My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Purchase of Commercial Diesel Generator Set for the City’s Corporate Yard
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 12 - Purchase of Commercial Diesel Generator Set for the City’s Corporate Yard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 8:50:50 AM
Creation date
8/10/2023 8:50:45 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 12 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br />June 20, 2023 <br />TOPIC: Purchase of Commercial Diesel Generator Set for the City’s Corporate Yard <br />AGENDA TITLE <br />Award a Purchase Order in the amount of $376,500 to Cummins, Inc. for One Commercial <br />Diesel Generator Set for the City’s Corporate Yard (Specification 23-093) (General Fund) <br />RECOMMENDED ACTION <br />Authorize a one-time award and payment of Purchase Order to Cummins, Inc. for the <br />procurement of a commercial diesel generator set in the amount of $376,500, subject to <br />non-substantive changes approved by the City Manager and City Attorney. <br />DISCUSSION <br />The Public Works Agency’s Water Resources Division oversees and maintains the daily <br />operations of the City’s water, sanitary sewer systems, and corporate yard facility. The <br />water system is composed of approximately 480 miles of water main, 21 groundwater <br />wells, seven pump stations, 10 reservoirs with a storage capacity of 49 million gallons, <br />four pressure-regulating stations, and seven connection points to the Metropolitan Water <br />District (MWD). The system has an average daily demand of 30 million gallons from its <br />roughly 45,000 service connections. <br />During power outage events, such as the Public Safety Power Shutoffs (PSPS) performed <br />by the City of Santa Ana’s energy provider Southern California Edison (SCE) to reduce <br />the fire risk caused by the SCE infrastructure, certain water production and corporate yard <br />equipment is rendered non-operational. The Water Resources Division is proposing to <br />replace Corporate Yard’s existing standby diesel generator. The purchase of a generator <br />will ensure that equipment at the corporate yard remains operational during power outage <br />events. <br />Santa Ana Ordinance No. NS-2312 authorizes the City to purchase against contracts from <br />any public agency employing a competitive bid process. Sourcewell, a cooperative <br />government purchasing agency, awarded a contract to Cummins, Inc. (Contract <br />No.092222-CMM) for the procurement of electrical energy power generation equipment <br />with related parts, supplies, & services, as a result of open, competitive bidding on behalf <br />of its members, which includes government agencies. Thus, Cummins, Inc. is extending <br />the contract to the City.
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).