HomeMy WebLinkAboutEXCEL PAVING COMPANY (PALP, INC.) (SAFE ROUTES TO SCHOOL DAVIS ELEMENTARY ACCESS COMPLIANCE)il10�--
INSURANCE ON FILE
WORK MAY PROCEED
UNTIL INSUSAN E f�J(FIRES
lit r\/�X
CLERK OF COUNCIL
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
DAT PROJECT 19-695.1 (ATPSBIL-5063(193))
APR 0 4 2023 SAFE ROUTES TO SCHOOL DAVIS ELEMENTARY ACCESS COMPLIANCE
This CONSTRUCTION CONTRACT is made and entered into this 206, day of December, 2022 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California (hereinafter "CITY"), and Palp, Inc. DBA Excel
Paving Company (hereinafter "CONTRACTOR").
�(
O' Cbof l 9) (3�)2— WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Safe Routes to School Davis Elementary Access Compliance
Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance
with the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Five Million Five Hundred and Fifty Eight
Thousand Four Hundred and Twenty Dollars and No Cents ($5,558,420.00), as set forth and identified
in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rev. 09/01/2017 Page 1 of
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "D") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: http://www.santa-ana.org/pwa/documents/CWA.pdf
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
114A1210]9fu1►11016041160
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 4
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity
in favor of CONTRACTOR against CITY or any other Indemnitee.
11. FEDERAL PROVISIONS.
The federal prevailing wage rates are attached hereto as Exhibit `B" and incorporated herein by this
reference. When the federal prevailing wage rates and California prevailing wage rates differ for similar
kinds of labor, the CONTRACTOR shall not pay less than the higher rate.
The provisions of Form FHWA 1273 apply to this Construction Contract and all work performed by the
CONTRACTOR and its subcontractor and lower tier subcontractors and is attached hereto as Exhibit "C"
and incorporated herein by this reference.
The CONTRACTOR shall comply with all federal requirements including, but not limited to, the Federal -
Aid Contract Provisions attached hereto as Exhibit "D" and incorporated herein by this reference.
With respect to any conflict between such federal requirements and the Contract Documents and/or the
provisions of state law and except as otherwise required under federal law or regulation, the more stringent
requirement shall control
12. USE OF CSLFRF FUNDS.
Funds from the Coronavirus State Fiscal Recovery Fund and/or the Coronavirus Local Fiscal Recovery
Fund, together known as the Coronavirus State and Local Fiscal Recovery Funds ("CSLFRF") program,
will be used to fund all or a portion of this Construction Contract. CONTRACTOR shall comply with all
applicable federal requirements including, but not limited to, the following, all of which are expressly
incorporated herein by reference:
a. Sections 602 and 603 of the Social Security Act as added by Section 9901 of the American Rescue
Plan Act of 2021 (the "Act');
b. U.S. Department of the Treasury ("Treasury") Final Rule for the Act;
c. Treasury Compliance and Reporting Guidance for the Act;
d. 2 C.F.R. Part 200 — Uniform Administrative Requirements, Cost Principles, and Audit
Requirements for Federal Awards, other than such provisions as the U.S. Department of the
Page 3 of 4
Treasury may determine are inapplicable to the CSLFRF program and subject to such exceptions
as may be otherwise provided by the U.S. Department of the Treasury;
e. Treasury Coronavirus Local Fiscal Recovery Fund Award Terms and Conditions; and
f. Federal contract provisions attached hereto as Exhibit "E" and incorporated herein by reference.
Subcontracts, if any, shall contain a provision making them subject to all of the provisions stipulated in
this Construction Contract. With respect to any conflict between such federal requirements and the terms
of this Construction Contract and/or the provisions of state law and except as otherwise required under
federal law or regulation, the more stringent requirement shall control.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
W-eft•. ( .
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: U.
JOHN M. FUNK
Chief Assistant City Attorney
RECOMMENDED FOR APPROVAL:
ABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
Palp, Inc. DBA Excel Paving Company
NPAE
IqTLE: Curtis P. Brown III President
Page 4 of 4
Castro, Jose
From: City of Santa Ana <certificate-request@ctraxjdidata.com>
Sent: Monday, March 20, 2023 1:54 PM
To: cathychupco@excelpaving.net; Ramirez, David; Castro, Jose; Thomas, Sean;
wphillips@excelpaving.net
Subject: Internal Notice of Compliance
NOTICE OF COMPLIANCE
c 1 1 i � I \ 1 F: PRINT THIS PAGE AND INCLUDE WITH AGREF.NI INT TO THE CLERK OF THE COUNCIL.
Contractor Palp, Inc.
Name:
Project 19-6951
Number:
Project Safe Routes To School Davis Elementary Access Compliance (ATPSBIL-
Name: 5063(193))
The Certificate of Insurance (COI) submitted indicates that the coverages are in compliance with the
insurance requirements. No further action is required at this time.
Thank you,
City of Santa Ana
Risk Management Division
in partnership with
CTrax Plus Services Team
3/20/2023 4:54 PM
PALP, INC.
CERTIFICATE OF LIABILITY INSURANCE
JEANA
Da11M112023 Yl
FTE
1172023
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the Certificate holder Is an ADDITIONAL INSURED, the pollcy(les) must have ADDITIONAL INSURED previsions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on
this certificate does not confer rights to the certificate holder In lieu of such endorsemont s .
PRODUCER
The Wooditch Company Insurance Services, Inc.
1 Park Plaza, Suite 400
Irvine, CA 92614
6RMEACT
C,iio agh 949) 553.9800 No :949 553-0670
DISURERfin AFFOROmO COVERAGE
NAIC
suRERA:Allied World Ins. Co. Inc.
22730
INSURE
Pelp, Inc. DBA Excel Paving Company; GAP Equipment, LLC
2230 Lemon Avenue
Long Beach, CA 90808
INsuRERB:AIIIed World Assurance Company
19489
iasuRER c:Staretone National Insurance Company
25496
INSURER D :
INSURER E:
NSURER F:
COVERAGES CFRTIFICATF NIIMRFR! RLVISIn1d AIn MIRFR•
THIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICYPERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENTIMTH RESPECTTO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECTTO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
TYPE OF INSURANCE
AOD
SUBfl
POLICY NUMBER
PO IC EFF
PO04MLL E%P
LIMITS
A
X
COMMERCIALGENERALLUIBa
CLAIMS -MADE QX OCCUR
X
X
6004-1245
61112022
61112023
EACHOCCURRENCE
$ 1,000,000
RE GETORENTEOmr1
100,000
MEDEXP An one rson
3.000
PERSONAL&iADVINJURY
1 1,000,000
'LAGGRE��C,yTE� �LIRMpITAPPGESPER:
POLICY I'•I dECT LOC
GENEFALAGGRE TE
2,000,000
GE
PRODUCTS.CO OPAGG
S 2,0110,000
EMPLOYEE BENEFI
11000,000
OTHER:
B
AUrOMOBUUr
LIABILITY
COMBINrdDSINGLELINUT
1,000,000
X
ANYAUTO 88CC
OWNAUTAHL�Ip
M�OESµSOpWWUN�NEEop
X
X
6000-1394
6/1/2022
61112023
BoDILY1NIURv eam,
BODILYIiNVJURV Pereceldw
X
�O�SONLY
AUTOSONLY X AMVff1LV
eahlm[ OE
'
UMBRELLA LIAR
OCCUR
EACH OCCURRENCE
AGGRE E
EXCESSLMB
CLAIMS -MADE
DELI I I RETENTION$
C
11aXU(ERSCOMPENSAnON
AND EMPLOYER LIABILITY
A�NPY�PpR�Oq�P,�REIETgOEWpPARDIERIEXECUTME IJ
(Mandatary In NH)FxObuoEY LJ
ryyeess,, eescrlbe under
DESCRIPTION OFOPEItATN)NS
NIA
X
10221268
6/112022
6MI2023
X PER Ono
E EACH DENT
1,000,000
E IX8 E- EMPLOYEE
1,0D0,000
E.L DIS E-POLICYUNI7
1,000.000
DESCFUP71ON OF OPERAMONS I LOCATIONS IVEHICLES (ACORD 101, Addleanal Remarks Schedule, may be attached If mom space Is mgekedl
RE: Excel Job #5901; City of Santa Ana Job 419.0951; (ATPSBIL-5063(103)); Safe Routes to School Davla Elementary Access Compliance Project.
glelpwvlauaipwvrwowv
The City of Santa Ana, Its officers, employees, agents, volunteers and representatives are included as Additlanal Insureds as respects General Liability and
Auto Liability per attached endorsements.
This Insurance shall apply as Primary and Non -Contributory per attached endorsements,
Waiver of Subrogation for Gomm] Liability, Auto Liability and Workers' Compensation: Sea Attached Endorsements.
CERTIFICATE HOLDER CANOFI I annN
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
City of Santa Ana
Risk Management Division, 4tl1 Floor
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
20 Civic Center Plaza
,AunroORIZED REPRESENTATIVE
'7 r_
Banta Ana, CA 92701
ACORD 25 (2016103) 491988.2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
ACORO'
k..�
AGENCY CUSTOMER ID: PALP, INC.
LOG 0: 1
ADDITIONAL REMARKS SCHEDULE
JEANA
Page 1 of 1
AGENCY
NAMED INSURED
Pafp, Inc. DBA Excel Paving Company; GAP Equipment, LLC
2230 Lemon Avenue
Long Beach, CA 60806
POLICY NUMBER
SEE PAGE 1
CARRIER
EE PAGE 1
NAICCODE
SEE P 1
EFFECTIVE DAM: SEE PAGE 1
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: ACORD 25 FORM TITLE: Certificate or Liability Insurance
Cancellation:
"Except 10 days notice of Cancellation for non-payment of premium.
"Should this policy be cancelled before the expiration date, The Wooditch Company will mail 30 (thirty) days written notice to those
Certificate Holders which require such action per contract or agreement."
All rlahts reserved.
The ACORD name and logo are registered marks of ACORD
--� CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6951 Safe Routes to School Davis Elementary Change Order Number 1
Access Compliance
To Excel Paving Co. Contractor
You are hereby directed to make the herein changes from the plans and speofficatlons or do the following described work not included in the plans and
specifications on this contract.
NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCL OR CITY MANAGER.
Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
EXTRA WORK AT AGREED PRICE
1. To compensate the contractor for the fire hydrant turnover and buries per PCO #2 dated
September 22, 2023,
AGREED PRICE = $26,297.30
Schedule Impact:Ten (10)Working Days
2. To compensate the contractor for the redesign of a Kraken Filterra unit as well as procure
additional material to supplement the new design per PCO #6.1 dated October 29, 2024.
AGREED PRICE = $22,430.00
Schedule Impact:Ten (10)Working Days
3. To compensate the contractor for an additional cross gutter surveying at 151h St. and Dresser
St. to maintain proper excess flow, additional survey at Washington Ave. and Spurgeon St.,
as well as a revised survey at Penn Way and 15th St. per PCOs #5, #9, and #13 dated
February 1, 2024, May 24, 2024 and July 18, 2024 respectively.
AGREED PRICE = $13,912.50
Schedule Impact:Twenty(20)Working Days
4. To compensate the contractor for the landscape removal of trees and shrubs at 151h St. and
Penn Way, install a guardrail system, sawcut meandering sidewalk limits, regrade the
meandering sidewalk per the revised plan, and to mobilize equipment for additional concrete
placement per PCOs #14, and #16.1 dated August 15 and October 3, 2024 respectively.
AGREED PRICE = $38,513.00
Schedule Impact: Twenty(20)Working Days
5. To compensate the contractor for mobilization costs for an excavator and a stomper for
additional concrete improvements, sawcut street limits and to mobilize equipment for
concrete placement along Washington and Spurgeon St. per PCOs #10 and #15 dated May
24, 2024 and August 20, 2024 respectively.
AGREED PRICE = $15,745.00
Schedule Impact: Fifteen (15)Working Days
Page 1 of 3
6. To compensate the contractor for additional mobilization costs for striping and installation of
new stop sign posts per PCO #11 dated May 28, 2024.
AGREED PRICE = $3,547.95
Schedule Impact:Ten (10)Working Days
7. To compensate the contractor for the removal and reconstruction of an existing manhole at
14t" St. and Poinsettia St., and to connect to the existing sewer line per PCO #17 dated
September 23, 2024.
AGREED PRICE = $25,750.00
Schedule Impact:Ten (10)Working Days
8. To compensate the contractor for the installation of a slurry blanket for an existing shallow
waterline at 1411 St. and Poinsettia St. per PCO#1 S.1 dated October 21, 2024.
AGREED PRICE = $30,375.00
Schedule Impact:Ten (10)Working Days
9. To compensate the contractor for time and material worked performed at various locations per
PCO#20 dated December 4, 2024.
AGREED PRICE = $43,420.57
Schedule Impact: Twenty(20)Working Days
10. To compensate the contractor for revised striping per PCO#21 dated December 11, 2024.
AGREED PRICE = $17,613.06
Schedule Impact: Ten (10) Working Days
11. To compensate the contractor reinstall metal guardrail per revised plan PCO #22 dated
February 4, 2025.
AGREED PRICE = $14,720.00
Schedule Impact: Ten (10)Working Days
12. To compensate the contractor for concrete cost impact 5,000 psi mix per PCO #23 dated
February 4, 2025.
AGREED PRICE = $7,189.18
Schedule Impact: N/A
TOTAL AGREED PRICE = $269,513.56
Page 2of3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 19-6951 Safe Routes to School Davis Elementary Change Order Number 1
Access Compliance
To Excel Paving Co. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER,
Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation due the
Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact
on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of
himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work
contained in this change order, plus all payment for interruption of schedules, extended field overhead, home
office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this
Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and
work performed on this project, and that the time and cost paid per this change order constitutes the total
equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on
this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all
rights, without exception or reservation of any whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ INCREASE $ 259,513.56
By reason of this order the CONTRACT TIME completion will be adjusted as follows: One Hundred Forty-Five(145)Working Days
We the undersigned contractor have given careful consideration tc the change proposed and hereby agree,if this proposal is approved,that we will provide
all equipment,furnish all materials,except as may otherwise be noted above,and perform all service necessary for the work above specified,and will accept
as full payment therefor the prices shown above.
Accepted,Date 4/9/2025 Contractor Excel paving Co.
Dig9elly signed by VJsde
By e � .Dh illip.te 2025.6409 Title
Project Manager
ord�.iam•oa•
Approval recommended by q Date
PUB RKS AGENCY E C IVE DIRECTOR
Approved by Date Z Z
CITYMANAGER
12 Attest: �, -,� Date
CITY CLERK)