My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Campesino Park, Memorial Park, and Madison Park Restroom Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 25 - Campesino Park, Memorial Park, and Madison Park Restroom Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:38:21 AM
Creation date
8/10/2023 9:38:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 25 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />June 6, 2023 <br />TOPIC: Campesino Park, Memorial Park, and Madison Park Restroom Projects <br />AGENDA TITLE <br />Approve Change Order and Revised Project Cost Analysis for an Existing Construction <br />Contract with iBuild Spectrum, Inc., for a Total Project Delivery Cost of $1,740,000, for <br />the Campesino Park, Memorial Park, and Madison Park Restrooms ( Project Nos. 21- <br />7533, 21-7534, 21-7535) (Non-General Fund) (Revive Santa Ana Program) <br />RECOMMENDED ACTION <br />Authorize the City Manager to approve Change Orders and revise the Project Cost <br />Analysis to reflect a transfer of savings from construction administration and inspection <br />to contingency in an amount of $33,898, with a total Project Delivery Cost of <br />$1,740,000. <br />DISCUSSION <br />On September 21, 2021, the City Council authorized the awarding of a contract to iBuild <br />Spectrum, Inc. for the Campesino Park, Memorial Park, and Madison Park restroom <br />projects, which encompasses contingency and construction administration. The <br />estimated total project delivery cost is $1,640,000. The project scope entails <br />demolishing the existing restroom buildings, installing new pre-fabricated restroom <br />buildings, and implementing certain site improvements to ensure an accessible path of <br />travel to these facilities. <br />Subsequently, on December 20, 2022, the City Council approved an increase in the <br />contract amount and total project funding by $100,000 to address additional repairs <br />necessitated by vandalism. <br />During construction, significant vandalism occurred at all three park sites. At Madison <br />Park specifically, the vandalism has taken a toll on the project’s scope as electrical <br />panels and electrical work was damaged. In order to complete the scope of work and <br />repair all damaged areas, the City requested that the contractor perform additional <br />repairs to electrical conduit runs and electrical panels. <br />To perform these vandalism related repairs and capitalize on the existing favorable <br />pricing of the existing contract with iBuild Spectrum, Inc., staff recommends approving <br />Construction Contract Change Orders (Exhibit 1), as allowed by the contract
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).