Loading...
HomeMy WebLinkAboutPresentation - #05 Speed Humps –Policy Update CITY COUNCIL MEETING ITEM 05 JULY 20, 2021 CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 Policy Background Policy developed in 1998. Goal -improve safety through use of speed humps. Previous policy procedure contained 10 steps. Revised policy procedure has been streamlined. Procedures now contains 4 steps. Technical requirements are similar. Posted Speed Limit of 25. Vehicle counts between 500 and 3,500 vpd. CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 2 What are Speed Humps? Speedhumpsareraisedsectionsofpavementlaintransverseto roadwaytravellanes,whicharedesignedtodecreasevehiclespeed. CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 3 What are Speed Bumps? Speed bumps are a more abrupt method to decrease vehicle speeds and are used in parking lots. CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 4 Speed Cushion Pilot CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 5 Where are humps/cushions installed? Local streets –single lane collector or residential classification, not a primary fire access and not a transit route. Consistent hump specifications used to achieve compatibility. Technical requirements are consistent with region. Blocks where speed limit is 25 mph (cannot be used on higher limits). Daily counts are ADT: 500 to 3,500 vpd. Adequate amount of space, block length, and block layout. th Measured speed (85%) is higher than or equal to 34 mph. Unimpeded visibility. OC Fire Authority approval needed. CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 6 How to Request Speed Humps/Cushions Request received by staff. Step 1 -Verify that all technical requirements are met. Step 2 –Verify 75% of segment residents are interested. Steps 1 and 2 are completed concurrently. Step 3 -Determine priority and identify funds for priority. Step 4 –Conduct poll of street segment residents. If 2/3 of residents support request, installation moves forward. If support is insufficient, new request may be submitted after two years. CITY OF SANTA ANA, PUBLIC WORKS AGENCY, 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92702 7