May 21, 2020
Mr. Minh Thai
Executive Director
City of Santa Ana
Planning and Building Agency
PO BOX 1988 (M-20)
Santa Ana, CA 92702
SUBJECT: FINAL ENVIRONMENTAL IMPACT REPORT AND RESPONSES TO COMMENTS FOR THE BOWERY
MIXED-USE PROJECT IN THE CITY OF SANTA ANA
Dear Mr. Thai:
Thank you for this opportunity to relay our significant ongoing concerns regarding the potential impacts to the City
of Tustin from The Bowery Mixed-Use Project proposed at the southwesterly corner of Red Hill Avenue and Warner
Avenue, which is directly adjacent to the City of Tustin and the Tustin Legacy master planned community.
The proposed project consists of the development of a 14.58-acre site with 1,150 multiple family residences within
five-story to six-story buildings, wrapped parking structures, and 80,000 square feet of retail and restaurant
commercial space. Also proposed is approximately 174,555 square feet of open space within courtyards, common
areas, roof decks, perimeter plazas, and other open space areas. The project requires a proposed General Plan
Amendment from Professional and Administrative Office to a mixed-use designation and a Zone Change from Light
Industrial to Specific Development.
In a letter dated February 5, 2020 (Attachment A), the City of Tustin provided comments to the City of Santa Ana on
the Draft Environmental Impact Report (DEIR) for the Bowery Mixed-Use Project. On April 27, 2020, the City of Santa
Ana released the Final EIR and Responses to Comments on the DEIR for the Project, which was received by the City
of Tustin Community Development Department on May 7, 2020. In response to our request for a continuance and
to the concerns raised by others, the Santa Ana Planning Commission continued the hearing to May 26, 2020.
City of Tustin staff has reviewed the Final EIR and the responses to our comments contained therein (Attachment B),
and believe that none of the City’s significant comments or concerns regarding traffic, cumulative impacts, or impacts
to Tustin parks that were identified in the February 5, 2020 letter has been adequately addressed or mitigated in the
FEIR. Therefore, the City of Tustin requests that the Planning Commission continue the May 26, 2020 public hearing
and not make a recommendation to the Santa Ana City Council on this project until our concerns have been
addressed and mitigated.
Bowery Mixed-Use Project
May 21, 2020
Page 2
The City of Tustin has the following ongoing concerns which were not adequately addressed in the DEIR or the FEIR.
1. The City of Santa Ana is continuing to take a noncomprehensive approach with new development proposed
along the Red Hill Avenue corridor. The Bowery is the second significant mixed-use project to be considered
recently in the area and prior to the completion of the Santa Ana General Plan Update, which is currently
underway and contemplates land use intensifications in several areas of Santa Ana. This project sits squarely
within one of the focus areas for the City’s General Plan Update, an update that is already in the planning
stages and thus, should be analyzed in the cumulative impacts analysis. The cumulative impacts of these
large-scale projects need to be addressed comprehensively so that they can be properly identified and
mitigated or avoided. Instead, the FEIR improperly defers the cumulative impacts analysis to some time
after this project is considered for approval. Further, the consideration and adoption of multiple project-
specific General Plan Amendments on a frequent basis is discouraged by State law and prohibited more than
four (4) times per year for general law cities (such as the City of Tustin.) The City of Santa Ana has routinely
adopted site-specific General Plan Amendments to accommodate higher density development in recent
years throughout the City, prior to completing its comprehensive General Plan Update, and this is contrary
to sound planning principles.
2. Walkways and paseos, unusable perimeter landscape areas, private open space such as balconies, and other
passive open space areas are being credited toward The Bowery project’s minimum park land requirement.
These areas are not equivalent to usable park land that usually accommodates sports fields and larger
recreational spaces that are in high use and demand throughout Orange County. It is interesting to note
that at least one (1) of the Santa Ana Planning Commissioners also expressed a concern at the May 11, 2020
public hearing regarding walkways being counted as park space or open space.
3. The FEIR does not include mitigation measures to address the impacts to parks in Tustin. Instead, the FEIR
claims that impacts are not significant and that sports league park usage fees fund maintenance and
improvements. Mitigation to fund park maintenance and improvements in Tustin should be required of The
Bowery project due to its proximity to Tustin parks. Alternatively, a park should be included on or near The
Bowery site, and/or the project density should be reduced. The Final EIR acknowledges that parks in Santa
Ana and Tustin would generally be accessed by vehicle and that the parks are beyond a 12-minute walking
distance. This acknowledgement supports the need to require a new park facility on, or adjacent to, The
Bowery site.
4. The City of Tustin continues to be concerned about the use of discounts to reduce project trip generation
and is reviewing the Final Traffic Impact Analysis traffic dated April 14, 2020 that was included in the Final
EIR to determine other specific outstanding concerns and potential impacts to Tustin. Potential traffic
impacts have been grossly underestimated.
5. The traffic analysis is flawed because it does not use existing conditions as the baseline. The traffic
analysis projects existing traffic impacts based on a trip generation model for industrial uses as if the site
was being fully utilized, which has not been the case since at least 2017. That in turn inflates the
appearance of existing traffic and makes the increase in traffic caused by the project appear smaller than
it actually will be. The use of the incorrect baseline analysis affects both VMT and LOS analyses.
Bowery Mixed Use Project
May 21, 2020
Page 3
6. The airplane noise analysis bases its impacts on where the project is located with respect to JWA’s noise
contours and there does not appear to have been any actual noise readings taken on site. An adequate
noise evaluation would include actual noise readings at the project site rather than an extremely broad
criteria such as an airport’s regional noise contour. The limited noise readings that are referenced in the
EIR appear to be the background noise, i.e., vehicular traffic and sources other than the noise most likely
to irritate residents – aircraft landing at, and departing from, the airport. Noise readings should be taken
to determine actual existing noise conditions to determine whether they fall within a level that is
acceptable for residential development and/or one which requires additional noise attenuation.
7. The FEIR appears to ignore the fact that the project is a residential use proposed in the middle of an
industrial and office/professional area. The FEIR concludes that the residents would have convenient
access to walking, biking and existing transit and this would reduce vehicle trips, for instance. However,
there is nothing about the setting of this project that supports a conclusion that people will be walking
or biking to work, given it is bounded either by industrial uses or major arterials.
8. The reduced project alternative is environmentally superior, but is dismissed on inadequate grounds.
Thank you again for the opportunity to express our ongoing concerns regarding the proposed project. The City of
Tustin would appreciate an additional continuance by the Santa Ana Planning Commission, and City staff is available
to discuss our concerns so that they can be addressed prior to a decision by the Santa Ana Planning Commission or
City Council.
If you have any questions regarding the City’s concerns, I can be reached at (714) 573-3031 or ebinsack@tustinca.org.
Sincerely,
Elizabeth A. Binsack
Community Development Director
Attachments: A - Letter dated February 5, 2020
B - Responses to City of Tustin Comments
cc: Ali Pezeshkpour, Senior Planner, Santa Ana Planning and Building Agency
Jerry Guevara, Assistant Planner I, Santa Ana Planning and Building Agency
Matthew S. West, City Manager
Nicole Bernard, Assistant City Manager
David Kendig, City Attorney
Douglas S. Stack, Public Works Director
Chad Clanton, Parks and Recreation Director
Ken Nishikawa, Deputy Director of Public Works/Engineering
Chris Koster, Deputy Director of Economic Development
Justina Willkom, Assistant Director – Planning
Krys Saldivar, Public Works Manager
Scott Reekstin, Principal Planner
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-49
Final EIR
April 2020
LETTER A8 City of Tustin (5 pages)
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-50
Final EIR
April 2020
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-51
Final EIR
April 2020
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-52
Final EIR
April 2020
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-53
Final EIR
April 2020
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-54
Final EIR
April 2020
This page intentionally left blank.
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-55
Final EIR
April 2020
Letter A8: City of Tustin
Comment 1: This comment describes the proposed Project and states that the City is concerned with the
significant changes in land uses (i.e., from commercial and industrial buildings to residential mixed use) along
Red Hill Avenue, Warner Avenue, and Dyer Road that are proposed by the Project and have occurred
recently with the approval and construction of The Heritage project at 2001 East Dyer Road. The comment
also states that the City of Santa Ana has already demonstrated that land use intensifications will likely
continue, as evidenced by proposed land use changes in the Santa Ana General Plan Update, and while
individually each project may cause relatively modest changes in traffic patterns or impacts to parks, the
cumulative impacts are likely to be substantial. Therefore, the comment states that there should be some
overall projections of the anticipated changes in land uses, so the cumulative impacts related to traffic and
parks and the associated mitigation can be documented. The comment also states that the Santa Ana General
Plan Update or a focused General Plan Amendment for the Red Hill Avenue corridor should be completed
before the proposed Project is considered so that cumulative impacts are properly analyzed and mitigated.
Response 1: This comment provides concerns related to overall growth from land use intensifications and
related cumulative impacts. Cumulative impacts are evaluated throughout Chapter 5 of the Draft EIR pursuant
to the requirements of CEQA. The EIR is a “Project” EIR. As described in CEQA Guidelines Section 15161, a
“Project” EIR should focus primarily on the changes in the environment that would result from the development
project. A project EIR’s evaluation of cumulative impacts may be based on a list of past, present, and
probable future projects producing related impacts (CEQA Guidelines Section 15130(b)(1)(A)). “Probable
future projects” include those for which an actual development application has been filed and for which
actual environmental review is underway (San Franciscans for Reasonable Growth v. City & County of San
Francisco (1984) 151 Cal.App.3d 61, 74). The City of Santa Ana sets the date of the project’s Notice of
Preparation (NOP) as the reasonable cutoff date for determining what projects have environmental review
underway and should be included in the cumulative impacts analysis (See Gray v. County of Madera (2008)
167 Cal.App.4th 1099, 1128 [reasonable to set a project’s application date as the cutoff]). Cumulative
CEQA review for future projects that submitted applications after publication of the NOP for the proposed
Project would include the proposed Project in their cumulative analyses, as appropriate. In addition, CEQA
Guidelines Section 15130(b)(1) states that it is appropriate for cumulative analysis to utilize projections
contained in an adopted local, regional or statewide plan, related planning document, or regionally
accepted criteria thresholds; or a reasonable combination of the two.
For example, pursuant to CEQA, the cumulative noise analyses in the Draft EIR is based on identification of
the closest project on the list of known projects and whether if it within hearing distance of the project site;
whereas the cumulative analyses of air quality emissions are based on emissions thresholds identified by the
South Coast Air Quality Management District (SCAQMD). The cumulative population and household analyses,
and related growth impacts (such as park and recreation) is based upon a combination of the Southern
California of Governments (SCAG) growth projections and the list of known cumulative projects within the
Santa Ana, Irvine, and Tustin, and Newport Beach area. Similarly, cumulative traffic analyses are based on
the growth projections from the Orange County Transportation Analysis Model (OCTAM) and the number of
vehicular trips from the list of cumulative projects within the traffic study area that is provided in the Draft
EIR. Based on these growth projections, the Draft EIR includes mitigation measures to reduce cumulative
impacts. The cumulative analyses differ with each environmental topic because the geographic scope and
other parameters of each cumulative analysis discussion can vary, and mitigation is incorporated as needed,
as described for each environmental topical section in the Draft EIR. Thus, based on the CEQA requirements
for a “project” EIR, the Draft EIR has properly analyzed and mitigated cumulative impacts.
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-56
Final EIR
April 2020
However, the City is currently also working through preparation of an EIR for the General Plan Update. The
NOP for the EIR for the General Plan has been released for a 30-day public review from February 26,
2020 to March 27, 2020 and identifies the anticipated growth throughout the City, as broken down into
Focus Areas and Specific Plan areas. In addition to the project level CEQA required cumulative analysis that
was prepared by the Draft EIR, the General Plan Update EIR will include evaluation of the anticipated
changes in land uses and growth throughout the City, including those in the vicinity of the Project site, and
provide an appropriate cumulative analysis, with mitigation, as needed.
Comment 2: This comment states that the open space proposed by the Project this area includes private
open space and perimeter open space and is not equivalent to park land provided, and the Project should
be required to provide land for park and recreational purposes to meet the City of Santa Ana's minimum
standard of 2 acres of property devoted to parks and recreational purposes for each thousand persons
residing within the City of Santa Ana. The comment also states that if on-site parkland is not required for the
proposed Project parkland facilities in Tustin may be impacted and must be mitigated. The comment states
that the analysis of the Project's compliance with the City's park standards should focus on the potential to
physically deteriorate existing and future recreational facilities in the City of Tustin, as the nearest existing
and planned large scale recreational facilities are located in the City of Tustin.
Response 2: As detailed in Section 3.0, Project Description, the proposed Project includes 174,555 square
feet of exterior open space recreation area and approximately 8,008 square feet of interior amenities to
total 183,363 square feet of recreational and open space onsite. Each of the four residential buildings
would have a recreational open space area that would include a pool, spa/hot tub, outdoor kitchen, seating
areas, fitness center, and club room. These onsite amenities are anticipated to meet many of the park and
recreation needs of Project residents. Based on a standard of 2 acres of public park and/or recreational
space per 1,000 residents (Municipal Code Section 35-108), the proposed Project would require 4.2 acres
of parkland to serve the new residents; and the Project includes a total of 4.2 acres (183,363 square feet)
of park and recreation area. Therefore, the Project would include the Municipal Code required park and/or
recreational space. In addition, the 81.88 acres of Santa Ana parkland within 3-miles of the Project site
provides a variety of facilities that include sports fields, exercise equipment, picnic areas, and playgrounds
to serve the park and recreational needs of the Project residents and employees.
Page 5.13-7 of the Draft EIR states that based on the California State Parks3 information for the Southern
California Region, the anticipated number of Project residents at full occupancy (2,081 residents), the
distance and type of recreational facilities near the Project site, it is anticipated that the Project would
generate 348 additional park users two or more times per week, 287 additional park users about once per
week, 429 additional park users once or twice per month, 508 additional park users several times a year,
and 314 additional park users once or twice a year. The California State Parks information also states that
users spent an average of 30 minutes per visit. This level of use would average approximately sixteen 30-
minute users per week per acre of Santa Ana parkland within 3 miles of the Project site. Including the City
of Tustin and Irvine parkland within 3 miles of the Project site (totaling approximately 243.38 acres), the
level of use would average approximately five 30-minute users per week per acre of parkland. In addition,
use of sports fields by approximately 14 percent of adults and 33.1 percent of those under 18 years old
that utilize park and recreation facilities (per California State Parks data) is largely used by organized
sports leagues that pay fees to the City in which they are in for use of the facilities, which is used to fund
maintenance and improvements related to use of the facilities. Based on this level of use and sport league
fees associated with sports field/court use, the Project is not anticipated to increase the use of existing and
3 Draft EIR Section 5.13, Parks and Recreation, and California State Parks, Survey on Public Opinions and Attitudes
on Outdoor Recreation in California, January 2014 (California State Parks 2014). Accessed:
https://www.parks.ca.gov/pages/795/files/2012%20spoa.pdf
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-57
Final EIR
April 2020
future parks and recreation facilities, including those in the City of Tustin, such that substantial physical
deterioration of any facility would occur or be accelerated.
Comment 3: This comment states that according to Table 5.13-1 on page 5.13-2 of the Draft EIR, with one
exception, the nearest City of Santa Ana parks are approximately two to three miles from the Project site.
The comment states that as a comparison, the Draft EIR should analyze the distances from other similar
existing City of Santa Ana residential neighborhoods to their nearest community parks. The comment also
states that Table 5.13-2 on pages 5.13-3 and 5.13-4 of the DEIR, which lists City of Tustin and City of Irvine
parks within the vicinity of the project site, should be modified to also include Ron Foell (Greenwood) Park.
Response 3: As described in Response 1, the EIR is a “Project” EIR. As described in CEQA Guidelines Section
15161, a “Project” EIR should focus primarily on the changes in the environment that would result from the
development project. The location of other City residential neighborhoods and park locations is not an impact
related to the proposed Project. However, as detailed in Table 5.13-1 in Section 5.13, Parks and Recreation
of the Draft EIR, and described in the previous response, the City of Santa Ana has 11 existing parks that
provide 81.88 acres of parkland within 3 miles of the Project site. The Draft EIR Table 5.13-3 shows that
over 37 percent of people regularly drive within 10 minutes to reach typical outdoor recreation uses; 20.8
percent drive between 11-20 minutes; and another 31.3 percent drive between 20 and 60 minutes. Also,
79.3 percent walk 12 minutes or less to outdoor recreation. All of the 81.88 acres of Santa Ana parkland
are within a 10-minute driving distance of the Project site and all of the parkland within both Santa Ana and
Tustin are beyond the 12-minute walking distance. Thus, both parkland within Santa Ana and Tustin from
residents at the Project site would be generally accessed by vehicle. Moreover, per the California State
Parks data, the existing parkland within 3 miles of the Project site is within the geographical area that most
park visitors utilize.
In addition, pursuant to this comment, Table 5.13-2 of the DEIR, was modified to include Ron Foell
(Greenwood) Park, as provided below and in Chapter 3, Revisions to the Draft EIR.
Ron Foell (Greenwood)
Park, Windrow Rd
Playground, Amphitheater,
Basketball Court, 2 Bocce Ball courts,
1.4 miles of Walking Trails, Picnic Pavilions
5 acres 1.9 miles Driving: 4 minutes
Walking: 39 minutes
Total of Tustin Parkland Within 3 Miles of the Project Site 92.9 97.9 acres
Comment 4: This comment asserts that the EIR determination that parks would be less than significantly impacted is not supported by any studies and that the EIR should analyze the actual anticipated usage of existing and proposed parks in the City of Tustin, especially those that offer sports-oriented recreational facilities. The comment also states that the proposed Veterans Sports Park at Tustin Legacy would be larger
and about half the distance from the Project site than the closest park in Santa Ana and will offer new, state
of art facilities that will be attractive to park users. The comment further states that the EIR should consider
the quality, amenities, and attractiveness of nearby parks when estimating park usage.
Response 4: As described in Responses 2 and 3 previously, based on the California State Parks information
the Project would average approximately five 30-minute users per week per acre of parkland within 3 miles
of the Project site (including those in the City of Tustin). Regarding City of Santa Ana sports-oriented
recreational facilities, of the 10 Santa Ana parks listed in Table 5.13-1 of the Draft EIR, that are 3-miles
from the Project site, 6 provide sports-oriented recreational facilities, that include: baseball fields, basketball
courts, multi-purpose fields, handball courts, swimming pool, tennis courts, and volleyball courts. The closest
City of Santa Ana park with sports-oriented recreational facilities is Delhi Park, which is 10.4 acres and
located 1.4 miles from the Project site.
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-58
Final EIR
April 2020
As described previously, sports fields are used by approximately 14 percent of the adults and 33.1 percent
of those under 18 years old that utilize park and recreation facilities (per California State Parks data). The
use of the sports-oriented recreational facilities is largely by organized sports leagues that pay fees to the
City for use of the facilities, which is used to fund maintenance and improvements related to use of the
facilities. Although the proposed Veterans Sports Park at Tustin Legacy, which is 31.5 acres and 0.9 mile
from the Project site would offer new amenities that would be attractive to Project site residents, the
anticipated usage of the facility based on the data from the California State Parks indicates that the
potential deterioration of the facility from use by Project residents would be less than significant.
Comment 5: This comment states that the park fees collected by the Project would not directly benefit any
park facilities in the City of Tustin. The comment also states that the payment of fees to offset park usage
would only apply to parks in Santa Ana and should not be used to reach the conclusion regarding
deterioration of parks in Tustin.
Response 5: Although the Draft EIR states on page 5.13-7 that the payment of fees would provide funding
for park and recreation facility improvements, the statement is not the basis for the less than significant
determination. The basis for the less than significant determination is described previously in Response 2. As
described previously, and detailed on page 5.13-7 of the Draft EIR, based on the data from the California
State Parks, the existing amount of park and recreation facilities in the vicinity of the Project site, the amount
and quality of recreation facilities that would be provided as part of the Project, and the number of residents
at full capacity of the proposed Project, the Project is not anticipated to increase the use of existing parks
and recreation facilities, including those within the City of Tustin, such that substantial physical deterioration
of the facility would occur or be accelerated.
Comment 6: This comment states that it is incorrectly stated on page 5.13-5 of the DEIR that 5,136.35 acres
of parkland will be provided per Project resident at full occupancy.
Response 6: The last sentence on page 5.13-5 of the Draft EIR contains a typographical error, referring to
acres instead of square feet, and has been modified as provided below and in Chapter 3, Revisions to the
Draft EIR. In addition, the existing parkland information in the second to last sentence has been updated to
reflect the additional park information provided previously in Comment 3. Thus, the last two sentences on
page 5.13-5 have been revised as provided below.
In addition, there are 92.9 97.9 acres of parkland within the City of Tustin and 63.6 acres
of parkland within the City of Irvine Park facilities (listed in Table 5.13-2) that are also
within 3 miles of the Project site and are likely (due to location) to be used by residents of
the proposed Project. This equals approximately 245.38 243.38 acres of existing parkland
within three miles of the site, which equates to 5,136.35 acres 5,094.49 square feet of
parkland per Project resident at full occupancy.
Comment 7: This comment states that Table 5.13-3 appears to be missing a column for average travel
times between 13 and 20 minutes.
Response 7: Table 5.13-3 includes a typographical error. The fourth column was to provide average travel times between 11 and 20 minutes and has been modified as provided below and in Chapter 3, Revisions to the Draft EIR.
Table 5.13-3: Average Travel Time in Southern California to Outdoor Recreation Areas
Mode <5 min 6-10 min 11-12 20 min 21-60 min >60 min
Driving 20.1% 17.2% 20.8% 31.3% 10.6%
Walking 27.5% 20.3% 31.5% 18.9% 1.8%
Source: California State Parks, 2014.
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-59
Final EIR
April 2020
Comment 8: This comment identifies the Project trip generation as identified in the Draft EIR and states that
the use of trip discounts results in reduced anticipated off-site impacts. The City of Tustin recommends that
the worst-case scenario be presented rather than the best-case scenario. It should be noted that the analysis
for The Heritage Project at 2001 East Dyer Road did not factor in pass-by trips to discount project trips.
Response 8: The application of pass-by and internal trip capture reductions provide a realistic estimate of
Project trips that reflects a reasonable estimate of the operation of the mixed-use Project that would provide
residences, retail and restaurant uses, and employment; and is located on a site that is geographically in
between homes and business, and lends itself to by-pass trips. Neither CEQA, nor City practice, requires the
Project to evaluate an unrealistic worst-case scenario. It is reasonable and supported by published data to
anticipate that there will be pass-by trips and internal capture, which is the goal of mixed-use development.
All pass-by rates and internal capture percentages were referenced by widely used and accepted rates
from the Institute of Transportation Engineers (ITE). The City notes that The Heritage project did not include pass-by trips in their trip generation analysis. However, The Heritage proposed a different mix of land uses and did not include coffee shop and fast-food uses, as proposed by the proposed Project. The Heritage did include reductions for internal trip capture.
Comment 9: This comment states that the Industrial Park trip generation for the existing land use is higher
than the trip generation based on the Institute of Transportation Engineers (ITE) industrial park classification
(i.e., per thousand square feet (TSF): 0.32 and 0.08 for AM in and out and PM in and out and 3.37 for ADT).
The use of the higher trip generation for existing uses results in a reduced net trip generation change when
compared to the proposed project, which would not be the worst-case scenario. The comment states that a
worst-case scenario should be used when projecting trip generation for the proposed Project.
Response 9: The Industrial Park trip rate used for this study came from the ITE Trip Generation Handbook
10th Edition. To accurately represent project trip generation, truck trips were calculated and a PCE factor
was added to truck trips. Because the previous land use would generate more truck trips than the proposed
land use, this is an appropriate method to represent the actual impact of the existing land uses on the
adjacent roadways and intersections.
Comment 10: This comment states that a queuing analysis should be provided for the left-turn into Driveway
1at Warner Avenue to determine if the forecasted 290 vehicles in the PM peak hour can be accommodated
in the proposed left-turn pocket and not have a negative impact on through traffic.
Response 10: As a project design feature and condition of approval, the project applicant will implement
the median modifications on Warner Avenue. A queuing analysis was prepared using Synchro for the
northbound left-turn queue at Red Hill Ave/Warner Ave and the westbound left-turn lane at the project
driveway. The table in this response provides the calculated queues. At the intersection of Red Hill
Avenue/Warner Avenue, the northbound left-turn lane would accommodate the expected queue in all
scenarios. At the project driveway, the worst-case left-turn queue is approximately 179 feet during the PM
peak hour. The final design of the left-turn lane has not been completed, however, to accommodate the
forecast queue, a minimum of 180 feet of storage plus a 60-foot transition would be provided (240 feet
total). The westbound left-turn pocket on Warner just east of the project driveway would be removed to
accommodate the required left-turn lane at the project driveway. This modification would change access to
the Warner Corporate Park site located on the north side of Warner Avenue. Currently, there are two
driveways to the Warner Corporate Park, a right-in/right-out only driveway at the location of the proposed
project driveway (western driveway) and a full-access driveway approximately 270 feet to the east of the
project driveway (eastern driveway). The proposed turn lane modification would revise the eastern driveway
to Warner Corporate Park to right-in/right-out only and a full-access signalized driveway would be
provided at the western driveway. As shown in the table below, the Project queuing would be adequately
accommodated.
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-60
Final EIR
April 2020
Red Hill Ave/Warner Ave Driveway 1/Warner Ave
NBL Queue WBL Queue
Available
Storage 395 Feet 670* Feet (approx. 270 Feet to first
intersecting driveway).
Existing Plus Project
Queue
Lengh 157/388 104/179
Opening Year Plus Proejct
Queue
Lengh 152/232 122/172
2040 Plus Project
Queue
Lengh 145/373 155/155
*Space between conflicting intersections due to final median design not known yet.
Queue length reported in feet for the AM/PM peak periods
Comment 11: This comment states that due to the high inbound southbound peak hour volume of 265 vehicles
into Driveway 3 on Red Hill Avenue, the City of Tustin recommends a dedicated right-turn lane to separate
the right-turns from through traffic in the #3 lane where speeds are 50 mph. The comment states that the
right-turn pocket length should be based on Synchro.
Response 11: A right-turn lane is not proposed at the driveway, nor has been recommended by the City of
Santa Ana. The comment notes that during the PM peak hour, approximately 265 trips are expected to turn
right into the Project. However, during this time the southbound through traffic is only forecast to be 770 trips
in the 2040 baseline scenario. There are three southbound lanes at the project driveway with a total hourly
capacity of 5,100, which corresponds to LOS A on southbound Red Hill Avenue adjacent to the Project.
Southbound through vehicles would be able to utilize the #1 and #2 lane for through traffic if right-turning
vehicles significantly impede traffic in the #3 lane. Additionally, there are no right-turn lanes along Red Hill
Avenue between Barranca Parkway/Dyer Road and Edinger Avenue, yet there are business parks with
driveways on Red Hill Avenue on the west side of the roadway. According to SWITRS data, no collisions
have been reported in the last three years at any driveway on Red Hill Avenue.
Comment 12: This comment states that at Red Hill Avenue and Warner Avenue, the northbound left-turn
volume in the PM peak hour increases from 578 to 860 feet with the Project. The comment requests
demonstration that the left-turn pocket length for northbound Red Hill Avenue can accommodate the
additional 282 vehicles. Response 12: A queuing analysis was prepared using Synchro for the northbound left-turn lane at the Red Hill Avenue/Warner Avenue intersection (queue sheets attached). The results show that the projected queue can be adequately contained in the northbound left turn storage.
Comment 13: This comment states that for the 2040 PM Peak Hour mitigation includes a right-turn overlap,
which implies that there is a right-turn lane. The comment asks if the Project would construct a right turn and
operate it with a right-turn overlap and states that to remain eligible and qualify for Measure M funding,
the City of Tustin does not support the conversion of the #3 through lane into a right-turn lane which would
result in a downgrade of Red Hill Avenue. The comment further states that should an alternative mitigation
be selected, the City of Tustin's preference would be the addition of a dedicated right-turn lane on eastbound
Warner Avenue to serve the high right-turn volume in the AM Peak Hour (i.e.,346 vehicles).
Response 13: The comment is correct that the mitigation measure is in error and can not be implemented
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-61
Final EIR
April 2020
without construction of a right-turn lane. However, the mix of retail and restaurant types of uses included in
the Project has been modified, as shown below and listed in Chapter 3, Revisions to the Draft EIR. The
proposed 80,000 square feet of commercial space would consist of the following uses:
• Retail Shopping Center: 18,000 31,000 square feet
• Fast Casual Restaurant: 5,000 3,500 square feet
• Quality Restaurant: 25,000 20,000 square feet
• High-Turnover Sit-Down Restaurant: 25,000 20,000 square feet
• Fast Food Restaurant: 5,000 3,500 square feet
• Coffee/Donut Shop: 2,000 square feet
The resulting trip generation of the Project would be lower; and as detailed in the Final TIA, included as
Appendix A of this Final EIR. Due to the lower trip generation, the Project would no longer result in significant
impact at the intersection of Red Hill Avenue/Warner Avenue in the 2040 PM Peak Hour condition, and
mitigation measures are not required.
Comment 14: This comment refers to Tustin Ranch Road and Warner Avenue North and states that for City
of Tustin locations where the intersection capacity utilization (ICU) is greater than the acceptable level of
service (i.e., LOS E or ICU is greater than 0.90), mitigation of the project contribution is required to bring the
intersection back to no-project conditions or better if the project contribution is greater than 0.02 or
greater at non-Congestion Management Program (CMP) locations. Therefore, this intersection is not
considered adversely impacted by the proposed Project. The comment states that Draft EIR indicates that
the intersection is adversely impacted and should be revised.
Response 14: The methodology section in the TIA has been modified to accurately reflect the thresholds.
The impact and mitigation measure for Intersection 47, Tustin Ranch Road and Warner Avenue North, were
removed. The Final TIA is included as Appendix A of this Final EIR.
Comment 15: This comment refers to the proposed a new signal at Driveway 1/Warner Avenue intersection,
and states that due to its proximity to the Red Hill Avenue and Warner Avenue signalized intersection
maintained by the City of Tustin it is expected that the proposed new signal at Driveway 1/Warner Avenue
be also maintained by the City of Tustin. The comment also states that the Project shall be required to
collaborate with the City of Tustin in its design and construction.
Response 15: Language was added to the Final TIA to indicate that the design and construction of the signal
will be coordinated with the City of Tustin. The Final TIA is included as Appendix A of this Final EIR.
Comment 16: This comment refers to a Class II Bicycle Facility on Warner Avenue and states that the
proposed Project shall be required to collaborate on the proposed joint Santa Ana/Tustin project to add a
Class II Bike Lane on Warner Avenue on the northern boundary of the Project, with the City of Santa Ana as
the lead.
Response 16: Language was added in Table 4. Study Area Roadway Characteristics to indicate planned Class II Bike Lanes along Warner Avenue. According to the City of Santa Ana, the Project would maintain the existing southern curb lines on Warner Avenue. The Bowery Project’s street improvements will coordinate with the bike lane project to ensure that the bikeway project is not precluded. The Final TIA is included as
Appendix A of this Final EIR.
Comment 17: This comment states that the through traffic volumes on Warner Avenue west of Red Hill Avenue
decrease significantly to/from the Red Hill Avenue and Warner Avenue intersection, which may
underestimate the Project impact at the proposed signalized Project driveway on Warner Avenue. The
comment requests an explanation of the decreased through traffic volumes.
The Bowery Mixed-Use Project 2. Response to Comments
City of Santa Ana 2-62
Final EIR
April 2020
Response 17: The through volumes on Warner Avenue have been corrected and the Project driveways were
re-evaluated with the higher volumes, as shown in the Final TIA, included as Appendix A. Both driveways
would operate with satisfactory LOS D or better with the corrected volumes.
Comment 18: This comment refers to Traffic Impact Analysis Tables 8 and 12, and states that the Level of
Service (LOS) for Intersection 22, Red Hill Avenue at Edinger Avenue needs to be corrected to LOS D in the
PM peak hour.
Response 18: The LOS tables have been modified to correctly indicated that 0.90 indicates LOS D. This is
shown in the Final TIA, included as Appendix A.
Comment 19: This comment states that the City of Tustin would receiving early responses to our comments
as well as a copy of the Final EIR when it becomes available and all future public hearing notices with respect to the Project pursuant to Public Resources Code Section 21092.2. Response 19: This comment does not provide any concerns or questions regarding the adequacy of the
Draft EIR. The City of Tustin will remain on the mailing list for the Project and will receive notification of
availability of the Final EIR, in addition to all other public notices.