Loading...
HomeMy WebLinkAbout1 - VAR 20-011 - 1 1 - 2 1 - 3 1 - 4 1 - 5 EXHIBIT 1 1 - 6 Resolution No. 2020-xx Page 1 of 7 LS 8.24.20 RESOLUTION NO. 2020-xx A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SANTA ANA APPROVING VARIANCE NO. 2020-01 AS CONDITIONED TO ALLOW A REDUCTION IN REQUIRED SETBACKS AT 1702 NORTH MAIN STREET BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA AS FOLLOWS: Section 1. The Planning Commission of the City of Santa Ana hereby finds, determines and declares as follows: A. Leslie Gentile, representing Farmers and Merchants Bank (“Applicant”), is requesting approval of Variance No. 2020-01 as conditioned, to allow for a reduction in required setbacks at 1702 North Main Street. B. Santa Ana Municipal Code (SAMC) Sections 41-368, 41-369 and 41-372 require a front yard and side yard setback of not less than 15 feet, and a 15-foot minimum landscape setback from front and street-side yards. C. In 2004, the City Council approved several original entitlements to allow the construction of the One Broadway Plaza tower at 1109 North Broadway with additional entitlement modifications approved in 2020. The certified environmental impact report (EIR) identified a mitigation measure requiring the dedication of land at the subject site (1702 North Main Street) for a southbound right-turn lane at the Main and 17th intersection. D. The future improvements for the southbound right-turn lane would result in the widening of Main Street, the construction of new sidewalk, curb, gutter, pavement, and the relocation of the traffic signal along the Main Street and 17th Street frontages. It would also result in a loss of approximately 1,800 square feet to the subject site. E. The Applicant is proposing a 19-foot setback from Main Street, which will be further reduced to 8 feet due to an 11-foot dedication for a southbound right-turn lane at the interaction of 17th Street and Main Street. In addition, the Applicant is proposing an 8-foot setback from 17th Street. F. Pursuant to SAMC Section 41-638, the Planning Commission is authorized to review and approve the variance for this project as set forth by the Santa Ana Municipal Code. G. On August 24, 2020, the Planning Commission held a duly noticed public hearing for Variance No. 2020-01. H. The Planning Commission of the City of Santa Ana has considered the information and determines that the following findings, which must be 1 - 7 Resolution No. 2020-xx Page 2 of 7 established in order to grant Variance No. 2020-01, for a reduction in required setbacks as required by SAMC Section 41-638: 1. That because of special circumstances applicable to the subject property, including size, shape, topography, location or surroundings, the strict application of the zoning ordinance is found to deprive the subject property of privileges not otherwise at variance with the intent and purpose of the provisions of this Chapter. There are special circumstances related to the existing size of the property. The property is located at the northwest corner of Main and 17th streets and contains 19,708 square feet. Due to an 11-foot dedication for a future southbound right-turn lane there would be a loss of approximately 1,800 square feet to the existing property size. In order to meet the City’s minimum standards to ensure safe and efficient onsite circulation, the project necessitates the building be placed closer to the intersection, resulting in a loss of approximately seven (7) feet of setback on Main Street and 17th Street. Without the reduction in setbacks, the project would need to be redesigned, resulting in: a loss of over half of its off-street parking spaces; a reduction in drive-aisle lane widths, creating onsite circulation hazards; and/or a smaller building footprint, reducing the building’s interior floor area. The parcel’s compact size and the 11-foot dedication requirement justify the Applicant’s request for a landscape setback variance. Further, the City’s Citywide Design Guidelines encourage new buildings to be located closer to streets in an effort to improve urban design and promote pedestrian activity. Specifically, Chapter 9 (Commercial Design Guidelines), Section 9.3.2 encourages buildings to be placed closer to street frontages, with parking areas behind. Placing the proposed building closer to the intersection of Main and 17th necessitates approval of the setback reduction in order to meet this design guideline. 2. That the granting of a variance is necessary for the preservation and enjoyment of one (1) or more substantial property rights. Granting this variance is necessary for the preservation and enjoyment of substantial property rights. In order to facilitate construction of a safe and efficient site that meets the City’s access, circulation, and parking codes, a reduction in setbacks is required. Finally, the reduction enables the building to be located closer to the nearby street frontages, assisting with the project meeting City design guidelines that encourage buildings placed closer to streets. 1 - 8 Resolution No. 2020-xx Page 3 of 7 3. That the granting of a variance will not be materially detrimental to the public welfare or injurious to surrounding property. Granting this variance will not be detrimental to the public or surrounding properties. The Public Works Agency reviewed the proposed plans and did not identify concerns regarding the location of onsite circulation (drive aisles) and parking areas. The design of the driveways, drive aisles and parking areas are safe and practical and will not be detrimental to the public welfare or surrounding property. 4. That the granting of a variance will not adversely affect the General Plan of the city. The variance for a setback reduction will not adversely affect the General Plan. The project is located in a General Commercial (GC) General Plan land use designation, which allows for commercial uses such as retail, service and banks and financial institutions. The project is consistent with several goals and policies of the General Plan, including the Economic Development Element, Land Use Element, and Urban Design Element. Land Use Element Goal 1 promotes a balance of land uses to address basic community needs. Policy 1.10, encourages the location of commercial centers at arterial roadway intersections in commercial districts. The project will provide for a new commercial building on two arterial streets. Land Use Element Goal 2 promotes land uses that enhance the City’s economic and fiscal viability. Policy 2.9, supports developments that create a business environment that is safe and attractive. The Condition of Approval for property maintenance will maintain a safe and attractive environment in the community. Economic Development Element Goal 2 maintains and enhances the diversity of the City’s economic base. Policy 2.3 encourages the development of mutually beneficial and supportive business clusters within the community. The project will provide a banking and financial establishment in an area that does not currently have one, thereby providing much needed community benefit. Urban Design Element Goal 1 improves the physical appearance of the City through development of districts that project a sense of place, positive community image and quality environment. Specifically, Policy 1.5 enhances architectural forms, textures, colors, and materials for all projects. The project will feature contemporary architecture with high quality materials, and feature a “brand wall” along the north elevation enhancing the building’s contemporary design and street presence. The building’s south elevation will be enhanced with a floor-to-ceiling glass curtain wall system 1 - 9 Resolution No. 2020-xx Page 4 of 7 providing an overall enhanced design along the Main and 17th intersection. Section 2. In accordance with the California Environmental Quality Act and the CEQA Guidelines, the project is exempt from further review per Section 15303 of the Guidelines. The Class 3 exemption applies to up to four commercial buildings not exceeding a cumulative total of 10,000 square feet in floor area on sites zoned for such use, if not involving the use of significant amounts of hazardous substances where all necessary public services and facilities are available and the surrounding area is not environmentally sensitive. The proposed project is a single building under 6,000 square feet in size, not anticipated to use significant amount of hazardous substances, is not located within an environmentally sensitive area, and will have access to all necessary public services and facilities made available through the City of Santa and Orange County Fire Authority (OCFA). As a result, Categorical Exemption, Environmental Review No. 2020- 25 will be filed for this project. Section 3. The Applicant shall indemnify, protect, defend and hold the City and/or any of its officials, officers, employees, agents, departments, agencies, authorized volunteers, and instrumentalities thereof, harmless from any and all claims, demands, lawsuits, writs of mandamus, referendum, and other proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature), and alternative dispute resolution procedures (including, but not limited to arbitrations, mediations, and such other procedures), judgments, orders, and decisions (collectively “Actions”), brought against the City and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, any action of, or any permit or approval issued by the City and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City) for or concerning the project, whether such Actions are brought under the Ralph M. Brown Act, California Environmental Quality Act, the Planning and Zoning Law, the Subdivision Map Act, Code of Civil Procedure sections 1085 or 1094.5, or any other federal, state or local constitution, statute, law, ordinance, charter, rule, regulation, or any decision of a court of competent jurisdiction. It is expressly agreed that the City shall have the right to approve, which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that Applicant shall reimburse the City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the Applicant of any Action brought and City shall cooperate with Applicant in the defense of the Action. Section 4. The Planning Commission of the City of Santa Ana, after conducting the public hearing, hereby approves Variance No. 2020-01 to allow for a reduction in required setbacks, as conditioned in Exhibit A, attached hereto and incorporated as though fully set forth herein. This decision is based upon the evidence submitted at the above said hearing, which includes, but is not limited to: the Request for Planning Commission Action dated August 24, 2020, and exhibits attached thereto; and the public testimony, written and oral, all of which are incorporated herein by this reference. 1 - 10 Resolution No. 2020-xx Page 5 of 7 ADOPTED this 24th day of August, 2020. AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTENTIONS: Commissioners: _______________________ Mark McLoughlin Chairperson APPROVED AS TO FORM: Sonia R. Carvalho, City Attorney By:________________________ Lisa E. Storck Assistant City Attorney CERTIFICATE OF ATTESTATION AND ORIGINALITY I, SARAH BERNAL, Recording Secretary, do hereby attest to and certify the attached Resolution No. 2020-xx to be the original resolution adopted by the Planning Commission of the City of Santa Ana on August 24, 2020. Date: ________________ ____________________________________ Recording Secretary City of Santa Ana 1 - 11 Resolution No. 2020-xx Page 6 of 7 EXHIBIT A Conditions of Approval for Variance No. 2020-01 Variance No. 2020-01 to allow a reduction in required setbacks is approved subject to compliance, to the reasonable satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal Code, the California Administrative Code, the California Building Standards Code, and all other applicable regulations. In addition, they shall meet the following conditions of approval: The Applicant must comply with each and every condition listed below prior to exercising the rights conferred by this variance. The Applicant must remain in compliance with all conditions listed below throughout the life of the variance. Failure to comply with each and every condition may result in the revocation of the variance. 1. All proposed site improvements must conform to the Site Plan Review (DP No. 2020- 02) and the staff report exhibits which are incorporated herein by reference. 2. Any amendment to this variance must be submitted to the Planning Division for review. At that time, staff will determine if administrative relief is available or the variance must be amended. 3. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be submitted for review and approval. The landscape plan shall: (1) conform to the commercial landscape standards, Citywide Design Guidelines, and the City’s Water Efficient Landscape Ordinance, and (2) contain regularly-spaced vines installed along the entire lengths of the new perimeter wall and the trash enclosure so as to form a natural graffiti deterrent. 4. The Applicant shall be responsible for maintaining the premises free of graffiti. All graffiti shall be removed within 24 hours of occurrence. 5. A Property Maintenance Agreement must be recorded against the property. The agreement will be subject to review and applicability by the Planning and Building Agency, the Community Development Agency, the Public Works Agency, and the City Attorney to ensure that the property and all improvements located thereupon are properly maintained, Developer (and the owner of the property upon which the authorized use and/or authorized improvements are located if different from the Applicant) shall execute a maintenance agreement with the City of Santa Ana which shall be recorded against the property and which shall be in a form reasonably satisfactory to the City Attorney. The maintenance agreement shall contain covenants, conditions and restrictions relating to the following: (a) Compliance with operational conditions applicable during any period(s) of construction or major repair (e.g., proper screening and securing of the 1 - 12 Resolution No. 2020-xx Page 7 of 7 construction site; implementation of proper erosion control, dust control and noise mitigation measure; adherence to approved project phasing etc.); (b) Compliance with ongoing operational conditions, requirements and restrictions, as applicable (including but not limited to hours of operation, security requirements, the proper storage and disposal of trash and debris, enforcement of the parking management plan, and/or restrictions on certain uses, (c) Ongoing compliance with approved design and construction parameters, signage parameters and restrictions as well as landscape designs, as applicable; (d) Ongoing maintenance, repair and upkeep of the property and all improvements located thereupon (including but not limited to controls on the proliferation of trash and debris about the property; the proper and timely removal of graffiti; the timely maintenance, repair and upkeep of damaged, vandalized and/or weathered buildings, structures and/or improvements; the timely maintenance, repair and upkeep of exterior paint, parking striping, lighting and irrigation fixtures, walls and fencing, publicly accessible bathrooms and bathroom fixtures, landscaping and related landscape improvements and the like, as applicable); (e) If Developer and the owner of the property are different (e.g., if the Applicant is a tenant or licensee of the property or any portion thereof), both the Applicant and the owner of the property shall be signatories to the maintenance agreement and both shall be jointly and severally liable for compliance with its terms. (f) The maintenance agreement shall further provide that any party responsible for complying with its terms shall not assign its ownership interest in the property or any interest in any lease, sublease, license or sublicense, unless the prospective assignee agrees in writing to assume all of the duties, obligations and responsibilities set forth under the maintenance agreement. (g) The maintenance agreement shall contain provisions relating to the enforcement of its conditions by the City and shall also contain provisions authorizing the City to recover costs and expenses which the City may incur arising out of any enforcement and/or remediation efforts which the City may undertake in order to cure any deficiency in maintenance, repair or upkeep or to enforce any restrictions or conditions upon the use of the property. The maintenance agreement shall further provide that any unreimbursed costs and/or expenses incurred by the City to cure a deficiency in maintenance or to enforce use restrictions shall become a lien upon the property in an amount equivalent to the actual costs and/or expense incurred by the City. (h) The execution and recordation of the maintenance agreement shall be a condition precedent to the issuance of final approval for any construction permit related to this entitlement. 1 - 13 EXHIBIT 2 1 - 14 7/22/2020 . apps.spatialstream.com/production/dashboard/8/9/0/CurrentBuild/html/Reporting.html#1/1 VAR 2020-01, Farmers & Merchants Bank1702 North Main Street Exhibit 2 – Vicinity Zoning and Aerial View © 2020 Digital Map Products. All rights reserved. Santa Ana Boundary Zoning 250 feet 1 - 15 EXHIBIT 3 1 - 16 EXISTING BUILDINGTO BE DEMOLISHEDTWO STORYBUILDING AREA:2,920 X2 =5,840 S.F.ALLEY ADJACENTBUILDING(N.I.C.)CLLC 9ADJACENTPARKING(N.I.C.)23'-0"6'-0"9'-0"8'-0"9'-0"23'-0"18'-0"23'-8"5'-8" 12'-2" 54'-0"GL-102210718'-0"18'-0"4@9'-0" =36'-0"3@ 8-6" =17'-0"71'-11"90'-0"10@ 8'-6" =85'-0"16'-11"19'-2"27'-5"6'-0"6'-6"8'-0"3'-0"9'-3"7'-0"PROPOSED FARMERS ANDMERCHANTS BANK5,995 SF18'-10" 8'-0"AD146'-0"5'-1"13'-6"`3'-0"TYP.UPDN65'-3"010102020202020203040405060909091212131316441831202021234434333636370335GL-10260202DN024440DN23'-0"252510'-0"1011DN28280202142545'-6"7'-6"2'-0"1'-5"3830021924090919ADJACENTBUILDING(N.I.C.)0707077'-0"38078'-5"2'-0"3'-0"2'-2"3'-0"1'-6"4'-8"3'-8"4'-0"1'-7"04262929282612'-0"5'-0"8394@ 8-6" =34'-0"3@9'-0" =27'-0"80424410206424'-0"4'-7"4'-0"4'-0"020204025'-0"VAPNO PARKINGATM PARKINGATM PARKINGVANPOOL/EVCHARGER ONLYNOPARKING17TH STREETMAIN STREET 244043440404230204041517170404250505220724040405050205054'-3"6'-3"54422956'-0"45PROJECT DATAADDRESS:1702 N. MAIN STREET, SANTA ANA,CA 92707APN:002-164-27APPLICANT:FARMERS AND MERCHANT BANKZONING:C1 -MDLAND USE:COMMERCIALTOTAL LOT SIZE:19,708 SF (0.45 AC) BEFORE THEDEDICATION AND 0.41 AC AFTEREXISTING USE:RETAILEXISTING BLDG SF:TWO STORY: 2,920 X 2 = 5,840 S.FPROPOSED USE:PROPOSED BLDG SF:EXISTING PARKING:32PARKING CALCULATION:4/1000 GFAPARKING REQUIRED:24+2 ATM = 26PARKING PROPOSED:24 + 2 ATM (1 ADA + 1 EV)OCCUPANCY TYPE:BCONSTRUCTION TYPE:SPRINKLERED:YESKEYNOTES - SITE PLANKEYNOTE01NEW ASPHALT PAVEMENT - SEE CIVIL DRAWINGS02NEW CONCRETE CURB - SEE CIVIL DRAWINGS03NEW CONCRETE VALLEY GUTTER - SEE CIVIL DRAWINGS04NEW LANDSCAPING - SEE LANDSCAPE DRAWINGS05NEW 4" PARKING STRIPE - PER CITY GUIDELINES SEE CIVIL DRAWINGS06NEW UNDERGROUND FILTRATION - SEE CIVIL DRAWINGS07NEW CONCRETE SIDEWALK - SEE CIVIL DRAWINGS AND SCHEDULE08NEW ACCESSIBLE PARKING MARKINGS - SEE CIVIL DRAWINGS10NEW WALL MOUNTED ACCESSIBLE SIGNAGE - SEE CIVIL DRAWINGS.41NEW POLE MOUNTED VANPOLL/EV CHARGER SIGNAGE - SEE CIVIL DRAWINGS.13EXISTING TRASH ENCLOSURE TO REMAIN.14NEW CONCRETE STEPS - SEE CIVIL DRAWINGS.15NEW CONCRETE SLOPING WALK - SEE CIVIL DRAWINGS AND SCHEDULE.16EXISTING CONCRETE APRON TO REMAIN.17LANDSCAPE SETBACK - SEE LANDSCAPE DRAWINGS.18FUTURE E.V. CHARGER, PROVIDE POWER - SEE ELECTRICAL DRAWINGS19NEW RAISED CONCRETE PLANTER WALL - SEE GL-102 ENLARGED SITE PLAN & DETAILS.20EXISTING CURB /GUTTER TO BE DEMOLISHED - SEE G-100.21EXISTING BUILDING TO BE DEMOLISHED - SEE G-100.22EXISTING ELECTRICAL CABINETS TO BE RELOCATED IN THE FUTURE.23EXISTING DRIVEWAY - SEE CIVIL FOR IMPROVEMENTS.24PROPOSED PROPERTY LINE.25NEW SITE LIGHTING - SEE CONCRETE BASE DETAIL 8/GL102 & ELECTRICAL.26ZERO CURB, SEE CIVIL DRAWINGS.27RELOCATED TRAFFIC SIGNAL BOX - SEE CIVIL.28NEW CURB RAMP - SEE CIVIL DRAWINGS.29NEW DETECTABLE WARNING SURFACE BY ARMOR TILE - SEE CIVIL DRAWINGS.30FUTURE LOCATION OF ELECTRICAL CABINETS - SEE CIVIL DRAWINGS.31NEW CONCRETE WHEEL STOP- SEE DETAILS 7/GL-102.32NEW 3'X3' SIDEWALK PLANTER CUTOUT AND TREE GRATE - SEE LANDSCAPE DRAWINGS.33NEW /RELOCATED LIGHT POLE - SEE CIVIL DRAWINGS (UNDER LANDLORD'S SCOPE OF WORK)34NEW /RELOCATED FIRE HYDRANT - SEE CIVIL DRAWINGS (UNDER LANDLORD'S SCOPE OF WORK)35NEW LIGHT FIXTURE INSTALLED ON EXISTING CONCRETE BASE - SEE ELECTRICAL DRAWINGS.36NEW EXTERIOR RECESSED ALUMINUM GRID G6PC BY CS OR APPROVED EQUAL09EXISTING UNDER GROUND UTILITY BOX TO REMAIN - SEE CIVIL DRAWINGS.37EXISTING ABOVE GROUND ELECTRICAL BOX TO REMAIN - SEE CIVIL DRAWINGS.12EXISTING LANDSCAPE TO REMAIN - SEE LANDSCAPE DRAWINGS.38NEW BIKE RACK - SEE CIVIL DRAWINGS & DETAIL 6/GL-10239(2) BACKFLOW PREVENTERS - SEE LANDSCAPE / CIVIL DRAWINGS.REPLACE EXISTING SIDEWALK AND CONCRETE - SEE CIVIL DRAWINGS.40V-B42NEW PATH OF TRAVEL - SEE CIVIL DRAWINGS.11NEW WALL MOUNTED VAN ACCESSIBLE SIGNAGE - SEE CIVIL DRAWINGS.43FIRE CONTROL VALVE - SEE CIVIL DRAWINGS.44EXISTING PROPERTY LINE.4 (4 REQUIRED)BIKE PARKING PROPOSED:45NEW TRANSFORMER, SEE ELECTRICAL DRAWINGS FOR DETAILS.SITE PLANGL-101 1/8" = 1'-0"GL-1011ARCHITECTURAL SITE PLANThe Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright Reserved1AORIGINAL SHEET - ARCH E123456BCDEF78G9RevisionByAppdYYYY.MM.DDIssuedByAppdYYYY.MM.DDSheetStantec No.TitleFacilityAgency ApprovalChkd.Dsgn.YYYY.MM.DDDwn.File Name: N/AConsultantPRELIMINARYNOT FORCONSTRUCTIONArchitect / Engineer of RecordProjectwww.stantec.com2014229400OSHPD No.1ST BUILDING PERMIT SUBMITTAL 2020.06.263/5/2020 3:47:02 PM<Pick location in Project Information>Stantec Architecture Inc.38 Technology DriveIrvine, CA 92618-5312Tel: (949) 923-6000• www.stantec.com1702 N. MAIN STREET, SANTA ANA, CA 92707FARMERS & MERCHANTS BANK17TH & MAINP-2017-XXXXX2ND PLANNING SUBMITTAL 2020.06.26N5,995 SF (4,655 SF BANK + 1,340 TENANT)BANK - B ; TENANT -B1 - 17 EXHIBIT 4 1 - 18 15234CUSTOMER LOUNGE SOFA (A &B), SELECTED BY OWNERFURNITURE LEGENDCLIENT CHAIR, SELECTED BYOWNER122JANITOR123123ELECTRICAL112112SERVER ROOM109109CONFERENCE102102TELLER105105OPS103103COPY/WORK104104ATM/ND111111UTILITY107107CASH101A101ACUSTOMERLOUNGE A110110WORK AREA113113BREAK ROOM114114UNISEXRESTROOM115115UNISEXRESTROOM121121UNISEXRESTROOM116116JANITOR108OPEN OFFICE101B101BCUSTOMERLOUNGE BABCD120120TENANT SPACE117117MANAGER101101LOBBY106FILESTORAGEMSB101101LOBBYSTAFF CHAIR, SELECTED BYOWNERCONFERENCE CHAIR, SELECTED BYOWNERCONFERENCE CHAIR, SELECTED BYOWNERBREAKROOM TABLE & CHAIRS,SELECTED BY OWNERCOFFEE TABLE, SELECTED BYOWNERCABINET, SELECTED BY OWNERMILLWORK BY GENERAL CONTRACTORA-2111__________________________A-2121__________________________A-2112__________________________A-2122__________________________24'-0"66'-0"90'-0"36'-4"17'-5" 71'-8" 17'-11"53'-9"42'-0"14'-8"15'-6"17'-11"12'-2" 4'-3"4'-0" 4'-3"3'-5"6'-0"4'-1"4'-7"12'-10"3'-6"TENANT SPACE1,340 SF1,340 SFBANK SPACE4,655 SF 1/4" = 1'-0"A-1111FLOOR PLANA-111The Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright Reserved1AORIGINAL SHEET - ARCH E123456BCDEF78G9RevisionByAppdYYYY.MM.DDIssuedByAppdYYYY.MM.DDSheetStantec No.TitleFacilityAgency ApprovalChkd.Dsgn.YYYY.MM.DDDwn.File Name: N/AConsultantPRELIMINARYNOT FORCONSTRUCTIONArchitect / Engineer of RecordProjectwww.stantec.com2014229400OSHPD No.1ST BUILDING PERMIT SUBMITTAL 2020.06.263/5/2020 3:47:02 PM<Pick location in Project Information>Stantec Architecture Inc.38 Technology DriveIrvine, CA 92618-5312Tel: (949) 923-6000• www.stantec.com1702 N. MAIN STREET, SANTA ANA, CA 92707FARMERS & MERCHANTS BANK17TH & MAINP-2017-XXXXX2ND PLANNING SUBMITTAL 2020.06.26FLOOR PLAN1 - 19 EXHIBIT 5 1 - 20 FINISH FLOOR0"T.O ROOF21'-2"15T.O. BRAND WALL23'-0"234T.O. PARAPET15'-4"B.O. CANOPY12'-0"B.O. SUNSHADE/ CANOPY8'-0"B.O. CANOPY10'-0"T.O. PARAPET16'-0"B.O. CANOPY8'-0"T.O. PARAPET17'-2"FINISH FLOOR0"T.O ROOF21'-2"ABCDB.O. CANOPY8'-0"B.O. CANOPY8'-0"T.O. PARAPET15'-4"CURTAIN WALL SILL2'-6"FINISH FLOOR0"B.O. CANOPY12'-0"B.O. ROOF20'-0"8'-2"8'-2"3'-1 1/2"4'-0"4'-0"4'-0"4'-0"3'-1 1/2"22'-3"2'-7"4"KEYNOTES01METAL CANOPY- FASCIA DARK BRONZE02TAKTL- CONCRETE PANELS-COLOR PL7503SMOOTH STUCCO FINISH, COLOR 7502 DRY DOCK0405CURTAIN GLASS SYSTEM MANUFACTURER: ARCADIA T-500 SERIESWITH VIRACON (MANUF) GLASS COLOR EVERGREENMETAL ROOF- COLOR DARK BRONCE06PRE-FABRICATED BRONZE- ROOF DRAIN LAMBS TONGUE07PRE-FABRICATED HANDRAIL- COLOR DARK BRONZE08ATM-DH BY OTHERS09PROPOSED SIGNAGE - BY OTHER (SHOWING FOR REPRESENTATION ONLY)12ACCESSIBLE PARKING SIGNAGE - BY OTHER (SHOWING FOR REPRESENTATION ONLY)13STOREFRONT GLASS/ALUMINUM SYSTEM-COLOR DARK BRONZE10PREFINISHED PARAPET COPING: COLOR TO MATCH SHERWIN WILLIAMS#7502 DRY DOCK11PREFINISHED PARAPET COPING: COLOR TO MATCH TAKTL COLOR PL7514H.M. DOOR- SEE SCHEDULE-PAINTED TO MATCH ADJACENT WALL15SIGN STANDOFFS 1/4" = 1'-0"A-2111NORTH EXTERIOR ELEVATION 1/4" = 1'-0"A-2112EAST EXTERIOR ELEVATIONELEVATIONS - EXTERIORA-211The Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright Reserved1AORIGINAL SHEET - ARCH E123456BCDEF78G9RevisionByAppdYYYY.MM.DDIssuedByAppdYYYY.MM.DDSheetStantec No.TitleFacilityAgency ApprovalChkd.Dsgn.YYYY.MM.DDDwn.File Name: N/AConsultantPRELIMINARYNOT FORCONSTRUCTIONArchitect / Engineer of RecordProjectwww.stantec.com2014229400OSHPD No.1ST BUILDING PERMIT SUBMITTAL 2020.06.263/5/2020 3:47:02 PM<Pick location in Project Information>Stantec Architecture Inc.38 Technology DriveIrvine, CA 92618-5312Tel: (949) 923-6000• www.stantec.com1702 N. MAIN STREET, SANTA ANA, CA 92707FARMERS & MERCHANTS BANK17TH & MAINP-2017-XXXXX2ND PLANNING SUBMITTAL 2020.06.261 - 21 11"2'-2"4'-5"1'-6"2'-4"1'-6"3'-4"1'-6"1'-2"4'-9"15234B.O. CANOPY8'-0"B.O. CANOPY12'-0"T.O. CURTAIN WALL12'-0"T.O. PARAPET15'-4"T.O. CANOPY13'-0"B.O. ROOF20'-0"CURTAIN WALL SILL2'-6"T.O ROOF21'-2"FINISH FLOOR0"FINISH FLOOR0"T.O. PARAPET17'-2"T.O. PARAPET16'-0"B.O. SUNSHADE8'-0"ABCDB.O. CANOPY10'-0"B.O. CANOPY8'-0"T.O ROOF21'-2"T.O. BRAND WALL23'-0"FINISH FLOOR0"FINISH FLOOR0"B.O. ROOF20'-0"T.O. PARAPET17'-2"T.O. PARAPET16'-0"KEYNOTES01METAL CANOPY- FASCIA DARK BRONZE02TAKTL- CONCRETE PANELS-COLOR PL7503SMOOTH STUCCO FINISH, COLOR 7502 DRY DOCK0405CURTAIN GLASS SYSTEM MANUFACTURER: ARCADIA T-500 SERIESWITH VIRACON (MANUF) GLASS COLOR EVERGREENMETAL ROOF- COLOR DARK BRONZE06PRE-FABRICATED BRONZE- ROOF DRAIN LAMBS TONGUE07PRE-FABRICATED HANDRAIL- COLOR DARK BRONZE08ATM-DH BY OTHERS09PROPOSED SIGNAGE - BY OTHER (SHOWING FOR REPRESENTATION ONLY)12ACCESSIBLE PARKING SIGNAGE - BY OTHER (SHOWING FOR REPRESENTATION ONLY)13STOREFRONT GLASS/ALUMINUM SYSTEM-COLOR DARK BRONZE14H.M. DOOR- SEE SCHEDULE-PAINTED TO MATCH ADJACENT WALL10PREFINISHED PARAPET COPING: COLOR TO MATCH SHERWIN WILLIAMS#7502 DRY DOCK11PREFINISHED PARAPET COPING: COLOR TO MATCH TAKTL COLOR PL75ELEVATIONS - EXTERIORA-212 1/4" = 1'-0"A-2121SOUTH EXTERIOR ELEVATION 1/4" = 1'-0"A-2122WEST EXTERIOR ELEVATIONThe Contractor shall verify and be responsible for all dimensions. DO NOT scale thedrawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction oruse for any purpose other than that authorized by Stantec is forbidden.Copyright Reserved1AORIGINAL SHEET - ARCH E123456BCDEF78G9RevisionByAppdYYYY.MM.DDIssuedByAppdYYYY.MM.DDSheetStantec No.TitleFacilityAgency ApprovalChkd.Dsgn.YYYY.MM.DDDwn.File Name: N/AConsultantPRELIMINARYNOT FORCONSTRUCTIONArchitect / Engineer of RecordProjectwww.stantec.com2014229400OSHPD No.1ST BUILDING PERMIT SUBMITTAL 2020.06.263/5/2020 3:47:02 PM<Pick location in Project Information>Stantec Architecture Inc.38 Technology DriveIrvine, CA 92618-5312Tel: (949) 923-6000• www.stantec.com1702 N. MAIN STREET, SANTA ANA, CA 92707FARMERS & MERCHANTS BANK17TH & MAINP-2017-XXXXX2ND PLANNING SUBMITTAL 2020.06.261 - 22 EXHIBIT 6 1 - 23 The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.Copyright Reserved1AORIGINAL SHEET - ARCH E1 23456BCDEF78G9RevisionByAppdYYYY.MM.DDIssuedByAppdYYYY.MM.DDSheetStantec No.TitleScaleFacilityAgency ApprovalChkd.Dsgn.YYYY.MM.DDDwn.File Name: N/AConsultantPRELIMINARYNOT FOR CONSTRUCTIONArchitect / Engineer of RecordProjectDrwn ByChckd ByIssue Datewww.stantec.com2014229400OSHPD No.1ST PLANNING SUBMITAL 2020.01.281/28/2020 11:14:24 AM<Pick location in Project Information>Stantec Architecture Inc.38 Technology Drive Suite 100Irvine, CA 92618-5312Tel: (949) 923-6000 • www.stantec.com1702 MAIN STREET, SANTA ANA 92707RENDERINGSA-213FARMERS & MERCHANTS BANK17TH & MAINAuthorCheckerDesigner01/27/20AuthorCheckerP-2017-XXXXXVIEW FROM SOUTHEAST CORNER -INTERSECTION OF 17TH AND MAIN STREETVIEW FROM NORTHEAST CORNER -FACING PARKING1 - 24