AGENDA TITLE
Resolution to Adopt and Approve for Submission of the Fiscal Year 2021-22 Measure M2
Year -End Expenditure Report and Adopt the Measure M2 Seven Year CIP
RECOMMENDED ACTION
1. Adopt a Resolution approving the Measure M2 Annual Expenditure Report for Fiscal
Year 2020-21, and authorize submission of the report to the Orange County
Transportation Authority, as required by Measure M2 Funding Eligibility Guidelines.
2. Update the Measure M2 Seven Year CIP for Fiscal Years 2021-2022 through 2027-
2028.
DISCUSSION
In November 1990, Orange County voters approved Measure M, a 20-year one -half -cent
sales tax to fund transportation projects in Orange County. Sixteen years later, in
November 2006, the voters again approved the Renewal of Measure M, referred to as
M2, for an additional thirty years. M2 became effective in April 2011, and the net revenues
generated by M2 contribute to two types of grant funding: Local Fair Share (LFS) and
Competitive. All Orange County cities are eligible for LFS funding which is distributed
based on population, number of existing Master Plan of Arterial Highways centerline
miles, and taxable sales. Under the competitive component of M2 funding, cities must
compete and demonstrate support of regional transportation to successfully qualify for
grant monies. Fulfilling M2 eligibility requirements also allows the City to qualify for other
regional competitive OC Go M2 grant funding opportunities.
Each year local agencies are required to submit documentation to the Orange County
Transportation Authority (OCTA) that includes the End of Year Expenditure Report
adopted via Resolution. The Expenditure Report is a detailed financial document
submitted by each jurisdiction which is used to track and validate financial activity related
to the Renewed Measure M2 and other improvement funds. The report accounts for
receipt, interest earned, and use of Measure M2 and other funds while delineating the
distribution of actual revenue and expenditures consistent with Maintenance of Effort
requirements. Adoption of the Measure M2 Annual Expenditure Report by Resolution
Resolution to Approve Measure M2 Expenditure Report
December 20, 2022
Page 2
(Exhibit 1) is a required reporting element that must be submitted within six months of the
jurisdiction's fiscal year end.
Approval of the second Recommended Action will update the OCTA Measure M2 7-Year
CIP Report (Exhibit 2) to include Measure M funded projects that were awarded during
prior funding cycles, but have active project expenditures that are being carried forward
for future audit compliance.
Staff recommends that the City Council approve both Recommended Actions to continue
with the flow of M2 project funding, while maximizing grant compliance under the grant
eligibility requirements presented.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with the action.
FISCAL IMPACT
Approval of the Recommended Action will maintain the City's eligibility to receive Measure
M2 funds annually. Upon renewal of Measure M2 eligibility, the City of Santa Ana is
anticipated to receive an estimated $5.76 million in LFS funds and potentially over $30
million in M2 competitive grant funds for Fiscal Year 2022-23. In the past, the City has
received an average exceeding $8 million dollars annually from M2 LFS revenue and
competitive fund program allocations combined. If the Recommended Actions are not
approved, the City will lose Measure M2 LFS revenue, along with the ability to apply for
and receive future OCTA Comprehensive Transportation Funding Program competitive
grant funds.
EXHIBIT(S)
1. Resolution — M2 Year -End Expenditure Report
2. Updated Measure M2 Seven Year CIP
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
RESOLUTION NO. 2022-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA CONCERNING THE MEASURE M2
EXPENDITURE REPORT FOR THE CITY OF SANTA ANA
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA
AS FOLLOWS:
Section 1. The City Council of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Local jurisdictions are required to meet eligibility requirements and submit
eligibility verification packages to the Orange County Transportation
Authority (OCTA) in order to remain eligible to receive M2 funds.
B. Local jurisdictions are required to adopt an annual M2 Expenditure Report
as part of one of the eligibility requirements.
C. Local jurisdictions are required to account for Net Revenues,
developer/traffic impact fees, and funds expended by local jurisdiction in the
M2 Expenditure Report that satisfy the Maintenance of Effort requirements.
D. The M2 Expenditure Report shall include all Net Revenue fund balances,
interest earned and expenditures identified by type and program or project.
E. The M2 Expenditure Report must be adopted and submitted to the OCTA
each year within six months of the end of the local jurisdiction's fiscal year
to be eligible to receive Net Revenues as part of M2.
Section 2. The City Council of the City of Santa Ana hereby finds that the
FY 2021/22 Measure M2 Expenditure Report is in conformance with the template
provided in the Measure M2 Eligibility Guidelines and accounts for Net Revenues
including interest earned, expenditures during the fiscal year, and balances at the end
of fiscal year.
Section 3. The M2 Expenditure Report is hereby adopted by the City of
Santa Ana.
Section 4. The City of Santa Ana Finance Director is hereby authorized to
sign and submit the M2 Expenditure Report to OCTA for the fiscal year 2021/22.
Resolution No. 2022-XXX
Page 1 of 2
Section 5. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this day of
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
John M. Funk
Chief Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
2022.
Vicente Sarmiento
Mayor
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, , Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2022-XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on
Date:
Clerk of the Council
City of Santa Ana
Resolution No. 2022-XXX
Page 2 of 2
EXHIBIT 2
Orange County Transportation Authority
FY 2022/23 - FY 2028/29 Capital Improvement Program
TIP ID CP--3033 IMPLEMENTING AGENCY Santa Ana, City of
Local Project Number: 12-SNTA-ACE-3599 Project Title
Additional Project IDs: 12-SNTA-ACE-3599 Bristol St Widening (Washington Ave to 17th St)
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Add Bristol Street from Washington Avenue to Seventeenth Street would be widened to a total of six lanes
2 lanes to existing roadway in project limits (three lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation
Element and the County of Orange's Master Plan o
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
Washington Ave to 17th St 2023 Other $0 $0 $0 $0 $0 $0
Project Notes
Totals: $0 $0 $0 $0 $0 $0
Last Revised: 22-00 - Accepted Total Programmed: $0
Local Project Number: 21-SNTA-ICE-3995
Project Title
Additional Project IDs: 21-SNTA-ICE-3995
Bristol St. and Memory Ln. Intersection Improvements
Type of Work: Intersection
Project Description
Type of Work Description: Intersection - Add
Widening of the intersection at Bristol Street and Memory Lane. The proposed project would include
through lane(s) to intersection
adding a southbound through lane by replacement/installation or curbs, gutters, sidewalk, driveway
approaches, pavement, landscaping, curb ramps, and a
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Bristol St. north of Memory Lane
YEAR ESCALATED
Project Notes
2023 Intersection Capacity $0 $0 $0 $0 $0 $0
Enhancements (ICE)
FY 22-23 CARRY FORWARD FOR ACTIVE
PROJECT EXPENDITURES for MEASURE M
Sept. 2021 SAR- updated ENG scheduled
Totals: $0 $0 $0 $0 $0 $0
completion date and ROW scheduled completion
date. Updated CON start and completion dates.
SEPT 2021 SAR REVIEW: NO PROJECT
AMENDMENT REQUESTED; SCHEDULE
UPDATED: CA 09/27/21 REMINDER: Award
Deadline is 06/30/22.
Last Revised: 22-00 - Accepted Total Programmed: $0
TIP ID CP-11808
IMPLEMENTING AGENCY Santa Ana, City of
Local Project Number: 20-SNTA-ACE-3968
Project Title
Additional Project IDs: 20-SNTA-ACE-3968
Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue
Type of Work: Road Widening
Project Description
Type of Work Description: Road Widening -
Add Bristol Street from Civic Center Dr to Washington Ave would be widened to a total of six lanes (three
2 lanes to existing roadway in project limits
lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation Element
and the County of Orange MPAH.
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Civic Center Drive to Washington Avenue
Project Notes
2023 Federal $0 $0 $793,760 $0 $793,760 $817,573
CARRY FORWARD FOR ACTIVE PROJECT
2023 Arterial Capacity $0 $0 $3,273,573 $0 $3,273,573 $3,371,780
EXPENDITURES IN FY 22/23
Enhancements (ACE)
2023 Measure M2 Local Fairshare $0 $0 $0 $0 $0 $0
Last Revised: 22-00 - Accepted
Totals: $0 $0 $4,067,333 $0 $4,067,333 $4,189,353
Total Programmed: $4,067,333
Local Project Number: 20-SNTA-ACE-3969 Project Title
Additional Project IDs: 20-SNTA-ACE-3969 Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Add Bristol Street from Warner Ave to St. Andrew PI would be widened to a total of six lanes (three lanes in
2 lanes to existing roadway in project limits each direction) to be consistent with the City of Santa Ana General Plan Circulation Element and the
County of Orange MPAH.
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Warner Avenue to St. Andrew Place YEAR ESCALATED
Project Notes 2023 Federal $0 $0 $1,508,045 $0 $1,508,045 $1,553,286
CARRY FORWARD FOR ACTIVE PROJECT 2023 Measure M2 Local Fairshare $0 $0 $0 $0 $0 $0
EXPENDITURES IN FY 22/23 2023 Arterial Capacity $0 $0 $7,501,206 $0 $7,501,206 $7,726,242
Enhancements (ACE)
Totals: $0 $0 $9,009,251 $0 $9,009,251 $9,279,528
Last Revised- ??-no - Accepted Total Programmed: $9,009,251
Local Project Number: 20-SNTA-ACE-3968 Project Title
Additional Project IDs: Bristol Street Improvements and Widening: Phase 3A - Civic Center to Washington
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Add The project will incorporate complete street concepts with storm drain quality features. The
2 lanes to existing roadway in project limits improvements include widening of the street from four lanes to six lanes, with bus turnouts, raised
median, bike lanes, and sound walls.
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Civic Center to Washington YEAR ESCALATED
Project Notes 2023 Measure M2 Local $0 $0 $0 $0 $0 $0
Fairshare
CARRY FORWARD FOR ACTIVE PROJECT
EXPENDITURES IN FY 22/23
Totals: $0 $0 $0 $0 $0 $0
Total Programmed: $0
Local Project Number: 14-SNTA-ACE-3725 Project Title
Additional Project IDs: 20-SNTA-ACE-3969 Bristol Street Improvements: Phase 4 - Warner to St. Andrew
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Add The Bristol Street Improvements project was planned and designed to incorporate complete street
2 lanes to existing roadway in project limits concepts with storm drain quality features. The improvements include widening from 4 to 6 lanes, with
bus turnouts, raised median, bike lanes, and sound w
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Bristol Street from Warner Avenue to St. Andrew YEAR ESCALATED
Street 2023 Measure M2 Local $0 $0 $0 $0 $0 $0
Project Notes Fairshare
CARRY FORWARD FOR ACTIVE PROJECT
EXPENDITURES IN FY 22/23 Totals: $0 $0 $0 $0 $0 $0
Last Revised: 22-00 - Accepted Total Programmed: $0
;35
Local Project Number: N/A Project Title
Additional Project IDs: Citywide Speed Limit Study
Type of Work: Transportation Planning Project Description
Type of Work Description: Transportation This project will provide for the hiring of a traffic engineering consultant to conduct an engineering and
Planning - Engineering traffic survey to update speed limits Citywide in accordance with state law requirements. Project scope
includes installation of new signs as
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Citywide YEAR ESCALATED
Project Notes 2023 Measure M2 Local $0 $0 $0 $0 $0 $0
Fairshare
CARRY FORWARD FOR ACTIVE PROJECT
EXPENDITURES IN FY 22/23
Totals: $0 $0 $0 $0 $0 $0
Last Revised: 22-00 - Accepted
Total Programmed: $0
Local Project Number:
Additional Project IDs:
Type of Work: Other
Type of Work Description: Other - Other
Limits
La Habra Boulevard in City of La Habra to
Interstate 405 in City of Fountain Valley
Project Notes
FY 22-23 CIP
Project Title
Euclid Street Corridor Traffic Signal Synchronization
Project Description
To provide inter -agency traffic signal coordination and infrastructure upgrades on Euclid Street from La
Habra Boulevard in City of La Habra through the Cities of La Habra, Fullerton, Anaheim, Garden
Grove, Santa Ana and Fountain Valley to Interstate
FISCAL TOTAL
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
2023 Measure M2 Local $10,000 $0 $110,000 $0 $120,000 $123,300
Fairshare
Totals: $10,000 $0 $110,000 $0 $120,000 $123,300