HomeMy WebLinkAboutItem 16 - Fremont Elementary and Spurgeon Intermediate SRTS ProjectPublic Works Agency
www.santa-ana.org/public-works
Item # 16
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
July 18, 2023
TOPIC: Fremont Elementary and Spurgeon Intermediate SRTS Project
AGENDA TITLE
Approve a Budget Reallocation and Award a Construction Contract to Onyx Paving
Company, Inc. in the Amount of $5,204,000 for the Fremont Elementary and Spurgeon
Intermediate Safe Routes to School Project, with an Estimated Project Delivery Cost of
$6,505,000 (Project No. 20-6964) (Non -General Fund)
RECOMMENDED ACTION
1. Authorize budget reallocation of $1,656,000 in unspent Roadway Maintenance and
Rehabilitation Account (SB-1) from the Fairview Avenue Rehab, the South City Limit
to Segerstrom Avenue, FY 2020-21 (No. 21-6978) Project to construction funds for
the Fremont Elementary and Spurgeon Intermediate Safe Routes to School (Project
No. 20-6964).
2. Award a construction contract to Onyx Paving Company, Inc., the lowest
responsible bidder, in accordance with the base bid in the amount of $5,204,000,
subject to change orders (not -to -exceed up to 25% of the base bid amount) in
accordance with the Greenbook: Standard Specifications for Public Works
Construction, for construction of the Fremont Elementary and Spurgeon
Intermediate Safe Routes to School Project, for a term beginning July 18, 2023, and
ending upon project completion, and authorize the City Manager to execute the
contract subject to non -substantive changes approved by the City Manager and the
City Attorney.
3. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$6,505,000, which includes $5,204,000 for the construction contract, $780,600 for
contract administration, inspection and testing, and a $520,400 project contingency
for unanticipated or unforeseen work.
4. Approve an amendment to the FY 2023-24 Capital Improvement Program to include
$1,656,000 in unspent Road Maintenance and Rehabilitation Account (SB-1) funds.
Fremont Elementary and Spurgeon Intermediate SRTS Project
July 18, 2023
Page 2
5. Determine that the recommended actions are exempt from further review in
accordance with the California Environmental Quality Act as Categorical Exemption
Environmental Review No. ER-2020-32 was filed for the project.
DISCUSSION
The Fremont Elementary and Spurgeon Intermediate Safe Routes to School (SRTS)
project will improve pedestrian and bicyclist safety with the construction of traffic
improvements along the suggested safe routes for the Fremont Elementary and
Spurgeon Intermediate schools (Exhibit 1). The scope of work includes construction of
curb extensions at crosswalks and intersections, traffic circles at intersections,
sidewalks, driveway approaches, curbs and gutters, speed humps, bikeways, street
lights, traffic signal installations, traffic signal modifications, utility improvements,
irrigation, and landscaping. The expected benefits from these improvements are the
increase in confidence of parents to allow more students to safely walk or ride their
bicycles to and from schools, parks, and other destination points, and improve the
quality of life for all users.
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of
1,435 regional vendors via PlanetBids, many of which are Santa Ana based. Sixty-one
vendors requested bidding documents, and a total of three bids were received.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on April 10, April 17, April 24, and May 1, 2023. The project was also
advertised in PlanetBids from April 10, 2023 through May 8, 2023. Bids were received
electronically via PlanetBids on May 8, 2023.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Onyx Paving Company, Inc.
Anaheim, CA
$5,204,000
2
Excel Paving Company
Long Beach, CA
$5)3981974
3
All American Asphalt
Corona, CA
$6)3901312
A total of three bids were received and all were deemed responsive. Onyx Paving
Company, Inc. submitted the lowest responsive base bid in the amount of $5,204,000
(Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the
basis of the Base Bid. Based on the bid analysis and a contractor's reference check,
Staff recommends awarding the construction contract to Onyx Paving Company, Inc., in
the amount of the base bid totaling $5,204,000 (Exhibit 3).
Fremont Elementary and Spurgeon Intermediate SRTS Project
July 18, 2023
Page 3
Onyx Paving Company, Inc. is currently the contractor for two projects with the City of
Santa Ana. These projects include the Local Street Preventative Maintenance and the
Residential Street Repair Program. These projects mark the first time Onyx Paving
Company, Inc. has engaged in work with the City of Santa Ana, establishing their
project history.
Project Delivery
To deliver a complete project, in addition to the construction contract bid amount, the
estimated total project delivery cost includes construction administration, inspection,
and testing, along with an allowance for contingencies to account for unexpected or
unforeseen conditions. Construction administration and inspection includes construction
management, workmanship, and quality; and materials testing. As indicated in the Cost
Analysis (Exhibit 4) and as summarized in the table below, the estimated total
construction delivery cost of the project is $5,204,000.
Project Item
Total
Construction Contract Bid Amount
$5,204,000
Construction Administration, Inspection, Testing
$780,600
Contract Contingencies
$520A00
TOTAL ESTIMATED CONSTRUCTION DELIVERY
COST
$6)5055000
Approval of this item will amend the FY 2022/23 Capital Improvement Program to
include the Fremont Elementary and Spurgeon Intermediate SRTS (Exhibit 5).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2020-32 was filed for the project.
FISCAL IMPACT
Project No. 20-6964 is the number assigned to the funding for tracking of all
expenditures to deliver the construction of this project. As indicated in the Cost Analysis,
the total construction delivery cost of the project is $6,505,000 which includes
construction, contract administration, inspection, testing, and contingency. If City
Council approves recommendation No. 1, available budget will be reallocated from the
Fairview Avenue Rehabilitation Project, FY 20/21 (No. 21-6978).
The proposed contract enables Staff to authorize change orders (not -to -exceed 25% of
the base bid) in accordance with the Greenbook: Standard Specifications for Public
Works Construction, if necessary, for contingencies. Staff expects to utilize other
available Public Works appropriations if a contingency becomes necessary to complete
the project. If there are no other available appropriations, then Staff will return to City
Council with a project update and recommendations.
Fremont Elementary and Spurgeon Intermediate SRTS Project
July 18, 2023
Page 4
The following table summarizes the funds budgeted and available for expenditure to
deliver construction of this project. Funding will be available in the FY 23-24 budget
through the Carry Forward (CF) process and funding for subsequent fiscal years will be
included in the proposed budgets for City Council consideration.
Fiscal
Accounting Unit —
Fund
Accounting Unit —
Year
Account No.
Description
Account No.
Amount
(Project No.
Descri tion
EXISTING PROJECT BUDGET
Traffic System
Active
Management
Transportation
2023-24
14817614-66220
Gran—
Program
$4,849,000
(CF)
(20-6964)
SBATP
Augmentation —
Augmentation
Improvements Other
Than Buildings
BUDGET REALLOCATION
05917665-66220
HUTA Gas Tax —
2023-24
(From Proj. 21-6978
Select Street
RMRA,
$116561000
(CF)
to 20-6964)
Construction
Improvements Other
Than Buildings
Total:
$6,505,000
EXHIBITS)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
5. CIP Project Sheet
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
Exhibit 1
Project No. 20-6964 (ATPSB1 L-5063(197)):
,n,a
PWA Fremont Elementary and Spurgeon
PUBLIC WORKS AGENCY Intermediate SIRTS
EXHIBIT 2
CITY OF SANTA ANA
PROPOSAL
YA-UJIM-11 INIU'20-0964
FREMONT ELEMEN'TARY AND SPURGEON INTERdVIEDIATE. WfS
13TJ) PROPOSAL
TO,* CITY COUNCIL OF THE CITY OF SAi TA ANC.
FROM: ONYX PAVING COMPANY, INC.
REQUIREMEN1
The undersigned bidder declares that they have carefully examined the location of the proposed
work that they have examined the Conti -act Documents in its eiit�rety and hereby proposes to
1
furnish all material and do all the work requ*red to complete the said work in accordance with
said plans (if any) and the specifications for the ualit pj-ice(s) or lulnp suln(s) set forth fil the
following schedule:
Itent
Description
Qty
Unit
7
Unit Price
Aniomit
I
U110(issified 1-Neavation
15790
CY
2
Asphalt Concrete Pavement
17080
TN
3
Cold Mill (2")
370
SF
4
Asphalt Rubber Hot Mix (ARfLN4)
510
5'
TN
TN
$
.5
Crushed Wscellaneous Base
4 OTT
N
$
-.�
13-0
6
PCC Sidewalk (41)
181900
SF
7
. PCC Dvivcway Approach
800
SF
(Residmitial T= 61
30
8
PCC Driveway Approach
19500
S—F
$ ----
$
(Commercial T--- 8")
9
PCC Pavement (Traffic Circle)
3
Cy-
$
$
10
PCC Pavemen t,Construction (Speed
18
cy--
$
Hump mid Street)
11
Coloi- Stamped Concrete with ebar
880
SF
$
(Traffic Circle)
12
PCC Modified Curb and GLItter
990
S11
$
01 raffic Circle)
13
PCC Curb Ramp
7,200
SF
14
Detectable Warning Pancl
2
EA
$
P-1 of P-21
EXHIBIT 2.'
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRIS
Hein Deseri-Dfioii t rill i I-
15
PCC Curb and Gutter (Fype, A-2-8)
300
LF
16
PCC Curb and Gutter (Type A-2-6)
1 ,300
LF
$
$
17
PCC Curb ([' pe B-1)
300
LF
$
0
18
PCC Retai ni ag Curb
200
LF
$
150
19
PCC Cross -Gutter (Art erial Street)
100
SF
55
$
20
PCC Cross -Gutter O,ocal Street)
3fflO
SF
$
$
30
21
PCC Du s Pad
100
SF
S
? 7
22
DrainageStructore
151
SF
$
23
Root Shave
3
E A
$
24
Furnish and InsLall New Water
22
'EA
$
Valve Frame and Cover to Finish
0—Grade
25
Fumish and Install New Water
24
U, A
$
$
Meter Box to Finished Grade
5a 0
Adjust Sewer CIMIOLK to Finished
t
EA
26
$
Grade
27
Adjust Sewer and Dfaitiage
24
EA
$
$
Manhole to Finished Grade
28
Fumisb and Install Now 116 Pullbox
3
EA
c�2 40 0
29
Adjust Survey Monument to
16
EA
$
$
Finished Grade
0
EA
30
Tree Removal (Small)
2
550
31
Tree Limb Removat
I
EA
$
32 Stump Removal
33 Abandon Water Valve
34 Consti-act Now Fire Hydrant
Service
7el 0
I EA $ 70 0
9 EA -7-70
6 HA $ 3 k OGD fir.
Ainount
P-2 of P-21
EXHIBIT 2'
Item
CITT OF SANTA ANA
PROPOSAL
PROJECTNO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON NiTERMEDIATE SXFS
Description Qty
Unit
Unit Price
35
Remove Fire Hydrant and 6
Assembly
EA
$
36
Landscaping wifli imporEed Soil I
LS
37
Irrigation I
Ll
7q
$
38
60-Dr-ty Eandscape and frrigation I
LS
$
Maintenance Period
67
39
Construct New Low Flow Catch I
fA
S
$
Basin M-W)
3, azpl 49
40
Catch Basin Reconstruction (Top I
EA
$
$
and Opening) W 51'
41
Catch Basin Reconstruction (Top 2
�EA
$
$
and Opening)
41/ 00a
42
Construct New Parkway Culvert I
EA
$
43
Connection to Existing Catch Basin 2
EA
$
44
Install Media Filte"r Vault I
EA
$
(Krakcn KFR-4 with 19.5" Filters
by Colitcol, Or LkpproyoAf-qunlL
45-
&nstrurt 8" f IDPI7, Pipe 30
LF
$
46
Construct 10%j SDR PVC Pipe 27
J,F
$
$
�2
47
Construct Proprietary Flow- I
EA
$
Through Biofiltratioti Striicturc
(1ilterra Internall Bypasss Curb
FTC 1.3x 7-F 7166 3-0 10 by
Contech. or Approved Equal)
48
Abandon Existing Water Service 3
EA
$
$
"Oe
49
Construct -�iew Water Service (2)� 2
EA
$
�2
4/
$
$
50
Construct New Water Service 0") 1
FA
cad
51
Remove Street Light Pole (South I
Side of 10tI'St. at Daisy St.)
EA
52
Install New Street Light Pole per 1
EA
$
C. ,A. Std Plan t 126 H- I and
112611-2 (South Side of 1011, St. at
Daisy
53
Install Overhead wire (South Side I
FA
$
$
of 10" St. at Daisy St.)
150 6
Amount
"P-3 of P-21
EXHIBIT 2
CITY OF SA TA
AN
PROPOSAL
PROJE, CT NO.: 2 0 - 6 964
FREMONT ELEMENTARY AND SPUROF40N
INTEIMEDIATE SRTS
Item
Desci-ilption Qty
Unit
Unit Price
Aniotint
54
SWPP11 Risk Lcwel 2
1
I,S1
55
Pfoject Advcrtisement 8ign
4
EA
TM
$
?.► 4) 67
56
Traffic Signal Installation at 51" St
I
LS
$
& SLIfliVall St
57
TrafficSignalModification at
$
Fairview St & 51h St
(/ 4147 e9
58
Install Video Detection System at
$ —
$
5111 St & Sullivan St
414/ 4249 49
59
Install Video Dctection System at
t
51h St & Fairview St
047
Co
Install GTT Opitcom EVP System
I
LS
at 51" St & Sullivan St
61
Install 2" PVC Conduit per Plan
90
LF
62
1 nstal 13 PVC Conduit per Kan
300
-IT
$
63
Install 4 PVC Conduit per Plan
500
LF
$
64
Install No. 5 Pull Box
1
EA
$
$
65
Install No. 6 Pull Box
5
EA
$
66
Install No. 6E Pul I Box
3
EA
$
67
hi call W Communication System at
I
LS
$
$
5111 St & Sullivan St
7, �0 a
68
Install 12 Strand SMFO Cabte
200
LF
$
c�2
69
Fusion lion I Strand SMI{' 0
24
FA
$
70
Fiber Optic Splice Closure
1
HA
316
71
Po(holc Rfliffic Signal Pole
8
EA
$ ---
$
Location foi- Utility on flices
62
72
Signingand Striping
I
LS
$
73
Cons(ruction Permit
I
LS
251000
S 25�000
74
Catch Basin Reconstruction (Top
I
FIA
and Opening) W----9'
49., 00161
PA of P-21
EXHIBIT2;
CITY OF SAA ANA
PROPOSAL
PROJECT NO.: 20-6964
FREIMONT ELEMENTARY AND SPURGEON INTERMEDIATE SWrS
TOTAL BASE B I D {I-74) $ J`� .20 �%� �L' D
P-5 of P-21
CITY OF SANTA ANA EXHIBIT 2
PROPOSAL
PROJECT NO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRTS
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base did, and any, all, or none of the add -alternate bid items if any).
' The quantity for this bid stern is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section -2 of the Standard Specifications. The actual
arnount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid stern is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within number (15QI-working dUs after the commencement date stated in the
Notice to Proceed.
The liquidated damages amount, in lieu ofthe amount specified in Subsection 6-9 of the
Standard Specifications, shall be $3,880.00per calendar day.
Name of Firm ONYX PAVING COMPANY, INC.
Signature of BIDDENgP
Title CO EY f . KIRSC --II Ef - CEO, P ES, VP, SEC, TF EA.
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names ofPresident, Secretary, Treasurer and Manager, thereof.)
P-6 of P-21
EXHIBIT 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRTS
This CONSTRUCTION CONTRACT is made and entered into this 18th day of July, 2023 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Onyx
Paving Company, Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Fremont Elementary and Spurgeon Intermediate
SRTS Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in
accordance with the Contract Documents prepared by the City's Public Works Agency and approved
by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed Five Million Two Hundred and Four
Dollars and No Cents ($5,204,000.00), as set forth and identified in the BID PROPOSAL, which is
attached hereto and incorporated herein as Exhibit "A," and in accordance with Section 2-7.1 of the
Greenbook: Standard Specifications for Public Works Construction.
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work as may be deemed necessary or
advisable.
1 of 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRTS
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY' S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at: https://www.santa-ana.org/documents/community-workforce-agreement/
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance aid payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to,
any of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
2 of 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRTS
of any of the obligations under the Contract Documents;
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
JENNIFER L. HALL
City Clerk
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
IN
JOSE MONTOYA
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NAB I L SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRI STIN E RIDGE
City Manager
CONTRACTOR:
Onyx Paving Company, Inc.
NAME: Corey Kirschner
Title: President
3 of 3
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Orange )
On July 10, 2023 before me, Carly Bredal, Notary Public ,
Date Here Insert Name and Title of the Officer
personally appeared Corey R. Kirschner
Name ) of Signer(
who proved to me on the basis of satisfactory evidence to be the person(k) whose name( is/axe
subscribed to the within instrument and acknowledged to me that he/sKe/tlley executed the same in
his/h*rAbeir authorized capacity(i(�C), and that by his/h)er/their signature(s5) on the instrument the person(a),
or the entity upon behalf of which the person(x) acted, executed the instrument.
certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
s,,OF Ty CARLY BREDAL
Notary Public - California Z
z m Orange County Signature
Commission # 2442539 y
�ak
4tIFOILL My Comm. Expires Mar 28, 2027 4 (Ignature of Notary Public
Place Notary Seal Above
OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document:
Document Date:
Number of Pages: Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
lr\•X:..J`^�X,.'rti.!ir t���j t.:.:±j�:.:'1.�1.`'1V `'^iV•�^ :'C%....r t:_ i r _�i: ''.�'�'�.� ". `.._�/�" "t.:h 'C:.. <- rat-<' :�qz- < �p< ty� .-c7<• " _ "<T
02014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907
EXHIBITA!
CITY OF SANTA ANA
PROPOSAT,
PROJECT NO.: 20-6964
FREMONT EHMENTARY AND SPURGEON INTERMEDIATE SRTS
BTD-PROPOSAL
T04- CITY COUNCIL OF THE ary OF MANTA ANA
FROK ONYX PAVING COMPANY, IN-C.
REQUIREMEN'Tk,
The undersigned bidder declares that they have careftilly examined the location of the proposed
Work that they have examined. the Co'ntract Documents ill its entirety and hereby proposes to
furnish all material and do all the wofk-- required to complete tho said work in accordance with
said. plans (if any) and the specifications for the unit price ) or lump sum(s) set forth in the
following sch-edule,
le ription
Qty
Unit
Unit Price
An iouut
uhChl's,51" fiedENO a vat loll
11790
Cy
$
$
2 AsPhaft (.,Onoride. Pavement
1 7
$ .11.."
3 Cold Mill (21
3 . 70
SF
$
..................... ........
4 Asphalt Rubber Hot Mix (ARHM)
5 10
TN
$
-------
5 Crushed I ; Mla
M4.9 -neous
40, IN
$
6 PCC Sidewalk (4")
189 0
8F
7 PCC Drive.way Approach
800
SF
$
$
(Residential T= 6")
30
8 PCC Driveway Approach
1,506-
'SF:
-------------------
9 11cc Pavevielit (Fraffic Circle)
3
C. y
$
10 PCC Pavement Coll-struction (Speed
18
coy
S
Dump and Str"0
I I Color stamped Concrete with Behar
880 SF $
(Traffic Circle)
--- - -------- - -
12 PCC Modified Curb a -ad Gmter
— --- -----
990
S1,
................
(Traffic, Cil-cle)
13 PCC Curb Ramp
7 $200
*SF
$
$
14 Detcotabte, Warning Palle
A
....... .. .. --- - — 2 ------------
........
EA
$
- - - ------
$
P- I of P-21
EXHIBIT k
CITY OF SANTA ANA
PROPOSA14
PROJECT NO,: 20-6964
FREMONTE.T.-EMENTARY AND SPURGEONINTERMEDIATE SM'S
Hein Description
Qt 't
U111
%
Ullit PlIce
v
F—Amount
! I.
.5 PccCurb talid Gutter (17ypt� A-2---97)
......... ..
300 IT
..
$
$
16 PCC Curb and Gutter (Typc A-2-6)
- ----- --- —113-00 LF
$
17 PCC' Curb (Tpe B-1)
300 L'F
$
18 PCC Rotaining Curb
200
L... ..............
S
19 PCC Cross -Gutter (Arterial Street)
100 SF
$
20 PCC Cross-Outter (Local Sti-ec 0
3�600: SF
$
PCC Bus Pad . .. . ........
1.00 SF
f 7
22 Dralinage Structilre
$
$
23 Root Shave
3 EA
$
$
-i4—
Furnisli mid I stall N w Water
22
------------
$
valve r�rt*amc and Cover to Fint'shed
Grade
............ ....... -------
25 Fumish and InstalI New Water
24 E A
E A
$ ......
.. --- -----
$
Motor Box to Finisliod Grade
26 Adjust Sewer Cleanout ta—F�inl's ...... ----
lied
.................
$
Grade
a 4940
27 Adjust Sewer and Drainage
24 EA
M8nhole, to Finished Grade
28 Fumish and Install Now 1/6 Pullbox
3 EA
1�249 0
29 Adjust Survey Monu men t to
1 . 6 F, - A
$
$
Fint'Shed Grade
-------- - ---- - 30 Tree Removal (Small)
2 EA
$
31 Trec.Llmb Removal
I E* A
$
— - - ---------
7eJ 0
32 Stump Reap
g
700
3 adon Water Valve .... ......... .... ..............
. ...............
9 EA
$ ...........
. .............
7-70
34 Construct Now Fire Hydriant
6 EA
$
$
P-2 of P-21.
EXHIBIT A;
CITY OF SANTA ANA
PROPOSAL
PROJECT NO,,- 20-6964
FREMONT ELEMENTARY AND SPURGEON M'FERMEDIATE SIM
Item
'Description
Qty
Unit
Utilt Price mount
35
Remove Fire and
Assembly
6
EA
$ 47 $
73-TLandscaping
with. finported Soil
I
LS
$ $
37
Irrigation
[61
- ------------
I LS
$ $
- — ----------
.38 60-Day Landscape and fi-rigatioll
- --------I LS
$
Maintenance Period
41 /1/, 41,; 20 a
39 Construct New Low Flow Catch
I EA
. ..... $
Basin (W=4')
awe
40 Catch Basin Reconstruction (Top
-------- . .... ... ......
1 EA
. $
and oplening) W"5'
................. ......
467e T
--., ..........
41 Catch Basin Rccojistrtjtint � (Top
- --------------
E
$
and Ope11119) W-14'
42 Construct Now Parkway Culvert
F, ..h. E - A .---
$
/
43 Cont ---
nec 1 1 011 to Existing Catch Basin.
1� I
2 --EA
$
44 Install CarfridgeMedia F1 . .........
ifteC'V,ault :
.. I E A
(Kraken KFR-4 with 19,5" Filters
33 Ft a 1) . .. .. .........
45 Construct 81, HDIT
1
w... ................
30 IT
. . .........
$ $
el 47
----------------
46 Construct 10"" SIR PVC Pipe
....... LF
...........
$
-- -------------
.2047
47 ConstructPro prietary Flow-
I EA
Throtigh Bl'ofiltratil'oti Sti-lictil.1-c
(�-('Ifterra Inteniall J1 ypam Curb
FTIBC 13x.7-F 71663-010 by
Contech or Approved
48 Abandon Existing Water Service
3 EA
---- ------------ $
49 Construct Now Watrv:Servicc (2")
2 r, A
�2 #j 0-00
50 COMM'Urt New Water .Service 0
1 EA
$
51. R emo'veStree'-*-- -------
tl,ight polt South
Side of 10t" St. at .Daisy St,"
$ ..... .. . .
52 Install NO w Strect Ligfit-P-ol e per
$
$
CO-S.A. Sid Plan 11 26fl- I and
112611-2 (Smith Stdc. of 1011, St. at
01
Daisy St.)
53 trlstall Overhead W'rv, (South Side
1 FA
--
$
of I O'h St. at Daisy St.)
570 6
11-3 of P-21
EXHIBIT A,,
CITY OF SANT A ANA
PROPOSAL
PROJECTNO,: 20-6964
FRE MONT ELEMENTARY AND SP1JRGEON INTERMEDIATE S.RTS
item Desctipfion
Qty Unit
......... .
Uriff P1.1ce Amount
54 SWPPP Risk Level 2
$
$
1 47 a 17
55 Project Adverusemant Sign
4 EA
$
56 Ttaffic Signal histallation at 51, S
$
$
.& Sullivan.&
"? �� ; 5'.. e � 6149
------------- -- ---------
51 Traffic signal wditicittion at
. .......
$ . .... ... ------
$
Fairyilow St & 51h St
d a 40
58 Install Video Detection System at
. . .... ..... I Is
5(11 St & Sulky ,fit
59 Install Video Detection System at
51h St & FairvieSt
;2
45w J,06 10
60 Install G fT 01-Atcom EVP System
LS
...
........
at 511, St & Sullivan St
49Z740
61 Install 2" PVC Conduit per Plan
90 LF
$
62 Install 3" PVC Conduit per Plan
3 OMO LF
$
4�7
63 -1-i �is i il 114 " P� V__C_
Conduit per Plan
500 LP
$
$
64 bstall No, 5 17101 Bux
1 # EA
$
$
*00a
la4l V#
65 Install No, 6 Pull. Box
5 EA
66 histall No. 6E Pull Box
3 EA
--- ---------- -
&
67 Install IP Commullicut'011 Syste D1
-
I i's
$
$
51h St & suffivall St
68 Itimall 12 Strand SMFO Cable
200 LF
69 Fusion Splice, 1. Strand SMI',.'o
24 134-A
$
$
5a
70 Fiber Optic Splice Closure
71 P0010101)-afflo Signal Pole
8 F, A
$
Location. for Utility Conftiuts�
72 S igni jig and Stripi I I Of
LS.
73 Coastruction Pen-0 it
25t000
$ 25$000
74 Catch Basin Reconstitiction (Top
I EIA . ..... $
and Openiag)
_J
P-4 of P-21
EXHIBIT
Cl'l"Y 0F.SANTA ANA
PROPOSAL
PROJECT NO. - - 20-6964
FREMONT ELEMENTARY AND SPURGEON WFER-MEDIATE SRTS
TOTAL BASE. BID (1-74) $
P-5 of P-21
CITY 4F SANTA ANA EXHIBIT A
PROPOSAL
PROJECT NO.: 20-6964
FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRTS
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" l irnit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
f This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the work for the total base bid amount
shown above, within number 50working days after the commencement date stated in the
Notice to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $3,880.00 per calendar day.
Name of Firm ONYX PAVING COMPANY, INC.
Signature of BIDDER •
Title GREY R. KIRSCH N ER - CEO, PRES, VP, SEC, TREA.
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-6 ofP-21
EXHIBIT
COST ANALYSIS
CONSTRUCTION OF PROJECT NO. 20-6964 (ATPSB1 L-5063(197)):
Fremont Elementary and Spurgeon Intermediate SRTS
Construction Contract
$ 5,204,000.00
Contract Administration, Inspection and Testing
$ 7809600.00
Contin encies
$ 520,400.00
TOTAL ESTIMATED CONSTRUCTION COSTS
$ 6,505,000.00
LO
I --
I
A
161
13m
L6:
w
UJ
Z
qp
LLI
L 0 th
I 10L
CL
OL
A
rn L;
ra -Q
3
u I
q� L
C. I -
z
nD
0 ILI
93L
w
-3
Q
LU r.7
a.
IL-
-r7-�
ql
C�-
r)
W 16_
L) Ir
LLJ to
C�
.
-1%..i -a
E�
w -L., coo
Q: Q)
0
0 6
0 Lrzz
UL I L
CL
m
IOL
cc
05
z
0
P -
I
%J
CA
%J
(A
CA
CA
I
rT
I
"T
%I
I
U,
LL
01)
oj
I-
7—
UL.
LL
%J
11
c
9r-
in
CD
C%4
0-1
17Y
Co
a',
U-
9d-
PO
LL
9d-
kj�
-t
CQ
Uri
0
z
LL
LL
o
M
I .
C
Qj
E
:3
<
0
f)
'r-
m
LU
2
C
13—
LU
u
No
z
r
LLI
> QL
C-Ij
LU
a
< rl
LO
W
2
X
w
Q)
QQ)
OL
CO
Q OL
O
EE
O-
.. M
-co`s
W
`) m
- -
W,_o
m
� -S�
Q
7
Q
M Q)
CO E
C) c
cn
W25
Q
W
Q
U
CO
0. -
CL
JF.
H
H
W
W
.
� Z .
CLLL
CL
CL
Z
0
H
0
J
r�-
I I
1
r�-
I
1
C%4
C%4
LL
LL
1
w
I
1
C%4
C%4
LL
LL
1
Ln
I
1
C%4
C%4
LL
LL
Rie
I I
1
Rie
I
1
m
m
LL
LL
m
I I
1
m
I
1
LL
LL
c%4
U-
U-
c
o o
o
c
o
0
co cD
M
M
m
cv (C)o0
co
00
cv
oz
04
c T
H
U)
H
H
~
~
LL
w
LL
' w
W
o
W
0 a
(-) 0
IOL
U)
O
W
� C
74
Z
CL