Loading...
HomeMy WebLinkAboutItem 19 - Campesino Park, Memorial Park, and Madison Park Restroom Projects Public Works Agency www.santa-ana.org/pw Item # 19 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report December 20, 2022 TOPIC: Campesino Park, Memorial Park, and Madison Park Restroom Projects AGENDA TITLE Increase the Contract Amount by $90,000 for an Existing Construction Contract with iBuild Spectrum, Inc., and $10,000 for Additional Construction Engineering for a Revised Estimated Project Delivery Cost of $1,740,000 for the Campesino Park, Memorial Park, and Madison Park Restrooms ( Project Nos. 21-7533, 21-7534, 21- 7535) (Non-General Fund and Revive Santa Ana Program) RECOMMENDED ACTION 1. Approve an amendment to the Project Cost Analysis to reflect the new amount of $10,000 for contract administration, inspection and testing, and a $90,000 project contingency for vandalized work repairs or unforeseen work, subject to non- substantive changes approved by the City Manager and City Attorney. 2. Approve an amendment to the Fiscal Year 2022-23 Capital Improvement Program in the amount of $100,000, which includes $10,000 in construction engineering funds and $90,000 for construction contingency funds for the Campesino Park, Memorial Park, and Madison Park Restroom Project. DISCUSSION On September 21, 2021, the City Manager authorized the award of a contract to iBuild Spectrum, Inc. for The Campesino Park, Memorial Park, and Madison Park Restroom Projects. The City has identified three restrooms that are a target for vandalism and require major efforts to maintain due to their old age and existing conditions. The scope includes demolishing the existing restroom buildings, installing new pre-fabricated restroom buildings, and some site improvements to provide an accessible path of travel to these facilities (Exhibit 1). During construction, vandalism has been a big problem at all three-park sites. At Madison Park the vandalism has taken a toll on the project’s scope, electrical panels and electrical work was damaged to the point where power could not be restored at the park site. In order to continue construction, the project site was fenced and the contractor was directed to hire a private security guard company to monitor the construction park footprint, in order to prevent any more damage to the electrical improvements that are being worked on. With the additional security measures, there is Amend Construction Contract with iBuild Spectrum, Inc. December 20, 2022 Page 2 3 1 0 2 opportunity to finish the damaged electrical system to the park, and opportunities to add additional landscape improvements. To deliver these additional improvements, capitalize on the existing favorable pricing of the existing contract with iBuild Spectrum, Inc. (Project Nos. 21-7533, 21-7534, 21- 7535), staff recommends amending the Fiscal Year 2022-23 Capital Improvement Program by $100,000 – increasing the construction administration and inspection amount by $10,000 and project contingencies by $90,000 – for a new estimated project delivery cost of $1,740,000 (Exhibits 2-3). ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER- 2021-093 was filed for the project FISCAL IMPACT Funding for the requested amendment to the construction contract of $90,000 and additional contract administration, inspection and testing of $10,000 is available from the unspent prior year CDBG funds included in the Citywide carryover of unspent amounts form Fiscal Year 2021-22 to Fiscal Year 2022-23, approved by Council on September 20, 2022. Funds are budgeted and available for expenditure as follows: Fiscal Year Accounting Unit - Account No. (Project No.) Fund Description Accounting Unit - Account No. Description Amount ORIGINAL CONSTRUCTION DELIVERY COST 2022-23 13518783-66200 (21-7533) Community Development Block Grant CDBG Programs, Building Improvements $223,214 2022-23 13518783-66200 (21-7534) Community Development Block Grant CDBG Programs, Building Improvements $510,786 2022-23 13518783-66200 (21-7535) Community Development Block Grant CDBG Programs, Building Improvements $24,928 2022-23 18117013-66200 (21-7533) American Rescue Plan Act ARPA-PRCSA, Building Improvements $303,572 2022-23 18117013-66200 (21-7535) American Rescue Plan Act ARPA-PRCSA, Building Improvements $577,500 Amend Construction Contract with iBuild Spectrum, Inc. December 20, 2022 Page 3 3 1 0 2 Fiscal Year Accounting Unit - Account No. (Project No.) Fund Description Accounting Unit - Account No. Description Amount Total $1,640,000 Prior Year Unspent Funds Carried Forward 2022-23 13518783-66200 (21-7535, 21- 7533, 21-7534) Community Development Block Grant CDBG Programs, Building Improvements $100,000 Total $1,740,000 All funds are scheduled for expenditure in Fiscal Year 2022-23. However, any remaining balances not expended at the end of the fiscal year will be carried forward into FY 2023- 24 for expenditure. EXHIBIT(S) 1. Location Map 2. Revised Cost Analysis 3. Amendment to Fiscal Year 2022-23 CIP Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Kristine Ridge, City Manager PWA SANTA ANA PUBLIC WORKS AGENCY Project No. 21-7533: Campesino Park Restroom Exhibit 1 PWA SANTA ANA PUBLIC WORKS AGENCY Project No. 21-7534: Memorial Park Restroom Exhibit 1 PWA SANTA ANA PUBLIC WORKS AGENCY Project No. 21-7535: Madison Park Restroom Exhibit 1 EXHIBIT 2 ORIGINAL AMOUNT ADDITIONAL FUNDING NEW TOTAL 1,408,575.00$ 1,408,575.00$ 140,353.00$ 90,000.00$ 230,353.00$ TOTAL ESTIMATED CONSTRUCTION COSTS 1,640,000.00$ 100,000.00$ 1,740,000.00$ EXPENDITURE CATEGORY CONSTRUCTION OF PROJECT NO. 21-7533, 21-7534, 21-7535: CAMPESINO PARK, MEMORIAL PARK, MADISON PARK RESTROOMS COST ANALYSIS Contract Administration, Inspection and Testing Contingencies Construction Contract 91,072.00$ 10,000.00$ 101,072.00$ CITY OF SANTA ANA FY 22/23CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: Project scope includes demolishing the existing restroom building, installing a new pre-fabricated restroom building and site improvements to provide an accessible path of travel to these facilities. PROJECT NEED: The restroom at Madison Park is one of three restrooms that has been identified as a target for vandalism and would require major efforts to maintain due to old age and existing conditions. PROJECT TITLE: Madison Pre-Fab Restroom PROJECT CATEGORY: City & Park Facility Improvements Park Facility LOCATION MAP AGENCY:DIVISION:CONTACT:DATE: Public Works CIP Engineering Gilbert Castillo, Senior Engineer 04-Nov-2022 PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Construction 100,000 ------ TOTAL 100,000 ------ SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 CDBG Programs 100,000 ------ TOTAL 100,000 ------