Loading...
HomeMy WebLinkAboutORANGE COUNTY TRANSPORTATION AUTHORITY (10)Return FULLY EXECUTED IRSIM copy to COTC, M-30 wMeW WOW A-2021-214 0 ta3 1 COOPERATIVE AGREEMENT NO. C-1-3598 0 2 BETWEEN 3 ORANi ION AUTHORITY 4 \\ A� 5{ f �CITIES OF HUNTI �, TUSTIN, WESTMINSTER, 6 ANGE 7 wwki& 8 FIRST STREET / BOLSA 9C SIGNAL SYNCHRONIZATION 9 PROGRAM PROJECT 10 THIS COOPERATIVE AGREEMENT (Agreement), is effective this day of 11 , 2021 ("Effective Date"), by and between the Orange County Transportation 12 Authority, 550 South Main Street, P.O. Box 14184, Orange California 92863-1584, a public corporation 13 of the State of California (herein referred to as "AUTHORITY") and the cities of Huntington Beach, Santa 14 Ana, Tustin, Westminster, and the County of Orange (hereinafter referred to as "PARTICIPATING 15 AGENCIES") each individually known as "Party" and collectively known as "Parties". 16 RECITALS: 17 WHEREAS, the AUTHORITY in cooperation with the PARTICIPATING AGENCIES is working 18 together in coordinating traffic signals across multiple jurisdictional boundaries as a part of the Renewed 19 Measure M (M2) Regional Traffic Signal Synchronization Program (RTSSP or Project P) to enhance 20 countywide traffic flow and reduce congestion; and 21 WHEREAS, the AUTHORITY has completed the competitive 2021 Call for Projects 22 (hereinafter, "2021 CALL") in support of Project P and awarded Project P funds based on the application 23 (hereinafter, "APPLICATION") prepared by the City of Santa Ana (hereinafter referred to as the 24 "APPLICANT AGENCY") for the implementation of signal synchronization of traffic signals along First 25 Street / Bolsa Avenue between the intersections of Bolsa Chica Street located in the City of Huntington 26 Beach and Newport Avenue located in the City of Tustin (hereinafter, "PROJECT"); and Page 1 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-13598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT WHEREAS, the PARTICIPATING AGENCIES agree to abide by the Comprehensive Transportation Funding Program Guidelines and M2 Ordinance, including all revisions; and WHEREAS, the PARTICIPATING AGENCIES in their approved APPLICATION have elected to designate the AUTHORITY and the AUTHORITY agrees to act as the implementing agency to carry out the PROJECT; and WHEREAS, the PROJECT will include approximately fifty five (55) traffic signalized intersections along the main corridor and five (5) offset from the main corridor as identified in the APPLICATION; and WHEREAS, the PROJECT will include Intelligent Transportation System (ITS) elements as identified in the APPLICATION and other associated systems (hereinafter collectively referred to as "ITS ELEMENTS"), that will be constructed and/or installed and implemented as part of the PROJECT as identified in the APPLICATION; and WHEREAS, the AUTHORITY agrees to work with PARTICIPATING AGENCIES to coordinate the inclusion of other ITS ELEMENTS (hereinafter OTHER ELEMENTS) that should be installed before or at the same time as the construction of the PROJECT and are not part of this Agreement; and WHEREAS, all costs associated with the inclusion of these OTHER ELEMENTS, if any, are the sole responsibility of the AGENCY owning each and any of those OTHER ELEMENTS; and WHEREAS, AUTHORITY and each respective Party acknowledges and understands that in-house resources (staff hours) from Party will provide various services for the PROJECT per the APPLICATION; and WHEREAS, AUTHORITY and each respective Party acknowledge and understand that PROJECT costs for various types of additional work required by each respective Party may not have been included in the original application and therefore costs are not included in the PROJECT allocation; and Page 2 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT WHEREAS, AUTHORITY and each respective Party agree that these additional costs will be paid by the PROJECT with written approval by AUTHORITY, which may result in additional dollar match; and WHEREAS, Parties acknowledge and understand that the costs for the additional work may be reversed by AUTHORITY's Audit; and WHEREAS, based on AUTHORITY's Board of Directors approved PROJECT ALLOCATION and APPLICATION, the AUTHORITY agrees to implement the PROJECT; and WHEREAS, the AUTHORITY and the PARTICIPATING AGENCIES desire to enter into this Agreement to implement the PROJECT in support of Project P; and WHEREAS, this Agreement defines the specific terms, conditions, and funding responsibilities between the AUTHORITY and the PARTICIPATING AGENCIES for the implementation of the PROJECT: and WHEREAS, the AUTHORITY's Board of Directors authorized funding for the PROJECT on May 10, 2021; and WHEREAS, the AUTHORITY's Board of Directors authorized this cooperative agreement on August 9.2021. WHEREAS, the City of Huntington Beach's City Council approved this Agreement on the day of 20 WHEREAS, the City of Santa Ana's City Council approved this Agreement on the day Of , 20 WHEREAS, the City of Tustin's City Council approved this Agreement on the day of ,20 WHEREAS, the City of Westminster's City Council approved this Agreement on the day of , 20 Page 3 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT WHEREAS, the County of Orange's Director of Public Works, with authority delegated by the County of Orange's Board of Supervisors approved this Agreement on the day of 20 NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and the PARTICIPATING AGENCIES as follows: ARTICLE 1. COMPLETE AGREEMENT A. This Agreement, including any attachments incorporated herein and made applicable by reference, constitutes the complete and exclusive statement of the term(s) and conditions(s) of this Agreement between AUTHORITY and PARTICIPATING AGENCIES and it supersedes all prior representations, understandings, and communications. The invalidity in whole or in part of any term or condition of this Agreement shall not affect the validity of other term(s) or conditions(s) of this Agreement. The above referenced Recitals are true and correct and are incorporated by reference herein. B. AUTHORITY's failure to insist on any instance(s) of PARTICIPATING AGENCIES' performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver or relinquishment of AUTHORITY's right to such performance or to future performance of such term(s) or condition(s), and PARTICIPATING AGENCIES' obligation in respect thereto shall continue in full force and effect. Changes to any portion of this Agreement shall not be binding upon AUTHORITY except when specifically confirmed in writing by an authorized representative of AUTHORITY by way of a written amendment to this Agreement and issued in accordance with the provisions of this Agreement. C. PARTICIPATING AGENCIES' failure to insist on any instance(s) of AUTHORITY's performance of any term(s) or conditions) of this Agreement shall not be construed as a waiver or relinquishment of PARTICIPATING AGENCIES' right to such performance or to future performance of such term(s) or condition(s), and AUTHORITY's obligation in respect thereto shall continue in full force and effect. Changes to any portion of this Agreement shall not be binding upon PARTICIPATING AGENCIES except when specifically confirmed in writing by an authorized representative of Page 4 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET / BOLSA AVENUE RTSSP PROJECT PARTICIPATING AGENCIES by way of a written amendment to this Agreement and issued in accordance with the provisions of this Agreement. ARTICLE 2. SCOPE OF AGREEMENT This Agreement specifies the roles and responsibilities of the Parties as they pertain to the subjects and projects addressed herein. Both AUTHORITY and Parties agree that each will cooperate and coordinate with the other in all activities covered by this Agreement and any other supplemental agreements that may be required to facilitate purposes thereof. ARTICLE 3. RESPONSIBILITIES OF AUTHORITY AUTHORITY agrees to the following responsibilities for funding of the PROJECT: A. AUTHORITY shall implement the PROJECT based on the intent of the usage in the APPLICATION, prepared by the APPLICANT AGENCY in accordance with the policies and procedures contained in the Comprehensive Transportation Funding Program (CTFP) Guidelines. B. AUTHORITY shall provide oversight to maintain inter -jurisdictional traffic signal operational integrity between PROJECT and other similar type projects not older than three (3) years. C. AUTHORITY shall provide formats, templates, and guidance in reporting requirements as described in the CTFP Guidelines. D. AUTHORITY, or agents of AUTHORITY, under this Agreement and upon closeout of PROJECT, may perform a technical and/or field review to ensure that the CTFP Guidelines, policies, and procedures were followed. Such a review may be performed one hundred and eighty (180) days after the PROJECT three-year grant period is complete. If the technical and or field review determines that any of the activities performed are ineligible for CTFP funding, PARTICIPATING AGENCIES must reimburse and return the amount of funding used to perform the ineligible activity to AUTHORITY. E. AUTHORITY shall invoice the PARTICIPATING AGENCIES for twenty percent (20%) of actual costs at the end of the Primary Implementation phase or at a mutually agreed upon time to facilitate any respective Party funding timeframes. The estimated match per the APPLICATION is outlined in Attachment A. Page 5 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET 1 BOLSA AVENUE RTSSP PROJECT F. AUTHORITY shall request updates for the PROJECT as part of the semi-annual review process, including documentation of in -kind match conforming to Attachment A and will include the PROJECT in the list of active projects in OCFundTracker until completion of the three-year grant period. Documents to be provided include, but are not limited to, payroll records, contracts, and purchase orders. ARTICLE 4. RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY The AUTHORITY, as the LEAD AGENCY, agrees to the following responsibilities for the implementation of the PROJECT: A. AUTHORITY, or agents of the AUTHORITY, shall manage, procure, implement, and complete all aspects of the PROJECT as identified in the APPLICATION, including filing all documentation necessary to comply with the California Environmental Quality Act (CEQA) regulations for the PROJECT. B. AUTHORITY, or agents of the AUTHORITY, shall coordinate outreach with PARTICIPATING AGENCIES for the PROJECT. C. AUTHORITY, or agents of the AUTHORITY, shall collect all data necessary to provide new optimized timing plans including, but not limited to, manual or video all movement counts at each PROJECT signalized intersection, and a mutually agreed upon number and location of twenty four (24) hour / seven (7) day automated machine traffic counts with vehicle classification. D. AUTHORITY, or agents of the AUTHORITY, shall develop and implement new timing plans optimized for signal synchronization. E. AUTHORITY, or agents of the AUTHORITY, shall provide updated timing plans for all control systems and all relevant data used to develop said plans to the PARTICIPATING AGENCIES. F. AUTHORITY, or agents of the AUTHORITY, shall prepare a "Primary Implementation Report' and "Operations and Maintenance Report" for the PROJECT as described in the Measure M2 Eligibility Guidelines and CTFP Guidelines adopted by the AUTHORITY. The AUTHORITY shall provide the reports to the PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments shall be noted in the final study. If specified in the APPLICATION, AUTHORITY, or Page 6 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15' 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT agents of the AUTHORITY, shall provide a "Before and After Study" video of a representative portion of PROJECT at up to two (2) public meetings. ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES PARTICIPATING AGENCIES agree to the following responsibilities for implementation and funding of the PROJECT: A. PARTICIPATING AGENCIES shall provide a technical representative to meet and participate as a member of the PROJECT's Traffic Forum. B. PARTICIPATING AGENCIES shall authorize the AUTHORITY to manage, procure, and implement all aspects of the PROJECT. C. PARTICIPATING AGENCIES shall participate and support the PROJECT implementation within the timeframe outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the AUTHORITY. D. PARTICIPATING AGENCIES shall provide AUTHORITY, or agents of the AUTHORITY, all current intersection as -built drawings, all current intersections controller assembly plans as provided by the manufacturer and modified by Party since original installation, local field master, local controller, and Advanced Traffic Management System timing plans and other ITS related data upon request. E. PARTICIPATING AGENCIES shall each provide the AUTHORITY with a combined dollar and in -kind services match, totaling at least twenty percent (20%) of actual PROJECT costs. The APPLICATION estimated this amount to be Seven Hundred Seventy Four Thousand Three Hundred Seventy Eight Dollars ($774,378.00) as shown in Attachment A. PARTICIPATING AGENCIES shall work with AUTHORITY to address and mitigate budget impacts. Failure to provide local dollar match and/or evidence of in -kind services match may result in the ineligibility of future participation in competitive funding opportunities. F. PARTICIPATING AGENCIES shall provide payment for the dollar match to AUTHORITY within thirty (30) calendar days of receipt of an invoice. Page 7 of 18 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET / BOLSA AVENUE RTSSP PROJECT 1 G. PARTICIPATING AGENCIES that have included an in -kind services match, as 2 identified in Attachment A, shall provide documentation of conformance as part of the semi-annual 3 review process or as requested by the AUTHORITY, or agents of the AUTHORITY. 4 H. PARTICIPATING AGENCIES shall waive all fees associated with any local agency 5 permits that may be required of the consultant, subconsultants, and/or service or equipment providers 6 in the performance of the PROJECT. 7 I. PARTICIPATING AGENCIES shall provide updates on PROJECT to AUTHORITY, or 8 agents of the AUTHORITY, as part of semi-annual review process until completion of the three-year 9 PROJECT grant period. Documents to be provided include, but are not limited to, payroll records, 10 contracts, and purchase orders. 11 J. PARTICIPATING AGENCIES shall, if specified in APPLICATION, continue Operations 12 and Maintenance after the three-year grant period is complete and continue until the end of the 13 PROJECT per additional maintenance of effort in APPLICATION. 14 ARTICLE 6. DELEGATED AUTHORITY 15 The actions required to be taken by PARTICIPATING AGENCIES in the implementation of this 16 Agreement are delegated to their respective City Manager, or designee, and the actions required to be 17 taken by AUTHORITY in the implementation of this Agreement are delegated to AUTHORITY's Chief 18 Executive Officer or designee. 19 ARTICLE 7. AUDIT AND INSPECTION 20 AUTHORITY and PARTICIPATING AGENCIES shall maintain a complete set of records in 21 accordance with generally accepted accounting principles. Upon reasonable notice, PARTICIPATING 22 AGENCIES shall permit the authorized representatives of AUTHORITY to inspect and audit all work, 23 materials, payroll, books, accounts, and other data and records of PARTICIPATING AGENCIES for a 24 period of five (5) years after final payment, final closeout, or until any on -going audit is completed, 25 whichever is later. For purposes of audit, the date of completion of this Agreement shall be the date of 26 AUTHORITY's payment of consultant's final billing (so noted on the paid invoice) under this Agreement. Page 8 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET / BOLSA AVENUE RTSSP PROJECT AUTHORITY shall have the right to reproduce any such books, records, and accounts. The above provision with respect to audits shall extend to and/or be included in contracts with PARTICIPATING AGENCIES' contractor. ARTICLE 8. INDEMNIFICATION A. To the fullest extent permitted by law, PARTICIPATING AGENCIES shall defend (at PARTICIPATING AGENCIES' sole cost and expense with legal counsel reasonably acceptable to AUTHORITY), indemnify, protect, and hold harmless AUTHORITY, and its officers, directors, employees, and agents (collectively the "Indemnified Parties"), from and against any and all liabilities, actions, suits, claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, orders, penalties, and expenses including legal costs and attorney fees (collectively "Claims"), including but not limited to Claims arising from injuries to or death of persons (PARTICIPATING AGENCIES' employees included), for damage to property, including property owned by AUTHORITY, or from any violation of any federal, state, or local law or ordinance, alleged to be caused by the negligent acts, omissions or willful misconduct of PARTICIPATING AGENCIES, its officers, directors, employees or agents in connection with or arising out of the performance of this Agreement. B. To the fullest extent permitted by law, AUTHORITY shall defend (at AUTHORITY's sole cost and expense with legal counsel reasonably acceptable to PARTICIPATING AGENCIES), indemnify, protect, and hold harmless PARTICIPATING AGENCIES, including their officers, directors, employees, and agents (collectively the "Indemnified Parties"), from and against any and all liabilities, actions, suits, claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, orders, penalties, and expenses including legal costs and attorney fees (collectively "Claims"), including but not limited to Claims arising from injuries to or death of persons (AUTHORITY's employees included), for damage to property, including property owned by PARTICIPATING AGENCIES, or from any violation of any federal, state, or local law or ordinance, alleged to be caused by the negligent acts, omissions or willful misconduct of AUTHORITY, its officers, directors, employees or agents in connection with or arising out of the performance of this Agreement. Page 9 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT C. The indemnification and defense obligations of this Agreement shall survive its expiration or termination. ARTICLE 9. ADDITIONAL PROVISIONS A. Term of Agreement: This Agreement shall be in full force and effect through December 31. 2026. B. Amendment: This Agreement may be extended or amended in writing at any time by the mutual consent of all Parties and AUTHORITY. No amendment shall have any force or effect unless executed in writing by all Parties and AUTHORITY. C. Termination: In the event any Party defaults in the performance of their respective obligations under this Agreement or breaches any of the provisions of this Agreement, a non -defaulting Party(s) shall have the option to terminate this Agreement upon thirty (30) calendar days prior written notice to the Party in default. D. Termination for Convenience: Either Party may terminate this Agreement for its convenience by providing thirty (30) calendar days prior written notice of its intent to terminate for convenience to the other Party. E. AUTHORITY and Parties shall comply with all applicable federal, state, and local laws, statues, ordinances, and regulations of any governmental authority having jurisdiction over the PROJECT. F. Legal Authority: AUTHORITY and Parties hereto consent that they are authorized to execute this Agreement on behalf of said Parties and that, by so executing this Agreement, the Parties hereto are formally bound to the provisions of this Agreement. G. Severability: If any term, provision, covenant or condition of this Agreement is held to be invalid, void or otherwise unenforceable, to any extent, by any court of competent jurisdiction, the remainder of this Agreement shall not be affected thereby, and each term, provision, covenant or condition of this Agreement shall be valid and enforceable to the fullest extent permitted by law. Page 10 of 18 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT 1 H. Counterparts of Agreement: This Agreement may be executed and delivered in any 2 number of counterparts, each of which, when executed and delivered shall be deemed an original and all 3 of which together shall constitute the same agreement. Facsimile signatures shall be permitted. 4 I. Assignment: Neither this Agreement, nor any of the Parties' rights, obligations, duties, or 5 authority hereunder may be assigned in whole or in part by either Party without the prior written consent 6 of the other Party in its sole and absolute discretion. Any such attempt of assignment shall be deemed 7 void and of no force and effect. Consent to one assignment shall not be deemed consent to any 8 subsequent assignment, nor the waiver of any right to consent to such subsequent assignment. 9 J. Governing Law: The laws of the State of California and applicable local and federal laws, 10 regulations, and guidelines shall govern this Agreement. 11 K. Litigation fees: Should litigation arise out of this Agreement for the performance thereof, 12 the court shall award costs and expenses, including attorney's fees, to the prevailing Party. 13 L. Notices: Any notices, requests, or demands made between the Parties pursuant to this 14 Agreement are to be directed as follows: 15 / 16 / 17 / 18 / 19 / 20 / 21 / 22 / 23 / 24 / 25 / 26 / Page 11 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT To SANTA ANA: To AUTHORITY: City of Santa Ana Orange County Transportation Authority 20 Civic Center Plaza 550 South Main Street Santa Ana, CA 92701 P. O. Box 14184 Orange, CA 92863-1584 Attention: Cesar Rodriguez Attention: Michael Le Senior Civil Engineer Senior Contract Administrator Tel: (714) 647-5626 Tel: (714) 560-5314 Email: crodriauez5nsanta-ana.oro Email: mle1Aocta.net CC: Alicia Yang Project Manager Tel: (714) 560-5362 Email: aygD2a7octa.net To HUNTINGTON BEACH: To TUSTIN: City of Huntington Beach City of Tustin 2000 Main Street, P.O. Box 190 300 Centennial Way Huntington Beach, CA 92648 Tustin, CA 92780 Attention: William Janusz Attention: Krys Saldivar Principal Civil Engineer Public Works Manager—Traffic/Transportation Tel: (714) 374-1628 Tel: (714) 573-3172 Email: w_,lanu_sz surfcit -hv b.org Email: ksaldivarptustinca.or Page 12 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET / BOLSA AVENUE RTSSP PROJECT To WESTMINSTER: To COUNTY OF ORANGE: City of Westminster County of Orange 8200 Westminster Boulevard 601 North Ross Street Westminster, CA 92863 Santa Ana, CA 92701 Attention: Adolfo Ozaeta Attention: Rick Diaz Transportation Manager Senior Civil Engineer Tel: (714) 548-3462 Tel: (714) 245-4581 Email: aozaeta@westminster-ca.qov Email: rick.diazp_ocpw.ocgov.com M. Force Maieure: Either Party shall be excused from performing its obligations under this Agreement during the time and to the extent that it is prevented from performing by an unforeseeable cause beyond its control, including but not limited to: any incidence of fire, flood; acts of God; commandeering of material, products, plants orfacilities by the federal, state or local government; national fuel shortage; or a material act or omission by the other Party, when satisfactory evidence of such cause is.presented to the other Party, and provided further that such nonperformance is unforeseeable, beyond the control and is not due to the fault or negligence of the Party not performing. / / / Page 13 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 24 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT This Agreement shall be made effective upon execution by all Parties. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to be executed as of the date of the last signature below. CITY OF HUNTINGTON BEACH ORANGE COUNTY TRANSPORTATION AUTHORITY By: Kim Carr Mayor Dated: ATTEST: Bv: Robin Estanislau City Clerk Dated: APPROVED AS TO FORM Bv: Michael E. Gates City Attorney Dated: Bv: Darrell E. Johnson Chief Executive Officer Dated: APPROVED AS TO FORM: By: James Dor' h(5ep 7, 202115:25 PDT) James M. Donich General Counsel Dated: APPROVAL By: Kia Mortazavi Executive Director, Planning Dated: Page 14 of 18 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET I BOLSA AVENUE RTSSP PROJECT This Agreement shall be made effective upon execution by all Parties. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to be executed as of the date of the last signature below. CITY OF SANTA ANA By: Kristine Ridge City Manager Dated: �' �. a' 2r Daisy Gomez Clerk of i-Cou-icil Dated: APPROVED AS TO FORM Sonia R. Carvalho, City Attorney By: X % -f L Jo M. Funk Assistant City Attorney Dated: September 16, 2021 RE MJNEND F R APPROVAL B fkl abil Saba, PE Executive Director Public Works Agency Dated: Page 15 of 18 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT This Agreement shall be made effective upon execution by all Parties. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to be executed as of the date of the last signature below. CITY OF TUSTIN Bv: Letitia Clark Mayor Dated: ATTEST: Bv: Erica N. Yasuda City Clerk Dated: APPROVED AS TO FORM Bv: David E. Kendig City Attorney Dated: Page 16 of 18 COOPERATIVE AGREEMENT NO. C-1-3598 FIRST STREET / BOLSA AVENUE RTSSP PROJECT This Agreement shall be made effective upon execution by all Parties. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to be executed as of the date of the last signature below. CITY OF WESTMINSTER By: Tri Ta Mayor Dated: ATTEST: By: Christine Cordon City Clerk Dated: APPROVED AS TO FORM By: Christian Bettenhausen City Attorney Dated: Page 17 of 18 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET/ BOLSA AVENUE — RTSSP ATTACHMENT A ESTIMATED LOCAL MATCH COMMITMENT SECTION 1: AGENCY TOTAL MATCH SUMMARY CASH MATCH IN -KIND MATCH* TOTAL MATCH AGENCY PI O&M PI O&M PI &M =0 City of $ 43, 852.00 $ 2,600.00 $ 0.00 $ 0.00 $ 43, 852.00 $ 2, 600.00 Huntington Beach $ 46,452.00 $ 0.00 $ 46,452.00 City of Santa $ 321,042.00 $ 12,000.00 $ 34,000.00 $ 3,600.00 $ 355,042.00 $ 15,600.00 Ana $ 333,042.00 $ 37,600.00 $ 370,642.00 $129,734.00 $ 3,290.00 $ 15,050.00 $ 350.00 $ 144,784.00 1 $ 3,640.00 City of Tustin $133,024.00 $15,400.00 $148,424.00 City $139, 620.00 $ $190.00 $ 0.00 $ 0.00 $ 139, 620.00 1 $ 8,190.00 of Westminster $147,810.00 $ 0.00 $147,810.00 County of $ 59,880.00 1 $ 1,170.00 $ 0.00 1 $ 0.00 $ 59, 880.00 1 $ 1,170.00 Orange $ 61,050.00 $ 0.00 $ 61,050.00 TOTAL $ 694,128.00 $ 27,260.00 $ 49,050.00 $ 3,950.00 $ 743,178.00 $ 31,200.00 MATCH $ 721,378.00 $ 53,000.00 $ 774,378.00 *In -kind match may be converted to cash match if agency does not satisfy in -kind match commitment by the end of the respective phase. However, Cash Match is NOT allowed to be converted to in -kind match. SECTION 2: MATCH BREAKDOWN (CASH VS IN -KIND SERVICES) A. Cash Match AGENCY FUNDING SOURCE AMOUNT OF CASH CONTRIBUTION City of Huntington Beach AQMD $ 46,452.00 City of Santa Ana M2 Fairshare $ 333,042.00 City of Tustin Transportation Funds / General Fund / M2 Fairshare $133,024.00 City of Westminster Traffic Impact Fee $147,810.00 County of Orange Road Funds $ 61,050.00 TOTAL CASH MATCH: $ 721,378.00 Page A - 1 COOPERATIVE AGREEMENT NO. C-1-3698 FIRST STREET/ BOLSA AVENUE — RTSSP ATTACHMENT A B. In -Kind Services i. Specific Improvements (List items and Cost): AGENCY IMPROVEMENT DATE OF CONSTRUCTION EXPENDITURE N/A TOTAL FOR SPECIFIC IMPROVEMENTS 1: $ 0.00 il. Staffina Commitment: FULLY AGENCY STAFF POSITION TYPE OF SERVICE TO NO.OF BURDENED TOTAL** PROJECT HOURS HOURLY RATE Sr. Civil Engineer Project Oversight, Plan Review, Signal Timing 150 $ 110 $ 16,500.00 Project Design Review/ Assistant Engineer Implement Timing / 120 $ 90 $ 10,800.00 City of Santa Construction Engine rin Ana Construction Inspector Construction Engineering 120 $ 70 $ 8,400.00 Engineering Intern General Project Support 95 $ 20 $ 1,900.00 Total for City of Santa Ana: $ 37,600.00 Consultant Principal Project Oversight, Plan 40 $ 175 $ 7,000.00 Engineer Review, Signal Timing Cityof Tustin Traffic Engineering Project Management, O&M Review and 30 $ 145 $ 4,350.00 Consultant Coordination PW Inspector (Consultant) Construction Inspection 30 $ 135 $ 4,050.00 Total for City of Tustin: $15,400.00 TOTAL FOR STAFFING COMMITMENT (ii): $ 63,000.00 TOTAL IN -KIND MATCH (i + ii): $ 53,000.00 **Total amount is the required participation by the identified agency. The number of hours and hourly rate will be based on each agency's actual fully burdened billing rates, which must collectively equal the same value of the assigned "Total" dollars. Each agency will be responsible for keeping detailed records of hours worked and description of work. An accounting record of personnel, hours at fully burdened rate is expected to be included with the final submittal. Records will be subject to auditing. Page A-2