`" This CONSTRUCTION CONTRACT is made and entered into this 20 day of April, 2020 by and
-3' between the City of Santa Ana, California, a charter city and municipal corporation organized and
N existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Crosstown
Electrical and .Data, Inc. (hereinafter "CONTRACTOR').
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Traffic Signal Equipment Replacement Project
(hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with
the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed Sixty Nine Thousand Eight Hundred
Thirty Seven Dollars and No Cents ($69,837.00), as set forth and identified in the BID PROPOSAL,
which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work as may be deemed necessary or
advisable.
rev. 09/012017 Page I of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeftame therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at:
http://www.santa-ana.orgipwa/documents/CWA.vd
CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (1001/o) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials fumished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
H
Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
7 Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By; Jg. -f
J HN FUNK
Assistant City Attorney
RECO ,ENDED FOR APPROVAL:
NAL SABA, PE
Acting Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
Crosstown Electrical and Data, Inc.
-ze!s=g—
NAME: David Heermance
TITLE: President
Page 3 of 3
City of Santa Ana Pace 1
Traffic Signal Equipment Replacement (20.6914), bidding on March 18, 2020 2:00 PM (Padnc) Printed 041OW2020
Bid Results EXHIBIT A
Bidder Details
Vendor Name
CROSSTOWN ELECTRICAL 8 DATA, INC.
Address
5454 DIAZ ST.
IRWINDALE, CA 91706
United States
Respondee
David Heennance
Respond** Title
President
Phone
6264113.6693 ExL
Email
dava@crosebwndata.com
VandorType
CADIR
License#
756309
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
Match 18, 2020 1:51:38 PM (Padnc)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
205640
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Tide File Name
File Type
Proposal Croastown Santa Ana Proposal 20-6914.pdf
General Attachment
CROSSTOWN -BOND Santa Ana Bid Bond CROSSTOWN.pdf
Bid Bond
CROSSTOWN -OWNERSHIP AFFIDAVIT Santa Ana Ownership AO CROSSTOWN.pdf
Ownership Affidavit
CROSSTOWN -NON COLLUSION AFFIDAVIT Santa Ana Non Collusion CROSSTOWN.pdf
Non -Collusion Affidavit
Line Items
Type Item Code UOM city Unit Price
Una Total Comment
Bass Bid Proposal
1 Replace Mast Arm Mounted 3-Section Traffic Signal Vehicle Head Assembly
EA 82 $787.00
$64.534.00
2 Replace Most Arm Mounted 4•Sectlon Tropic Signal Vehicle Head Assembly
EA 1 $893.D0
$893.00
3 Replace Top Mounted 3•sectlon Traffic Signal Vehicle Head Assembly
EA 1 $1.045.00
$1,046.00
4 Replace Side Mounted 3-Section Traffic Signal Vehicle Head Assembly
EA 2 $1,045.00 52,090.00
5 Replace Top Mounted Mecilon Tragic Signal Vehlde Head Assembly
FA 1 $1,276.00 $1,276.00
Pianet8ide, Inc.
City of Santa Ana
Traffic Signal Equipment Roplacemant (21-6914), bidding on March 76, 2020 200 PM (Pacific)
Bid Results
Type Item Code
UOM City
Plana(®ids, Inc.
Unit price
Subtotal
Total
Pe6e2
Printed 0410612020
EXHIBIT A
Line Total Comment
$69,677.00
$60,637.00
CITY OF SANTA ANA
PROPOSAL EX H IB rr A
PROJECT NO.: 20-6914
TRAFFIC SIGNAL EQUIPMENT REPLACEMENT
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: CROSSTOWN ELECTRICAL 6 DATA, INC.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with
said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the
following schedule:
Item
Description
Qty
Unit
Unit Price
Amount
I
Replace Mast Arm Mounted 3-Section
81
EA
S
S
Traffic Signal Vehicle Head Assembly
787.00
64,534.00
2
Replace Mast Arm Mounted 4-Section
I
EA
$
$
Traffic Signal Vehicle Head Assembly
893.00
893.00
3
Replace Top Mounted 3-section Traffic
1
EA
S
S
Signal Vehicle Head Assembly
1,045.00
1,045.00
4
Replace Side Mounted 3-Section
2
EA
S
S
Traffic Signal Vehicle Head Assembly
1,045.00
1,045.00
5
Replace Top Mounted 5-Section
I
EA
S
$
Traffic Signal Vehicle Head Assembly
1
1,275.00
1,275.00
P-1 of P-16
CITY OF SANTA ARIA
PROPOSAL
PROJECT NO.: 20-6914
TRAFFIC SIGNAL EQUIPMENT REPLACEMENT
TOTAL BASE BID FOR PROJECT:20-6914 s 69,837.00
EXHIBIT A
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
' The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25°Ao" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
i This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS-ANID—LIOUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within Iixty (60) MrkingdaU after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $1,000 per calendar day.
Name of Firm
Signature of BI
Title PRESIDENT
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
David Heermance, President
Wendy Parker, Vice President
Andrea Heermance, Secretary
Ben Heermance, CFO
P-2 ofP-16