)
- EA
48
$2,305.00
$110,640.00
8
Connect Sewer Laterals Previoulsy Pipe Bursted by City Forces
EA
1
$2,538.00
$2,538.00
9
CCTV Inspection of New Sewer Main
LF
2615
$2.00
$5,230.00
10
CCTV Inspection of New Sewer Laterals
EA
49
$148.00
$7,252.00
11
Sewer Flow Level Monitoring & Alarming Device
EA
2
$20,789.00
$41,578.00
12
Bypass Pump Existing Sewer Flow
LS
1
$15,901.00
$15,901.00
13
Furnish and Install Traffic Loop Type D
EA
2
$772.00
$1,544.00
14
Furnish and Install Traffic Loop Type E
EA
4
$653.00
$2.612.00
15
In -Ground Vehicle Sensor
EA
3
$950.00
$2,850.00
16
Driveway Approach 6" Thick PCC Per City Std. Plan 1112 Case 2*
SF
300
$30.00
$9,000.00
17
Driveway Approach 8" Thick PCC Per City Std. Plan 1112 Case 2*
SF
2230
$19,00
$42,370.00
18
Unclassified Excavation
CY
50
$26.00
$1,300.00
19
Asphalt Concrete (AC) Pavement
- TN
1250
$141.00
-- $176,250.00 -
Planelf3ids, Inc.
City of Santa Ana
Page 3
Citywide
Sewer Main Improvements Phase II (19-6426), bidding on March 31, 2020 4:00 PM (Pacific)
H I B I I A
Bid Results
Type
Item Code UOM
oty
Unit Price
Line Total Comment
20
Coldmill (T=2")
SF
38000
$0.43
$16,340.00
21
Coldmill (T=3")
SF
2320
$4.00
$9,280.00
22
Construct PCC Modified Curb (Traffic Circle)
SF
200
$153.00
$30,600.00
23
Construct 6" PCC with (3day) Cure Including Dowels
CY
10
$947.00
$9,470.00
24
Construct Color Stamped Concrete including rebar (T=10")
SF
180
$137.00
$24,660.00
25
Construct Color Scored Concrete (T=4")
SF
60
$173,00
$10,380.00
26
PCC Curb and Gutter (Type B-1)
LF
40
$144.00
$5,760.00
27
Adjust Manhole Frame and Cover to Finished Grade"
EA
2
$750,00
$1,500.00
28
Adjust Water Valve Frame and Cover"
EA
8
$600.00
$4,800.00
29
Rubberized Emulsion Aggregate Slurry (REAS), Type II
TN
36
$1,176,00
$42,336.00
30
Crack Sealing
LS
1
$8,910,00
$8,910.00
31
Remove existing Striping, Pavement Legends, and Markers
LS
1
$15,000.00
$15,000.00 '..
32
Protection of Surface utility Frames and Covers
LS
1
$594.00
$594.00
33
Signing and Striping
LS
1
$17,000.00
$17,000.00 '..
34
Traffic Control
LS
1
$16,607.00
$15,607.00
35
Additional Potholing (As Needed)"
EA
10
$975.00
$9,750.00
PlanatGida, Inc.
City of Santa Ana Page 4 _
Citywide Sewer Main Improvements Phase II (19-6426), bidding on March 31, 2020 4:00 PM (Pacific) EH I B f T A
Bid Results
Type Item Code UOM City Unit Price Line Total Comment
36 Labor Agreement Oversight
LS 1 $10,000.00 $10,000.00
37 As -Built
LS 1 $25,000.00 $25,000.00
Subtotal $1,390,208.00
Asterisk Notes (per P-3 of P-16 of Specifications) - NOT part of Total Bid Calculation
38 '= The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the 25% limit as stated in Section 3-2 of the
Specifications..,
as 0 0 0
Subtotal 0
Total $1,399,208.00
P3anmiE3ids, Inc.
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-6426
CITYWIDE SEWER MAIN IMPROVEMENTS PHASE II
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within ninety (90) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $1,300 per calendar day.
Name of Firm Lucas Builders, Inc.
Signature
Title President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Saman Silva - President/Treasurer
Priscilla Moynier - VP/Sec
P-3 of P-17
Recordad in official IRecords, orange county
IIII�IIRIIII��IIaiII�VIiIr
III5IIIIIiII�IIIII IIIIBiiI IIII NO FE
20208500023210:08 am 03/10/20
a81 13A Z01
0.00 6D.00 0,00 0,00 0.00 0.00 0.00 0.00
N
Q
MAYOR
Miguel A, Pulido
MAYOR PRO TEM
Juan Villages
COUNCiLMEMBERS
Phil Sacerre
Cecilia Iglesias
DaWd Ponaloza
Vicente Sarmlento
Jose Salado
FILE
4MAR19 2020
ORANeR .RecORDERDEPARTMBIII
DEPUTY
CITY MANAGER
Matins Ridge
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Delay Gomez
CITY OF SANTA ANA
Public Works Agency Design Engineering
20 Civic Center Plaza, M-36 • P.O. Box 1988
Santa Ana, Cagfomla 9M2
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act (CEQA)
(1 Fee Exemption per California Government Code Section 6103
I To: COUNTY CLERK From City of Santa Ana
County of Orange Public Works Agency
P.O. Box 238 2D Civic Center Plaza (M-38)
i Santa Ana, CA 92702 `Santa Ana, CA 92702
Project TI41e: City Wide Sewer Main Impr Phase II 19-64
M Project Number(s): PWA-2020-369-CITY
Project Location: 1 CityWide (Partial)
City. Santa Ana County: Orange ER Number: ER-2020-17 Date of Approval: 03/09/2020
Project Description: The project consist of constructing approximately 1,800 linear feet (LF) of 8" PVC & 800 LF of 10-inch sewer
mains, manholes & laterals. Also, project with construct a traffic circle at 3rd & Bush.
Applicant Name: City of Santa Ana, Public Works Agency
Applicant Address: 20 Civic Center Plaza M-36
Santa Ana, CA92702
Name of Public Agency Approving Project: City Council
Name of Agency Carrying Out Project: Public Works Agency
Exempt Status:
Ministerial (Sec. 15268)
IC Declared Emergency (Sec. 15269 (a))
M Emergency Project (Sec. 15269 (b through a))
❑ General Rule (Sec. 15061(b)(3y(6))
C1 Statutory Exemption:
E1 Categorical Exemption: 15301(b)
Reason(s) Why Project is Exempt From CEQA:
15301(b) consists of repair/maintenance of existing public facilities.
POSTED
MAR 10 2020
ORAN4Rcou LR -RECORDER DEPARTMENT
SYI DEPUTY
City Contact: EdwatSVforres Title: Associate Engineer Telephone: (714) 847-5018
Signature: �'4--� Date:
SANTA ANA CITY COUNCIL
Miguel A. Pulide Juenmaegne vIcentesenlento lkmd Paul= - Joe oftin PNl Down OWN Igloo" - --
Mayor Meyer Pm Tom,tNnrtl6 word WoNp WerAa ..=:-e a: Wed a, Words
MwId 1 m IWgonos�srmtn-nne.oro vsnmtlanlatmeenla-ono ors Juenolmel&oanln,peR nm:`+^l�g�Mderrta,^^a om "s=•neared'o�sanl"an •:d teal 9A M m -='
(e1 lme'no9) volm NWO
a
X93IOAlNnOO-AdO3 AONe0V GM-Ad00 95V/Md00-Ad00 1NV01'IddV 109fONd"IVNID180
Nm3 o AindAO'Z9nOSv'lM VNNIVI . / i ?'
O8MBORN IVIOI de410 ❑ Noa40 ❑ ;IPe1O ❑ 4000 ❑
E
00'0 §
00'0 $ 00.090
ZOOH13W1NdWAVd
AegIO ❑
aa} 6ullpuu4 Aleluewnoop A1uno0 ❑
(Aluo PAubg IoAluaD aad uopped 10 uolleollddV;461a leleM ❑
(Ado* ldlaaed 4ses penssl Alsnolna/d 4oepe) pled Alsnolnajd aad ❑
_ (4oepu) uopeulwlalea 1oe113 oN MdOD ❑
(4oalle) u01ldwax3 JO evlloN
aol woA idw9x3
00'0 t 09'9EL'3 (d110) luewnoop Wed6oM AJolelnued pe9lVaD ❑
(076-. - - $ 9Z'90Y'6$ (ON)(aNW) uopelepaa anlle6aNlPale6lllIN ❑
00'0 S 9Z'£VE'ES (al3) podol { loodwl lulu0wuollnu3 ❑
:SO3d 399VOPIddV NOMO
�19uVlanpd•[] AoueBV eluls ❑ IalAela laloads 1e41D p IgpleI0I0n40S Aoue6V ollgnd I9001 [�
NOV alopdwddo y0940)1NVOPIddV 103POWd
Mae �f0 `dNV ViNVS 9M VZVld i18A30 OIAIO OZ
_,.„...__.. •• - 3DODdIZ 31V1s Allo SSSHOOV1NVOI'1ddV103POUd
9b0 -Lb9 i441) AON30V SMOM onand 'VNV d1NVS dO WO
NZ00099OZOZ
UROWnN 1N3SNn0Da
OZOW WSO
31Va
'(s)4Luddayl i3gWnN 3snoHONli1'd37D 31V1
UZO OZOZ„0£
�;,..,..'... - :a3SWnN 4d13O8
Ile '1. ea q
i79-St 11 nVHd lddWi NIVIN NnMq$ SCIIM AIIO
VNV VINVS dO AIIO
11VW3
ignuE)dqLlsnOjAaJd(86110160'AOH)e9'£9LMda
JAMO3M HSVO 14d JNI'lld-IVIN3GVNOMIANS OZOZ
ollplIM pue Old Jo luewldedaa • ulwellle0lo aluls
"� "..:.,V i
ORANGE COUNTY REGISTER
2190 TOWNE CENTER PL, ANAHEIM, CA 92806
Telephone (714) 796.7000 1 Fax (714) 706.6069
r r i i i • � i
(2015.6 C.G,f?)
Stateof California )
County of ORANGE. ) ss
Notice Typo: SID -NOTICE INVITING13IDS
Ad Description:
10.8426:CITY WIDE SEWER MAIN IMPROVEMENTS PHASE 11
I am a oitizen of the United States and a resident of Iho State of California; I am
over the ago of eighteen years, and not party to or interested to the above
entitled matter. I am the principal clerk of the printer and publisher of the
ORANGE COUNTY REGISTER,a newspaper published In the English
language In The city of SANTA ANA, county of ORANGE, and adjudged a
newspaperof general circulation as defined by the laws of the State of
California by the Superior Court of the County or ORANGE,. State of California,
undordam 1111911906, Case No,-A21046. That the notice, 4t which the
annexed is a printed copy, has been published in each regular and entire issue
of Bald newspaper and not In any supplement thereof on the following dates,
to.wlt:
03/13/2020, 03114/2020
Executed om 03/14/2020
At SANTA ANA CA
I Corti (or declare) under penalty of perjury that the foregoing is true and
correct,
AZ
Signature
IIIIII
*
A
IIII
0
III
0
(III
0
IIIIIIII
0
0
�
5
II
3
III IIII
7
IIII
9
3
IIIIIIII
6
3
III
ama,l
lhls space agOnnglampooly
CITY OF SANTA ANA
BONDS
PROJECT NO.: 19-6426
PAYMENT BOND
BOND 11ES00001301
PREMIUM: INCLUDED IN
PERFORMANCE BOND
2020 ,tit 30 AM 8: 12
CITY OF icANT,a ANA
CLr?'( ;OUP�CIL
KNOW ALL MEN BY THESE PRESENTS that LUCAS BUILDERS, INC.
as CONTRACTOR, and EVEREST REINSURANCE COMPANY
a corporation, organized and existing under the laws of the State, and duly authorized to transact
business under the laws of the State of California, as SURETY, are held and firmly bound unto
the City of Santa Ana, as AGENCY, in the penal sum of ONE MILLION THREE HUNDRED
NINETY—NINE THOUSAND TWO HUNDRED EIGHT & 00/100 Dollars
($ 1, 399, 208.00 ), which is 100 percent of the total contract amount for the above stated
project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly
and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has
been awarded and is about to enter into the annexed Contract Agreement with.AGENCY dated
JULY 7, 2020 for CITYWIDE SEWER IMPROVEMENTS PHASE II
if CONTRACTOR or any subcontractor fails to pay for any labor or material of any kind used in
the performance of the Work of Improvement to be done under said Contract Agreement, or fails
to submit amounts due under the State Unemployment Insurance Act with respect to said labor,
SURETY will pay for the same in an amount not exceeding the sum set forth above, which
amount shall insure to the benefit of all persons entitled to file claims under the State Code of
Civil Procedures; provided that any alterations in the work to be done, materials to be furnished,
or time for completion made pursuant to the terms of the contract documents shall not in any
way release either CONTRACTOR or SURETY, and notice of said alterations is hereby waived
by SURETY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
A.15TH day of JULY , 20 20
CONTRACTOR* LUCAS BUILDERS, INC.; 510 E. JAMIE AVE., LA HABRA, CA 90631
BY: (310) 853-0690
EVEREST REINSURANCE COMPANY: 725 TOWN & COUNTRY, #400, ORANGE, CA 92868
FLAKE / ATTORNEY —IN —FACT
Subscribed and sworn to before me,
20
Signature:
Notary Public in and for the County of
State of
this day of
Rate of premium on this bond is $ 1% FLATE RATE per thousand.
Total amount of premium charge is $ 13,992 To be filled in by Surety
*Provide CONTRACTOR /ADMITTED SURETY name, address, and telephone number and the
name, title, address, and telephone number of authorized representative.
* CULBERTSON INSURANCE SERVICES, INC.; 5500 E. SANTA ANA CANYON ROAD, SUITE 201
ANAHEIM, CA 92807 (714) 921-0530
2 of 3
JU'_ 2 7 2320
JURAT FORM
A notary public or other officer completing this certificate verities only the
identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA )
COUNTY OF Orange
Subscribed and sworn to (or affirmed) before me on this 15th day of
July , 2020 by Spencer Flake
proved to me on the basis of satisfactory evidence to be the person(s) who appeared
before me.
ERIN SHERWOOD
' _ COMM. #2292388 m
� '98'<< NOTARY PUBLIC CALIFORNIA�
(NOTARY SEAL) ti ORANGE COUNTV
MY COMM. EXPIRES JULV O6, 2023,
NOTARY PUBLIC SIGNATURE, Erin Sherwood
OPTIONAL INFORMATION
THIS OPTIONAL INFORMATION SECTION IS NOT REQUIRED BYLAW BUT MAY BE BENEFICIAL TO PERSONS
RELYING ON TFHS NOTARIZED DOCUMENT,
TITLE OR TYPE OF DOCUMENT
DATE OF DOCUMENT
When executing a jurat, a notary shall administer an oath of affirmation to the affiant and shall
determine, from satisfactory evidence, that the affiant is the person executing the document. The
affiant shall sign the document in the presence of the notary.
EVE R Est
POWER OF ATTORNEY
EVEREST REINSURANCE COMPANY
DELAWARE
KNOW ALL PERSONS BY THESE PRESENTS: That Everest Reinsurance Company, a corporation of the State of Delaware
CCompam/) having its principal office located at 477 Martinsville Road, Liberty Corner, New Jersey 07938, do hereby nominate,
constitute, and appoint:
Charles L. Flake, Spencer Flake, David L. Culbertson, Heather Willis
its true and lawful Attorneys) -in -fact to make, execute, attest, seal and deliver for and on its behalf, as surety, and as its act and deed,
where required, any and all bonds and undertakings in the nature thereof, for the penal sum of no one of which is in any event to exceed
UNLIMITED, reserving for itself the full power of substitution and revocation.
Such bonds and undertakings, when duly executed by the aforesaid Aftorney(s)-in-fact shall be binding upon the Company as fully and to
the same extent as if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with 0s
corporate seal.
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board
of Directors of Company ("Board') on the 28th day of July 2016:
RESOLVED, that the President, any Executive Vice President, and any Senior Vice President and Anthony Romano are
hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behalf of the Company, any and all bonds,
undertakings, contracts or obligations in surely or co -surety with others and that the Secretary or any Assistant Secretary of the Company
be and that each of them hereby is authorized to attest to the execution of any such bonds, undertakings, contracts or obligations in
surety or cc -suety and attach thereto the corporate seal of the Company.
RESOLVED, FURTHER, that the President, any Executive Vice President, and any Senior Vice President and Anthony
Romano are hereby authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute, on
behalf of the Company, bonds and undertakings in surety or co -surety with others, and that the Secretary or any Assistant Secretary of
the Company be, and that each of them is hereby authorized to attest the execution of any such power of attorney, and to attach thereto
the corporate seal of the Company.
RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the
Company may be affixed to such powers of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or
certificate bearing such facsimile signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any
bond, undertaking, contract or obligation in surety or co -surety with others to which it is attached.
IN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to
be signed by their duly authorized officers this 28th day of July 2016,
.05urahce
Everest Reinsurance Company
eMlf O
v SEAL v
y ` 1973 W
*
Attest: Nicole Chase, Assistant Secretary
By: Anthony Romano, Vice President
On this 28th day of July 2016, before me personally came Anthony Romano, known to me, who, being duly swom, did execute the above
instrument; that he knows the seal of said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was
affixed thereto; and that he executed said instrument by like order.
LINDA ROBINS
York
Notary Public, State of New
No 0IR06239736
Qualified in Queens County
s{,�
! ,
w .-✓
V
Term Expires April 25, 2023
Linda Robins, Notary Public
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company, at the Liberty Corner, this _ 15th day
Of July 2020 .
ES 00 01 04 16
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL ..
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of Orange )
On July 20, 2020 before me, Priscilla Moonier, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Saman Silva
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person() whose name( is/ace
subscribed to the within instrument and acknowledged to me that he/sfwfidwy executed the same in
his/bwlftair authorized capacity(b*, and that by hisMA (ftojk signature(R) on the instrument the person(s),
or the entity upon behalf of which the person(W acted, executed the instrument.
PRISCILLA MOYNIER
Notary Public- California
Q-0
Orange County
Commission p 2235918
My Camm. Expires Apr 18, 2022
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature {Q���j(�
Signature of Notary Public
Place Notary Seal Above
OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: Payment Bond
Number of Pages:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
02014 National Notary Association • www.NationaiNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907
BOND 11ES00001301
CITY OF SANTA ANA PREMIUM: $13,992
BONDS
PROJECT NO.: 19-6426
KNOW ALL MEN BY THESE PRESENTS that LUCAS BUILDERS, INC.
as CONTRACTOR, and EVEREST REINSURANCE COMPANY
,
a corporation, organized and existing under the laws of the State, and duly authorized to transact
business under the laws of the State of California, as SURETY, are held and firmly bound unto
the City of Santa Ana, as AGENCY, in the penal sum of ONE MILLION THREE HUNDRED
NINETY-NINE THOUSAND TWO HUNDRED EIGHT & 00/100 Dollars
($ 1, 399, 208.00 ), which is 100 percent of the total contract amount for the above stated
project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly
and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has
been awarded and is about to enter into the annexed Contract Agreement with AGENCY dated
JULY 7, 2020 for CITYWIDE SEWER IMPROVEMENTS PHASE II
if CONTRACTOR faithfully performs and fulfills all obligations in the performance of the Work
of Improvement to be done under said Contract Agreement in the manner and time specified
therein, then this obligation shall be null and void, otherwise it shall remain in full force and
effect in favor of AGENCY; provided that any alterations in the obligations or time for
completion made pursuant to the terms of the contract documents shall not in any way release
either CONTRACTOR or SURETY, and notice of such alterations is hereby waived by
SURETY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
15TH day of JULY
20 20.
CONTRACTOR* LUCAS BUILDERS, INC 510 E. JAMIE AVE., LA HABRA, CA 90631
,kBY: — — (310) 853-0690
REINSURANCE COMPANY. 725 TOWN & COUNTRY, #400, ORANGE, CA 92868
SfENCER-PLAKE / ATTORNEY -IN -FACT
Subscribed and sworn to before me, this day of
20
Signature:
Notary Public in and for the County of State of
Rate of premium on this bond is $ 1% FLAT RATE per thousand.
Total amount of premium charge is $ 13,992 To be filled in by Surety
*Provide CONTRACTOR /ADMITTED SURETY name, address, and telephone number and the
name, title, address, and telephone number of authorized_ representative.
CULBERTSON INSURANCE SERVICES, INC.; 5500 E. SANTA ANA CANYON ROAD, SUITE 201
ANAHEIM, CA 92897 (714) 921-0530
I of 3
Mii1:7_�I1�
A notary public or other officer completing this certificate verifies only the
identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA )
COUNTY OF Orange
Subscribed and sworn to (or affirmed) before me on this 15th day of
July 2020 by Spencer Flake
proved to me on the basis of satisfactory evidence to be the person(s) who appeared
before me.
ERIN SHERWOOD
----� '...mot-..,,.._ COMM. #22923aa t�
g �% �` NOTARY PUBLIC-CALIFORNIA�
(NOTARY SEAL l ORANGE COUNTY
MY COMM, EXPIRES JULY O8; 9m,
NOTARY PUBLIC SIGNATURE, Erin Sherwood
OPTIONAL INFORMATION
THIS OPTIONAL INFORMATION SECTION IS NOT REQUIRED BY LAW BUT MAY BE BENEFICIAL TO PERSONS
RELYING ON THIS NOTARIZED DOCUMENT.
TITLE OR TYPE OF DOCUMENT
DATE OF DOCUMENT
When executing a jurat, a notary shall administer an oath of affirmation to the affiant and shall
determine, from satisfactory evidence, that the affiant is the person executing the document. The
affiant shall sign the document in the presence of the notary.
ti
Z7vE R ES -
POWER OF ATTORNEY
EVEREST REINSURANCE COMPANY
DELAWARE
KNOW ALL PERSONS BY THESE PRESENTS: That Everest Reinsurance Company, a corporation of the State of Delaware
('Company') having its principal office located at 477 Martinsville Road, Liberty Corner, New Jersey 07938, do hereby nominate,
constitute, and appoint:
Charles L. Flake, Spencer Flake, David L. Culbertson, Heather Willis
its true and lawful Attorney(s)-in-fact to make, execute, attest, seal and deliver for and on its behalf, as surety, and as its act and deed,
where required, any and all bonds and undertakings in the nature thereof, for the penal sum of no one of which is in any event to exceed
UNLIMITED, reserving for itself the full power of substitution and revocation.
Such bonds and undertakings, when duly executed by the aforesaid Attomey(s)-in-fact shall be binding upon the Company as fully and to
the same extent as if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with its
corporate seal.
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board
of Directors of Company ("Board") on the 28th day of July 2016:
RESOLVED, that the President, any Executive Vice President, and any Senior Vice President and Anthony Romano are
hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behalf of the Company, any and all bonds,
undertakings, contracts or obligations in surety or co -surety, with others and that the Secretary or any Assistant Secretary of the Company
be and that each of them hereby is authorized to attest to the execution of any such bonds, undertakings, contracts or obligations in
surety or co -surety, and attach thereto the corporate seal of the Company.
RESOLVED, FURTHER, that the President, any Executive Vice President, and any Senior Vice President and Anthony
Romano are hereby authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute, on
behalf of the Company, bonds and undertakings in surety or co -suety, with others, and that the Secretary or any Assistant Secretary of
the Company be, and that each of them is hereby authorized to attest the execution of any such power of attorney, and to attach thereto
the corporate seal of the Company.
RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the
Company may be affixed to such powers of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or
certificate bearing such facsimile signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any
bond, undertaking, contract or obligation in surety or co -surety with others to which it is attached.
IN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to
be signed by their duly authorized officers this 28th day of July 2016.
.Urarft,P
9((��
p. poggt.'
~ `0,f 3
SEAL a
y ' 1973 ;
y% -. tiIAWP{e f
jo"'
Attest: Nicole Chase, Assistant Secretary
Everest Reinsurance Company
By: Anthony Romano, Vice President
On this 28th day of July 2016, before me personally came Anthony Romano, known to me, who, being duly swom, did execute the above
instrument; that he knows the seal of said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was
affixed thereto; and that he executed said instrument by like order.
LINDA ROBINS
Notary Public, State of New York -�
No 01R06239736
Qualified in Queens County
Term Expires April 25, 2023
Linda Robins, Notary Public
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company, at the Liberty Corner, this 15th day
of July 202O .
ES 00 01 04 16
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189
.crs-e-
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of Orange )
On July 20, 2020 before me, Priscilla Moonier, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared
Names) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(R) whose name(sr) is/are
subscribed to the within instrument and acknowledged to me that he/stxerd wi executed the same in
his/1wlibmir authorized capacity(ko, and that by his/i *Rk signature(R) on the instrument the person(s),
or the entity upon behalf of which the person( acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official
seal.
PRISULLA MOYNIER i
Notary
Public - California
•�: = Orange County Signature
Commission p 2235918 Signature of Notary Public
My Comm. Expires Apr 18. 2022
Place Notary Seal Above
OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: Faithful Performance Bond
Number of Pages:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other.
Signer Is Representing:
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
02014 National Notary Association • www.Nationa]Notary.org - 1-800-US NOTARY (1-800-876-6827) Item #5907
MAR 1 9 2021
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426; Citywide Sewer Main Improvements Phase II Change Order Number 1
To Lucas Builders, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
EXTRA WORK AT TIME & MATERIALS
1) To compensate the contractor for costs associated with the removal of a 14-inch asphalt street
section at Second and Broadway in lieu of a contract 6-inch asphalt section during construction
(PCO No. 5).
TOTAL COST = $3,060.66
2) To compensate the contractor for costs associated with unmarked concrete encasement and two
abandoned 3-inch lines during construction (PCO No. 6).
TOTAL COST = $12,747.33
3) To compensate the contractor for costs associated with unmarked utility services at Stations STA.
10+05, STA. 8+95 & STA. 8+88 during construction (PCO No. 8).
TOTAL COST = $9,684.43
4) To compensate the contractor for costs associated with unmarked utility services at Station 8+75
during construction (PCO No. 9).
TOTAL COST = $9,321.98
5) To compensate the contractor for costs associated with unmarked 2-inch water service at Station
10+10 during construction (PCO No. 14).
TOTAL COST = $8,952.34
6) To compensate the contractor for costs associated with unmarked 1-inch water service at Station
13+10 during construction (PCO No. 15).
TOTAL COST = $1,949.57
7) To compensate the contractor for costs associated with the removal of a 14-inch asphalt street
section at Townsend in lieu of a contract 6-inch asphalt section during construction (PCO No. 24).
TOTAL COST = $5,373.11
Page 1 of 3
EXTRA WORK AT AGREED PRICE
8) To compensate the contractor for costs associated for paving the entire street on Second Street
and the Second Street and Broadway intersection per PCO 11.
TOTAL COST = $29,468.24
TOTAL AGREED PRICE _ $80,557.66
Page 2 of 3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426 Citywide Sewer Main Improvements Phase II Change Order Number
To Lucas Builders, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation
includes payment for all work contained in this change order, plus all payment for interruption of
schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or
cumulative impact on all other work under this Contract. The signing of this change order constitutes full
mutual accord and satisfaction for all changes and work performed on this project, and that the time and
cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of
himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation
of any whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ _______________ INCREASE $ 80,557.66
By reason of this order the CONTRACT TIME completion will be adjusted as follows: 15 working days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide
all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept
as full payment therefor the prices shown above.
Accepted, Date Contractor Lucas Builders, Inc.
�� �,lwry�w»ear„y.osw
By Yongjoo SaTitle
�o`�rammu,°..,sfnmm 6
Approval recommended by Date �j f 0 2A2
PUBLIC WORKS AGENCY EXECUTIVE DIRECTOR
Approved by ` Date 21Z t-
CITYM�AGER
Page 3 of 3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426; Citywide Sewer Main Improvements Phase II Change Order Number 2
To Lucas Builders, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTILAPPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time,
Change requested by
EXTRA WORK AT TIME & MATERIALS
PUBLIC WORKS AGENCY
1) To compensate the contractor for costs associated with the removal of asphalt pavement failure
as a result of inadequate subgrade (PCO No. 10).
TOTAL COST = $3,067.40
2) To compensate the contractor for costs associated with using crushed miscellaneous base in lieu
of sand for trench zone backfill on Second Street near Broadway (PCO No. 13).
TOTAL COST = $962.55
3) To compensate the contractor for costs associated with two unmarked communications services
at Stations STA. 12+86 and STA. 12+76 during construction (PCO No. 16).
TOTAL COST = $6,156.02
4) To compensate the contractor for costs associated with the new Standard Plan No. 1204 for two-
way wye's in lieu on one way wyes during construction (PCO No. 18).
TOTAL COST = $872.48
5) To compensate the contractor for costs associated with unmarked gas service at Station 11+55
during construction (PCO No. 19).
TOTAL COST = $12,925.04
6) To compensate the contractor for costs associated with unmarked gas service at Station 11+19
during construction (PCO No. 20).
TOTAL COST = $12,162.53
7) To compensate the contractor for costs associated with unmarked water service at Station 15+64
during construction (PCO No. 21).
TOTAL COST = $3,542.25
8) To compensate the contractor for costs associated with two (2) unmarked utility lines per PCO
22.
TOTAL COST = $1,802.98
Page 1 of 3
9) To compensate the contractor for costs associated with using crushed miscellaneous base in
lieu of sand for trench zone backfill on Second and Townsend per PCO 26.
TOTAL COST = $5,293.37
10) To compensate the contractor for costs associated for water main break per PCO 27.
TOTAL COST = $6,408.47
11) To compensate the contractor for pipe bursting costs associated for house address 1924 at
Station 10+60 and House address 1911 at Station 1911 per PCO 28.
TOTAL COST = $5,018.07
TOTAL AGREED PRICE = $58,211.16
Page 2 of 3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426; Citywide Sewer Main Improvements Phase II Change Order Number
To Lucas Builders, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation
includes payment for all work contained in this change order, plus all payment for interruption of
schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or
cumulative impact on all other work under this Contract. The signing of this change order constitutes full
mutual accord and satisfaction for all changes and work performed on this project, and that the time and
cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of
himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation
of any whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $
By reason of this order the CONTRACT TIME completion will be adjusted as follows: 12 working days
INCREASE $ 58,211.16
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide
all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept
as full payment therefor the prices shown above.
Accepted, Date VA7-1-$onntractor
By Title
Approval recommended by _
Lucas Builders, Inc.
PUBLIC WORKS AGENCYEXECUTIVE DIRECTOR
Date 7 (-, - ZOZI
Approved by �-' j�-:.�,,�_ Date
CITI"MANAGER
Page 3 of 3
ly-
. OF �A INA
Ma g�l
PUBLIC W 'EIN,
CONTRACdA.`,",j _jM.q
Pltywide 1! 0hqr@e Order NurA.Wer
0"
v U itWjw,
idl NOW to N W the Wpp'tfi ghgpgqsftom olo. p or, o Work OR lhol dad h d *ns 00
i' N A
#
w
kOf�F F o'moo gy
WRIS T
RANIF190i
q,
aced
P
n
il OF
CW
'01
j Mud
66
!l: i Fps"..,
?
1.0SF
3,OOD,
Zoo,
1.00Q
'sf-
Z000; -
SF. t.
8, 0 0
UP
,�robh
�x
ESTIMATED TOTAL = $260,000.00
Page 1 of 2
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426; Citywide Sewer Main Improvements Phase II Charge Order Number
To Lucas Builders, Inc. Contractor
You are hereby directed to make the herein danger; from the plans and specification or do the following described work not brcluded in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowancewD be made for Idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation
includes payment for all work contained in this change order, plus all payment for interruption of
schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or
cumulative impact on all other work under this Contract. The signing of this change order constitutes full
mutual accord and satisfaction for all changes and work performed on this project, and that the time and
cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of
himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation
of any whatsoever to file any further claim related to this project.
TOTAL COSTTHIS CHANGE ORDER: DECREASE $....... ....... INCREASE $ 250000
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Forty-five (45) Working Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide
all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above spedfied, and will accept
as full payment therefor the prices shown above.
Accepted, Date �' S Z Contractor Lucas Builders, Inc.
By 1liY too 1 Tide
f1� jG>C. 1 LQn�Cx�rP/
Approvalremmmended byn i�-t �--�Y V 9 - Date t 12S2.6 2-2—
PUBLIC WORKSAGENCY EXECU/T%IVE DIRECTOR
-�
Approved by (/ Dale f%/$C z 2
CITYMANAGER
Page 2 of 2
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426; Citywide Sewer Main Improvements Phase If Change Order Number 4
To Lucas Builders, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise staled, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
DELETE WORK AT CONTRACT UNIT PRICE
1) Delete the following bid items 26 and 28.
ESTIMATED ESTIMATED
ITEM # DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
26
PCC Curb and Gutter (Type B-1) 40 LF $144.00 ($5,760.00)
28
Adjust Manhole Valve Frame and 8 EA $600.00 ($4,800.00)
Cover
EXTRA WORK AT TIME & MATERIALS
1) To compensate the contractor for costs associated with the cost of material increase related with
the physical shortage of goods also known as force majeure (PCO No. 1).
TOTAL COST = $9,742.09
2) To compensate the contractor for costs associated with the realignment of the sewer main and
the encased 16 cell telecommunication duck in conflict with the proposed mainline connection on
Bush Street south of Fourth Street (PCO No. 29).
TOTAL COST = $37,251.82
3) To compensate the contractor for costs associated with an unmarked communications services
and utilities along Bust Street from First Street to Fourth Street at Stations STA. 12+62, 12+64,
12+68, 13+15,13+25, 14+37, 14+41, 14+88, 14+65.5, 14+69, 15+09.5, 15+41, 15+43, 15+66,
15+69, 15+93, 15+96, 16+42,16+53.5, 16+86, 16+92, 17+49, 17+75, 17+93, and 17+68 (PCO
No. 29.1).
TOTAL COST = $39,364.60
4) To compensate the contractor for costs associated with unmarked encased conduit at Station
17+46 during construction (PCO No. 29.2).
TOTAL COST = $5,260.00
Page 1 of 3
5) Compensate the contractor for costs associated with slurry backfill from Station 14+15 to Station
14+39, approximately twenty-four linear feet (PCO No. 34).
TOTAL COST = $4,927.00
6) Compensate the contractor for costs associated with an unmarked water and utility lines at
Station 17+40 during construction per PCO No. 36.
TOTAL COST = $12,827.94
7) Compensate the contractor for costs associated with crushed aggregate base in lieu of sand in
order to provide a structural base for the pavement section per PCO No. 39.
TOTAL COST = $4,975.00
8) To compensate the contractor for costs associated with the removal of an increased asphalt
street section along Bush Street per PCO 40.
TOTAL COST = $8,850.00
9) Compensate the contractor for costs associated with crushed aggregate base in lieu of sand in
order to provide a structural base for the pavement section per PCO No 41.
TOTAL COST = $5,849.53
TOTAL AGREED PRICE _ $118,487.98
Page 2 of 3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6426; Citywide Sewer Main Improvements Phase It Change Order Number
To
Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTILAPPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation
includes payment for all work contained in this change order, plus all payment for interruption of
schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or
cumulative impact on all other work under this Contract. The signing of this change order constitutes full
mutual accord and satisfaction for all changes and work performed on this project, and that the time and
cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of
himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation
of any whatsoever to file any further claim related to this project.
TOTALCOSTTHIS CHANGE ORDER: DECREASE $ --------------- INCREASE $ 118,487.98
By reason of this order the CONTRACT TIME completion will be adjusted as follows: 30 working days.
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide
all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept
as full payment therefor the pdces shown above.
Accepted, Date 6-15-22 Contractor Luc under
By Title
Sam Silva I
Approval recommended by Date
PUBLIC WORKS AGENCY EXECUTIVE DIRECTOR
Approved by � Date a - 26 — Zb zL.
CITYMANAGER
Page 3 of 3