HomeMy WebLinkAboutItem 07 - Housing Division Quarterly Report Community Development Agency www.santa-ana.org/community-development Item # 7 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report May 2, 2023 TOPIC: Housing Division Quarterly Report AGENDA TITLE: Quarterly Report for Housing Division Projects and Activities for the Period of January 1, 2023 to March 31, 2023 RECOMMENDED ACTION Receive and file the Quarterly Report for Housing Division Projects and Activities for the period of January 1, 2023 to March 31, 2023. DISCUSSION This report for the quarter ending on March 31, 2023 provides information for all of the affordable housing projects and activities for the City’s Housing Division. The report is divided into seven sections: Loan Activity, Loan Portfolio Management and Monitoring, Density Bonus Housing Agreements, Development Impact Fee Deferral Agreements, Rent Stabilization, Affordable Housing Funds and Commitments, and Development Projects. Loan Activity Applications The Housing Division offers several different programs including down payment assistance for first-time homebuyers and rehabilitation grants for mobile homes and single-family homes. Inquiries are received from the public and applications are mailed out, received, and approved for these programs on a continual basis. Table 1 shows the number of inquiries and applications sent out, received, and approved by type for the quarter and for the total fiscal year: Table 1: Applications Sent Out, Received & Approved Inquiries Applications Sent Out Applications Received Applications ApprovedProgram Q3 Total FY Q3 Total FY Q3 Total FY Q3 Total FY Residential Rehabilitation Grant Program 0 80 0 50 0 25 1 15 Homeownership / Down Payment Assistance Program 27 123 27 123 9 17 5 11 Housing Division Quarterly Report May 2, 2023 Page 2 3 3 9 8 Loan Subordinations 0 0 0 0 0 0 0 0 The number of applications received is typically lower than the number of applications sent out in any given period due to the stringent program guidelines for eligibility regulated by the federal government, which makes it difficult for most applicants to qualify. The City of Santa Ana’s Residential Rehabilitation Grant Program is designed to improve and preserve affordable housing through the use of federal Community Development Block Grant (CDBG) funds. The Program is administered by Habitat for Humanity of Orange County on behalf of the City. The Program provides grants of up to $25,000 for eligible home repairs for low-income homeowners at or below 80% of the Area Median Income (AMI) as defined by the U.S. Department of Housing and Urban Development (HUD). Eligible activities include the repair, replacement, and/or installation of major systems including plumbing, heating, electrical, windows, roof, paint, and handicap accessibility. A total of one (1) rehabilitation project was completed during this quarter. Down Payment Assistance Loan Program Progress For the Down Payment Assistance Loan Program (DPAP), staff evaluates applicant eligibility and oversees underwriting to ensure compliance with program guidelines and requirements established by HUD. During this quarter, staff conducted two (2) down payment assistance virtual workshops via Zoom with a total of 59 attendees. Five (5) down payment assistance loan applications were approved and five (5) closed escrow. Staff also conduct monthly workshops together with NeighborWorks of Orange County every second Tuesday of the month. In addition to these workshops, staff participated in one workshop with home lending professionals and one First Time Homebuyer Workshop sponsored by Councilmember Phan. In total, 15 professionals and 15 residents attended the workshops to get information on how to qualify for the City’s down payment assistance program. Staff also provided a television interview in Spanish for Estrella TV on January 25. On February 25, staff participated in a First-Time Homebuyer Fair in partnership with the Shalom Center. The event included other homebuying professionals and lenders that provided booths and informational lectures. Staff provided program materials and spoke about the program to all attendees. The event welcomed around 250 people. Loan Portfolio Management & Monitoring The Housing Division is responsible for managing the residential loan portfolio, which includes all of the loans entered into by the City and Housing Authority acting as the Housing Successor Agency. As of the end of the second quarter, the principal balance was $144,082,637.77. This is comprised of 341 loans of which 319 are deferred or residual receipt payment loans. As shown in Table 2, the loan portfolio generated Housing Division Quarterly Report May 2, 2023 Page 3 3 3 9 8 $132,267.74 in payments of principal and interest during the third quarter. The amount of residual receipts payments changes every quarter. Table 2: Portfolio Revenue Funding Source HOME CDBG Redevelopment NSP CalHOME Inclusionary Loan Payoffs $71,285.04 $0 $0 $0 $0 $0 Residual Receipts Payments $36,902.44 $0 $0 $0 $0 $0 Amortized Loan Payments $0 $3,668.83 $20,311.43 $0 $100.00 $0 Total for Q2 $108,187.48 $3,668.83 $20,311.43 $0 $100.00 $0 Monitoring As part of the requirements for these loans, staff must monitor the owner-occupancy of single-family homes that have received loans, and the building code compliance of units in rental projects with long-term affordability covenants. During this quarter, 42 owner- occupancy recertification letters were mailed and 38 were returned and processed. This number includes letters sent from previous months. Staff also conducted a total of 224 inspections during this quarter. Density Bonus Agreements The California Density Bonus law allows developers proposing five or more residential units to seek increases in base density for providing on-site housing units in exchange for providing affordable units on site. To help make constructing on-site affordable units feasible, the law allows developers to seek up to three incentives/concessions and an unlimited number of waivers, which are variances from development standards that would help the project be built without significant burden and without detriment to public health. The first version of the Density Bonus Law was adopted in 1979 and has since been amended at various times. Recent revisions allow affordable housing developers to request incentives/concessions and/or waivers for 100-percent affordable developments, even if they do not require a numerical density bonus. Moreover, in early 2017, the law was amended to restrict the ability of local jurisdictions to require studies to “justify” the density bonus and requested incentives/waivers and places the burden on local jurisdictions to prove that the incentives/concessions or waivers are not financially warranted. As of the date of this report, the City of Santa Ana has entered into the following Density Bonus Agreements: Date of Agreement Housing Development Address Affordable Units October 2018 Metro East Senior Park 2222 E. First St. 415 rental units restricted for very low income and low income or senior tenants August 2018 First Point I & II Apartments 2110, 2114 and 2020 E. First St. 547 rental units restricted for very low income and low income tenants Housing Division Quarterly Report May 2, 2023 Page 4 3 3 9 8 February 2019 Legacy Square 609 North Spurgeon St. 92 rental units restricted for very low income and low income tenants November 2019 The Rafferty 114 & 117 E. Fifth St.11 rental units restricted for very low income tenants December 2021 FX Residences 801, 807, 809 and 809 ½ East Santa Ana Blvd 16 permanent supportive housing units June 2022 WISEPlace 1411 N. Broadway 47 permanent supportive housing units August 2022 Brandywine Acquisition Group 1814 & 1818 E. First St. 4 townhomes restricted for sale to moderate-income buyers Development Impact Fee Deferral Agreements Development impact fees are a one-time charge to new developments imposed under the Mitigation Fee Act. These fees are charged to new developments to mitigate impacts resulting from the development activity and cannot be used to fund existing deficiencies. This means that for improvements that benefit existing as well as new development, impact fees can only pay for the portion of the improvement that benefits the new uses. Impact fees must be adopted based on findings of a reasonable relationship between the development paying the fee, the size of the fee, and the use of fee revenues. Development impact fees do not require voter approval and are commonly used by cities to address the impact of new development on schools, parks, transportation, etc. Prior to issuance of any building permits, the City currently requires the payment of various development impact fees. However, affordable housing developers may submit a request to defer specific development impact fees for their property pursuant to California Government Code section 66007. The City and owner then execute a Development Impact Fee Deferral Agreement to defer certain development impact fees applicable to the property and place a lien on the property to secure payment of these fees, which are due before the issuance of the certificate of occupancy or the final building check. As of the date of this report, the City has entered into the following outstanding Development Impact Fee Deferral Agreements that are pending payment: Date of Agreement Developer Housing Development Address Estimated Total Fees Due October 2019 Santa Ana Pacific Associates & Santa Ana Pacific Associates II 2110, 2114 and 2020 E. First St.$4,121,986 December 2021 Shelter Providers of Orange County 802, 809, 809 ½ East Santa Ana Blvd.$510,000 July 2022 Washington Santa Ana Housing Partners 1126 &1146 E. Washington Ave.$652,717 Rent Stabilization Program Effective November 18, 2022, City Council adopted an amended Rent Stabilization and Just Cause Eviction Ordinance that included a number of changes. The amended Rent Stabilization and Just Cause Eviction Ordinance expands the administration and Housing Division Quarterly Report May 2, 2023 Page 5 3 3 9 8 enforcement of renter protections for Santa Ana residents by establishing a rental housing board and a rental registry program. The amended Ordinance also includes additional petitions for tenants and landlords, voluntary mediation services, and other enhancements. The City has prepared user-friendly information on the Ordinance for both tenants and landlords on the City’s webpage, including a detailed summary of changes to the Ordinance and answers to Frequently Asked Questions in English, Spanish, and Vietnamese. Over the next several months, staff will be conducting outreach and education for tenants and landlords on the amended Ordinance. Tenants and landlords are encouraged to sign up to receive the latest updates. Program Updates: The City of Santa Ana continues to work with RSG, Inc. on the long-term implementation of the Rent Stabilization and Just Cause Eviction Ordinance. The Rent Stabilization Program has met many critical milestones over the course of Q3. On January 3, 2023, the City entered into an agreement with Revenue and Cost Specialists (RCS) to conduct a comprehensive fee study to determine appropriate program fees to recover all program costs associated with services provided under the City’s Rent Stabilization and Just Cause Eviction Ordinance. In Q3, staff worked with RCS to finalize the fee study and the rental registry fee that will be recommended to the City Council as a part of the FY 2023-24 Miscellaneous Fee Schedule. On February 7, 2023, City Council authorized the City Manager to enter into an agreement with 3Di, Inc. to implement, operate, and maintain a rental registry portal that supports the City’s Rent Stabilization and Just Cause Eviction Ordinance. In Q3, staff worked with the consultant on a weekly basis to begin configuring the portal where property owners will register rental units, update rental unit information, update tenancy information, submit notices, and pay the City’s rental registry fee. Staff also began working with the Finance and Management Services Agency to ensure the City will be able to collect, allocate, process, and utilize rental registry fees for the administration of the Ordinance. In addition to the progress made towards the long-term implementation of the Rent Stabilization Program, staff has continued to serve the community in the following ways throughout Q3: •Created three new infographics: Eviction Process Infographic, Just Cause Eviction Infographic, and Rent Stabilization Infographic. •Reviewed and made continuous improvements to the layout, content, and forms on the Renter Protections webpage for easier access and understanding. •Fielded calls and emails from the public and provided information, referrals, and education to renters and property owners on the City’s Rent Stabilization and Just Cause Eviction Ordinance. •Collected notices from landlords to monitor for compliance of the Ordinance. Housing Division Quarterly Report May 2, 2023 Page 6 3 3 9 8 •Hosted our highest attended community workshop focused on Tenant Rights and the Eviction Process, with 309 registrants. Residents Served: During this quarter, staff and RSG fielded calls from the public and provided information and education to renters and property owners on the City’s Rent Stabilization and Just Cause Eviction Ordinance. A breakdown of the number of inquiries is as follows: The City requires that when changing the terms of a tenancy, an owner must submit proof of service to the City as evidence that the owner has complied with noticing requirements. A breakdown of the number of notices received is as follows: Staff and RSG also conducted one (1) virtual workshop in partnership with the Public Law Center via Zoom in English, Spanish, and Vietnamese: The City regularly disburses important updates and information to Santa Ana residents. During this quarter, staff informed the public of programmatic updates via social media and email distribution lists, reaching a total of 47,102 Santa Ana residents. Available Funds and Land Assets for Affordable Housing Development Projects The City of Santa Ana and the Housing Authority acting as the Housing Successor Agency manages multiple sources of local, state, and federal funds to develop affordable housing. Exhibit 1 provides a summary of the funds available as of March 31, 2023. Affordable Housing Opportunity and Creation Ordinance On-Site Development: Since 2011, a total of 33 units have been developed on-site as a result of the Affordable Housing Opportunity and Creation Ordinance, including 23 ownership units for-sale and 10 rental units: Month # of Inquiries January 2023 60 February 2023 80 March 2023 90 Total 230 Month # of Notices January 2023 30 February 2023 134 March 2023 61 Total 225 Month # of Registrants January 31, 2023 309 Total 309 Housing Division Quarterly Report May 2, 2023 Page 7 3 3 9 8 Units Built On-Site Ownership Rental Total 23 10 33 In-Lieu Fees Generated: All in-lieu fees, penalties, and other monies collected pursuant to the Ordinance, including interest, are deposited into the Inclusionary Housing Fund. Since inception, the Inclusionary Housing Fund has generated $28,443,446 to be used for the development of housing affordable to low- and moderate-income households, with a reasonable amount spent on administrative or related expenses associated with the administration of the Ordinance. In-lieu fees generated have been used to develop new affordable housing opportunities, provide emergency shelter, and create homeownership opportunities. Below is a summary of how in-lieu fees have been used by the City: Project Inclusionary Housing Funds SPENT # of Units Address Santa Ana Arts Collective $4,775,000 57 1666 N. Main Street La Placita Cinco $1,300,000 50 2239 West 5th Street The Link Interim Emergency Shelter $4,140,295 N/A 2320 S. Redhill Avenue Westview House $1,514,113 84 2530 and 2534 Westminster Avenue Habitat for Humanity “Lacy & Vance”$565,271 2 826 N. Lacy Street & 830 N. Lacy Street WISEPlace Steps to Independence Public Service Program $90,000 N/A N/A TOTAL $12,384,679 193 Project Inclusionary Housing Funds COMMITTED # of Units Address Habitat for Humanity “Washington Street”$2,200,000 6 1921 W. Washington Ave. Down Payment Assistance $1,250,000 N/A N/A TOTAL $3,450,000 6 Inclusionary Housing In-lieu Fees Received per Fiscal Year FYs 2009-2017 FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 $7,851,002 $2,712,304 $7,236,945 $0 $3,709,875 $6,933,320 $0 Housing Division Quarterly Report May 2, 2023 Page 8 3 3 9 8 Affordable Housing Development Projects There are six (6) affordable housing projects under construction, and two (2) affordable housing projects in pre-development. Below is a brief summary and status-update for each project. Exhibit 2 provides a development timeline for each project. The most recent RFP for Affordable Housing Development was issued on December 8, 2021 and closed on February 28, 2022. WISEPlace Permanent Supportive Housing and Habitat for Humanity of Orange County were awarded pre-commitment letters. Projects under Construction Legacy Square (609 N Spurgeon Street) Developer National Community Renaissance with Mercy House as the service provider Description New construction of a 100% affordable multifamily apartment complex consisting of 92 units of rental housing and one (1) manager’s unit. All units will be affordable to households earning less than 60% AMI of which 33 units will be set-aside for permanent supportive housing. Authority Funds Eight (8) Project-Based Vouchers (PBVs) Update •Fire: Final inspections for fire alarm and fire sprinkler are signed off. Pending fire pump sign off when generator is approved •Elevator inspection is scheduled for April. •Building department has pre walked final inspection •Planning walk is forthcoming •Temporary generator- OCFA approved the plans. They will go back to building and safety for final stamp. The temporary generator has been hooked up and it is ready for final inspection. •Offsite-final paving is scheduled for April and this is the final step of site work. •AQMD permit for perm backup generator is roughly 3-4 weeks out. North Harbor Village (1108 N Harbor Boulevard) Developer Jamboree Housing Corporation Description Acquisition and rehabilitation of a former motel yielding 89 units of permanent supportive housing. City / Authority Funds CDBG ($1,687,047); Eight-nine (89) PBVs consisting of 34 HUD-VASH PBVs and 55 non HUD-VASH PBVs. Update Construction is currently underway. Recent activities include plan resubmittals to address some of the site conditions. They are awaiting the final coordinated set to address changes in MEP/Architectural. Concurrently working on completing the paving for the main parking lot. Once the resubmitted plans are approved and the parking lot is completed, construction will move forward at a faster pace. Westview House (2530 Westminster Avenue) Developer Community Development Partners with Mercy House as the service provider Housing Division Quarterly Report May 2, 2023 Page 9 3 3 9 8 Description New construction of an affordable multifamily apartment development consisting of 85 units of both large family and PSH units with one (1) manager’s unit. Twenty-six (26) of the units will be funded by Mainstream Program PBVs and Mental Health Services Act (MHSA) funds through the No Place Like Home (NPLH) program. City / Authority Funds Inclusionary Housing ($1,514,113), HOME Investment Partnerships Program ($2,003,705), Rental Rehabilitation Program ($386,523), and twenty-six (26) Mainstream Program PBVs Update Grading activities have been completed and concrete has been poured. A groundbreaking ceremony was held on November 2, 2022. The project is completing rough framing and roofing is set to begin in mid-April. Completion of the project is anticipated in February 2024. Crossroads at Washington (1126, 1136 and 1146 E Washington Avenue) Developer The Related Companies of California (TRCC) with A Community of Friends (ACOF) as co-developer and lead service provider Description New construction of a 100% affordable multifamily apartment complex consisting of 85 units of rental housing and one (1) manager’s unit. All units will be affordable to households earning less than 30% AMI of which 43 units will be set-aside for permanent supportive housing. City / Authority Funds HOME Investment Partnerships Program ($3,007,489), Neighborhood Stabilization Program ($1,637,420), sixty-five (65) year ground lease agreement for 1126, 1136 and 1146 E. Washington Avenue (Appraised Value as of September 22, 2019: $4,108,136) and Fifteen (15) PBVs Update Onsite wet utitlities completed. Offsite dry utilities exclusive of street lighting are installed. Sheeting is finished and roofing will start in April. Habitat for Humanity (826 N Lacy & 830 N Lacy Street) Developer Habitat for Humanity of Orange County Description New construction of two (2) single-family detached homes for homeownership serving households up to 120% AMI. City / Authority Funds Inclusionary Housing ($565,271) and a 99-year ground lease agreement for 416 Vance Street and 826 N. Lacy Street (Appraised Value as of Oct 25, 2018: $578,000) Update The work for the MEPS (mechanical, electrical, plumbing, and structural) inspection was completed. The inspection was conducted and signed off on in late March. The drywall work was also completed and passed inspection. Siding is currently being installed along with decorative carpentry. Volunteer opportunities continue to be offered Wednesday through Saturday throughout the duration of the build. During the first quarter, there were 402 unique volunteers with a total of 3,452 volunteer hours. WISEPlace Permanent Supportive Housing (1411 N Broadway) Developer Jamboree Housing Corporation with WISEPlace as the co-developer and lead service provider Description Adaptive reuse and new construction of the WISEPlace building to provide 48 permanent supportive housing units, and one (1) manager’s unit. City / Authority Funds HOME-ARP ($5,256,327); Twenty-five (25) PBVs Housing Division Quarterly Report May 2, 2023 Page 10 3 3 9 8 Update The developer closed on their construction loan financing and began construction in March 2023. City Council approved the HOME-ARP Loan Agreement and three other Subordination Agreements on March 7, 2023. The expected construction completion date is November 2024. Projects in Pre-Development FX Residences (801, 809, 809 ½ E Santa Ana Boulevard) Developer HomeAid Orange County, Inc. with Mercy House as the service provider Description New construction of an affordable multifamily apartment complex consisting of 16 units of permanent supportive housing, and one (1) manager’s unit. City / Authority Funds Housing Successor Agency ($1,656,947), three (3) PBVs, 99-year ground lease agreement for 801 E. Santa Ana Blvd. (Appraised Value as of Oct 25, 2018: $788,000) Update HomeAid and Builder Captain City Ventures expect to pull permits by the end of the 2nd quarter of 2023 and break ground on the project middle of the 2nd quarter of 2023. Completion of the project is estimated by the 1st quarter of 2024. Habitat for Humanity (1921 W Washington Avenue) Developer Habitat for Humanity of Orange County Description New construction of three (3) duplexes / six (6) homes for homeownership serving households up to 80% AMI. City / Authority Funds Inclusionary Housing Funds ($2,200,000) Update The entitlement application for the project was submitted in February 2023. The first community Sunshine Ordinance meeting was held on March 14, 2023, at the El Salvador Community Center in Santa Ana. The meeting was attended by over 45 individuals. Representatives from Habitat for Humanity and the City presented attendees information on the project and provided an opportunity for questions. The interest in the opportunity to apply for the homes outweighed any concerns expressed by the group. Overall, the project was overwhelmingly well received by the community. In March, the property was fenced off. Geological testing was started and will be completed in April 2023. FISCAL IMPACT There is no fiscal impact associated with this action. EXHIBIT(S) 1. Available Funds for Affordable Housing Development Projects 2. Project Timelines Submitted By: Michael L. Garcia, Executive Director of Community Development Approved By: Kristine Ridge, City Manager Available Funds for Affordable Housing Development Projects As of March 31st, 2023 Housing Successor Agency (Housing Authority) $4,982,390 Cash on Hand ($1,656,947)Frances Xavier Residence Project Pre-Commitment Loan 1 ($250,000)Administrative Costs Allowance 2 ($2,755,174)Administrative Costs Allowance for Future Fiscal Years 3 ($307,386)Crossroads at Washington Option Agreement Amendment 4 ($12,883)Crossroads at Washington Environmental Assessment Oversight 5 $0 Available Funds Inclusionary Housing Funds $14,036,581 Cash on Hand ($930,000)Down Payment Assistance Program 6 ($56,527)Lacy Street Project Grant 7 ($151,411)Westview House Loan 8 ($37,500)Westview House Project Cost ($11,544)WISEPlace Steps to Independence Program Agreement 9 ($2,200,000)1921 W. Washington Project Pre-Commitment 13 ($2,518,215)Administrative Costs Allowance (CDA/PBA) $8,131,384 Available Funds HOME Program $6,689,393 Funds to Drawdown ($300,749)Crossroads at Washington Loan 10 ($200,371)Westview House Loan 8 $6,188,273 Available Funds to Drawdown HOME-American Rescue Plan Program (PSH Projects Only) $1,464,630 Funds to Drawdown ($1,464,630)WISEPlace PSH Loan 12 $0 Available Funds to Drawdown CDBG Program (Acquisition/Rehabilitation Projects Only) $4,690 Funds to Drawdown $4,690 Available Funds to Drawdown Rental Rehabilitation Grant Program $48,578 Cash on Hand 11 ($38,652)Westview House Loan 8 $9,926 Available Funds $14,334,272 Total Available Funds 1 Approved by Housing Authority on January 15, 2019. Additional $587,000 approved by Housing Authority on December 7, 2021. 2 The Housing Successor Agency relies on available cash to fund the monitoring and compliance functions related to the former Redevelopment Agency's housing loans. 3 Funds to be set aside for compliance and monitoring requirements due to uncertainty of future repayment revenues. 4 Approved by Housing Authority on December 15, 2020. Additional $150,000 maximum approved by Housing Authority on August 17, 2021 (2nd Amendment to Option Agreement). 5 Approved by Housing Authority on July 20, 2021. 6 $400,000 originally approved by City Council on March 6, 2018. Nine loans paid through end of September 2021. Additional $1,200,000 approved by Council on November 2, 2021. 7 Approved by City Council/Housing Authority on March 5, 2019. Additional $333,777 approved by City Council on April 6, 2020. 8 Approved by City Council on May 17, 2022. 9 Approved by City Council on April 7, 2020. 10 Approved by City Council on June 21, 2022. 11 Old program income available after close out of program with HUD. 12 Approved by City Council on March 7, 2023. 13 Approved by City Council on November 15, 2022. Exhibit 1 EXHIBIT 2 Page 1 of 7 Current Affordable Housing Development Project Timelines Projects Under Construction Legacy Square – 609 North Spurgeon Street Aug 18 Santa Ana CDA Funding Application Dec 18 Applied for NPLH and SNHP Funds Jan 19 Santa Ana funding award Feb 19 Planning entitlements approved Feb 19 Applied for Round 4 AHSC Funding May 19 Award of SNHP funds Jul 19 Applied for Round 1 MHP Nov 19 Applied for State 4% tax credits Jan 20 Construction drawings (8-12 weeks) Feb 20 Apply for Round 5 AHSC funding May 20 Apply for 4% tax credits May 20 Plan check (12-16 weeks) Jun 20 Award of AHSC funds July 20 Award of 4% Tax Credits July 20 Award of Tax-Exempt Bonds May 20 Plan Check (12-16 weeks) Jan 21 Building permit issuance Feb 21 Construction closing/syndication Feb 21 Begin construction (24 months) Jul 21 Groundbreaking Ceremony Mar 22 Press Release announcing 5 Community Workshops for Lease Up information Apr 22 Framing complete May 22 Roofing to start July 22 Elevator Cab delivery Sept 22 Interior painting, and flooring &HVAC getting installed Oct 22 Production insulation and Building Inspection of the Community Room and Leasing Office Jan 23 Fire signed off on all floors, solar panels and roofing completed, all units in the finish stages. Landscape on podium complete. Apr 23 Construction complete Aug 23 100% fully leased (4 months) North Harbor Village – 1108 N. Harbor Mar 19 Start of design development Mar 19 Applied to FHLBSF for AHP Financing ($890,000) Mar 19 Award of VASH Vouchers & City Loan by City Council (89 Vouchers and $1,687,047) Mar 19 Start environmental approval process with City of Santa Ana (CEQA/NEPA) Mar 19 Applied for Home Depot Grant ($500,000) Jun 19 CEQA / NEPA Approval – City of Santa Ana Jun 19 AHP Award Date ($890,000) EXHIBIT 2 Page 2 of 7 Aug 20 Applied to HCD for MHP 1st Round Funding ($13,316,412) Dec 19 Notified project did not receive 1st Round MHP funding Feb 20 Applied to HCD for VHHP Funding ($10,000,000) Mar 20 Applied to HCD for MHP 2nd round funding Mar 20 Applied to OCHFT Financing ($2,292,920) May 20 Notified project did not receive 2st Round MHP funding May 20 Received OCHFT funding award ($2,292,920) Jun 20 Received VHHP funding award ($10,000,000) Jun 20 Submitted Plans for Ministerial Design Approval Jun 20 Applied for CDLAC tax-exempt bond allocation ($24,000,000) Jul 20 Applied for TCAC 4% competitive state and federal tax credits ($9,896,911) Sept 20 CDLAC Allocation Nov 20 Ministerial Design Approval (upon completion of community meeting on 11/4/2020) Oct 20 TCAC Allocation Oct 20 Start construction documents for rehab Nov 20 Submit first plan check Dec 20 Awarded Home Depot Grant Jan 21 Receipt of first plan check comments Jan 21 Submit second plan check Feb 21 Receipt of second plan check comments Feb 21 Submit third plan check Mar 21 Received permit ready Apr 21 Construction loan closing Apr 21 Pull Permits and start construction May 21 Site Demolition Dec 21 Work on mock up units begins Jun 22 Structural retrofitting and repairs July 22 Roofing and Framing Aug 22 Stock drywall & Inspections Aug 22 Gutter, Awning and Painting & installation of stairs Oct 22 OCHFT Loan finalized Apr 23 Interior refurbishments & finishes Apr 23 Complete Flooring Feb 23 Start of Lease up Mar 23 Plan resubmittal/Plan Coordination Apr 23 Grading/Paving for parking lot and site work May 23 Roof/Drywall/Stucco Jun 23 Interiors/Fixtures & Appliances/ Aug 23 Construction Completion Sep 23 Final cleaning Oct 23 Lease up Nov 23 Full occupancy EXHIBIT 2 Page 3 of 7 Westview House – 2530 Westminster Avenue Oct 19 City of Santa Ana RFP submittal May 20 OC 2020 Supportive Housing NOFA Submittal Dec 20 OC 2020 Supportive Housing NOFA award Jan 21 City of Santa Ana PBV Award Jan 21 Construction/permanent debt commitments Jan 21 Receive Entitlements Jan 21 No Place Like Home application Mar 21 OCHFT application May 21 OCHFT Award Jun 21 No Place Like Home commitment Sep 21 CDLAC/TCAC 4% application Dec 21 CDLAC/TCAC 4% award May 22 Close on construction financing Jun 22 Construction permits issued Jun 22 Construction start Nov 22 Groundbreaking Ceremony Dec 22 Grading activities completed and concrete poured Feb 24 Construction complete July 24 All units Leased Nov 24 Perm Debt Conversion Crossroads at Washington – 1126,1136 and 1146 E. Washington Avenue Aug 19 Submitted PSH application to County Oct 19 Submitted for Planning entitlements Oct 19 Community meeting Nov 19 Approval of Joint Powers Agreement, Option to Ground Lease, Voucher Resolution and Cooperation Agreement, and Regional Housing Needs Assessment (RHNA) Agreement and Density Bonus Dec 19 NEPA EA City Approval – City of Santa Ana submits NEPA EA to HUD Feb 20 PSH Funds and Voucher approval from County Board of Supervisors Feb 20 Planning entitlements approved Mar 20 TCAC 9% Application – 1st Round 2020 Jul 20 TCAC FCAA/9% Application – 2nd Round 2020 Oct 20 TCAC FCAA/9% Award – 2nd Round 2020 Mar 21 Submitted OCHFT PSH NOFA Application May 21 OCHFT PSH NOFA Award Dec 21 Submit DTSC Equitable Community Revitalization Grant (ECRG) Pre- Qualifying Application Feb 22 Submit for 1st plan check Mar 22 DTSC approves draft Removal Action Workplan; draft Removal Implementation Plan under review Apr 22 DTSC ECRG Full Application Jul 22 DTSC ECRG Award Jul 22 City issues permit ready letter Jul 22 Construction finance closing/Start construction Nov 22 Building foundation complete EXHIBIT 2 Page 4 of 7 Dec 22 Framing began Dec 23 Construction complete Apr 24 Full occupancy Habitat for Humanity – 826 N. Lacy Street & 830 Lacy Street May 20 DDA signed June 20 Prepare grading plans Oct 20 Prepare architectural plans Oct 20 Submit Neighborhood Review Application Feb 21 Final Approval from Historic French Park Committee Apr 21 Submit Site Review Application Dec 21 Submit grading/ Non-Priority WQMP Jan 22 Submit architectural plans May 22 Planning Commission Approval Jul 22 Grading permit issued Aug 22 Groundbreaking Aug 22 Building Permits issued Aug 22 Commence Grading Sep 22 Begin Foundation Construction Oct 22 Framing Ceremony/Framing Construction Begins Jan 23 Roof diaphragm sheathing and exterior sheathing completed Jan 23 Roof sheathing/frame and shear walls Inspection Jan 23 Buildings dried in Jan 23 House wrap and waterproofing Jan 23 Drywall stack complete Jan 23 Exterior Door installation complete Jan 23 Homebuyer outreach and application open Feb 23 Window installation complete Feb 23 Rough in plumbing Feb 23 Rough in electrical Feb 23 Rough in mechanical Feb 23 Rough in fire sprinkler- OCFA Mar 23 MEP Inspection Mar 23 OCFA Inspection Mar 23 Structural/framing complete Mar 23 Structural/framing Inspection Mar 23 Seal exterior penetrations Mar 23 Wood siding started Mar 23 Start exterior wood trim carpentry-ongoing Mar 23 Insulation completion and inspection Mar 23 Drywall hanging Mar 23 Preliminary homebuyer application review May 23 Habitat for Humanity Leaders Build on-site Jun 23 Homebuyer selection Aug 23 Anticipated Construction Completion Aug 23 Certificate of Occupancy/Closing EXHIBIT 2 Page 5 of 7 WISEPlace Permanent Supportive Housing – 1411 N. Broadway May 19 Start of conceptual design development Sept 19 Applied to City of Santa Ana for Financing Feb 20 Notified not awarded City of Santa Ana Financing Mar 20 Applied to Orange County Housing Finance Trust (OCHFT) Financing Apr 20 Met with City of Santa Ana Planning Staff on entitlements May 20 Notified not awarded OCHFT Financing Jun 21 Met with City of Santa Ana staff to review revised conceptual plans Jan 22 Submitted Historic Resource Commission and entitlements application to City of Santa Ana Feb 22 Applied to City of Santa Ana for HOME-ARP Funding and PBVs Mar 22 City of Santa Ana Historic Resource Commission Approval Mar 22 Applied to OCHFT Financing Mar 22 Applied to AHP Financing Apr 22 Awarded City of Santa Ana for HOME-ARP Funding and PBVs May 22 Awarded OCHFT Funding May 22 City of Santa Ana Planning Commission Approval of entitlements May 22 City of Santa Ana Community Development Commission Approval of Funding and Density Bonus Agreement (DBA) Jun 22 Notified not awarded AHP Funding Jun 22 Applied to County of Orange for ARPA Funding Jun 22 City of Santa Ana City Council Approval of DBA Jun 22 Awarded County of Orange ARPA Funding Jun 22 Applied for TCAC 9% competitive federal tax credits Sept 22 TCAC Allocation Sept 22 Start Construction Documents, Plan Check and Permitting Jan 23 Closing Kick Off Mar 23 Receive grading permit and building permit ready letter Mar 23 Construction loan closing Mar 23 Pull Permits and start construction Apr 23 Site Demolition Nov 23 Podium Complete Jun 24 Dry In Complete Nov 24 Construction Complete May 25 100% Full occupancy (6 months) EXHIBIT 2 Page 6 of 7 Projects in Pre-Development FX Residences – 801, 809, 809 ½ E. Santa Ana Boulevard Jan 19 Council approval for land lease and project funding Jan 19 Submittal of application for NPLH funding Feb 19 Confirm with City staff that project site can yield additional units under existing zoning Mar 19 Revise conceptual drawings for additional 5 units (17 total units, up from the original 12 units) Mar 19 SNHP funding application submitted to County Apr 19 City staff to review revised conceptual design Apr 19 Begin development agreement May19 Board of Supervisors meeting for SNHP funding Jul 19 Execute Development Agreement Jul 19 Formal awards letters for NPLH funding to be issued Aug19 Initial planning submittal Sept19 Sunshine Ordinance Meeting Mar 21 Planning Commission Meeting (ministerial approval of density bonus) Oct 21 Submit for first plan check Dec 21 City Council Meeting (ministerial approval of density bonus) Dec 21 City Council approval of additional $587,000 for construction costs Feb 22 Building permit submittal Mar 22 Received 1st set of comments back from Plan Check, consultants working on responses. Jul 22 FX Funding Closing Meetings begin, 2nd Building Plan Submittal Aug 22 Building and Grading comments being addressed Oct 22 Construction Funding Closing process is underway Dec 22 Dry closed funding for CalHFA/SNHP and City of Santa of Santa Ana April 23 Met with city planner to clarify all comments on 3rd submittal April 23 Submit 4th building review & OCFA building review May 23 Pull Building Permits & PGP Permits June 23 Start of Construction Mar 24 Anticipated Completion of construction May 24 Lease up units ( 3 months) Habitat for Humanity – 1921 Washington Avenue Dec 21 Habitat for Humanity OC closed escrow on property Aug 22 Subsidy Approval from Community Development Commission Nov 22 Subsidy Approval from City Council Dec 22 Submit Demo Permit Application Jan 23 Demo Permit Issued Feb 23 Submit Site Plan Review Application Mar 23 First Sunshine Ordinance Meeting Mar 23 Demolition permit Jul 23 Groundbreaking Ceremony EXHIBIT 2 Page 7 of 7 Jul 23 Submit Grading / Non-Priority WQMP Aug 23 Submit Architectural plans Sep 23 Planning Commission Approval Nov 23 Building Permit issued Nov 23 Begin Foundation Construction Jan 24 Framing Ceremony Aug 24 Complete Rough Insoectiuons Dec 24 Construction Completed