City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
May 16, 2023
TOPIC: Purchasing Policies and Procedures
AGENDA TITLE
Ordinance Amending City Manager’s Contracting Authority for Public Works and Non-
Public Works Contracts Under Chapter 2, Article VII and Article VII.II and Public Works
Construction Rules and Regulations Under Chapter 33, Article VIII of the Santa Ana
Municipal Code
RECOMMENDED ACTION
Approve the first reading of an ordinance amending Articles VII and VII.II of Chapter 2
regarding the City Manager’s contracting authority and City purchasing rules and
regulations, and Article VIII of Chapter 33 regarding Public Works construction rules and
regulations of the Santa Ana Municipal Code as follows:
i) Amend Section 2-748 of Chapter 2, Article VII concerning the City Manager’s
Contracting Authority:
(1) Public Works contracts to increase from $250,000 to $750,000;
(2) emergency public works construction contracts to increase from $100,000
to $750,000; and
(3) Non-Public Works and Public Works contract change orders authority
increase from 10 percent or $25,000, whichever is greater, to 20 percent.
ii) Amend Section 2-803 to 2-807 of Chapter 2, Articles VII.II concerning Purchasing
Rules and Regulations:
(1) Clarifying language administrative in nature;
(2) Extending local vendor preference to increase from procurement between
$5,000 and $100,000 to procurement between $15,000 and $100,000;
(3) For administrative contracts to increase from $5,000 to $15,000;
(4) For informal contracts to increase from $5,000 and $25,000 to $15,000
and $50,000;
(5) For formal contracts to increase from $25,000 to $50,000
(6) For no-bid purchases to increase from $25,000 to $50,000; and
(7) Add language to coincide with current practices for awarding service
contracts.
Purchasing Policies and Procedures
May 16, 2023
Page 2
3
4
2
9
iii) Amend Section 33-203 of Chapter 33, Article VIII concerning the Public Works
Construction Rules and Regulations:
(1) Housekeeping language administrative in nature.
EXECUTIVE SUMMARY
The City of Santa Ana’s Public Works Agency is responsible for building and
maintaining Santa Ana’s infrastructure to maintain the quality of life of its residents and
businesses. This includes building, maintaining, and administering projects related to
public streets, traffic management, storm drains, sewers, water, trash collection,
recycling, street sweeping, public right-of-way landscaping, park maintenance, graffiti
removal, fleet maintenance, building maintenance, and facility improvements.
Since the beginning of FY 2022-23, the City of Santa Ana has drafted and solicited over
105 Invitations for Bids (IFB) and Requests for Proposals (RFP); of which,
approximately 76 percent were related to a Public Works Agency project. The Public
Works Agency, together with the Finance and Management Services Agency, finds that
revisions to both the City Manager’s contract authority and purchasing requirements
regarding its informal and formal bidding process are recommended to modernize the
City’s procurement process, increase the pool of companies who bid on City projects,
increase efficiency, expedite project delivery, and closely align the City’s purchasing
requirements with newly enacted federal and state guidelines while maintaining local
vendor preferences.
If approved, the City Manager will have authority to enter into public works contracts up
to $750,000 and bidding requirements will increase (formal bid process) to $50,000 for
both public works and non-public works contracts.
DISCUSSION
Background
The City’s Municipal Code includes authority for the City Manager to bind contracts,
purchasing thresholds for informal bids and formal bids, and local preference
allowances. The City Council last updated the City Manger’s contracting authority in
March 2019, increasing it from $25,000 to $250,000 for public works contracts, and
$25,000 to $50,000 for non-public works contracts. The City Council last updated the
purchasing thresholds (i.e. informal and formal bidding requirements) in 2012.
Formal and Informal Bid Threshold
The City has an existing formal process to advertise for and collect bids and proposals
for purchases of goods and services over $25,000, and an informal bid requirement for
purchases over $5,000.
Informal bids require staff to document at least three informal quotes gathered via
phone or email for purchases between $5,000 and $25,000, unless unique
Purchasing Policies and Procedures
May 16, 2023
Page 3
3
4
2
9
circumstances dictate the goods or services are only available from less than three
vendors.
Formal bids are required for purchases in excess of $25,000 by way of IFB or RFP. The
formal bidding requires solicitation through Planetbids, the City’s current e-Procurement
portal, as well as a public notice. Public notice includes publication in a newspaper of
general circulation for public works contracts.
Due to the increasing cost of goods and services, informal and formal bidding have
become more frequent. Staff recommends increasing the informal and formal bidding
threshold requirement to $15,001 to $50,000, and $50,001 and above, respectively.
The revision would allow flexibility for staff to do as-needed procurement at local
businesses, more efficient project delivery, and increased efficiency with existing
resources.
Comparison to Other Cities and Proposed Thresholds
The following table summarizes the contracting and purchasing authority for charter
cities in Southern California with populations from 300,000 to 500,000. The table
includes the current and proposed thresholds for Santa Ana.
City CM Authority Informal Bids Formal Bids Local
Preference
Anaheim All: Up to
$200,000
Public Projects:
$10,000-
$50,000 require
up to 3 quotes
Public Projects:
Over $100k
All Other:
>$20,000
5% maximum
$2,000
Irvine All: Up to
$1,000,000
Public Projects:
>$60,000-
$200,000
All Other:
$10,000-
$45,000
Public Projects:
>$200,000
All Other:
$45,000-
$200,000
5% maximum
$2,000
Long Beach All: Up to
$200,000
None Required Public Projects:
$25,000
All Other:
>$100,000
10% maximum
$10,000
Riverside All: Up to
$50,000
Public Projects:
Up to $25,000
All Other:
Up to $50,000
Public Projects:
>$50,000
All Other:
>$50,000
5%
Santa Ana
(Current)
Public Works
Contracts:
All:All:
>$25,000
7% small Santa
Ana business
Purchasing Policies and Procedures
May 16, 2023
Page 4
3
4
2
9
City CM Authority Informal Bids Formal Bids Local
Preference
Up to $250,000
All Other:
Up to $50,000
>$5,000-
$25,000
or 4% Orange
County
business, for
purchases up
to $100,000
Santa Ana
(Proposed)
Public Works
Contracts:
Up to $750,000
All Other:
No Change
All:
>$15,000-
$50,000
All:
>$50,000
No Change
Several of the cities on this list noted that they are also considering increasing contract
authority and procurement thresholds.
City Manager Contracting Authority
The City’s current municipal code authorizes the City Manager to bind the City to any
non-public works contract in an amount not to exceed $50,000 and any public works
contract in an amount not to exceed $250,000. The municipal code also authorizes the
City Manager to bind the City on change orders to any one public work contract of no
more than ten percent of the original contract amount, or $25,000, whichever is greater.
With the increasing amount of public works projects, increasing cost of goods and
services, and desire to improve project delivery, the Public Works Agency and Finance
and Management Services Agency both recommend increasing the City Manager’s
contracting authority from $250,000 to $750,000 for public works contracts. All other
contracts above $50,000 will continue to require City Council approval. Additionally,
staff recommends increasing the City Manager’s change order authority to increase
from ten percent to 20 percent of the original contract amount.
Housekeeping Adjustments
Revisions are proposed to Articles VII and VII.II of Chapter 2 regarding City Manager’s
contracting authority and City purchasing rules and regulations, and Article VIII of
Chapter 33 regarding Public Works construction rules and regulations of the Santa Ana
Municipal Code to clarify the City’s current practice and additional clean-up language
which are administrative in nature.
FISCAL IMPACT
There is no quantifiable fiscal impact associated with the proposed ordinance. However,
the City would be able to utilize staff resources more efficiently for other public services.
EXHIBIT(S)
Purchasing Policies and Procedures
May 16, 2023
Page 5
3
4
2
9
1. Ordinance including Chapter 2, Article VII and VII.II and Chapter 33 of the Santa
Ana Municipal Code
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency
Approved By: Kristine Ridge, City Manager
Ordinance No. NS-XXX
Page 1 of 9
ORDINANCE NO. NS-XXX
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA AMENDING ARTICLES VII AND VII.II OF
CHAPTER 2 OF THE SANTA ANA MUNICIPAL CODE
REGARDING CITY MANAGER’S CONTRACTING
AUTHORITY AND CITY PURCHASING RULES AND
REGULATIONS, AND ARTICLE VIII OF CHAPTER 33 OF
THE SANTA ANA MUNICIPAL CODE REGARDING PUBLIC
WORKS CONSTRUCTION RULES AND REGULATIONS
WHEREAS, Sections 421 and 422 of the Santa Ana City Charter provide that the
City Council may by ordinance authorize the City Manager to bind the City on non -public
works contracts and public works contracts for such amounts as may be established from
time to time.
WHEREAS, Sections 421 and 422 also provide that the City Council may by
ordinance establish rules and procedures for competitive bidding for non-public works
contracts and public works contracts.
WHEREAS, on March 19, 2019, the City Council adopted Ordinance No. NS-2963,
by which the City Manager’s contracting authority was increased to $50,000 for non -public
works contracts and to $250,000 for public works contracts.
WHEREAS, the City Council is regularly presented with a voluminous amount of
contracts and agreements for approval annually. The process to obtain City Council
approval can be lengthy and requires a substantial amount of City staff time. This process
can also adversely impact the City’s ability to provide efficient and timely delivery of
services to its constituents and businesses.
WHEREAS, since the beginning of the current Fiscal Year, the City of Santa Ana,
has prepared and solicited over 105 Invitations for Bids (IFB) and Requests for Proposals
(RFP); of which, approximately seventy six percent (76%) were related to a Public Works
Agency project. The Public Works Agency, together with the Finance and Management
Services Agency, finds that revisions to both the City Manager’s contract authority and
purchasing requirements regarding its informal and formal bidding process are necessary
to modernize the City’s procurement process, increase the pool of companies who bid on
City projects, increase efficiency, expedite project delivery, and closely align the City’s
purchasing requirements with newly enacted federal and state guidelines , while also
maintaining local vendor preferences.
WHEREAS, further increasing the City Manager’s contracting authority for both
non-public works and public works contracts and other housekeeping changes to the
City’s procurement rules and procedures are also desirable because they will free staff
time to devote to other necessary public services and facilitate participation of small local
vendors for the City’s business, as the formal process can be time-consuming and costly.
EXHIBIT 1
Ordinance No. NS-XXX
Page 2 of 9
WHEREAS, further increasing the City Manager’s contracting authority for both
non-public works and public works contracts and change orders to such contracts will
also further streamline the process to execute Public Works Agency contracts and
agreements for the construction, rehabilitation, maintenance, testing and inspection of
public infrastructure, thereby improving the delivery of services necessary for the
continued enhancement and preservation of such public infrastructure.
WHEREAS, due to the increasing cost of goods and services as a result of normal,
as well as historic inflation, informal and formal bidding have become more frequent.
Increasing the informal and formal bidding threshold requirement will allow flexibility for
City staff to perform as-needed procurement at local businesses, complete more efficient
project deliveries, and increase overall efficiency with existing resources.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA ANA, DOES
HEREBY ORDAIN AS FOLLOWS:
Section 1. The recitals above are each incorporated and adopted as findings by
the City Council.
Section 2. Section 2-748 of Article VII (City Manager’s Contracting Authority) of
Chapter 2 (Administration) of the Santa Ana Municipal Code is hereby amended to read
in its entirety as follows (new language is underlined, deleted language in strikeout for
tracking purposes only):
Sec. 2-748. – City manager’s contracting authority.
(a) Non-public works contracts.
(1) The city manager is authorized to bind the city to any one (1) or more written
non-public works contract, per vendor, in an amount or amounts not exceeding
the sum of fifty thousand dollars ($50,000.00). For purposes of this section, a
non-public works contract shall mean any contract not deemed to be a public
works contract under subsection (b)(1).
(2) The city manager is hereby authorized to bind the city on amendments to any
one (1) non-public works contract when such amendment for any one (1) non-
public works contract, together with any previously approved amendments for
said contract, do not cumulatively amount to an increase of the city's expenditure
obligation under said contract of more than twenty (20) percent of the original
contract amount.
(b) Public works contracts.
(1) The city manager is authorized to bind the city to any one (1) or more written
public works contract, per vendor, in an amount or amounts not exceeding the
sum of two seven hundred and fifty thousand dollars ($250,000.00) ($750,000).
For purposes of this section, a public works contract shall be deemed to mean
Ordinance No. NS-XXX
Page 3 of 9
a project for the erection, improvement, and/or maintenance, inspection, testing
and repair of public buildings, streets, drains, sewers, or parks.
(2) The city manager is authorized to bind the city to any one (1) written contract for
emergency public works construction in an amount not exceeding the sum of
one hundred thousand dollars ($100,000) seven hundred fifty thousand dollars
($750,000).
(3) The city manager is hereby authorized to bind the city on change orders to any
one (1) public works contract, per vendor, without previous city council approval
when such change order for any one (1) public works contract, together with any
previously approved change orders for said contract, do not cumulatively
amount to an increase of the city's expenditure obligation under said contract of
more than ten (10) twenty (20) percent of the original contract amount., or the
amount of fifty thousand dollars ($50,000), whichever is the greater.
Sec. 2-749. Reserved.
Section 3. Section 2-803.1 of Article VII.II (Purchasing Rules and Regulations)
of Chapter 2 (Administration) of the Santa Ana Municipal Code is hereby amended to
read in its entirety as follows (new language is underlined, deleted language in strikeout
for tracking purposes only):
Sec. 2-803.1. Local preference in contracts for materials, supplies, labor and
equipment.
Except for those contracts for which the Charter of the City of Santa Ana prohibits
the provision of a local preference, and/or those contracts funded through programs or
partners which prohibit the use of a local preference, the city council au thorizes the
purchasing manager to extend a preference to local business and Orange County
business as set forth herein.
(a) In the procurement of material, supplies, labor and equipment involving
expenditures between five thousand ($5,000) fifteen thousand dollars ($15,000)
and one hundred thousand dollars ($100,000.00), the purchasing manager shall
extend a preference to each local business and each Orange County business,
which preference shall be applied to the bid which provides maximum quality at
minimum price. Said preference shall be set by resolution of the city council.
(b) If the bidder submitting the maximum quality at minimum cost bid is not a local
business or an Orange County business, and if a local business or an Orange
County business has submitted a responsive and responsible bid, and with the
benefit of the applicable preference, the bid submitted by local business or
Orange County business is equal to or less than the original maximum quality at
minimum cost bid, the contract shall be awarded to the local b usiness or the
Orange County business at its submitted bid price. If two (2) or more low bids
received are equal after the application of the preference, the contract shall be
awarded in the following order:
(1) To a local business.
Ordinance No. NS-XXX
Page 4 of 9
(2) To an Orange County business.
(3) To the bidder submitting the maximum quality at minimum cost bid.
The city shall reserve the right to reject any or all bids.
(c) In order for the preference to apply, a bidder must certify under penalty of
perjury, that the bidder qualifies as a local business or Orange County business.
The preference is waived if the certification does not appear on the bid.
Section 4. Section 2-805 of Article VII.II (Purchasing Rules and Regulations)
of Chapter 2 (Administration) of the Santa Ana Municipal Code is hereby amended to
read in its entirety as follows (new language is underlined, deleted language in strikeout
for tracking purposes only):
Sec. 2-805. Procurement of materials, supplies, labor, and equipment
between five hundred dollars ($500.00) and twenty-five thousand dollars
($25,000) fifty thousand dollars ($50,000).
(a) For agreements exceeding five hundred dollars ($500.00) but not exceeding five
thousand dollars ($5,000) fifteen thousand dollars ($15,000), the city manager
may bind the city on contracts for materials, supplies, labor, and equipment in
amounts not exceeding five thousand dollars ($5,000) fifteen thousand dollars
($15,000) in any one contract, or in the aggregate with any one vendor or service
provider. These contracts can be entered into administratively without the need
for informal or formal bidding.
(b) Unless exempt from bidding pursuant section 2 -807, all contracts involving an
expenditure between five thousand dollars ($5,000) and twenty-five thousand
dollars ($25,000) fifteen thousand dollars ($15,000) and fifty thousand dollars
($50,000) for materials, supplies, labor, and equipment shall be let on the basis
of obtaining maximum quality at minimum cost in accordance with procedures
established by the purchasing manager. Those procedures shall provide for at a
minimum the following:
(1) There shall be a written or verbal invitation for bid which shall include the
following information: A general description of the things to be purchased or
project, the time and place for bid opening when applicable, bid instructions,
and the terms and conditions of the bid and any resulting contract. The
purchasing manager shall make a good faith effort to notify all businesses
engaged in providing such materials, supplies, labor, and equipment located
within the boundaries of the city of the opportunity to bid.
(2) Where required by state or federal law or regulations, or upon request by a
bidder, the bids shall be opened, if sealed, and declared in public at the time
and place stated on the "Invitation for Bid."
Ordinance No. NS-XXX
Page 5 of 9
Section 5. Section 2-806 of Article VII.II (Purchasing Rules and Regulations) of
Chapter 2 (Administration) of the Santa Ana Municipal Code is hereby amended to read
in its entirety as follows (new language is underlined, deleted language in strikeout for
tracking purposes only):
Sec. 2-806. Procurement of materials, supplies, labor, and equipment in
excess of twenty-five thousand dollars ($25,000) fifty thousand dollars
($50,000).
Unless exempt from bidding pursuant to section 2-807, all contracts involving an
expenditure in excess of twenty-five thousand dollars ($25,000) fifty thousand dollars
($50,000) for materials, supplies, labor, and equipment shall be let on the basis of
obtaining maximum quality at minimum cost, in accordance with procedures established
by the purchasing manager. Those procedures shall provide for at least the following:
(a) Public notices inviting bids shall include a general description of the things to be
purchased and the date, time, and place for bid opening. Adequate public notice
of the invitation for bids shall be given a reasonable time prior to the date set
forth therein for the opening of bids, in accordance with regulations established
by the purchasing manager. To the extent that public notice is by way of
publication in a newspaper of general circulation, such publication shall be for at
least two (2) days, the first of which shall be at least ten (10) days before the
date set for opening bids. Public notice shall occur as follows:
(1) For all public works contracts, public notice shall occur by way of publication
in a newspaper of general circulation and such publication shall be for at least
two (2) days, the first of which shall be at least ten (10) days before the date
set for opening bids.
(2) For non-public works contracts, public notice shall occur by way of electronic
bidding system for the purpose of receiving sealed electronic bids or
proposed contracts.
(b) Invitation of bids shall be mailed or transmitted by other means established by
the administrative code but not recited over the telephone or in person. Any
interested bidder may obtain an invitation for bid.
(c) All bids shall be submitted sealed in accordance with the instructions contained
in the "Invitation for Bid" form.
(d) The bids shall be opened in public, at the time and place stated on the "Invitation
for Bid." All bids shall be publicly declared.
Ordinance No. NS-XXX
Page 6 of 9
Section 6. Section 2-807 of Article VII.II (Purchasing Rules and Regulations) of
Chapter 2 (Administration) of the Santa Ana Municipal Code is hereby amended to read
in its entirety as follows (new language is underlined, deleted language in strikeout for
tracking purposes only):
Sec. 2-807. Non-bid purchases.
The following contracts may be exempted from competitive bidding through an open
market purchase by the purchasing manager, and confirmed by the city council in the
case of contracts for over twenty-five thousand dollars ($25,000) fifty thousand dollars
($50,000), but shall nevertheless be entered into only after compliance with the rules
established by the purchasing manager, which shall include the review of such alternative
sources of supply or performance as may be available in competition with one another
and selection therefrom on the basis of obtaining maximum quality at minimum costs:
(a) Purchases of materials, supplies, labor, and equipment whenever it shall appear
that there is only one (1) reasonably available source or where solicitation of
bids would for any reason be an idle act.
(b) Purchases of materials, supplies, labor, and equipment necessary for the
preservation of life, health or property, following the declaration of a state of
emergency or disaster in the city. A full written account of eme rgency
procurements made during the declared emergency or disaster shall be
submitted to the city council within thirty (30) days after their procurement.
(c) Situations where no bids are received or all bids are rejected and the city council
determines, upon the affirmative vote of at least two -thirds (⅔) of its members,
that the materials, supplies, labor or equipment can be obtained at a lower cost.
(d) Purchases from vendors whose names are on current established lists and have
been awarded the same type of purchase contract by a federal agency (including
the general services administration), a state agency, county, city or other public
agency after a competitive bidding process determined by the purchasing
manager to be substantially equivalent to tha t prescribed by this article.
(e) Contracts for services.
Section 7. Section 33-203 of Article VIII (Public Works Construction Rules and
Regulations) of Chapter 33 (Streets, Sidewalks and Public Works) of the Santa Ana
Municipal Code is hereby amended to read in its entirety as follows:
Sec. 33-203. Procurement of public works construction.
The following procedure shall apply to every contract for which final plans and
specifications are available in conformance with procurement rules defined in Article VII
and Article VII.II of Chapter 2 of the Santa Ana Municipal Code :
(a) Notice inviting bids. Notice inviting bids shall include a general description of the
public works construction, the place to obtain the plans and specifications, and
the date, time, and place for opening bids. The notice shall be published in a
Ordinance No. NS-XXX
Page 7 of 9
newspaper of general circulation in the city for at least two (2) days, the first of
which shall be at least ten (10) days before the date set for opening bids. The
city shall make a good faith effort to send a notice inviting bids to all businesses
engaged in providing labor and materials for such construction located within the
boundaries of the city.
(b) The bid. Included with the plans and specifications for a work of public works
construction shall be the following documents: Instructions to bidder, proposal,
bond samples and the contract. The bidder shall execute the proposal and
contract, and submit them sealed with at least a ten (10) per cent bid bond,
cashier's check or certified check.
(c) Award of contract. Upon opening the bids at the date, time and place stated in
the notice, the aggregate bid of each bidder shall be publicly declared. Following
the determination of the lowest and best bidder, the proposal and agreement
from this bidder shall be sent to the city attorney for approval as to form. The
documents shall then be presented to the city council for approval and
authorization for execution. If two (2) or more bids received are the same and
the lowest, the council may accept the one it chooses.
(d) Notification of award. A notification letter, a request for bonds, when necessary,
and a copy of the fully executed contract shall be delivered to the successful
bidder.
(e) Performance bonds. To secure faithful performance of the contract, the city
manager is authorized to require security in the form of cash, cashier's check,
certified check or corporate faithful performance bonds, in the following
percentages of the aggregate amount bid: One hundred (100) per cent bond for
faithful performance, and fifty (50) per cent contractor's payment bond.
(f) Rejection of bids. The right to reject all bids is expressly reserved to the city
council. After rejecting such bids, or if no bids are received, the city council may
determine and declare that, in its opinion based on estimates submitted by the
city manager, the public works construction may be performed better or more
economically by the city with its own employees, and after the adoption of a
motion to this effect by the affirmative votes of at least two -thirds (⅔) of the
members of the city council, the council may proceed to have said work done in
the manner stated without further observance of the provision of this article.
Section 8. The City Council finds and determines that this ordinance is not subject
to the California Environmental Quality Act (CEQA). Pursuant to CEQA and the CEQA
Guidelines, the adoption of this Ordinance is exempt from CEQA review pursuant to
sections 15061(b)(3) and 15061(b)(5) of the CEQA Guidelines because it will not result
in a direct or reasonably foreseeable indirect physical change in the environment, as there
is no possibility it will have a significant effect on the environment. As a result,
Environmental Review No. 2023-27 will be filed upon adoption of this ordinance.
Ordinance No. NS-XXX
Page 8 of 9
Section 9. If any section, subsection, sentence, clause, phrase or portion of this
ordinance is for any reason held to be invalid or unconstitutional by the decision of any
court of competent jurisdiction, such decision shall not affect the validity of the remaining
portions of this ordinance. The City Council of the City of Santa Ana hereby declares that
it would have adopted this ordinance and each section, subsection, sent ence, clause,
phrase or portion thereof irrespective of the fact that any one or more sections,
subsections, sentences, clauses, phrases, or portions be declared invalid or
unconstitutional.
Section 10. This Ordinance shall become effective thirty (30) da ys after its
adoption.
Section 11. The Clerk of Council shall certify the adoption of this Ordinance
and shall cause the same to be published as required by law.
ADOPTED this ______ day of __________________, 2023.
_________________________
Valerie Amezcua
Mayor
APPROVED AS TO FORM
Sonia R. Carvalho
City Attorney
By:
Jonathan T. Martinez
Assistant City Attorney
AYES: Councilmembers: _________________________________
NOES: Councilmembers: _________________________________
ABSTAIN: Councilmembers: _________________________________
NOT PRESENT: Councilmembers: _________________________________
Ordinance No. NS-XXX
Page 9 of 9
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, Jennifer L. Hall, City Clerk, do hereby attest to and certify that the attached Ordinance
No. NS-____ to be the original ordinance adopted by the City Council of the City of Santa
Ana on __________________, and that said ordinance was published in accordance with
the Charter of the City of Santa Ana.
Date: _______________ _______________________________
City Clerk
City of Santa Ana