HomeMy WebLinkAboutItem 15 - Centennial Lake Circulation Renovation ProjectPublic Works Agency
www.santa-ana.org/public-works
Item # 15
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 18, 2023
TOPIC: Centennial Lake Circulation Renovation Project
AGENDA TITLE
Award a Construction Contract to CJW Construction, Inc. in the Amount of $4,942,135,
Approve an Amendment to the Fiscal Year 2022-23 CIP, and Approve Amendment to
the Agreement with J. Smith & T. Muli, Inc. to Increase the Contract for the Centennial
Lake Circulation Renovation Project with an Estimated Total Delivery Cost of
$6,179,135 (Project No. 18-2681) (Revive Santa Ana program)
RECOMMENDED ACTION
1. Approve an amendment to the Fiscal Year 2022-23 Capital Improvement Program
to include $1,342,240 of funding in American Rescue Plan Funds for the Centennial
Lake Circulation Renovation project.
2. Award a construction contract to CJW Construction, Inc., the lowest responsive and
responsible bidder, in accordance with the base bid in the amount of $4,942,135, for
the construction of the Centennial Lake Circulation Renovation Project, for a term
beginning April 18, 2023, and ending upon project completion, and authorize the
City Manager to execute the contract subject to non -substantive changes approved
by the City Manager and the City Attorney.
3. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$6,179,135, which includes $4,942,135 for the construction contract; $742,000 for
contract administration, inspection, and testing; and a $495,000 project contingency
for unanticipated or unforeseen work.
4. Authorize the City Manager to execute the first amendment to the agreement with J.
Smith & T. Muli, Inc. to increase the Contract Amount by $11,500, for a total amount
not to exceed $61,391, for lake engineering and construction services for the
remaining term of the agreement, beginning May 20, 2022 through December 31,
2023, including up to two additional one-year periods upon a writing executed by
the City Manager and City Attorney.
Centennial Lake Circulation Renovation
April 18, 2023
Page 2
5. Determine the recommended actions are exempt for further review in accordance
with the California Environmental Quality Act as Categorical Exemption
Environmental Review No. ER-2023-31 was filed for Project 18-2681.
DISCUSSION
The Centennial Lake Circulation Renovation project is a comprehensive rehabilitation
effort to improve the existing 10-acre lake located in Centennial Regional Park (Exhibit
1). The current operational equipment and facilities originally installed in 1978 have
reached the limits of their design life. The functionality and efficiency of the system are
failing and the condition and health of the lake water have declined to the point where
park maintenance staff is unable to address the deficiencies.
The construction scope of work takes a holistic approach to restoring and rebalancing
the lake with measures involving both mechanical and biological systems and includes
new pumps, piping, aeration devices, and natural habitat improvements (Exhibit 2).
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of 59
regional vendors via PlanetBids, many of which are Santa Ana based. A total of two
bids were received with one bid from a Santa Ana contractor.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on January 19 and 26, 2023. The project was also advertised in PlanetBids
from January 25, 2023 through February 28, 2023. Bids were received electronically via
PlanetBids on February 28, 2023.
Bid Results Summary
Rank
Bidder's Name
Location
Base Bid
1
CJW Construction, Inc.
Santa Ana, CA
$4,942,135
NR
Zusser Company, Inc.
Los Angeles, CA
Non -Responsive
A total of two bids were received and of the two bidders, Zusser Company, Inc. was
non -responsive. CJW Construction, Inc. submitted the lowest responsive base bid in the
amount of $4,942,135 (Exhibit 3). As specified in the bid documents, the lowest bid shall
be determined on the basis of the Base Bid. Based on the bid analysis and a
contractor's reference check, staff recommends awarding the construction contract to
CJW Construction, Inc., in the amount of the base bid totaling $4,942,135 (Exhibit 4).
Centennial Lake Circulation Renovation
April 18, 2023
Page 3
Proiect Delive
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen
conditions. Construction administration and inspection includes the following:
construction management; inspection of the Contractor's work to ensure contract
compliance, workmanship, and quality; and materials testing.
As indicated in the Cost Analysis (Exhibit 5) and as summarized in the table below, the
estimated total construction delivery cost of the project is $6,179,135.
Project Item
Total
Construction Contract
$4,942,135
Construction Administration, Inspection, Testing
$742,000
Project Contingencies
$495,000
TOTAL CONSTRUCTION DELIVERY COST
$6,179,135
The amendment to the Agreement with J. Smith & T. Muli, Inc. to increase the Contract
Amount by $11,500, for a total amount not to exceed $61,391, for lake engineering and
construction services for the remaining term of the agreement will be budgeted per the
construction administration (Exhibit 6).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2023-31 was filed for the project 18-2681.
FISCAL IMPACT
On August 2, 2022, the City Council approved the Revive Santa Ana Spending Plan
that reflected the entire American Rescue Plan Act (ARPA) allocation of local fiscal
recovery funds. A $3,679,135 cost savings was subsequently identified and redirected,
by the City Manager's authorization, to the Centennial Lake Circulation Renovation
project, which is in the Public Health and Safety classification.
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $6,179,135, which includes construction, contract administration, inspection
and testing, and authorized contingencies of $1,237,000. All funds are available for
expenditure in Fiscal Year 2022-23, however, any remaining balances not expended at
the end of the fiscal year will be carried forward into FY 2023-24.
The following table summarizes the funds budgeted for expenditure to deliver the
construction of this project:
Centennial Lake Circulation Renovation
April 18, 2023
Page 4
Fiscal
Accounting Unit
Fund
Accounting Unit -Account
Year
- Account No.
Description
No. Description
Amount
Project No.
Additional Funds/Budget Reallocation
18117013-66220
American
Improvements
2022-23
(From 22-1375 to
Rescue Plan
Other TBuilding
Other Than
$1,342,240
18-2681)
Act
Existing Budget
01213020-66220
Cannabis
PRCSA Youth Services,
2022-23
(18-2681)
Public Benefit
Improvements Other Than
$2,500,000
Fund
Buildings
18117013-66220
American
ARPA-PWA, Improvements
2022-23
(From 22-1375 to
Rescue Plan
Other Than Building
$2,336,895
18-2681)
Act
Total
$6,179,135
EXHIBIT(S)
1. Location Map
2. CIP Sheet
3. Bid Proposal
4. Construction Contract
5. Cost Analysis
6. First Amendment Agreement with J. Smith & T. Muli, Inc.
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
EXHIBIT 1
r
LOCATION MAP ,&
NOT T4 SCALE
�N ORq ryC'F
SANTAANA 3Al PQ
�i Project No. 18-2681: o
PWA Centennial Lake Circulation Renovation
..
PUBLIC WORKS AGENCY
EXHIBIT 2
PROJECT TITLE:
Centennial Lake Circulation Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
LOCATION MAP
W Hood Ave �n
W Edinger Ave
NabE4
ec
c�
A
I* gal Regional Park
W Centenn
CITY OF SANTA ANA FY 22/23 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Design of a new circulation system on a 10 acre lake
at Centennial Park.
PROJECT NEED:
In 2017, the City retained a Consultant to analyze the
circulation system at Centennial Park Lake. The report
indicates only a portion of the current
circulation system is working and the lake needs a
complete new circulation system. Currently staff is
manually removing algae from the lake due to the
poor aeration system. The new system is estimated
to cost 2.2 million. Funding has been identified this year
to complete the design of the new system.
PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
Construction 1679 111
TOTAL 3,679,135
SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
ARPA 3 6
TOTAL 3,679,135
AGENCY: DIVISION: CONTACT: DATE:
Public Works Agency Parks, Fleet & Facilities Suzi Furjanic, Assoc. Park Planner 28-Mar-2023
- 1 -
EXHIBIT 3
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: CJW Construction, Inc
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Bid Item
Unit
Description
Quantity
Unit
Amount
No.
Note No.
Price
1
DN-19
CLEAR AND GRUB PER LIMITS
1
LS
$98,000
$98,000
SHOWN
2
DN-17
UNCLASSIFIED EXCAVATION
1,450
CY
$68
$98,600
FURNISH AND INSTALL 12-INCH
3
CN-14
C-900 DR-25 PR CL 165 PVC PIPE,
95
LF
$72
$6,840
LENGTH PER PLAN.
CONSTRUCT CONCRETE LAKE
EDGE AT SIDEWALK /
4
CN-1
BOARDWALK PER PLAN,
155
LF
$350
$54,250
CONSTRUCTION METHOD AND
DETAIL 02 ON SHEET 10
CONSTRUCT CONCRETE LAKE
5
CN-2
EDGE PER PLAN AND DETAILS
480
LF
$350
$168,000
ON SHEET 10
GRADE MEANDERING STREAM
6
CN-3
PER PLAN AND INSTALL ROCK
255
LF
$250
$63,750
LINING
CONSTRUCT CONCRETE BOAT
7
CN-4
RAMP PER DETAIL 12 ON SHEET
1
EA
$40,000
$40,000
12
8
CN-5
CONSTRUCT MANMADE REEF 1
6
EA
$600
$3,600
PER DETAIL 05 ON SHEET 11
9
CN-6
CONSTRUCT MANMADE REEF 2
2
EA
$1,200
$2,400
PER DETAIL 06 ON SHEET 11
10
CN-7
CONSTRUCT FOUNTAIN PER
1
EA
$12,000
$12,000
DETAIL 07 ON SHEET 14
FURNISH AND INSTALL
11
CN-8
WATERFOWL FOOD VENDING
7
EA
$1,000
$7,000
MACHINE PER PLAN
CONSTRUCT CONCRETE STEPS
12
CN-9
PER PLAN AND DETAIL 32 ON
550
SF
$80
$44,000
SHEET 18
P-1 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Unit
Description
Quantity
Unit
Amount
No.
Note No.
Price
CONSTRUCT OWL BOX PER
13
CN-10
DETAIL 10 ON SHEET 12. INSTALL
5
EA
$325
$1,625
OWL BOX IN SELECTED TREES
PER CITY ENGINEER
FURNISH AND INSTALL PUMP
14
CN-11
VAULT TYPE B WITH EQUIPMENT
1
EA
$186,000
$186,000
COMPLETE AS PER SHEET 20
15
CN-12
CONSTRUCT MANMADE REEF 3
25
EA
$400
$10,000
PER DETAIL 7 ON SHEET 11
16
CN-13
CONSTRUCT BOAT DOCK PER
1
EA
$6,000
$6,000
DETAIL 13 ON SHEET 12
CONSTRUCT COMPACTED DG
17
CN-15
STEPS PER DETAIL 31 ON SHEET
4,500
SF
$24
$108,000
18
CONSTRUCT WETLAND PLANTER
18
CN-16
FOR AQUATIC VEGETATION
4,200
SF
$30
$126,000
TYPE I PER DETAIL 16 ON SHEET
13
CONSTRUCT WETLAND PLANTER
19
CN-17
FOR AQUATIC VEGETATION
2,000
SF
$58
$116,000
TYPE II PER DETAIL 17 ON SHEET
13
FURNISH AND INSTALL
20
CN-18
AERATION POD PER PLAN, AND
21
EA
$900
$18,900
DETAIL 18 SHEET ON 14
FURNISH AND INSTALL PUMP
21
CN-19
VAULT TYPE A WITH EQUIPMENT
5
EA
$186,000
$930,000
COMPLETE AS PER SHEET 15
FURNISH AND INSTALL 8-INCH
22
CN-20
SCHED 40 PVC PIPE, LENGTH PER
740
LF
$70
$51,800
PLAN.
FURNISH AND INSTALL PUMP
23
CN-21
VAULT TYPE B WITH EQUIPMENT
1
EA
$186,000
$186,000
COMPLETE AS PER SHEET 16
FURNISH AND INSTALL 6-INCH
24
CN-22
SCH 40 PVC PIPE, LENGTH PER
2,110
LF
$50
$105,500
PLAN.
FURNISH AND INSTALL 4-INCH
25
CN-23
SCH 40 PVC PIPE, LENGTH PER
5,100
LF
$40
$204,000
PLAN.
FURNISH AND INSTALL 2-INCH
26
CN-24
SCH 40 PVC PIPE, LENGTH PER
515
LF
$38
$19,570
PLAN.
CONSTRUCT AND INSTALL
27
CN-25
SKIMMER BOX AT LAKE EDGE AT
13
EA
$2,000
$26,000
GRASS PER PLAN, AND DETAIL 25
ON SHEET 14
P-2 of P-21
CITY OF SANTA ANA Add No. One
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Unit
Description
Quantity
Unit
Amount
No.
Note No.
Price
CONSTRUCT AND INSTALL
28
CN-26
SKIMMER BOX AT LAKE EDGE AT
14
EA
$2,000
$28,000
WALKWAY PER PLAN, AND
DETAIL 26 ON SHEET 14
FURNISH AND INSTALL 6-INCH
29
CN-27
SLOTTED INTAKE PER DETAILS
4
EA
$4,000
$16,000
27A AND 27B ON SHEET 14
FURNISH AND INSTALL 12-INCH
30
CN-28
EQUALIZER LINE PVC PIPE (C-900
320
LF
S38,400
DR-25) PER PLAN, AND DETAIL 28
$120
SHEET 18, LENGTH PER PLAN
FURNISH AND INSTALL PUMP
31
CN-36
VAULT TYPE B WITH EQUIPMENT
1
EA
$186,000
S 186.000
COMPLETE AS PER DETAILS ON
SHEET 18
FURNISH AND INSTALL
32
CN-37
WEIGHTED AIRLINE TUBING
2,550
LF
$2
$5,100
FROM WALL TO AERATION POD
PER PLAN.
INSTALL WEIGHTED AIRLINE
33
CN-38
TUBING THROUGH PROPOSED
8
EA
$400
$3,200
LAKE EDGE PER PLAN, AND
DETAIL 38 ON SHEET 18
CONSTRUCT PIPE WALL
34
CN-39
PENETRATION THROUGH LAKE
42
EA
$800
$33,600
EDGE PER PLAN, AND DETAILS
39A & 39B ON SHEET 13
FURNISH AND INSTALL 3"-6"
35
CN-41
RIVER ROCK PER PLAN, AND
40
CY
$30
$1,200
TYPICAL SECTION'R' HEREON.
FURNISH AND INSTALL 45-MIL
36
CN-42
EPDM LINER PER PLAN, AND
222
SY
$20
$4,440
TYPICAL SECTION W HEREON.
FURNISH AND INSTALL 1/4-TON
37
CN-43
RIP -RAP PROTECTION PER PLAN,
5
CY
$400
$2,000
AND SECTION HEREON.
38
CN-44
CONSTRUCT FISH SPAWNING
31,600
SF
$4
$126,400
AREA PER DETAIL 3 ON SHEET 10
CONSTRUCT BIOFILTER PER
39
CN-45
PLAN AND DETAIL 12 ON SHEET
4
EA
$60,000
$240,000
23
CONSTRUCT 4" THICK CONCRETE
40
CN-52
PAVEMENT PER PLAN AND
5,100
SF
$18
$91,800
COUNTY OF ORANGE OCPW STD
PLAN 1621
P-3 of P-25
CITY OF SANTA ANA Add No. One
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Unit
Description
Quantity
Unit
Amount
No.
Note No.
Price
CONSTRUCT LANDSCAPE
41
CN-53
PLANTER PER DETAIL 30 ON
4,200
SF
$10
$42,000
SHEET 18
INSTALL RELOCATED
42
CN-56
BOOKSHARE KIOSK AT
1
EA
$800
$800
LOCATION SHOWN
FURNISH AND INSTALL PUMP
43
CN-57
VAULT TYPE B WITH EQUIPMENT
2
EA
$186,000
$372,000
COMPLETE AS PER SHEET 21
INSTALL 36" BOX AUSTRALIAN
44
CN-58
WILLOW (GIJEIRA
PARVIFLORA)PER CITY OF
12
EA
$2,500
$30,000
SANTA ANA STD PLAN 1124B
FURNISH AND INSTALL 124NCH
45
CN-59
SCHED 40 PVC PIPE, LENGTH PER
51
LF
$400
$20,400
PLAN.
INSTALL 3/4 INCH SCHEDULE 40
PVC IRRIGATION LINE. TRENCH
46
CN-66
DETAILS PER SHEET 22. ROOT
265
LF
$38
$10,070
WATERING BUBBLER AT EACH
TREE PER DETAIL 9 ON SHEET 22.
REMOVE EXIST PUMP, WIRING,
47
DN-1
VAULT, AND APPURTENANCES.
11
EA
$1,000
$11,000
BACKFILL HOLE(S).
ABANDON EXISTING LAKE EDGE
48
DN-2
SKIMMER AND BACKFILL WITH
28
EA
$800
$22,400
CONCRETE
49
DN-3
ABANDON EXIST PIPE IN -PLACE.
11
EA
$15,400
CAP/ PLUG CUT ENDS.
$1,400
50
DN-5
REMOVE AND TEMPORARILY
2
EA
$280
$560
STORE BOOKSHARE KIOSK
51
DN-6
RELOCATE PARK BENCH PER
2
EA
$600
$1,200
SHEET 3
REMOVE LIGHT STANDARD,
52
DN-7
FOUNDATION, CONDUIT, AND
1
EA
$2,800
$2,800
WIRING. BACKFILL HOLE(S)
53
DN-8
REMOVE WOODEN POSTS AND
222
LF
$10
$2,220
STEEL CABLE BARRICADE
RELOCATE AND RECONNECT
54
DN-9
EXISTING IRRIGATION PIPES TO
215
LF
$14
$3,010
LIMITS SHOWN
P-4 of P-25
CITY OF SANTA ANA Add No. One
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Unit
Description
Quantity
Unit
Amount
No.
Note No.
Price
RELOCATE TREES AS NEEDED TO
$13,500
55
DN-10
CONSTRUCT WATER FEATURE
2,700
SF
$ 5
PER SHEETS 5,6, AND 9
REMOVE EXISTING TREES
$800
$9,600
56
DN-11
WITHIN LIMITS INCLUDING
12
EA
ROOTBALL AND TRUNK
REMOVE EXIST LAKE EDGE
57
DN-13
WALL PER LIMITS SHOWN ON
600
LF
$50
$30,000
PLANS.
58
DN-14
REMOVE AND DISPOSE OF 8"
150
LF
$8
$1,200
EQUALIZER LINES.
ABANDON INTAKE STRUCTURE
59
DN-15
AND 24" ACP IN PLACE.
1
EA
$8,000
K000
BACKFILL WITH CLSM.
ABANDON EXISTING ELECTRIC
60
DN-18
FACILITY IN PLACE, DE-
11
EA
$4,000
$44,000
ENERGIZE TO RENDER
INOPERABLE AND SAFE
61
PROJECT ADVERTISEMENT SIGN
1
EA
$2,000
$2,000
62
1 CONSTRUCTION PERMIT
1
I LS
$30,000
1 $30,000
63
1 DEWATERING
1
LS
$800,000
$800,000
CN= "Construction Notes" from Plan Set
DN= "Demolition Notes" from Plan Set
P-5 of P-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
TOTAL BASE BID $ 4,942,135.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within number (280) working days after the commencement date stated in the Notice to
Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $2,000.00 per calendar day.
Name of Firm CJW Construction, Inc
Signature of BIDDER
Title Daniel Duarte, President Tammy Harvey, Secretary
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-6 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm CJW Construction, Inc
Signature of BIDDER
Title Daniel Duarte, President Tammy Harvey, Secretary
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-7 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: CYVN Construction, Inc
Business Address: 841 E. Washington Avenue Suite B, Santa Ana, CA 92701
Business E-Mail Address: estimating@cjwconstruction.com
Telephone: 714-835-6820
State Contractor's License No. and Class: CSLB 4803675
License Expiration Date: 1/31/2024
State Dept. of Industrial Relations (DIR)
Registration No.:
State Dept. of Industrial Relations (DIR)
Registration Expir te:
Signed:
Title: Daniel Duarte, President
1000009924
06/30/2024
P-8 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or type of worker needed to execute the services available
to interested parties upon request and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify, and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm CJW Construction, Inc
Signature of BIDDER
Title Daniel Duarte, President
(if an individual, so state)
P-9 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: ''/z% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: %z% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name ZZ Construction
License #/Exp. 1054314 / Ex. 06/30/2023
DIR Reg. #/Exp. 1000930487 Ex. 06/30/2023
Location Santa Ana, CA
Phone 714-863-4132
Type Of Work Landscaping & Concrete (Partial)
Amount $ $300,000
Name Herman and Charles, Inc.
License #/Exp. 1086284 / June 2023
DIR Reg. #/Exp. 1000859957 / June 2023
License # 1086284 / June 2023
Location San Bernardino, CA
Phone 951-205-1637
Type Of Work Electrical (Partial)
Amount $ $655,000
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Signature of Bidder
Name Macro -Z-Technology
License #/Exp. 561313 / Ex. 03/31/2023
DIR Reg. #/Exp. 1 000 000 232 / Ex. 06/30/2024
Location Santa Ana, CA
Phone 714-564-1130
Type Of Work Earthwork (Partial)
Amount $ $200,000
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
P-12 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
I, Orange County Public Works. 601 N Ross St, Santa Ana, CA 92701
Name and Address of Owner.
Teejay Aeropagita, Resident Engineer. 714-856-2099
Name and Telephone Number of person familiar with project.
$6,510,523 Repair of Channel & Erosion Protection 09/29/2020
Contract Amount Type of Work Date Completed
2. Orange County Water District. 18700 Ward St, Fountain Valley, CA 92708
Name and Address of owner.
Ryan Bouley, Principal Engineer 714-378-8207
Name and Telephone Number of person familiar with project.
$1,859,000 Sediment Removal of Dam 02/13/2021
Contract Amount
Type of Work
Date Completed
3, USACE -Los Angeles District. 915 Wilshire Blvd., Suite 1101, Los Angeles, CA 90017
Name and Address of owner.
Fernando Cano, Project Engineer. 951-898-6151
Name and Telephone Number of person familiar with project.
Riprap revetment & stone toe
$29,748,020 protection along Santa Ana River
Contract Amount Type of Work
08/08/2024
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Alliant Insurance Services, Inc. 18100 Von Karman Avenue, 10th Floor, Irvine, CA 92612: (949) 660-5956
Western Surety Company, 2 Park Plaza, Irvine, CA 92614: (949) 399-4970
P-13 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
1. County of Orange. 300 North Flower St Suite 800 Santa Ana, CA 92703
Name and Address of Owner.
Teejay Aeropagita, Resident Engineer. 714-856-2099
Name and Telephone Number of person familiar with project.
$4,251,275 Sediment Removal from channel 04/12/2019
Contract Amount Type of Work Date Completed
2. California State Lands Commission. 100 Howe Ave, Suite 100-South, Sacramento, CA 95825
Name and Address of owner.
Keith Merkle 858-560-6441
Name and Telephone Number of person familiar with project.
$3,742,180 Maintenance dredging of lowlands
Contract Amount Type of Work
12/31 /2020
Date Completed
3. Los Angeles County Public Works. 900 South Fremont Ave, Alhambra, CA 91803
Name and Address of owner.
Victor Bermudez 626-688-8275
Name and Telephone Number of person familiar with project.
Repair of levees and -flood
$7,599,811 management improvement
Contract Amount Type of Work
03/21 /2021
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
See previous reference page.
P-14 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
P-16 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chapter.
Signed:
Title: Daniel Duarte, President
Firm: CJW Construction, Inc
Date: 2/28/2023
P-17 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amount to the California Apprenticeship Council.
Signed:
Title: Daniel Duarte, President
Firm: CJW Construction, Inc
Date: 2/28/2023
P-18 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherwise entitled.
Signed:
Title: Daniel Duarte, President
Firm: CJW Construction, Inc
Date: 2/28/2023
P-19 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation?
Yes No X
If the answer is yes, explain the circumstances in the following space.
P-20 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS (NOT USED)
■■_.
._
._
- -
Signed:
Title: President
Firm: CJW Construction, Inc.
Date: 02/28/2023
Daniel Duarte
P-21 of P-21
CITY OF SANTA ANA
PROPOSAL Add No. One
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The BIDDER, under penalty of perjury, certifies that, except as noted below, he/she or any other
person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of
ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any
Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgment rendered against it by a court of
competent jurisdiction in any matter involving fraud or official misconduct within the past
3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining
bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating
agency, and dates of action.
Signature:
Printed Name: Daniel Duarte
Title: President
Firm Name: CJW Construction, Inc.
Note: Providing false information may result in criminal prosecution or administrative
sanctions.
P-22 of P-25
CITY OF SANTA ANA
PROPOSAL Add No. One
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
NONLOBBYING CERTIFICATION FOR FEDERAL -AID CONTRACTS
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The BIDDER certifies, by signing and submitting this Proposal, to the best of his or her knowledge
and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or
employee of any Federal agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with the awarding of
any Federal contract, the making of any Federal grant, the making of any Federal loan, the
entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any Federal
agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with this Federal contract, grant, loan, or cooperative
agreement, the undersigned shall complete and submit Standard Form-LLL, 'Disclosure
of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for making
or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who
fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and
not more than $100,000 for each such failure.
The BIDDER also agrees by submitting his or her Proposal that he or she shall require that the
language of this certification be included in all lower tier subcontracts, which exceed $100,000
and that all such subrecipients shall certify and disclose accordingly.
Signature:
Printed Name: Daniel Duarte
Title: President
Firm Name: CJw Construction, Inc.
P-23 of P-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal 3. Report Type:
Action:
= a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post -award
d. loan For Material Change Only:
e. loan guarantee year quarter
f. loan insurance date of last report
4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee,
Enter Name and Address of Prime:
Prime Subawardee
Tier , if known
Congressional District, if known
6. Federal Department/Agency:
8. Federal Action Number, if known:
10. a. Name and Address of Lobby Entity
(If individual, last name, first name, MI)
11.
12.
14.
Congressional District, if known
7. Federal Program Name/Description:
CFDA Number, if applicable
9. Award Amount, if known:
b. Individuals Performing Services (including
address if different from No. I Oa)
(last name, first name, MI)
(attach Continuation Sheet(s) if necessary)
Amount of Payment (check all that apply) 13. Type of Payment (check all that apply)
$ actual ❑ planned a. retainer
b. one-time fee
Form of Payment (check all that apply): c. commission
ea. cash d. contingent fee
b. in -kind; specify: nature e deferred
value f. other, specify
Brief Description of Services Performed or to be performed and Date(s) of Service, including
officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) if necessary)
15. Continuation Sheet(s) attached: Yes ❑ No ❑
16. Information requested through this form is authorized by
Title 31 U.S.C. Section 1352. This disclosure of lobbying
reliance was placed by the tier above when his transaction
was made or entered into. This disclosure is required
pursuant to 31 U.S.C. 1352. This information will be
reported to Congress semiannually and will be available for
public inspection. Any person who fails to file the required
disclosure shall be subject to a civil penalty of not less than
$10,000 and not more than $100,000 for each such failure.
Federal Use Only:
Signature:_
Print Name:
Title:
Telephone No.:
Date:
Authorized for Local Reproduction
Standard Form - LLL
Add No. One
P-24 of P-25
CITY OF SANTA ANA
PROPOSAL Add No. One
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING
ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of
covered Federal action or a material change to previous filing pursuant to title 31 U.S.C. section 1352. The filing of a form is required for such
payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a
Member of Congress an officer or employee of Congress or an employee of a Member of Congress in connection with a covered Federal action.
Attach a continuation sheet for additional information if the space on the form is inadequate. Complete all items that apply for both the initial
filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional
information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence, the outcome of a
covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information
previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by
this reporting entity for this covered Federal action.
4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District if known. Check the
appropriate classification of the reporting entity that designates if it is or expects to be a prime or subaward recipient. Identify the tier
of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but are not limited to subcontracts,
subgrants and contract awards under grants.
5. If the organization filing the report in Item 4 checks "Subawardee" then enter the full name, address, city, state and zip code of the
prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organization level below agency
name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal
Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identification in item 1 (e.g., Request for
Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the
application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of
the award/loan commitments for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to
influenced the covered Federal action.
(b) Enter the full names of the individual(s) performing services and include full address if different from 10 (a). Enter Last Name,
First Name and Middle Initial (MI).
11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item
10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material
change report, enter the cumulative amount of payment made or planned to be made.
12. Check the appropriate box. Check all boxes that apply. If payment is made through an in -kind contribution, specify the nature and
value of the in -kind payment.
13. Check the appropriate box. Check all boxes that apply. If other, specify nature.
14. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the
date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with Federal officials.
Identify the Federal officer(s) or employee(s) contacted or the officer(s) employee(s) or Member(s) of Congress that were contacted.
15. Check whether or not a continuation sheet(s) is attached.
16. The certifying official shall sign and date the form, print his/her name title and telephone number.
Public reporting burden for this collection of information is estimated to average 30 minutes per response, including time for reviewing
instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for
reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.
P-25 of P-25
EXHIBIT 4
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
This CONSTRUCTION CONTRACT is made and entered into this 18t1' day of April, 2023 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California (hereinafter "CITY"), and CJW Construction,
Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Centennial Lake Circulation Renovation Project (hereinafter
referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract
Documents prepared by the City's Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction,
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Four Million Nine Hundred Forty -Two
Thousand One Hundred Thirty -Five Dollars and No Cents ($4,942,135.00), as set forth and identified
in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A"
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
Page 1 of 4
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5, The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: ht[p://www.santa-ana.or�1/1)wa/documents/CWA.lidf
CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation hssurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
Page 2 of 4
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of
indemnity in favor of CONTRACTOR against CITY or any other Indemnitee.
11. USE OF CSLFRF FUNDS
Funds from the Coronavirus State Fiscal Recovery Fund and/or the Coronavirus Local Fiscal Recovery
Fund, together known as the Coronavirus State and Local Fiscal Recovery Funds ("CSLFRF") program,
will be used to fund all or a portion of this Construction Contract. CONTRACTOR shall comply with all
applicable federal requirements including, but not limited to, the following, all of which are expressly
incorporated herein by reference:
a. Sections 602 and 603 of the Social Security Act as added by Section 9901 of the American
Rescue Plan Act of 2021 (the "Act");
b. U.S. Department of the Treasury ("Treasury") Final Rule for the Act;
c. Treasury Compliance and Reporting Guidance for the Act;
d. 2 C.F.R. Part 200 — Uniform Administrative Requirements, Cost Principles, and Audit
Requirements for Federal Awards, other than such provisions as the U.S. Department of the
Treasury may determine are in applicable to the CSLFRF program and subject to such
exceptions as may be otherwise provided by the U.S. Department of the Treasury;
e. Treasury Coronavirus Local Fiscal Recovery Fund Award Terms and Conditions; and
f. Federal contract provisions attached hereto as Exhibit `B" and incorporated herein by
reference.
Subcontracts, if any, shall contain a provision making them subject to all of the provisions stipulated in
this Construction Contract. With respect to any conflict between such federal requirements and the terms
of this Construction Contract and/or the provisions of state law and except as otherwise required under
federal law or regulation, the more stringent requirement shall control.
[signature page to follow]
Page 3 of 4
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
JENNIFER HALL
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: �►+! µ,-iL
JOHN FUNK
Chief Assistant City Attorney
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
CJW Construction, Inc.
NAME: Daniel Duarte
TITLE: President
Page 4 of 4
11 .
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: CJW Construction. Inc
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Bid Item
Unit
No.
Note No.
Description
Quantity
Unit
Price
Amount
1
DN-19
CLEAR AND GRUB PER LIMITS
1
LS
$98,000
$98,000
SHOWN
2
DN-17
UNCLASSIFIED EXCAVATION
1,450
CY
$68
$98,600
FURNISH AND INSTALL 12-INCH
3
CN-14
C-900 DR-25 PR CL 165 PVC PIPE,
95
LF
$72
$6,840
LENGTH PER PLAN.
CONSTRUCT CONCRETE LAKE
EDGE AT SIDEWALK /
4
CN-1
BOARDWALK PER PLAN,
155
LF
$350
$54,250
CONSTRUCTION METHOD AND
DETAIL 02 ON SHEET 10
CONSTRUCT CONCRETE LAKE
5
CN-2
EDGE PER PLAN AND DETAILS
480
LF
$350
$168,000
ON SHEET 10
GRADE MEANDERING STREAM
6
CN-3
PER PLAN AND INSTALL ROCK
255
LF
$250
$63,750
LINING
CONSTRUCT CONCRETE BOAT
7
CN-4
RAMP PER DETAIL 12 ON SHEET
I
EA
$40,000
$40,000
12
8
CN-5
CONSTRUCT MANMADE REEF 1
6
EA
$600
$3,600
PER DETAIL 05 ON SHEET 11
9
CN-6
CONSTRUCT MANMADE REEF 2
2
EA
$1,200
$2,400
PER DETAIL 06 ON SHEET 11
10
CN-7
CONSTRUCT FOUNTAIN PER
1
EA
$12,000
$12,000
DETAIL 07 ON SHEET 14
FURNISH AND INSTALL
11
CN-8
WATERFOWL FOOD VENDING
7
EA
$1,000
$7,000
MACHINE PER PLAN
CONSTRUCT CONCRETE STEPS
12
CN-9
PER PLAN AND DETAIL 32 ON
550
SF
$80
$44,000
SHEET 18
P-1 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Description
Quantity
Unit
Unit
Amount
No.
Note No.
Price
CONSTRUCT OWL BOX PER
13 CN-10
DETAIL 10 ON SHEET 12. INSTALL
5
EA
$325
$1,625
OWL BOX IN SELECTED TREES
PER CITY ENGINEER
FURNISH AND INSTALL PUMP
14 CN-11
VAULT TYPE B WITH EQUIPMENT
1
EA
$186,000
$186,000
COMPLETE AS PER SHEET 20
15
CN-12
CONSTRUCT MANMADE REEF 3
25
EA
$400
$10,000
PER DETAIL 7 ON SHEET 11
16
CN-13
CONSTRUCT BOAT DOCK PER
1
EA
$6,000
$6,000
DETAIL 13 ON SHEET 12
CONSTRUCT COMPACTED DG
17
CN-15
STEPS PER DETAIL 31 ON SHEET
4,500
SF
$24
$108,000
18
CONSTRUCT WETLAND PLANTER
18
CN-16
FOR AQUATIC VEGETATION
4,200
SF
$30
$126,000
TYPE I PER DETAIL 16 ON SHEET
13
CONSTRUCT WETLAND PLANTER
19
CN-17
FOR AQUATIC VEGETATION
2,000
SF
$58
$116,000
TYPE II PER DETAIL 17 ON SHEET
13
FURNISH AND INSTALL
20
CN-18
AERATION POD PER PLAN, AND
21
EA
$900
$18,900
DETAIL 18 SHEET ON 14
FURNISH AND INSTALL PUMP
21
CN-19
VAULT TYPE A WITH EQUIPMENT
5
EA
$186,000
$930,000
COMPLETE AS PER SHEET 15
FURNISH AND INSTALL 8-INCH
22 CN-20
SCHED 40 PVC PIPE, LENGTH PER
740
LF
$70
$51,800
PLAN.
FURNISH AND INSTALL PUMP
23 CN-21
VAULT TYPE B WITH EQUIPMENT
1
EA
$186,000
$ 186,000
COMPLETE AS PER SHEET 16
FURNISH AND INSTALL 6-INCH
24
CN-22
SCH 40 PVC PIPE, LENGTH PER
2,110
LF
$50
$105,500
PLAN.
FURNISH AND INSTALL 4-INCH
25
CN-23
SCH 40 PVC PIPE, LENGTH PER
5,100
LF
$40
$204,000
PLAN.
FURNISH AND INSTALL 2-INCH
26 CN-24
SCH 40 PVC PIPE, LENGTH PER
515
LF
$38
$19,570
PLAN.
CONSTRUCT AND INSTALL
27
CN-25
SKIMMER BOX AT LAKE EDGE AT
13
EA
$2,000
$26,000
GRASS PER PLAN, AND DETAIL 25
ON SHEET 14
P-2 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Description
Quantity
Unit
Unit
Amount
No.
Note No.
Price
CONSTRUCT AND INSTALL
28 CN-26
SKIMMER BOX AT LAKE EDGE AT
14
EA
$2,000
$28,000
WALKWAY PER PLAN, AND
DETAIL 26 ON SHEET 14
f
FURNISH AND INSTALL 6-INCH
29 CN-27
SLOTTED INTAKE PER DETAILS
4
EA
$4,000
$16,000
27A AND 27B ON SHEET 14
FURNISH AND INSTALL 12-INCH
30
CN-28
EQUALIZER LINE PVC PIPE (C-900
320
LF
$38,400
DR-25) PER PLAN, AND DETAIL 28
$120
SHEET 18, LENGTH PER PLAN
FURNISH AND INSTALL PUMP
31
CN-36
VAULT TYPE B WITH EQUIPMENT
I
EA
$186,000
$186.000
COMPLETE AS PER DETAILS ON
SHEET 18
FURNISH AND INSTALL
32 CN-37
WEIGHTED AIRLINE TUBING
2,550
LF
$2
$5,100
FROM WALL TO AERATION POD
PER PLAN.
INSTALL WEIGHTED AIRLINE
33
CN-38
TUBING THROUGH PROPOSED
8
EA
$400
$3,200
LAKE EDGE PER PLAN, AND
DETAIL 38 ON SHEET 18
CONSTRUCT PIPE WALL
34
CN-39
PENETRATION THROUGH LAKE
42
EA
$800
$33,600
EDGE PER PLAN, AND DETAILS
39A & 39B ON SHEET 13
FURNISH AND INSTALL 3"-6"
35 CN-41
RIVER ROCK PER PLAN, AND
40
CY
$30
$1,200
TYPICAL SECTION 'R' HEREON.
FURNISH AND INSTALL 45-MIL
36 CN-42
EPDM LINER PER PLAN, AND
222
SY
$20
$4,440
TYPICAL SECTION'R' HEREON.
FURNISH AND INSTALL 1/4-TON
37
CN-43
RIP -RAP PROTECTION PER PLAN,
5
CY
$400
$2,000
AND SECTION HEREON.
38
CN-44
CONSTRUCT FISH SPAWNING
31,600
SF
$4
$126,400
AREA PER DETAIL 3 ON SHEET 10
CONSTRUCT BIOFILTER PER
39
CN-45
PLAN AND DETAIL 12 ON SHEET
4
EA
$60,000
$240,000
23
CONSTRUCT 4" THICK CONCRETE
40
CN-52
PAVEMENT PER PLAN AND
5,100
SF
$18
$91,800
COUNTY OF ORANGE OCPW STD
PLAN 1.621
P-3 of P-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Description
Quantity
Unit
Unit
Amount
No. Note No.
Price
I
CONSTRUCT LANDSCAPE
41 CN-53
PLANTER PER DETAIL 30 ON
4,200
SF
$10
$42,000
SHEET 18
INSTALL RELOCATED
42 CN-56
BOOKSHARE KIOSK AT
1
EA
$800
$800
LOCATION SHOWN
FURNISH AND INSTALL PUMP
43
CN-57
VAULT TYPE B WITH EQUIPMENT
2
EA
$186,000
$372,000
COMPLETE AS PER SHEET 21
INSTALL 36" BOX AUSTRALIAN
44
CN-58
W.ILLOW (GIJEIRA
PARVIFLORA)PER CITY OF
12
EA
$2,500
$30,000
SANTA ANA STD PLAN l 124B
FURNISH AND INSTALL 12-INCH
45
CN-59
SCHED 40 PVC PIPE, LENGTH PER
51
LF
$400
$20,400
PLAN.
INSTALL 3/4 INCH SCHEDULE 40
PVC IRRIGATION LINE. TRENCH
46
CN-66
DETAILS PER SHEET 22. ROOT
265
LF
$38
$10,070
WATERING BUBBLER AT EACH
TREE PER DETAIL 9 ON SHEET 22.
REMOVE EXIST PUMP, WIRING,
47
DN-1
VAULT, AND APPURTENANCES.
11
EA
$1,000
$11,000
BACKFILL HOLE(S).
ABANDON EXISTING LAKE EDGE
48
DN-2
SKIMMER AND BACKFILL WITH
28
EA
$800
$22,400
CONCRETE
49
11
EA
DN-3
ABANDON EXIST PIPE IN -PLACE.
$15,400
CAP/ PLUG CUT ENDS.
$1,400
DN-5
REMOVE AND TEMPORARILY
EA
$280
$560
50
2
STORE BOOKSHARE KIOSK
51 DN-6
RELOCATE PARK BENCH PER
2
EA
$600
$1,200
SHEET 3
REMOVE LIGHT STANDARD,
52 DN-7
FOUNDATION, CONDUIT, AND
l
EA
$2,800
$2,800
WIRING. BACKFILL HOLE(S)
53
DN-8
REMOVE WOODEN POSTS AND
222
LF
$10
$2,220
STEEL CABLE BARRICADE
RELOCATE AND RECONNECT
54
DN-9
EXISTING IRRIGATION PIPES TO
215
LF
$14
$3,010
LIMITS SHOWN
P-4 of P-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Bid Item
Description
Quantity
Unit
Unit
Amount
No. Note No.
Price
RELOCATE TREES AS NEEDED TO
55 DN-10
CONSTRUCT WATER FEATURE
2,700
SF
$ 5
$13,500
PER SHEETS 5,6, AND 9
REMOVE EXISTING TREES
56 DN-11
WITHIN LIMITS INCLUDING
12
EA
$800
$9,600
ROOTBALL AND TRUNK
REMOVE EXIST LAKE EDGE
57
DN-13
WALL PER LIMITS SHOWN ON
600
LF
$50
$30,000
PLANS.
58 DN-14
REMOVE AND DISPOSE OF 8"
150
LF
$8
$1,200
EQUALIZER LINES.
ABANDON INTAKE STRUCTURE
59 DN-15
AND 24" ACP IN PLACE.
l
EA
$8,000
$8,000
BACKFILL WITH CLSM.
ABANDON EXISTING ELECTRIC
60
DN-18
FACILITY IN PLACE, DE-
11
EA
ENERGIZE TO RENDER
$4,000
$44,000
INOPERABLE AND SAFE
61
PROJECT ADVERTISEMENT SIGN
1
1
EA
$2,000
$2,000
62
CONSTRUCTION PERMIT
LS
$30,000
$30,000
63
DEWATERING
1
LS
$800,000
$800,000
CN= "Construction Notes" fi•om Plan Set
DN= "Demolition Notes" from Plan Set
P-5 of P-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
TOTAL SASE BID $ 4,942,135.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "250/6" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within number J280) working day after the commencement date stated in the Notice to
Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $2,000.00 per calendar day.
Name of Firm CJW Construction, Inc
Signature of BIDDER
Title _ DanieI Duarte, President Tammy HarveL, Secretary _
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-6 of P-21
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
EXHIBIT B
FEDERAL CONTRACT PROVISIONS
During the performance of this Construction Contract, CONTRACTOR shall comply with all applicable
federal laws and regulations including, but not limited to, the federal contract provisions in this Exhibit
"A"
1. REQUIRED CONTRACT PROVISIONS IN ACCORDANCE WITH APPENDIX II TO
PART 200 — CONTRACT PROVISIONS FOR NON-FEDERAL ENTITY CONTRACTS UNDER
FEDERAL AWARDS (2 C.F.R. § 200.327)
(a) Appendix II to Part 200 (A); Appendix II to Part 200 (B): Remedies for Breach;
Termination for Cause/Convenience. The Contract Documents include remedies for breach and
termination for cause and convenience.
(b) Appendix II to Part 200 (C) — Equal Employment Opportunity: During the performance of
this Construction Contract, CONTRACTOR agrees as follows:
The CONTRACTOR will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
The CONTRACTOR will take affirmative action to ensure that applicants are employed, and that
employees are treated during employment without regard to their race, color, religion, sex, sexual
orientation, gender identity, or national origin. Such action shall include, but not be limited to the
following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff
or termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship. The CONTRACTOR agrees to post in conspicuous places, available to employees and
applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination
clause.
Jiij The CONTRACTOR will, in all solicitations or advertisements for employees
placed by or on behalf of the CONTRACTOR, state that all qualified applicants will receive consideration
for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national
origin.
Lifil The CONTRACTOR will not discharge or in any other manner discriminate against
any employee or applicant for employment because such employee or applicant has inquired about,
discussed, or disclosed the compensation of the employee or applicant or another employee or applicant.
This provision shall not apply to instances in which an employee who has access to the compensation
information of other employees or applicants as a part of such employee's essential job functions discloses
the compensation of such other employees or applicants to individuals who do not otherwise have access
to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance
of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer,
or is consistent with the CONTRACTOR's legal duty to furnish infornation.
iv The CONTRACTOR will send to each labor union or representative of workers
with which he has a collective bargaining agreement or other contract or understanding, a notice to be
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
provided advising the said labor union or workers' representatives of the CONTRACTOR's commitments
under this section, and shall post copies of the notice in conspicuous places available to employees and
applicants for employment.
(v) The CONTRACTOR will comply with all provisions of Executive Order 11246 of
September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
vi The CONTRACTOR will furnish all information and reports required by Executive
Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his books, records, and accounts by the administering agency
and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules,
regulations, and orders.
jyjjj In the event of the CONTRACTOR's noncompliance with the nondiscrimination
clauses of this Construction Contract or with any of the said rules, regulations, or orders, this Construction
Contract may be canceled, terminated, or suspended in whole or in part and the CONTRACTOR may be
declared ineligible for further Government contracts or federally assisted construction contracts in
accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24,
1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
fyija The CONTRACTOR will include the portion of the sentence immediately
preceding paragraph (i) and the provisions of paragraphs (i) through (vii) in every subcontract or purchase
order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each
subcontractor or vendor. The CONTRACTOR will take such action with respect to any subcontract or
purchase order as the administering agency may direct as a means of enforcing such provisions, including
sanctions for noncompliance:
Provided, however, that in the event the CONTRACTOR becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering agency, the
CONTRACTOR may request the United States to enter into such litigation to protect the interests of the
United States.
The CITY further agrees that it will be bound by the above equal opportunity clause with respect to its
own employment practices when it participates in federally assisted construction work: Provided, That if
the CITY so participating is a State or local government, the above equal opportunity clause is not
applicable to any agency, instrumentality or subdivision of such government which does not participate
in work on or under the Construction Contract.
The CITY agrees that it will assist and cooperate actively with the administering agency and the Secretary
of Labor in obtaining the compliance of the CONTRACTOR and subcontractors with the equal
opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will
furnish the administering agency and the Secretary of Labor such information as they may require for the
supervision of such compliance, and that it will otherwise assist the administering agency in the discharge
of the agency's primary responsibility for securing compliance.
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
The CITY further agrees that it will refrain from entering into any contract or contract modification subject
to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not
demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant
to the Executive Order and will carry out such sanctions and penalties for violation of the equal
opportunity clause as may be imposed upon contractors and subcontractors by the administering agency
or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the CITY
agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any
or all of the following actions: cancel, terminate, or suspend in whole or in part the grant (contract, loan,
insurance, guarantee) for this project; refrain from extending any further assistance to the applicant under
the program with respect to which the failure or refund occurred until satisfactory assurance of future
compliance has been received from such applicant; and refer the case to the Department of Justice for
appropriate legal proceedings.
(c) Appendix II to Part 200 (D) — Davis -Bacon Act: Not applicable to this Construction
Contract since it is funded by CSLFRF.
(d) Appendix II to Part 200 (D) — Copeland "Antti-Kickback" Act: Not applicable to this
Construction Contract since it is funded by CSLFRF.
(e) Appendix II to Part 200 (E) — Contract Work Hours and Safety Standards Act:
Overtime Requirements. No contractor or subcontractor contracting for any part of
the contract work which may require or involve the employment of laborers or mechanics shall require or
permit any such laborer or mechanic in any workweek in which he or she is employed on such work to
work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation
at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty
hours in such workweek.
fiij Violation; liability for unpaid wages; liquidated damages. In the event of any
violation of the clause set forth in paragraph (ii) of this section the CONTRACTOR and any subcontractor
responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor
shall be liable to the United States (in the case of work done under contract for the District of Columbia
or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall
be computed with respect to each individual laborer or mechanic, including watchmen and guards,
employed in violation of the clause set forth in paragraph (ii) of this section, in the sum of $10 for each
calendar day on which such individual was required or permitted to work in excess of the standard
workweek of forty hours without payment of the overtime wages required by the clause set forth in
paragraph (ii) of this section.
Withholding for unpaid wages and liquidated damages. The CITY shall upon its
own action or upon written request of an authorized representative of the Department of Labor withhold
or cause to be withheld, from any moneys payable on account of work performed by the CONTRACTOR
or subcontractor under any such contract or any other Federal contract with the CONTRACTOR, or any
other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is
held by the CONTRACTOR, such sums as may be determined to be necessary to satisfy any liabilities of
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
CONTRACTOR or subcontractor for unpaid wages and liquidated damages as provided in the clause set
forth in paragraph (iii) of this section.
iv Subcontracts. The CONTRACTOR or subcontractor shall insert in any
subcontracts the clauses set forth in paragraph (ii) through (v) of this Section and also a clause requiring
the subcontractors to include these clauses in any lower tier subcontracts. The CONTRACTOR shall be
responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in
paragraphs (ii) through (v) of this Section.
(f) Appendix II to Part 200 (F) — Rights to Inventions Made Under a Contract or Agreement:
Not applicable to this Construction Contract.
(g) Appendix II to Part 200 (G) — Clean Air Act and Federal Water Pollution Control Act:
Pursuant to the Clean Air Act, (1) CONTRACTOR agrees to comply with all
applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §
7401 et seq., (2) CONTRACTOR agrees to report each violation to the CITY and understands and agrees
that the CITY will, in turn, report each violation as required to assure notification to the Federal awarding
agency and the appropriate Environmental Protection Agency Regional Office, and (3) CONTRACTOR
agrees to include these requirements in each subcontract exceeding $150,000.
ii Pursuant to the Federal Water Pollution Control Act, (1) CONTRACTOR agrees
to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water
Pollution Control Act, as amended, 33 U.S.C. 1251 et seq., (2) CONTRACTOR agrees to report each
violation to the CITY and understands and agrees that the CITY will, in turn, report each violation as
required to assure notification to the Federal awarding agency and the appropriate Environmental
Protection Agency Regional Office, and (3) CONTRACTOR agrees to include these requirements in each
subcontract exceeding $150,000.
(h) Appendix II to Part 200 (H) — Debarment and Suspension:
This Construction Contract is a covered transaction for purposes of 2 C.F.R. pt. 180
and 2 C.F.R. pt. 3000. As such CONTRACTOR is required to verify that none of the CONTRACTOR,
its principals (defined at 2 C.F.R. § 180.995), or its affiliates (defined at 2 C.F.R. § 180.905) are excluded
(defined at 2 C.F.R. § 180.940) or disqualified (defined at 2 C.F.R. § 180.935).
Li. CONTRACTOR must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt.
3000, subpart C and must include a requirement to comply with these regulations in any lower tier covered
transaction it enters into.
CiiiI This certification is a material representation of fact relied upon by CITY. If it is
later determined that CONTRACTOR did not comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt.
3000, subpart C, in addition to remedies available to the CITY, the Federal Government may pursue
available remedies, including but not limited to suspension and/or debarment.
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
iv CONTRACTOR warrants that it is not debarred, suspended, or otherwise excluded
from or ineligible for participation in any federal programs. CONTRACTOR also agrees to verify that all
subcontractors performing work under this Construction Contract are not debarred, disqualified, or
otherwise prohibited from participation in accordance with the requirements above. CONTRACTOR
further agrees to notify the CITY in writing immediately if CONTRACTOR or its subcontractors are not
in compliance during the term of this Construction Contract.
(i) Appendix II to Part 200 (I) — Byrd Anti -Lobbying Act: CONTRACTORS that apply or
bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier
above that it will not and has not used Federal appropriated funds to pay any person or organization for
influencing or attempting to influence an officer or employee of any agency, a member of Congress,
officer or employee of Congress, or an employee of a member of Congress in connection with obtaining
any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose
any lobbying with non -Federal funds that takes place in connection with obtaining any Federal award.
Such disclosures are forwarded from tier to tier up to the recipient who in turn will forward the
certification(s) to the awarding agency. CONTRACTOR must sign and submit to the CITY the
certification regarding lobbying attached hereto as Attachment "1" and incorporated herein by this
reference.
0) Appendix H to Part 200 (J) — §200.323 Procurement of Recovered Materials:
Q CONTRACTOR shall comply with section 6002 of the Solid Waste Disposal Act,
as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include
procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 C.F.R.
part 247 that contain the highest percentage of recovered materials practicable, consistent with
maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or
the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid
waste management services in a manner that maximizes energy and resource recovery; and establishing
an affirmative procurement.
In the performance of this Construction Contract, the CONTRACTOR shall make
maximum use of products containing recovered materials that are EPA -designated items unless the
product cannot be acquired: competitively within a timeframe providing for compliance with the contract
performance schedule; meeting contract performance requirements; or at a reasonable price.
iii Information about this requirement, along with the list of EPA -designate items, is
available at EPA's Comprehensive Procurement Guidelines web site,
littps://www.epa. gov/smm/coniprehensive-procurement-guideline-cpg-program.
iv The CONTRACTOR also agrees to comply with all other applicable requirements
of Section 6002 of the Solid Waste Disposal Act."
(k) Appendix II to Part 200 (K) — §200.216 Prohibition on Certain Telecommunications and
Video Surveillance Services or Equipment:
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
Q CONTRACTOR shall not contract (or extend or renew a contract) to procure or
obtain equipment, services, or systems that uses covered telecommunications equipment or services as a
substantial or essential component of any system, or as critical technology as part of any system funded
under this Construction Contract. As described in Public Law 115-232, section 889, covered
telecommunications equipment is telecommunications equipment produced by Huawei Technologies
Company or ZTE Corporation (or any subsidiary or affiliate of such entities).
W For the purpose of public safety, security of government facilities, physical
security surveillance of critical infrastructure, and other national security purposes, video surveillance and
telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision
Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such
entities).
Telecommunications or video surveillance services provided by such
entities or using such equipment.
(33,) Telecommunications or video surveillance equipment or services produced
or provided by an entity that the Secretary of Defense, in consultation with the Director of the National
Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity
owned or controlled by, or otherwise connected to, the government of a covered foreign country.
ii See Public Law 115-232, section 889 for additional information.
(1) Appendix II to Part 200 (L) — §200.322 Domestic Preferences for Procurement:
(i) CONTRACTOR shall, to the greatest extent practicable, purchase, acquire, or use
goods, products, or materials produced in the United States (including but not limited to iron, aluminum,
steel, cement, and other manufactured products). The requirements of this section must be included in all
subcontracts.
ii For purposes of this section:
(1) "Produced in the United States" means, for iron and steel products, that all
manufacturing processes, from the initial melting stage through the application of coatings, occurred in
the United States.
(22,) "Manufactured products" means items and construction materials
composed in whole or in part of nonferrous metals such as aluminum; plastics and polymer -based products
such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.
2. COMPLIANCE WITH U.S. DEPARTMENT OF THE TREASURY CORONAVIRUS
LOCAL FISCAL RECOVERY FUND AWARD TERMS AND CONDITIONS
(a) Maintenance of and Access to Records. CONTRACTOR shall maintain records and
financial documents sufficient to evidence compliance with section 603(c) of the Act, Treasury's
regulations implementing that section, and guidance issued by Treasury regarding the foregoing.
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
CONTRACTOR agrees to provide the CITY, Treasury Office of Inspector General and the Government
Accountability Office, or any of their authorized representatives access to any books, documents, papers,
and records (electronic an otherwise) of the CONTRACTOR which are directly pertinent to this
Construction Contract for the purposes of conducting audits or other investigations. Records shall be
maintained by CONTRACTOR for a period of five (5) years after completion of the project.
(b) Compliance with Federal Regulations. CONTRACTOR agrees to comply with the
requirements of section 603 of the Act, regulations adopted by Treasury pursuant to section 603(f) of the
Act, and guidance issued by Treasury regarding the foregoing. CONTRACTOR also agrees to comply
with all other applicable federal statutes, regulations, and executive orders, including, without limitation,
the following:
W Universal Identifier and System for Award Management (SAM), 2 C.F.R. Part 25,
pursuant to which the award terns set forth in Appendix A to 2 C.F.R. Part 25 is hereby incorporated by
reference.
ii Reporting Subaward and Executive Compensation Information, 2 C.F.R. Part 170,
pursuant to which the award term set forth in Appendix A to 2 C.F.R. Part 170 is hereby incorporated by
reference.
iii OMB Guidelines to Agencies on Govemmentwide Debarment and Suspension
(Nonprocurement), 2 C.F.R. Part 180, including the requirement to include a term or condition in all lower
tier covered transactions (contracts and subcontracts described in 2 C.F.R. Part 180, subpart B) that the
award is subject to 2 C.F.R. Part 180 and Treasury's implementing regulation at 31 C.F.R. Part 19.
iv Recipient Integrity and Performance Matters, pursuant to which the award term set
forth in 2 C.F.R. Part 200, Appendix XII to Part 200 is hereby incorporated by reference.
(v) Govemmentwide Requirements for Drug -Free Workplace, 31 C.F.R. Part 20.
vi New Restrictions on Lobbying, 31 C.F.R. Part 21.
f.yW Uniform Relocation Assistance and Real Property Acquisitions Act of 1970 (42
U.S.C. §§ 4601-4655) and implementing regulations.
(c) Compliance with Federal Statutes and Regulations Prohibiting Discrimination.
CONTRACTOR agrees to comply with statutes and regulations prohibiting discrimination applicable to
the CSLFRF program including, without limitation, the following:
Title VI of the Civil Rights Act of 1964 (42 U.S.C. §§ 2000d et seq.) and Treasury's
implementing regulations at 31 C.F.R. Part 22, which prohibit discrimination on the basis of race, color,
or national origin under programs or activities receiving federal financial assistance.
dil The Fair Housing Act, Title VIII of the Civil Rights Act of 1968 (42 U.S.C. §§
3601 et seq.), which prohibits discrimination in housing on the basis of race, color, religion, national
origin, sex, familial status, or disability.
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
fifil Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. § 794), which
prohibits discrimination on the basis of disability under any program or activity receiving federal financial
assistance.
iv The Age Discrimination Act of 1975, as amended (42 U.S.C. §§ 6101 et seq.), and
Treasury's implementing regulations at 31 C.F.R. Part 23, which prohibit discrimination on the basis of
age in programs or activities receiving federal financial assistance.
Uv) Title II of the Americans with Disabilities Act of 1990, as amended (42 U.S.C. §§
12101 et seq.), which prohibits discrimination on the basis of disability under programs, activities, and
services provided or made available by state and local governments or instrumentalities or agencies
thereto.
(d) False Statements. CONTRACTOR understands that making false statements or claims in
connection with the CSLFRF program is a violation of federal law and may result in criminal, civil, or
administrative sanctions, including fines, imprisonment, civil damages and penalties, debarment from
participating in federal awards or contracts, and/or any other remedy available by law.
(e) Protections for Whistleblowers.
In accordance with 41 U.S.C. § 4712, CONTRACTOR may not discharge, demote,
or otherwise discriminate against an employee in reprisal for disclosing to any of the list of persons or
entities provided below, information that the employee reasonably believes is evidence of gross
mismanagement of a federal contract or grant, a gross waste of federal funds, an abuse of authority relating
to a federal contract or grant, a substantial and specific danger to public health or safety, or a violation of
law, rule, or regulation related to a federal contract (including the competition for or negotiation of a
contract) or grant.
ii The list of persons and entities referenced in the paragraph above includes the
following:
management;
enforcement agency;
A member of Congress or a representative of a committee of Congress;
Q An Inspector General;
The Government Accountability Office;
A Treasury employee responsible for contract or grant oversight or
An authorized official of the Department of Justice or other law
A court or grand jury; or
A management official or other employee of CONTRACTOR, or a
subcontractor who has the responsibility to investigate, discover, or address misconduct.
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
(f) Increasing Seat Belt Use in the United States. Pursuant to Executive Order 13043, 62 FR
19217 (Apr. 18, 1997), CONTRACTOR is encouraged to adopt and enforce on-the-job seat belt policies
and programs for their employees when operating company -owned, rented or personally owned vehicles,
and encourage its subcontractors to do the same
(g) Reducing Text Messaging While Driving. Pursuant to Executive Order 13513, 74 FR
51225 (Oct. 6, 2009), CONTRACTOR should encourage its employees and subcontractors to adopt and
enforce policies that ban text messaging while driving, and CONTRACTOR should establish workplace
safety policies to decrease accidents caused by distracted drivers.
(h) Assurances of Compliance with Civil Rights Requirements. The Civil Rights Restoration
Act of 1987 provides that the provisions of this assurance apply to the Project, including, but not limited
to, the following:
Qi) CONTRACTOR ensures its current and future compliance with Title VI of the
Civil Rights Act of 1964, as amended, which prohibits exclusion from participation, denial of the benefits
of, or subjection to discrimination under programs and activities receiving federal funds, of any person in
the United States on the ground of race, color, or national origin (42 U.S.C. § 2000d et seq.), as
implemented by the Department of the Treasury Title VI regulations at 31 CFR Part 22 and other pertinent
executive orders such as Executive Order 13166; directives; circulars; policies; memoranda and/or
guidance documents.
ii CONTRACTOR acknowledges that Executive Order 13166, "Improving Access to
Services for Persons with Limited English Proficiency (LEP)," seeks to improve access to federally
assisted programs and activities for individuals who, because of national origin, are limited in their English
proficiency. CONTRACTOR understands that the denial of access to persons to its programs, services
and activities because of their limited proficiency in English is a form of national origin discrimination
prohibited under Title VI of the Civil Rights Act of 1964. Accordingly, CONTRACTOR shall initiate
reasonable steps, or comply with Treasury's directives, to ensure meaningful access to its programs,
services and activities to LEP persons. CONTRACTOR understands and agrees that meaningful access
may entail providing language assistance services, including oral interpretation and written translation
where necessary to ensure effective communication in the Project.
iii CONTRACTOR agrees to consider the need for language services for LEP persons
during development of applicable budgets and when conducting programs, services and activities. As a
resource, the Department of the Treasury has published its LEP guidance at 70 FR 6067. For more
information on LEP, please visit littp://www.lep.gov.
iv CONTRACTOR acknowledges and agrees that compliance with this assurance
constitutes a condition of continued receipt of federal financial assistance and is binding upon
CONTRACTOR and CONTRACTOR's successors, transferees and assignees for the period in which
such assistance is provided.
(v) CONTRACTOR agrees to incorporate the following language in every contract or
agreement subject to Title VI and its regulations between the CONTRACTOR and the CONTRACTOR's
subcontractors, successors, transferees and assignees:
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 18-2681
CENTENNIAL LAKE CIRCULATION RENOVATION
The subcontractor, successor, transferee and assignee shall comply with Title VI of the Civil Rights Act
of 1964, which prohibits recipients of federal financial assistance fr•orn excluding from a program or
activity), denying benefits of, or otherwise discriminating against a person on the basis of race, color, or
national origin (42 U.S.C. § 2000d et seq), as implemented by Department of the Treasury Title VI
regulations, 31 CFR Part 22, which are herein incorporated by reference and made apart of this contract
(or agreement). Title VI also extends protection to persons with `Limited English proficiency" in any
program or activity receiving federal.frnancial assistance, 42 U.S.C. § 2000d et seq., as implemented by
Department of the Treasury Title VI regulations, 31 CFR Part 22, which are herein incorporated by
reference and made a part of this contract (or agreement).
vi CONTRACTOR understands and agrees that if any real properly or structure is
provided or improved with the aid of federal financial assistance by the Department of the Treasury, this
assurance obligates the CONTRACTOR, or in the case of a subsequent transfer, the transferee, for the
period during which the real property or structure is used for a purpose for which the federal financial
assistance is extended or for another purpose involving the provision of similar services or benefits. If any
personal property is provided, this assurance obligates the CONTRACTOR for the period during which it
retains ownership or possession of the property.
vii CONTRACTOR shall cooperate in any enforcement or compliance review
activities by the Department of the Treasury of the aforementioned obligations. Enforcement may include
investigation, arbitration, mediation, litigation, and monitoring of any settlement agreements that may
result from these actions. CONTRACTOR shall comply with information requests, on -site compliance
reviews, and reporting requirements.
viii CONTRACTOR shall maintain a complaint log and inform the Department of the
Treasury of any accusations of discrimination on the grounds of race, color, or national origin, and limited
English proficiency covered by Title VI of the Civil Rights Act of 1964 and implementing regulations and
provide, upon request, a list of all such reviews or proceedings based on the complaint, pending or
completed, including outcome. CONTRACTOR must also inform the Department of the Treasury if
CONTRACTOR has received no complaints under Title VI.
ix CONTRACTOR must provide documentation of an administrative agency's or
court's findings of non-compliance of Title VI and efforts to address the non-compliance, including any
voluntary compliance or other agreements between the CONTRACTOR and the administrative agency
that made the finding. If the CONTRACTOR settles a case or matter alleging such discrimination,
CONTRACTOR must provide documentation of the settlement. If CONTRACTOR has not been the
subject of any court or administrative agency finding of discrimination, please so state.
(x) If CONTRACTOR makes sub -awards to other agencies or other entities,
CONTRACTOR is responsible for assuring that sub -recipients also comply with Title VI and all of the
applicable authorities covered in this assurance.
EXHIBIT 5
COST ANALYSIS
CONSTRUCTION OF THE PROJECT NO. 18-2681: CENNTENNIAL LAKE
CIRCULATION RENOVATION
Construction Contract
$
4,942,135.00
Contract Administration, Inspection and Testing
$
742,000.00
Contingencies
$
495,000.00
TOTAL ESTIMATED CONSTRUCTION COSTS
$
6,179,135.00
100MI121
FIRST AMENDMENT TO AGREEMENT WITH J. SMITH & T. MULI. INC.. TO
PROVIDE LAKE ENGINEERING SERVICES
THIS FIRST AMENDMENT to the above -referenced agreement is entered into on April 18,
2023, by and between J. Smith & T. Muli, Inc., a California corporation ("Consultant"), and the
City of Santa Ana, a charter city and municipal corporation organized and existing under the
Constitution and laws of the State of California ("City").
RECITALS
A. The parties entered into Agreement No. N-2022-159 ("Agreement") dated May 20, 2022, to
retain a qualified consultant to provide lake engineering services for the Centennial Park
Lake Renovation Project.
B. The Agreement is in full force and effect through December 31, 2023.
C. The parties now wish to amend the Agreement to increase the compensation under the
Agreement.
The Parties therefore agree:
1. Section 2.a., Compensation, is hereby amended to increase the total amount to be
expended under the term of the Agreement by $11,500.00. The total not -to -exceed amount of the
Agreement shall be $61,391.00.
2. Except as modified by this First Amendment, all terms and conditions of the Agreement
shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the
Agreement on the date and year first written above.
Jennifer L. Hall
City Clerk
APPROVED AS TO FORM
SONIA R. CARVALHO, City Attorney
By:
Bran n Salvatierra
Deputy City Attorney
RECOMMENDED FOR APPROVAL
Nabil Saba
Executive Director
Public Works Agency
Kristine Ridge
City Manager
CONSULTANT
. imith, PE
li4dent
Page 1 of 1