HomeMy WebLinkAboutItem 37 - Construction Management and Inspection Services for Well 32 RehabilitationPublic Works Agency
www.santa-ana.org/pw
Item # 37
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
June 21, 2022
TOPIC: Construction Management and Inspection Services for Well 32 Rehabilitation
AGENDA TITLE
Approve Agreement with Butier Engineering Inc. to Provide Construction Management
and Inspection Services for the Well 32 Rehabilitation Improvements Project in an
Amount Not to Exceed $1,224,820 for a Three -Year Term (Project No. 13-6433) (Non -
General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute an agreement with Butier Engineering Inc. to
perform construction management and inspection services for the Well 32 Rehabilitation
Improvements project in the amount of $1,024,820, with a contingency of $200,000, for a
total amount of $1,224,820, for a three-year term beginning June 21, 2022 and expiring
June 20, 2025, with an option for two, one-year extensions, subject non -substantive
changes approved by the City Manager and City Attorney.
DISCUSSION
The City of Santa Ana Public Works Agency (City) desires to enter into an agreement
with a qualified consulting firm to provide construction management and inspection
services for the Well 32 Rehabilitation Improvements project located at 2801 North
Westwood Ave. (Exhibit 1). The project consists of replacing the existing well pump and
constructing an above ground well building, a water disinfection building, and
approximately 3,250 linear feet of new pipeline.
The consultant shall provide general construction management services to support
construction efforts and will assist in the overall delivery of this project, including pre -
construction tasks, managing construction, ensuring that work is completed in
accordance with the contract documents, and assisting with project closeout and the
commissioning phase. The consultant team will report directly to the City's project
manager.
On March 22, 2022, the Public Works Agency released Request for Proposal (RFP) No.
22-051, by which it sought the services of a qualified consulting firm to provide
construction management and inspection services. The RFP was advertised on the City's
online procurement management and publication system, with proposals due on April 22,
Agreement with Butier Engineering, Inc.
June 7, 2022
Page 2
2022. Six proposals were received and evaluated by a selection committee. Based on
criteria outlined in the RFP, the following summarizes the top three responding firms and
their ranking.
Firm
City
Rank
Butier Engineering
Tustin
1
Wallace & Associates LLC
Corona
2
Ardurra
Newport Beach
3
Staff recommends awarding an agreement (Exhibit 2) to Butier Engineering, Inc. to
provide construction management and inspection services based upon the scope of work
and selection criteria outlined in RFP 22-051. Their proposal demonstrated the firm has
the necessary capacity and expertise to complete the required services. The firm's rates
are reasonable and within industry standard, the team qualifications are appropriate for
this project, and the proposal was determined to provide the best value for the City.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with the action.
FISCAL IMPACT
Funds are available in the following account for the current fiscal year. As part of the
Citywide carry forward process, staff will submit a request for any project balance to be
carried forward into subsequent fiscal years to the Finance Department, which will be
compiled with requests from other departments and presented to the City Council.
Fiscal
Accounting Unit
Fund
Accounting Unit -
Year
- Account No.
Description
Account No.
Amount
Description
06617647-66301
Acquisition &
Water Utility Capital
FY 22-23
(13-6433)
Construction
Projects, Water
$1,224,820
(Water Capital)
Capital Project
TOTAL:
$1,224,820
EXHIBIT(S)
1. Location Map
2. Agreement with Butier Engineering, Inc.
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
- PROJECT LOCATION
SANTA ANA
PWA
PUBLIC WORKS AGENCY
EXHIBIT 1
EXHIBIT 1
44,1 GRANGe \
�"0 C G
Project No. 20-2729: o
Standard - McFadden Park ' '
AGREEMENT TO PROVIDE CONSTRUCTION
MANAGEMENT AND INSPECTION SERVICES FOR
WELL 32 REHABILITATION IMPROVEMENTS
THIS AGREEMENT is made and entered into on this 215t day of June, 2022 by and between Butier
Engineering Inc. ("Consultant"), and the City of Santa Ana, a charter city and municipal
corporation organized and existing under the Constitution and laws of the State of California
("City").
RECITALS
A. On March 22, 2022, the city issued Request for Proposal No. 22-051, by which it sought a
Consultant having special skill and knowledge in the field of well rehabilitation to provide
construction management and inspection services.
B. Consultant represents that Consultant is able and willing to provide such services to the
City.
C. In undertaking the performance of this Agreement, Consultant represents that it is
knowledgeable in its field and that any services performed by Consultant under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform the services described in the scope of work that was included in
RFP No. 22-051, which is attached hereto as Exhibit A and incorporated by reference, and as more
specifically delineated in Consultant's proposal, which is attached hereto as Exhibit B and
incorporated by reference.
2. COMPENSATION
a. City agrees to pay, and Consultant agrees to accept as total payment for its services for
City, the rates and charges identified in Exhibit C, which is attached hereto and
incorporated by reference. The total amount to be expended under this Agreement shall
not exceed $1,224,820 during the term of this Agreement, including any extension
periods exercised under Section 3. The sum is comprised of (1) the base amount of
$1,024,820 and (2) an approximate 19.5% contingency in the amount of $200,000 for
additional services at the City's sole discretion.
b. Payment by City shall be made within 45 days (forty-five) days following receipt of
proper invoice evidencing work performed, subject to City accounting procedures.
Payment need not be made for work which fails to meet the standards of performance
Page 1 of 13
set forth in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on the date first written above and terminate on June 20,
2025, unless terminated earlier in accordance with Section 16, below. The term of this Agreement
may be extended for a two (2) one ( l) year periods upon a writing executed by the City Manager
and City Attorney.
4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq.,
and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq.,
("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the
performance of other requirements on "public works" and "maintenance" projects. If the services
being performed are part of an applicable "public works" or "maintenance" project, as defined by
the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to
fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the
City, its elected officials, officers, employees and agents free and harmless from any claim or
liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an
independent contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer -employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Consultant
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Consultant shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Consultant shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or
caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all
Documents & Data. Consultant makes no such representation and warranty in regard to
Documents & Data which were provided to Consultant by the City. City shall not be limited in
Page 2 of 13
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
7. INSURANCE
Coverage shall be at least as broad as:
Commercial General Liability (CGL): Insurance Services Office Form CG 00 01
covering CGL on an "occurrence" basis, including products and completed operations,
property damage, bodily injury and personal & advertising injury with limits no less
than $2,000,000 per occurrence. If a general aggregate limit applies, either the general
aggregatelimit shall apply separately to this project/location (ISO CG 25 03 or 25 04)
or the generalaggregate limit shall be twice the required occurrence limit
Automobile Liability: Insurance Services Office Form Number CA 0001
covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8
(hired) and 9 (non -owned), withlimit no less than $1,000,000 per accident
for bodily injury and property damage.
Workers' Compensation insurance as required by the State of California,
with StatutoryLimits, and Employer's Liability Insurance with limit of no
less than $1,000,000 per accident for bodily injury or disease.
Professional Liability (Errors and Omissions) Insurance appropriates to
the Consultant's profession, with limit no less than $2,000,000 per
occurrence or claim, $2,000,000aggregate.
If the Consultant maintains broader coverage and/or higher limits than the
minimums shown above, the Entity requires and shall be entitled to the
broader coverage and/or the higher limits maintained by the contractor. Any
available insurance proceeds in excess of the specified minimum limits of
insurance and coverage shall be available to the Entity.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The Entity, its officers, officials, employees, and volunteers are to be
covered as additional insureds on the CGL policy with respect to liability
arising out of work or operations performed by or on behalf of the Consultant
including materials, parts, or equipment furnished in connectionwith such work
or operations. General liability coverage can be provided in the form of an
endorsement to the Consultant's insurance (at least as broad as ISO Form CG
20 10 11 85 or bothCG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20
37 forms if later revisions used).
Page 3 of 13
Primary Coverage
For any claims related to this contract, the Consultant's insurance coverage
shall be primary insurance primary coverage at least as broad as ISO CG 20
0104 13 as respects the Entity, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by the Entity, its officers, officials,
employees, or volunteers shall be excess of the Consultant's insuranceand shall
not contribute with it.
Notice of Cancellation
Each insurance policy required above shall state that coverage shall not be
canceled, except with notice to the Entity.
Waiver of Subrogation
Consultant hereby grants to Entity a waiver of any right to subrogation which
any insurer of said Consultant may acquire against the Entity by virtue of the
payment of any loss under such insurance. Consultant agrees to obtain any
endorsement that may be necessary to affect this waiverof subrogation, but this
provision applies regardless of whether or not the Entity has received a waiver
of subrogation endorsement from the insurer.
Self -Insured Retentions
Self -insured retentions must be declared to and approved by the Entity. The
Entity may require theConsultant to purchase coverage with a lower retention
or provide proof of ability to pay losses and related investigations, claim
administration, and defense expenses within the retention. The policy language
shall provide, or be endorsed to provide, that the self -insured retention may be
satisfied by either the named insured or Entity.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a
current
A.M. Best's rating of no less than ANII, unless otherwise acceptable to the Entity.
Claims Made Policies
If any of the required policies provide coverage on a claims -made basis:
1. The Retroactive Date must be shown and must be before the date of the
contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at
least five (S) years after completion of the contract of work.
3. If coverage is canceled or non -renewed, and not replaced with another
claims -made policyform with a Retroactive Date prior to the contract
effective date, the Consultant must purchase "extended reporting"
coverage for a minimum of five (S) years after completion of contract
work.
Page 4 of 13
Verification of Coverage
Consultant shall furnish the Entity with original Certificates of Insurance
including all required amendato endorsements or copies of the applicable
policy language effecting coverage re uiredb y this clause and a copy of the
Declarations and Endorsement Page of the CGL policy listing ali olic
endorsements to Entity before work begins. However, failure to obtain the
required documents prior to the work beginning shall not waive the Consultant's
obligation to provide them. The Entity reserves the right to require complete,
certified copies of all required insurance policies, including endorsements
required by these specifications, at any time.
Subcontractors
Consultant shall require and verify that all subcontractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that
Entity is an additional insured on insurance required from subcontractors.
Special Risks or Circumstances
Entity reserves the right to modify these requirements, including limits, based on the nature
oftherisk, prior experience, insurer, coverage, or other special circumstances.
8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1) for personal
injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Consultant, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement; and (2)
from any claim that personal injury, damages, just compensation, restitution, judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution, judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing,
to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of,
pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
Page 5 of 13
9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent, trademark, or copyright infringement, including costs, contained in the work product
or documents provided by Consultant to the City pursuant to this Agreement.
10. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed
under this Agreement. Consultant shall maintain complete and accurate records with respect to
the costs incurred under this Agreement and any services, expenditures, and disbursements
charged to the City for a minimum period of three (3) years, or for any longer period required by
law, from the date of final payment to Consultant under this Agreement. All such records and
invoices shall be clearly identifiable. Consultant shall allow a representative of the City to
examine, audit, and make transcripts or copies of such records and any other documents created
pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all
work, data, documents, proceedings, and activities related to this Agreement for a period of three
(3) years from the date of final payment to Consultant under this Agreement.
11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Consultant agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance, but in no event less than reasonable care. "Confidential Information" shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the
Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Consultant without reference to information disclosed by the
City.
12. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct
or indirect, which would conflict in any manner with performance of services specified under this
Agreement.
Page 6 of 13
13. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Consultant, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
ofthis Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Consultant. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant,
Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other consultants retained by City.
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant
compensation for all services performed by Consultant prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Consultant consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
Page 7 of 13
17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
18. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
19. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder -
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
Page 8 of 13
To City:
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
Fax: 714-647-5635
To Consultant:
Mark M. Butier Jr, President
Butier Engineering Inc.
17822 E. 171h Street
Tustin, CA 92780
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24) hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
[Signatures on the following page]
Page 9 of 13
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST:
Daisy Gomez
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
Bv:`
Jose Montoya
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
Nabil Saba
Executive Director
Public Works Agency
CITY OF SANTA ANA
Kristine Ridge
City Manager
CONSULTANT:
Mark M. Butier Jr.
President
Page 10 of 13
EXHIBIT A
Page 11 of 13
REQUEST FOR PROPOSALS (RFP)
FOR
WELL 32 REHABILITATION IlVIPROVEMENTS
CONSTRUCTION MANAGEMENT AND INSPECTION
SERVICES
RFP NO.: 22-051
CITY OF SANTA ANA
Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Sean Thomas
Acting Senior Engineer
(714) 647-5655 Office
sthomas5 rus.:nta-ana.o1
for Release:
Nabil Saba
Executive Director
Public Works Agency
KEY RFP DATES Sub' ct to thane at discretion of Ci
Issue Date: March 22, 2022
Job Walk: N/A
Deadline for Requests for hifon-nation: April 7, 2022
Proposal Due Date: April 19, 2022 at 2pm
Projected Award Date: June 7, 2022
NOTICE INVITING PROPOSALS
NOTICE IS HEREBY GIVEN that proposals will be received from qualified firms for Well 32
Rehabilitation Improvements Construction Management and Inspection Services.
Responses to this Request for Proposals (RFP) must be submitted electronically to the PlanetBids
system no later than April 19, 2022 at 2:00 p.m. Proposals received after this date/time will not be
considered. It is the responsibility of the proposer to ensure that any proposals submitted have
sufficient time to be received by the City of Santa Ana prior to this proposal due date and time.
Additionally, it is a requirement that hard copy proposals also be sent by courier service, mailed,
or hand delivered in an enclosed sealed envelope and marked clearly with the following:
"SEALED PROPOSAL FOR
WELL 32 REHABILITATION IMPROVEMENTS CONSTRUCTION MANAGEMENT
AND INSPECTION SERVICES
RFP NO.22-051
IN THE CITY OF SANTA ANA
DO NOT OPEN WITH REGULAR MAIL."
City of Santa Ana
Attn.: Sean Thomas
Public Works Agency; M-36
20 Civic Center Plaza; Ross Annex
Santa Ana, CA 92701
For further instructions regarding hard copy submission of proposals, refer to PlanetBids.
All notifications, requests for information, updates and addenda will be posted online on
PlanetBids at littpsJ/wy+r�v.planetbids.com/portal/port-,il.cfm?C'omnanvlD=20137. Proposers shall
be responsible for monitoring the site to obtain information regarding this solicitation. Failure to
respond to required updates may result in a determination of a nonresponsive qualification.
City of Santa Ana RFP 22-051
Page 2
TABLE OF CONTENTS
I. INTRODUCTION / PROJECT DESCRIPTION 4
U. INSTRUCTIONS TO PROPOSERS 6
A. CITY RESPONSIBILITIES
B. PROPOSER RESPONSIBILITIES
C. REQUEST FOR INFORMATION OR CLARIFICATION
D. ADDENDA
E. LICENSES & PERMITS
F. INSURANCE
G. INFORMATION PACKET
H. CITY RIGHT TO REJECT
I. BID PROTESTS
III. SUBMITTAL REQUIREMENTS 8
A. GENERAL
B. PROPOSAL CONTENTS
1. STATEMENT OF QUALIFICATIONS
2. SCOPE OF SERVICES AND SCHEDULE
3. FEE PROPOSAL
4. CERTIFICATIONS
IV. PROPOSAL REVIEW (CONSULTANT SELECTION) 10
A. EVALUATION AND RATING
B. SELECTION
V. CONTRACT AWARD 10
A. REQUEST FOR COUNCIL ACTION
B. EXECUTION OF AGREEMENT
VI. IMPLEMENTATION 10
A. KICK-OFF MEETING
B. NOTICE TO PROCEED
VII. PUBLIC RECORDS 11
VIII. APPENDIX
ATTACHMENT 1: SCOPE OF WORK
ATTACHMENT 2: AGREEMENT
ATTACHMENT 3: CERTIFICATION
City of Santa Ana RFP 22-051
Page 3
I. INTRODUCTION / PROJECT DESCRIPTION
Nature of Work:
The City of Santa Ana Public Works Agency (City) desires to enter into an agreement with
a qualified consulting firm to lead efforts to provide construction management and
inspection services.
Number of Proposals and Signature:
Five (5) hard copies are required to accompany an electronic submittal of the complete
proposal package on PlanetBids. One of the hard copies shall be marked as "ORIGINAL"
and be signed by a company official with the power to bind the company, and
submitted to the City of Santa Ana. Please be explicit in identifying the appropriate
person with legal authority to bind the company.
The Statement of Qualifications shall be limited to a maximum of (10) double -sided
pages (excluding front and back covers, section dividers and attachments such as
resumes, forms). Font size shall be minimum 11-point Arial. Proposal exhibits shall be
maximum I I" x 17".
Proposal Evaluation and Rating:
The criteria for evaluating the RFP submitted will take the following items into
consideration:
• FhivTeam Experience 25%
■ Understanding of Need 30%
• Relevant Project Experience 30%
• Schedule of Delivery 10%
• References 5%
The City has established a proposal review committee to evaluate proposers based on the
response to this RFP, which includes adherence to outlined directions and format, and the
City evaluation criteria set forth above. A final score will be calculated for each
submitted proposal and used to rank the proposers.
City of Santa Ana RFP 22-051
Page 4
Project Funding
Funding sources for each project may vary and shall comply with the funding agency's
requirements. Special conditions may apply. Refer to Attachment 1 (Scope of Work) in
the Appendix of this RFP.
Term of Contract Agreement:
The City desires to enter into a contract with the top scoring firm for an initial three (3)
year term with a City option for two (2) one (1) year extension period. This term is outlined
in the Standard Consultant Agreement, as contained in the Appendix of this RFP as
Attachment 2.
City of Santa Ana RFP 22-051
Page 5
II. INSTRUCTIONS TO PROPOSERS
A. CITY RESPONSIBILITIES
The City will provide information in its possession relevant to preparation of required
information in this RFP. The City will provide only the staff assistance and
documentation specifically referred to herein.
B. PROPOSER RESPONSIBILITIES
Point of Contact: The selected proposer will assume responsibilities for all services in its
proposal. The selected proposer shall identify a sole point of contact with the greatest
knowledge concerning the required service operations and contractual matters, including
payment of all charges resulting from the Agreement. Contact information such as email
and phone number must be included into the proposal.
Evidence of Financial Capacity: Proposer may be requested to submit its most recent
audited financial statement, evidencing proposer's financial capacity to fully perform the
required services, including provision of equipment and personnel expenses over a ninety
(90) day period. If said financial statement does not reflect full ninety (90) day
operational capacity, proposer may include a letter of credit as evidence of supplemental
capacity.
C. REQUEST FOR INFORMATION OR CLARIFICATION
All questions or requested clarifications shall be made only in writing to the Q&A section
located in PlanetBids no kwcr than live (5) calendar days. prior to the date and time set
for opening of proposals. No verbal requests or responses will be accepted. Significant
interpretations or clarifications will be addressed viaa addenda to this RFP.
D. ADDENDA
Any changes in RFP from the date of release to date of submittal will result in an
addendum or amendment. Notification of such addendum or amendment shall be posted
on PlanetBids at littgl J/vvww.plaiietbids.com/poilal/portal.c fni'Coinpany]D=20137 as
set forth in the Notice Inviting Proposals. Addenda shall become part of the agreement
documents.
E. LICENSES & PERMITS
The selected proposer shall be required to obtain a City of Santa Ana Business license
within ten (10) business days of selection and must provide a copy to the City's project
manager or designee prior to commencing any work in Santa Ana.
Additionally, Proposer will be responsible for obtaining any licenses/permits required by
the Scope of Work.
City of Santa Ana RFP 22-051
Page 6
F. INSURANCE
The Selected Proposer shall provide the required evidence of insurance coverage as set
forth in the Scope of Work within ten (10) business days after receipt of notice that the
contract has been awarded. Failure to provide the required insurance certificates shall be
cause for the annulment of the award and the forfeiture of the proposal guaranty. The
City will provide the Selected Proposer with a "New Vendor Checklist", which outlines
insurance requirements.
G. PAYMENT INFORMATION PACKET
The selected proposer shall return a completed payment information packet within ten
(10) business days after the successful proposer has received notice that the contract has
been awarded.
H. PRE -PROPOSAL MEETING
Should a pre -proposal meeting be scheduled, the date, time, and location is identified on
the cover page of this RFP. The meeting will include discussion of the project scope
and a question -and -answer session. It is highly recommended that the Proposer's key
team members attend this meeting. Significant interpretations or clarifications will be
addressed via addenda to this RFP, as described above in "Section D: Addenda."
I. CITY RIGHT TO REJECT
The City reserves the right to reject any or all proposals submitted and no representation
is made hereby that any contract will be awarded pursuant to this RFP or otherwise.
The City reserves the right to accept or reject the combined or separate components of
this proposal in part or in its entirety or to waive any minor inconsistency,
informality or technical defect in the proposal.
The City reserves the right to reject, replace, and approve any and all subcontractors. All
subcontractor(s) shall be identified in response to this RFP. Subcontractors shall be the
responsibility of the successful proposer and the City shall assume no liability of such
subcontractors.
J. BID PROTESTS
Proposers with concerns or rebuttal of any staff determination of non -responsiveness or
non- responsibility may submit, in writing within five (5) business days, to the Project
Manager, any concerns regarding the RFP process or staff determination. Such writing
shall be considered by the City Manager or her designated representative, and may be
acted upon within five (5) business days. If no action is taken within such time, there
shall be no change to the staff determination. The exercise by the Proposer of its right to
submit written concerns shall be a condition precedent to seeking judicial review of
any award of a contract hereunder.
City of Santa Ana RFP 22-051
Page 7
III. SUBMITTAL REQUIREMENT'S
A. GENERAL
1. -11c number of Proposal Copies and signature is specified in:
RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION
2. Deadline:
Proposals are due to the City of Santa Ana at the date, time, and location
specified in the Notice Inviting Proposals.
B. PROPOSAL CONTENTS
The proposal format and page limitation, if any, is specified in:
RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION
I. STATEMENT OF QUALIFICATIONS
a. Cover Letter: Proposals shall include a letter signed by a principal or
authorized representative who can make legally binding commitments
for the entity.
b. Contract AWeement Statement: Proposal shall include a
statement outlining your concurrence or concerns with any and all
provisions contained in the Agreement attached herein as
Attachment 2 in the Appendix.
c. Firm and Team E eriencc : Proposal shall include a profile of the
firm's experience. Include resumes of project team/sub-consultants
that will be providing services which outline their technical and design
experience. At a minimum, this should include the project
manager/principal agent, associates in charge when project
manager/principal agent is unavailable, key personnel, firm size, and
an organization chart identifying only those who will perform work for
the proposed project and the percentage of each individuaI's time
devoted to this project. The project manager/principal agent shall be
the primary contact person to represent your firm and will be the
person to conduct the presentation, if invited for an interview.
City of Santa Ana RFP 22-051
Page 8
� ri •r�
d. Understanding„ gf Need: Proposal shall include an outline which
demonstrates the firm's understanding of the work. This outline should
include anticipated approach, tasks necessary for successful
completion, deliverables, and suggestions or special concerns that the
City should be made aware of. Identify any assumptions and/or
exclusions used in preparation of the scope of work and associated
fee estimate.
e. Relevant Project Experience: Proposal shall include a list of relevant
projects, which your firm or personnel have completed within the last
5 years, including significant work with public agencies. Project
information should include project description, project location, year
completed, client name and contact information, and name of consultant
project manager. City of Santa Ana staff may conduct site visits at select
projects.
References: Proposals shall include a listing of relevant projects with
references for three public entities with valid current emails for which
Proposer has performed similar work within the past five (5) years.
2. SCOPE OF SERVICES AND SCHEDULE:
Proposal shall include a Scope of Services and Schedule which details the work
phases to be completed, the tasks to be accomplished, the deliverables to be
provided, and the schedule / timeline to complete the project, based upon the
requested Scope of Work detailed in Attachment 1 of this RFP.
FEE PROPOSAL:
The fee proposal shall be submitted separate and concurrently with the technical
proposal, both submitted electronically in PlanetBids and as a hard copy in a
separately sealed envelope, clearly labeled as "Fee Proposal." This shall include
the firm's Standard Hourly Fee Schedule, a table outlining the tasks and team
hourly effort for each of the major tasks, and a Project Fee Schedule as outlined
in the Scope of Work.
The fee proposal will not be opened until the proposals have been evaluated by
the proposal selection committee. The City will select the consultant based on
qualifications, and then negotiate a contract price based on available funding.
4. CERTIFICATIONS:
The following forms shall be signed and included as part of the proposal
submittal package:
• Attachment 3-1: Non -Collusion Affidavit
City of Santa Ana RFP 22-051
Page 9
• Attachment 3-2: Non -Lobbying Certification
• Attachment 3-3: Non -Discrimination Certification
IV. PROPOSAL REVIEW (CONSULTANT SELECTION)
A. EVALUATION AND RATING
The criteria for evaluating the proposals are specified in:
RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION.
B. SELECTION
The selection committee will be comprised of at least (3) City staff from multiple
departments. The committee may interview the top ranking proposers. The City will
recommend award of contracts to the proposers who will provide the best value to the
City. The City reserves the right to begin negotiations and enter into a contract without
interview or further discussions.
V. CONTRACT AWARD
A. REQUEST FOR COUNCIL ACTION
Following evaluation and rating by the proposal review committee and acceptance from
Funding agency following financial audit, the Project Manager will recommend award
contracts to the three top-ranking proposers that will provide the best value to the City.
B. EXECUTION OF AGREEMENT
The Scope of Services, Schedule, and Fees submitted in the proposal will be the basis of
any negotiation of final terms, which will lead to a completed agreement ready for
execution based on the standard Agreement attached herein as Attachment 2 in the
Appendix.
VI. IMPLEMENTATION
A. KICK-OFF MEETING
A kick-off meeting will be held after award of contracts. Consultants and their team
will meet with City of Santa Ana staff to conduct introductions, discuss scope of services,
and implementation processes.
B. NOTICE TO PROCEED
Prior to issuance of a formal Notice to Proceed (NTP), Consultants shall provide all
required bonds, insurance documents, and contents of the Information Packet for review
and approval by the City.
City of Santa Ana RFP 22-051
Page 10
For'On-Ca1P' contracts, individual City Project Managers will request project/task
specific proposals from Consultants on an as -needed basis. Proposals will then be
evaluated by City staff and written NTPs will be issued accordingly per each task order.
VII. PUBLIC RECORDS
All data, documents and other products used, developed, or produced during response
preparation of this RFP will become property of the City. All responses to this RFP shall
become property of the City. Proposer information identified as proprietary information
be maintained confidential, to the extent allowed under the California Public
Records Act.
Proposals will become public record after award of contract. Proposer information
identified as proprietary information shall be maintained confidential, to the extent
allowed under the California Public Records Act.
City of Santa Ana RFP 22-051
Page 11
Appendix
ATTACHMENT I
SCOPE OF WORK
CITY OF SANTA ANA
REQUEST FOR PROPOSALS
FOR
WELL 32 REHABILITATION IMPROVEMENTS CONSTRUCTION
MANAGEMENT AND INSPECTION SERVICES
RFP NO.22-051
INTRODUCTION/PROJECT DESCRIPTION
The City desires to engage a professional consultant to perform Construction Engineering
and Management Services for the Well 32 Rehabilitation Improvements Project. The
consultant shall provide general Construction Management services to support the
construction efforts and serve as an extension of City staff to assist in the overall delivery
of this project, including pre -construction tasks, managing construction and ensuring that
the work is completed in accordance with the contract documents, and project closeout and
commissioning phase. The consultant team will report directly to the City's Construction
Manager or his authorized representative. City staff may assist in managing construction
and will oversee the work of the Project Manager, Inspector, and Contract Administrator.
The Well 32 Rehabilitation Improvements Project:
The estimated construction cost for the Well 32 Rehabilitation Improvements Project is
$13 million. The City anticipates advertising construction bids in the early spring 2022,
and starting construction by summer of 2022. Total construction duration for the project is
anticipated to be 16 months. The project has federal funding from the Bureau of
Reclamation. See Bid Documents on PlanetBids for project specific plans and
specifications.
The general scope of the project includes but is not limited to the following:
• Well rehabilitation
• Pavement and concrete work
• Mechanical System
• New Building Construction
• Water service and pipelines
• Pump and motor improvements
• Irrigation and landscaping
• Electrical System
• MCC cabinet replacement
• Site Improvements; paving, concrete sidewalk, etc.
• Road paving
• System Controls and Instrumentation
City of Santa Ana RFP 22-051
Page Al-1
■ Park Lighting
■ Basketball / Tennis Court Rehabilitation
Consultant Services:
The required services by the Project Manager, the Inspector and the Contract Administrator
may include the following:
1. The PM shall be a registered engineer in the State of California and shall represent the City
Construction Manager in the field. The CM shall possess a minimum of (5) years'
experience in construction management. The Inspector and the Contracts Administrator
should have relevant experience in construction management and certifications that affirm
the experience.
2. Prior to the start of the project, the PM shall be responsible for conducting a bid analysis
to determine who the lowest responsible bidder for the project will be. Shall obtain
certificates of insurance, performance bond and 'New Vendor Packet" requirements have
been satisfied. This includes verifying that all sub -contractors have a valid City Business
License. Once determined, a staff report will need to be generated to recommend the award
of a Construction Contract.
3. The PM shall be responsible for review of completeness and quantity of all required shop
drawings, product data, samples and other submittals ("Submittals"). Shall transmit the
Submittals to City staffing for review and approval, and shall establish and implement
procedures for expediting the processing and approval of Submittals.
4. Attend pre -construction meeting and schedule and conduct weekly construction and
progress meetings to discuss such matters as procedures, progress, problems and
scheduling. Will prepare and promptly distribute minutes.
5. Inspector(s) shall oversee and inspect all aspects of construction to ensure compliance with
the Plans, Specifications, and Special provisions.
6. Shall be responsible for ensuring that all building permits, special permits, if required are
obtained, and that all applicable fees have been paid, and shall obtain approvals from
authorities having jurisdiction over the Project.
7. Shall review construction schedule, including activity sequences and duration, schedule of
submittals and schedule of delivery for products with long lead-time. Update the project
schedule as required showing current conditions and revisions required by actual progress.
8. Shall conduct comprehensive evaluation of change order requests, provide independent
estimates, render recommendations and assist in claim resolution. Shall regularly monitor
and report on the status of the Project Construction Budget on a monthly basis, indicating
City of Santa Ana RFP 22-051
Page Al-2
actual costs for completed activities and work in progress, and indicating estimates for
uncompleted work. Report should identify variances between actual and budgeted or
estimated costs, and shall advise the City whenever it appears that the Actual Construction
Cost has exceeded, or will exceed, the Project Construction Budget for the entire Project
or any Project Component.
9. Monitor the contractor's safety program. Take necessary steps to ensure the jobsite
conditions are in compliance with OSHA regulations.
10. Maintain cost accounting records on authorized work performed under unit costs and
additional work performed on the basis of actual costs of labor and materia Is, or other work
requiring accounting records.
11. May develop and implement procedures for the review and processing of applications by
contractor for progress and final payments. Make recommendations for certification to the
City for payment.
12. Determine that the work of contractor is being performed in accordance with the contract
documents. Make recommendations to the City regarding special inspection or testing of
work not in compliance with the provisions of the contract documents. Subject to review
by the City, reject work which does not conform to the requirements of contract documents.
13. The individuals, Project Manager, Inspector and Contract Administrator, shall not be
responsible for construction means, methods, techniques, sequences and procedures
employed by the contractor in the performance of the contract, and shall not be responsible
for the failure of the contractor to carry out work in accordance with the contract
documents. However, any errors, omissions, or discrepancies found in the Contract
Documents shall be called to the attention of the City's Construction Manager and clarified
prior to construction starts.
14. Consult with the City when the contractor requests interpretations of the meaning and intent
of the drawings and specifications, and assist in achieving the resolution of problems,
which may arise.
15. Record the progress of the project. Submit written daily and progress reports to the City.
Keep daily logs containing a record of weather, contractor's work on the site, number of
workers and equipment, work accomplished, problems encountered, and other relevant
data. Make the log available to the City. Prepare and send Weekly Statement of Working
Days to the contractor. Monitor contractor's compliance with labor code requirements.
16. Maintain, at the job site, records of contract documents including drawings, addenda,
change orders, and other modifications of plans and specifications marked to show all
changes made during construction. Maintain as -built records of underground utilities,
including locations and depths of trenches. At the completion of the project, deliver to the
City all contract documents including as- built records.
City of Santa Ana RFP 22-051
Page Al-3
17. Evaluate the completion of the work of the contractor and make recommendations to the
City when work: is ready for final inspection. Assist the City in conducting final
inspectio ns.
18. Facilitate and coordinate inspection by representatives of other agencies.
19. Schedule and coordinate special inspection and material testing with the County of Orange
or other consultants.
20. Shall monitor and enforce prevailing wage forms and requirements for conformance to the
prevailing wage rates on a weekly basis. Shall verify that all Trade personnel listed in the
daily log are also listed in the certified payroll and shall conduct weekly employee
interviews, one for each trade, and submit verification with the monthly progress payments.
21. Shall monitor and enforce the City's Community Workforce Agreement (CWA) forms and
requirements to ensure compliance. Verification should be provided with the monthly
progress payments.
22. The PM shall be responsible for all project closeout items, such as: As -Built plans and
related documentation, punch list completion, commissioning, warranty requests during
the one-year period. Shall schedule and oversee the warranty repair. Should include site
visits as requested by the City to look at defects or imperfection to determine if it is a
warranty issue.
23. Construction Management Software PROCORE shall be required to interface with
contractor.
24.Optional Task: Attend and co -lead a pre -construction meeting with the community.
Primary purpose of this meeting is to introduce the CM team to the community and discuss
major anticipated construction impacts.
The city reserves the right to add or reduce some of the above tasks and duties as it sees fit. The
consultant, serving as staff extension, shall remain sufficiently flexible to meet the needs of the
City and of the project.
Payment and InN•oiCina:
Selected Consultant shall invoice the City based on time and material according to the City's
standard invoice template. Tasks and hours shall be clearly identified and all rates must match
those included in the approved agreement.
Ci tL_ Responsibilities
The City will provide information in its possession relevant to the preparation of the required
information in the RFP. The City will provide only the staff assistance and the documentation
specifically in referred to herein.
City of Santa Ana RFP 22-051
Page Al-4
• Furnish scope of work and provide general direction as needed for the assigned project
• All plan check coordination within the City
■ Advertise, award, and administer of construction contract
■ Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards)
• Electronic files for title sheets and sheet borders
■ Facilitate meeting space and coordination and City facilities
Consultant Responsibilities:
Consultant shall provide all required insurance as outlines in Attachment 2 of this RFP.
City of Santa Ana RFP 22-051
Page Al-5
Appendix
ATTACHMENT
CONSULTANT AGREEMENT
THIS AGREEMENT is made and entered into this day of . 2022 by and between
("Consultant'), and the City of Santa Ana, a charter city and
municipal corporation organized and existing under the Constitution and laws of the State of
California
RECITALS
A. The City desires to retain a consultant having special skill and knowledge in the field of
Construction management and inspection services for the rehabilitation improvements of Well
32.
B. Consultant represents that Consultant is able and willing to provide such services to the
City.
C. In undertaking the performance of this Agreement, Consultant represents that it is
knowledgeable in its field and that any services performed by Consultant under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform during the term of this Agreement, the tasks and obligations
including all labor, materials, tools, equipment, and incidental customary work required to fully
and adequately complete the services described and set forth in Scope of Services - Exhibit A,
attached hereto and incorporated by reference.
2. COMPENSATION
a. City agrees to pay, and Consultant agrees to accept as total payment for its services for
City, the rates and charges identified in Compensation - Exhibit B. The total amount
to be expended under this Agreement shall not exceed $ during the term of this
Agreement, including any extension periods exercised under Section 3.
b. Payment by City shall be made within 45 days (forty-five) days following receipt of
Page 1 of 10
Non -Fed Funding(6 1 2020)
proper invoice evidencing work performed, subject to City accounting procedures.
Payment need not be made for work which fails to meet the standards of performance
set forth in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on the date first written above for a
with the option for the City to grant up to a renewals, exercisable by a writing
by the City Manager and the City Attorney, unless terminated earlier in accordance with Section
16, below.
4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq.,
and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq.,
("Prevailing Wage Laws'), which require the payment of prevailing wage rates and the
performance of other requirements on "public works" and "maintenance" projects. If the services
being performed are part of an applicable `public works" or "maintenance" project, as defined by
the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to
fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the
City, its elected officials, officers, employees and agents free and harmless from any claim or
liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an
independent contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer -employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Consultant
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Consultant shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Consultant shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or
caused to be prepared by Consultant under this Agreement ("Documents & Data'). Consultant
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all
Page 2 of 10
Non -Fed Funding(6 1 2020)
Documents & Data. Consultant makes no such representation and warranty in regard to
Documents & Data which were provided to Consultant by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
7. INSURANCE
Prior to undertaking performance of work under this Agreement, Consultant shall maintain
and shall require its subcontractors, if any, to obtain and maintain insurance as described below:
a. Commercial General Liability Insurance. Consultant shall maintain commercial
general liability insurance naming the City, its officers, employees, agents,
volunteers and representatives as additional insured(s) and shall include, but not be
limited to protection against claims arising from bodily and personal injury,
including death resulting therefrom and damage to property, resulting from any act
or occurrence arising out of Consultant's operations in the performance of this
Agreement, including, without limitation, acts involving vehicles. The amounts of
insurance shall be not less than the following: single limit coverage applying to
bodily and personal injury, including death resulting therefrom, and property
damage, in the total amount of $1,000,000 per occurrence, with $2,000,000 in the
aggregate. Such insurance shall (a) name the City, its officers, employees, agents,
and representatives as additional insured(s); (b) be primary and not contributory
with respect to insurance or self-insurance programs maintained by the City; and
(c) contain standard separation of insureds provisions.
b. Business automobile liability insurance, or equivalent form, with a combined single
limit of not less than $1,000,000 per occurrence. Such insurance shall include
coverage for owned, hired and non -owned automobiles.
C. Worker's Compensation Insurance. In accordance with the provisions of Section
3700 of the Labor Code, Consultant, if Consultant has any employees, is required
to be insured against liability for worker's compensation or to undertake self-
insurance. Prior to commencing the performance of the work under this
Agreement, Consultant agrees to obtain and maintain any employer's liability
insurance with limits not less than $1,000,000 per accident.
d. If Consultant is or employs a licensed professional such as an architect or engineer:
Professional liability (errors and omissions) insurance, with a combined single limit
of not less than $1,000,000 per claim with $2,000,000 in the aggregate.
e. The following requirements apply to the insurance to be provided by Consultant
pursuant to this section:
L Consultant shall maintain all insurance required above in full force and
effect for the entire period covered by this Agreement.
ii. Certificates of insurance shall be furnished to the City upon execution of
this Agreement and shall be approved by the City.
iii. Certificates and policies shall state that the policies shall not be canceled or
reduced in coverage or changed in any other material aspect without thirty
(30) days prior written notice to the City.
Page 3 of 10
Non -Fed Funding (6. ] .2020)
iv. Where the amounts or coverage provided by the certificates of insurance
provides coverage greater than those listed by this Agreement, the amounts
provided by the certificates of insurance shall be incorporated by reference
into the Agreement.
V. Consultant shall supply City with a fully executed additional insured
endorsement.
f If Consultant fails or refuses to produce or maintain the insurance required by this
section or fails or refuses to finrnish the City with required proof that insurance has
been procured and is in force and paid for, the City shall have the right, at the City's
election, to forthwith terminate this Agreement. Such termination shall not affect
Consultant's right to be paid for its time and materials expended prior to notification
of termination. Consultant waives the right to receive compensation and agrees to
indemnify the City for any work performed prior to approval of insurance by the
C ity.
8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its oflicers,
agents, employees, contractors, special counsel, and representatives from liability: (1) for personal
injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Consultant, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement; and (2)
from any claim that personal injury, damages, just compensation,, restitution, judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution, judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing,
to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of;
pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
Letters patent, trademark, or copyright infringement, including costs, contained in the work product
or documents provided by Consultant to the City pursuant to this Agreement.
10. RECORDS
Page 4 of 10
Non -Fed Funding(6 1 2020)
Consultant shall keep records and invoices in connection with the work to be performed
under this Agreement. Consultant shall maintain complete and accurate records with respect to
the costs incurred under this Agreement and any services, expenditures, and disbursements
charged to the City for a minimum period of three (3) years, or for any longer period required by
law, from the date of final payment to Consultant under this Agreement. All such records and
invoices shall be clearly identifiable. Consultant shall allow a representative of the City to
examine, audit, and make transcripts or copies of such records and any other documents created
pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all
work, data, documents, proceedings, and activities related to this Agreement for a period of three
(3) years from the date of final payment to Consultant under this Agreement.
11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Consultant agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance, but in no event less than reasonable care. "Confidential Information" shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the
Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Consultant without reference to information disclosed by the
City.
12. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct
or indirect, which would conflict in any manner with performance of services specified under this
Agreement.
13. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
14. EXCLUSIVITY AND AMENDMENT
Page 5 of 10
Non -Fed Funding (6 1 2020 )
This Agreement represents the complete and exclusive statement between the City and
Consultant, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Consultant. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to, the terms and conditions hereof; shall not bind or obligate Consultant or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant,
Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other consultants retained by City.
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant
compensation for all services performed by Consultant prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Consultant consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
18. JURISDICTION -VENUE
Page 6 of 10
Non -Fed Funding(6 1 2020)
This Agreement has been executed and delivered in the State of California and the valid ity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of in connection with or by reason of this Agreement.
19. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall because for termination of this Agreement.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
With courtesy copies to:
Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
Page 7 of 10
Non -Fed Funding (6 1 2020)
To Consultant:
First & Last Name
Title
Consultant Firm Name
Address
City, State, Zip
Fax:
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24) hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST:
Daisy Gomez
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
John Funk
Sr. Assistant City Attorney
RECOMMENDED FOR APPROVAL:
Nabil Saba
Executive Director
Public Works Agency
CITY OF SANTA ANA
Kristine Ridge
City Manager
CONSULTANT:
(name)
(title)
Page 8 of 10
Non -Fed Funding(6.1.2020)
EXHIBIT A
SCOPE OF SERVICES
Page 9 of 10
Non -Fed Funding(6,1,2020)
EXHIBIT B
COMPENSATION
Fee Proposal including hourly rates if applicable
Page 10 of 10
Non -Fed Funding (6.1 2020)
Appendix
ATTACHMENT 3-1: NON -COLLUSION AFFIDAVIT
CERTIFICATIONS
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham
bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone
else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any
manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the
bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price,
or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract
of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or
the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to
any corporation, partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on the
signature portion thereof shall also constitute signature of this Non -collusion Affidavit. BIDDERS
are cautioned that making a false certification may subject the certifier to criminal prosecution.
Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of 20---, by
proved to me on the basis of satisfactory evidence to be the person(s) who appeared
before me.
Notary Public Signature Notary Public Seal
City of Santa Ana RFP 21-131
Page A3-1
Appendix
ATTACHMENT 3-2: NON -LOBBYING CERTIFICATION
CERTIFICATIONS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her
knowledge and belief, that:
No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to
any person for influencing or attempting to influence an officer or employee of any federal agency, a
Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress
in connection with the awarding of any federal contract, the making of any federal grant, the making
of any federal loan, the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
2. If any funds other than federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence any officer or employee of any federal agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned
shall complete and submit a "Disclosure of Lobbying Activities".
This certification is a material representation of fact upon which reliance was placed when this transaction was made
or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed
by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification shall be subject to a civil
penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the
language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub
recipients shall certify and disclose accordingly.
Firm
Signed and Printed Name:
Title
Date
City of Santa Ana RFP 21-131
Page A3-2
Appendix
ATTACHMENT 3-3: NON-DISCRIMINATION CERTIFICATION
CERTIFICATIONS
The undersigned consultant or corporate officer, during the performance of this contract, certifies as
follows:
1. The Consultant shall not discriminate against any employee or applicant for employment because of
race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure
that applicants are employed, and that employees are treated during employment without, regard to
their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising;
layoff or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. The Consultant agrees to post in conspicuous places, available to
employees and applicants for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of
the Consultant, state that all qualified applicants will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
3. The Consultant shall send to each labor union or representative of workers with which he/she has a
collective bargaining agreement or other contract or understanding, a notice to be provided advising
the said labor union or workers' representatives of the Consultant's commitments under this section,
and shall post copies of the notice in conspicuous places available to employees and applicants for
employment.
4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965,
and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Consultant shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering agency
and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules,
regulations, and orders.
6. In the event of the Consultant's non-compliance with the nondiscrimination clauses of this contract
or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or
suspended in whole or in part and the Consultant may be declared ineligible for further Government
contracts or federally assisted construction contracts in accordance with procedures authorized in
Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and
remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule,
regulations, or order of the Secretary of Labor, or as otherwise provided by law.
The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and
the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted
City of Santa Ana RFP 21-131
Page AM
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive
Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract
or purchase order as the administering agency may direct as means of enforcing such provisions,
including sanctions for noncompliance; provided, however, that in the event the Consultant becomes
involved in, or is threatened with, litigation with a sub -consultant or vendor as a result of such
direction by the administering agency, the Consultant may request that the United States enter into
such litigation to protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended,
No discrimination shall be made in the employment of persons upon public works because of race,
religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or
sex of such persons, except as provided in Section 1420, and any consultant of public works violating
this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title:
Firm:
Date:
City of Santa Ana RFP 21-131
Page A3-4
EXHIBIT B
Page 12 of 13
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services
RFP No. 22-051
t y �
ILI
Proposal to Provide
SECTION A
Cover Letter
(Pages 1-2)
SECTION B
Firm & Team Experience
(Pages 3-6)
Resumes
Well 32 Rehabilitation Improvements j
Construction Management and SECTION C
Inspection Services, RFP No. 22-051
Understanding of Need
(Pages 7-10)
SECTION D
Relevant Project
Experience
(Pages 11-14)
SECTION E
References
(Page IS)
Due: April 22, 2022
SECTION F
Scope of Services
and Schedule
(Pages 16-20)
SECTION G
Certifications
BUTIER
SECTION A
Cover Letter/Contract Agreement Statement
- a .
0
0
0
r
0
0
Section A. Cover Letter & Contract Agreement
April 22, 2022
City of Santa Ana
Attn: Sean Thomas, P.E., Acting Senior Engineer
Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Subject: Well 32 Rehabilitation Improvements Construction Management and Inspection
Services: RFP No. 22-051
Dear Mr. Thomas:
Butier Engineering, Inc. (Butler) is pleased to submit five (5) hard copies and an electronic submittal
of our complete proposal package on PlanetBids for the above stated subject. We have provided one
(1) hard copy of our Fee Proposal in a separately sealed envelope and submitted an electronic copy
on PlanetBids. Our submittal is fully responsive to the RFP dated March 22, 2022, and Addendum
No. 1 dated April 14, 2022.
The Butier Team offers several distinguishing qualifications and a proven record of performance to the
City of Santa Ana. To address the demands of the Well 32 Rehabilitation Improvements Project, we
have assembled a team that has provided construction management and inspection services on a
variety of well projects throughout Southern California.
Contract Agreement Statement
We have reviewed the Contract Agreement and concur with any and all provisions as contained in the
Agreement attached in the RFP as Attachment 2 in the Appendix.
Designated Principal/Authorized Representative
As President/CFO of Butier Engineering, Inc., Mark M. Butier, Jr. is authorized to make legally binding
commitments for the company. He can be contacted directly at (714) 832-7222 and
jrbutier@butier.com for future correspondence.
Experience and Established Relationship with City of Santa Ana
Butier is currently providing CM and inspection services for the South Main Street Corridor
Improvement Project and the San Lorenzo Sewage Lift Station Project. In addition, we coordinated
closely with the City's Public Works, Building, and Parks and Recreation Departments while providing
CM and inspection services for OCWD's Mid -Basin Injection Wells and Pipeline —Centennial Park
Project. Additional relevant projects include the drilling and construction of Mesa Water District's
Chandler Avenue Well No. 12 and Croddy Way Well No. 14 located in the City of Santa Ana and
the City of Tustin's Simon Ranch Reservoir, Booster Pump Station, and Zone 1 and 3 Pipeline
Replacement Project, which is also located in Santa Ana.
Experience of Proposed Project Manager
Butier's proposed Project Manager Omar Dandashi, P.E. has diverse qualifications in the
development of large-scale projects totaling over $750 million. He is currently performing as the
Project Manager for the City of Santa Ana's South Main Corridor Improvements Project. In
addition, he performed as the Construction Manager for the City of Newport Beach's $8.5 million
Balboa Village Improvement Project, which included a four -square block area in the vicinity of the
"Balboa Pier and Fun Zone" on the Balboa Peninsula. The major revitalization of the aging Village —
including upgraded streets and alleys, parking facilities, landscaping, lighting, and street furniture —
promoted redevelopment of the area.
A
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No 22-051
Team Member Firm
Butier and ON -SITE Technical Services, Inc. (Mechanical, Startup & Commissioning) have a 20-year
working relationship on major water capital improvement projects for public agencies and special
districts throughout Southern California. ON -SITE is currently providing mechanical/start-up
services as a part of Butler's team for Mesa Water District's Chandler Avenue Well No. 12 and
Croddy Way Well No. 14 Project. They conduct QA inspection services on wells, pump stations,
recycled water facilities, pipelines, and engineered equipment manufactured at various domestic and
international facilities on a daily basis.
Unique Team Features
Strong Professional Relationship with Engineer of Record —Butler and Tetra Tech,
specifically Mr. Tom Epperson, have 30 years of project history. Our firm has provided CM and
inspection services on several large, multi -phase projects designed by Tetra Tech, including
OCWD's Mid -Basin Injection Wells and Pipeline —Centennial Park; City of Tustin's Simon Ranch
Reservoir, Booster Pump Station, and Zone 1 and Zone 3 Pipeline Replacement; City of
Anaheim's Nohl Canyon Water Storage Tank; and OCWD's Burris Pump Station Phase 2, just to
name a few. Our long-standing relationship with Tetra Tech and Mr. Epperson will make the
development of our management approach more efficient and cost-effective.
Delivering Community Sensitive Projects—Butier has a successful record of delivering large
capital projects under similar project delivery challenges, including engaged and active
community groups, limited site access, highly restrictive traffic control plans and haul routes,
and environmental concerns. Our team has extensive experience balancing the vested interest of
the Owner, local jurisdictions, and stakeholder expectations. We are currently providing public
outreach services for the City of Santa Ana's South Main Street Corridor Improvements
Project, which stretches for 2.5 miles from First Street to Dyer Road.
Sophisticated IT Infrastructure and Project Doc umentation—Butier's web -based platform
allows project information to be disseminated via the internet using Procore, a cloud -based
construction project management software. The program affords the project team with 24/7
visibility into project status and a centralized, comprehensive platform to manage all vital project
data. We are currently using Procore for the City's South Main Street Corridor Improvements
Project and San Lorenzo Sewer Lift Station Project.
Extensive Experience in the Analysis and Defense of Contractor Claims—Butier's senior
staff has been responsible for the administration and defense of complex construction claims. The
firm's focus in water gives us a specific case history that aligns CM practices with the type of
issues encountered on projects of this size and complexity.
■ Local Market Knowledge —The Butier team will provide unmatched cost control and estimating
services. The firm's strong relationship with the Southern California construction community
allows us to provide market price cost estimates and mitigate cost exposure during construction.
When you choose Butier Engineering, Inc., you are selecting a partner. We will help guide you
through the process and keep you informed each step of the way. We are confident that we have
assembled a team that will serve the best interests of all project participants. If you have any
questions regarding our proposal, please direct them to me for clarification at (714) 832-7222.
Respectfully Yours,
BUTTER Engineering, In
ark M. Butler, Jr.
President/CFO
BUTTER
A. COVER LETTER & CONTRACT AGREEMENT
li
Section B. Firm and Team Experience
andent Third-R-
Butier Engineering, Inc. (Butler) is a Southern
California -based firm that provides third -party
construction management services, a
commitment we made to our clients 45 years
ago. Butier services public agencies, special
districts, and the private sector in the delivery of
heavy civil infrastructure. Our project expertise
includes water and wastewater treatment,
conveyance, and storage; transportation; and
public facilities. This focused expertise has
enabled us to deliver over $1.5 billion of public
infrastructure projects.
Comprehensive
Services
Our team
demonstrates a depth
of experience in the
services outlined in the B
City's scope of work.
Working closely with
client, designer, and
contractor, we create
efficient teams to
manage the day -to-
day flow of
construction activities,
project documents, and public affairs to keep a
project on its critical path toward successful
completion. Through distinct lines of authority,
responsibility, and communication, we
streamline the scope of services to eliminate
redundancies and carefully control the crucial
time, cost, and quality elements of the project.
Committed, Available Resources
Butier is committed to providing the City with
the required level of resources and staffing
flexibility to meet the demands of the Well 32
Rehabilitation Improvements Project. Our team
of 45 construction management professionals
consists of skilled project managers,
schedulers, estimators, and inspectors who
have successfully managed well rehabilitation
projects throughout Southern California. By
having the Butier Team serve the City as a
single -source of responsibility, the CM and
inspection activities will be well coordinated
U
TI
Best Positioned,
Best Qualified
and delivered efficiently. In addition to our
licensed professional engineers, our field
inspection staff possess certifications from the
American Concrete Institute, American
Welding Society, International Code Council,
NACE International, and Post Tension
Institute.
Local + Flexible = Responsive
Butiers office is centrally located at 17822 E. 17'"
Street in Tustin, CA. Hence, we are able to
provide responsive service to our clients
throughout Southern California. Given the
dynamic nature of construction services, it is
important that the team
can accommodate
o
changing demands without
compromising quality.
.6,,
Collaborative Effort
ER Butier has established a
00
,4 strong relationship with
the City, having performed
CM and inspection
r' services for several
capital improvement
}�* projects. We have
extensive experience
integrating City staff into
our field team. Our proven work strategies help
eliminate unnecessary iterations of schedule
milestones and provide adequate notice to City
staff for coordination of work. In addition, Butier
has formed excellent relationships with key
project stakeholders.
Staffing Efficiencies
Our Senior Schedulers provide resource -loaded
Oracle Primavera P6 schedules that are utilized
to define specific tasks for construction
management and field inspection activities. This
allows us to segregate costs to each project
and evaluate the potential of staffing
efficiencies. We compare the construction
baseline schedule against the program level
construction management staffing plan. A
disciplined review of concurrent construction
schedules offer the opportunity to share
resources among multiple projects.
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No 22-051
Meet Our Well 32 Project Team!
Education
Master of Science.
Engineering, University of
California, Irvine
Bachelor of Science,
Engineering, University of
California, Irvine
License/Registration
Professional Engineer (Civil).
State of California, No. 51426,
Exp. 06/30/2022
OMAR DANDASHI, P.E.
Project Manager
Mr_ Omar Dandashi has over 25 years
of experience designing, managing,
and estimating civil infrastructure
projects, including city and county road
construction, highways, bridges, paving,
drainage, large and small diameter
pipelines, and wet and dry utilities.
Omar is the Senior Vice President of
Blue Mountain Development, and he
is responsible for multiple aspects of
program management, construction
administration, government agency
negotiation, political and public
relations, public utility relationship
building, community outreach and
communications, project finance
and budget management, as well as
extensive partnership -focused relations.
Omar has established a strong
working relationship with the City
The value of Butier's CM team to the City of Santa
Ana, Public Works Agency (City) will be in the
collective experience and abilities of our individual
members to provide independent, third -party CM and
special inspection support services; meet the City's
cost and schedule objectives; build upon strong
relationships with project stakeholders; provide
flexible staffing economies; and integrate the CM
Team with City Operations Personnel.
Project management and inspection responsibilities
will be handled by the project team member best
experienced to provide the needed service. The
Project Manager will represent the City Construction
Manager in the field and will be responsible for
managing the project field office, field personnel, and
subconsultants. Our Lead Field Inspector will
implement the QA/QC program and prepare reports
required to document daily activity.
BUTT ER
of Santa Ana, Public Works Agency
during his role as Butler's Project
Manager for the South Main Street
Corridor Improvements Project He is
responsible for multiple stakeholder
coordination, overseeing public
relations and community outreach
activities, and supervising the QA field
inspection team.
In addition, Omar was the Program/
Construction Manager for the City of
Ontario's Ontario Ranch — a 4,000-
acre major expansion known as New
Model Colony. The project Included
S500-million of infrastructure
components, including over 35
miles of new roadways. underground
infrastructure, bridges, water
distribution. and parks for the 19,000-
home residential community.
In addition, all technical support, contracts
administration, and project controls will fall under the
Project Manager's responsibility with the assistance
of the Contract Administrator.
This is a more lean and efficient use of contract
administration budgets by matching staff skills to
project needs. Our CM team is vigilant during all
phases of a project to meticulously document project
activities and to minimize Contractor claims.
With the use of Butier's sophisticated construction
project management software, combined with our
established relationships, we can streamline the
review and approval processes. Omar will maintain
direct access to key decision -makers and end -users,
which will help keep the project moving. However, he
will always receive approval from the Engineer.
B. FIRM & TEAM EXPERIENCE
Mark M. Butier, Jr.
Project Director/Community Outreach Support
Throughout Mark Butier's 33-year career, he has
focused on providing professional project
management, construction management, and claims
mitigation services on major water / wastewater
treatment, storage, and transmission pipeline
projects. He will meet with City representatives at
key project milestones, as appropriate. In addition,
Mark has served as the firm's contact between the
field construction management staff/client and the
project public outreach effort, when necessary. He
has been responsible for generating, distributing,
and presenting to numerous public boards and
community associations dealing with the impact of
construction activity on the local community.
Casey Harris
Senior Scheduler/Claims Analysis
Casey has 45 years of experience as a project
manager, resident engineer, scheduler, and
estimator. His capital improvement project
experience represents over $700 million in
construction costs. He is an expert CPM scheduler
and is proficient in Primavera Project Planner. He is
currently performing as Senior Scheduler for the
City's South Main Street Corridor Improvements.
Steve Naylor, ACI, ICC
Lead Field Inspector
As a Senior Quality Control Inspector, Steve has
managed the scheduling and daily field operations
for various water capital improvement and public
facility projects. He has over 30 years of field
construction experience and is ICC certified in
reinforced concrete with specific experience in code
enforcement, performing inspections on
reinforcement and concrete placement, shotcrete,
high -strength non -shrink grout, and epoxy work on
retrofitting. His broad range of experience includes
wells, pump stations, reservoirs, treatment facilities,
pipelines, and bridges.
Bruce Phillips
Electrical Inspector
Bruce brings over 30 years of experience in
industrial and commercial construction. He has
focused the last 20 years of his career on providing
BUTIER
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
construction cost estimating, project management,
human resources (craft), client development and
client management services. His skills include a
comprehensive array of experience in operations,
management, project management, estimating and
start-up/commissioning services in water and
wastewater treatment facilities, upstream oil and gas
production, petroleum refining, petro-chemical, food
processing and power generation.
Frankie Alonso
Field Inspector
Mr. Alonso is a results -oriented, hands-on
construction professional with 35 years of expertise
in all facets of heavy civil infrastructure, particularly
underground pipeline construction. He has a
verifiable track record for the successful completion
of projects through planning, organizing, and
managing overall daily operations. He has the ability
to identify, isolate, and eliminate work hazards.
Bryan Wilson
Contract Administrator
Bryan will be responsible for the initial set up of
Procore—a cloud based construction project
management solution —to organize, manage, and
control project documentation. He will provide
training to project team members during the pre -
construction phase and assist the Field Engineer at
substantial completion with preparing the electronic
project records for final submittal to the City.
Kent Kreeger
Mechanical/Start-Up/Commissioning
Kent has over 30 years of direct QA Management
experience providing inspection and engineering
support of projects both domestic and overseas. He
has direct experience in the hydroelectric, power
generation, petrochemical and water industries
providing engineering support in all aspects of rotating
and stationary equipment operation and reliability.
Kent has a proven track record managing domestic
and overseas fabrication inspection assignments.
B. FIRM & TEAM EXPERIENCE
6UT1ER
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
Mayor Vicente Sanniento
City Council Members
Kristine Ridge. City Manager
Nabil Saba, P.E.
Executive Director of Publie Works
County of Orange
City Public Affairs
Local Businesses and Residents
Sean Thomas, PE
IActing Senior Engineer
I
and Information
Morrison Park Neighborhood Assoc,
—
{ —
City Parks, Recreation
Pentecostal Church of God
_ _
I
S Community Services
an Santa Ana Police & Fire Depmants
—
BUTIER ENGINEERING, INC
Tetra Tech
OCFCD, OCTA and Caltrans
J
(Engineer of Record)
Cal/OSHA, SCAOMD and RWOCB
General Contractor (TBD)
SCE, SoCal Gas, AT&T and Cable
Mark Butler, Jr. (AB Needed)
Inspection/Testing
Project Director
_Special
Omar Dandashi, P.E. (60%)
Project Manager
•` - �Oliiiiql
Casey Hams (s%)
Senior SchadulerlClalms Analysis
Bryan Wilson (30%) Kent Kreager (AB Needed)
Contract Administrator Mechanical I Start -Up I
Commissioning
FIELD iNSPECTORS
Steve Naylor (too"/,)
Lead Field Inspector
Bruce Phillips (As Needed)
Electrical Inspector
Frwkia Alonao iAs Heeoadl
Field Inspector
6
B. FIRM AND TEAM EXPERIENCE
BUTIERing Engineer
EDUCATION
MBA, Finance,
University of California,
Irvine, Graduate School
of Management, 1998
Graduate Studies, Civil
Engineering, California
State University at
Long Beach
B.A., Economics,
University of Southern
California, 1987
B.A., Social Sciences,
University of Southern
California, 1987
LICENSES /
CERTIFICATIONS
General Engineering
Contractor, State of
California, Class A
716863
Registered
Construction Inspector,
ACIA: Division I
Engineering 5572
Mark M. Butier, Jr.
Project Director
Professional Summary
Mr. Butier serves as President and Chief Financial Officer for Butier
Engineering. His primary duties include functioning as the primary point of
contact between Butier and its clients; contract management; sub -consultant
contract management; maintenance of Butier's project information system;
development of the firm's field procedural manuals; and staff resource
management. Mr. Butier works closely with the field construction
management staff to ensure all contract scope requirements are being fully
implemented. Mr. Butier also serves as the firm's contact between the field
construction management staff/client and the project public outreach effort,
when necessary. He has been responsible for generating, distributing, and
presenting to numerous public boards and community associations dealing
with the impact of construction activity on the local community.
Mr. Butier has 25 years of varied experience as an Assistant Resident
Engineer and Inspector for municipal and governmental agency projects.
Primary emphasis has been in municipal water and wastewater transmission
and treatment projects, as well as landfills. His responsibilities include project
field engineer / inspector in quality control for civil inspection; shop drawing
review and approval; full responsibilities for contract administration; CPM
scheduling; cost controls; and contractor claims and changes.
Project Experience
Project Director, Mid -Basin Injection: Centennial Park Project; Santa
Ana, CA; Orange County Water District (Estimated Completion: 2019;
Value: $23.2 million) —The Butier Team is providing constructability review,
project coordination, resident engineering, and construction inspection
services for the Mid -Basin Injection Wells Project located within Santa Ana's
87-acre Centennial Park. The wells will be used to directly inject product
water from the District's GWRS into the principal groundwater aquifer. The
project consists of the following: construction of four (4) groundwater injection
wells in below grade vaults (approximately 1,200 feet deep); construction of a
monitoring well at the Heritage Museum site; construction of 5,500 LF of
purified recycled water injection supply pipeline that connects to the District's
existing GWRS pipeline and crosses the Santa Ana River; construction of
4,200 LF of backflush discharge pipeline that discharges to the Greenville -
Banning Channel and Centennial Park Lake; installation of submersible
pumps within the four injection wells; replacement of 9.6 acres of paving with
the Park; demolishing an existing City of Santa Ana restroom facility; and
construction of two new buildings with shared City and District uses.
Project Director, San Lorenzo Sewer Lift Station; Santa Ana, CA; City of
Santa Ana, Public Works (Completion: 06/2021; Value: $7.6 million) —
The San Lorenzo Sewage Lift Station Project consists of construction of the
following: lift station —below ground dry and wet wells; aboveground CMU
block building; three (3) 15 hp dry pit sewage pumps; piping, fittings, valves,
flow meter, in -line grinders, rail and hoist system; HVAC, ventilation and
BUTTER
C—N,.rmr, Manager's, Consulting Engineers
Mark M. Butier, Jr.
Project Director
ducting; electrical and instrumentation; site grading and improvements; 560
(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of
10" force main; sewer manholes and appurtenances; and abandonment of
existing Segerstrom Lift Station.
Project Director, EW-1 Well Equipping Project; Fullerton, CA; Orange
County Water District (Estimated Completion: September 2017; Value:
$1,092,074)—Mr. Butier is overseeing the construction management and
inspection services team for the well equipping project, which is located on
private property in Fullerton Industrial Park. EW-1 was one of six extraction
wells that was part of a 2008 project to contain groundwater with elevated
concentrations of volatile organic compounds (VOCs). However, the project
was put on hold and the wellhead was not constructed, a pump was not
installed, and considerable biological growth formed inside EW-1 as it sat idle
for over eight years. The current project includes rehabilitation and
redevelopment of the well, completing construction of the wellhead, installing
a submersible pump and shroud, and constructing piping and a connection to
a nearby OCSD sewer trunk line in State College Blvd. for discharge of the
pumped groundwater. The Butier Team coordinated with OCWD, the
Contractor, and the property owner's association to select an acceptable
temporary piping route to the nearest storm drain. In addition, a grade
separation project is being constructed concurrently in State College Blvd.
adjacent to Fullerton Industrial Park. The Butier Team is the main point of
contact between the Contractor and the City of Fullerton„ OCTA and OCSD,
to assist in coordinating project construction activities.
Project Director, Chino II Well Field Equipping of Raw Water Wells Nos.
II-10 and II-11; Eastvale and Ontario, CA; (Chino Basin Desalter
Authority Completion: 2017; Value: $3.8 million)— The scope of work
included equipping of two water wells including, but not limited to, the
following: construction of 16'8" W x 41'4"L x 16"H reinforced masonry block
building; installation of 3,300 gpm vertical turbine stainless steel pumping unit
and 600 hp premium efficiency motor, 16-inch diameter epoxy lined steel
discharge header pipe, 12-inch diameter pump to waste piping, 16-inch
diameter flow meter, site pressure piping and tubing, valves, taps and Corp
stops, pressure gages, 16-inch diameter C905 PVC underground discharge
pipeline, and connection to existing 24-inch diameter discharge pipeline; and
on- and off -site electrical, including power, control, lighting, underground
electrical duct, instrumentation equipment and panels, switchgear, VFD and
motor control center equipment, and installation of SCADA equipment. The
project included close coordination with the City of Ontario, City of Eastvale,
County of San Bernardino County Flood Control District, Southern California
Edison, and local businesses and residents.
Project Director, Simon Ranch Reservoir, Booster Pump Station, and
Pipeline Replacement Project; North Tustin, CA; City of Tustin
(Duration: 0312020 — 08/2021; Value: $14.5 million) —Simon Ranch
Reservoir is located in North Tustin surrounded by a residential neighborhood of
BIJTIER
Construction 11an19e1, Consulting Cnglnevs
Mark M. Butier. Jr.
Project Director
large custom homes. The purpose of the project is to upgrade the aged
infrastructure to ensure continued domestic water and fire water protection for
the region. The current fire flow protection will be increased from 700 GPM to
over 3,000 GPM. The scope of work includes the demolition and removal of the
existing rectangular buried concrete reservoir and replacing it with a 1.0 MG
circular prestressed concrete tank. Additional scope items include replacement
of existing pipelines; construction of Zone 3 piping, as well as 5 new fire
hydrants; construction of a new booster pump station at the reservoir site; 1- 500
kW standby emergency generator with an automatic transfer switch; Zone 3 and
Zone 1 interconnection through a pressure regulating valve; replacement of
asphalt at Valhalla and Outlook; and grading and shoring operations.
Project Director, Trampas Recycled Water Pump Station; San Juan
Capistrano, CA; Santa Margarita Water District (Est. Completion:
October 2020; Value: $5.3 million)— The scope of work for construction of
the TRWPS included; earthwork, precise grading, site improvements, CMU
building, perimeter fencing and motorized swing gate, drainage facilities,
electrical and telemetry equipment, vertical turbine booster pumps and
motors, buried piping, above -ground piping, manual and automated valves,
flow meters, surge tanks with air compressors, pump building with electrical
room, HVAC system for pump building, paving, concrete, instrumentation and
control systems, sound attenuating features, and cathodic protection.
BLUE MOUNTAIN
DEVELOPMENT
EDUCATION
Master of Science,
Engineering, University
of California, Irvine
Bachelor of Science,
Engineering, University
of California, Irvine
LICENSES /
CERTIFICATIONS
Professional Engineer
(Civil), State of
California,
No. 51426, Exp.
06/30/2022
PROJECT ROLES
Project Executive
Forward Planning
Director
Program Manager
Technical Project
Manager
Senior Strategist
YEARS OF
EXPERIENCE
25+
AREAS OF
EXPERTISE
Construction
Management
Program Management
Contract Bidding
Value Engineering
Community Outreach
Regulatory Compliance
Environmental
Omar M. Dandashi, P.E.
Project Manager
Professional Summary
Mr. Omar Dandashi has over 25 years of experience designing, managing,
and estimating civil infrastructure projects, including city and county road
construction, highways, bridges, paving, drainage, large and small diameter
pipelines, and wet and dry utilities. He is the Senior Vice President of Blue
Mountain Development and currently functions as the Project Executive for
several of the firm's projects.
Drawing on an extensive background, Mr. Dandashi brings diverse and well -
structured qualifications to the development of over $750-million in large-
scale infrastructure, public facilities, and private development projects. His
background and experience focus on integrated project delivery, project
planning, finance, entitlement, environmental compliance, design, and
construction.
Mr. Dandashi has been responsible for multiple aspects of program
management, construction administration, government agency negotiation,
political and public relations, public utility relationship building, community
outreach and communications, project finance and budget management, as
well as extensive partnership -focused relations. He has served as an industry
speaker, guest lecturer, and advocate for industry -wide issues, promoting
common solutions to current challenges.
As a Project Manager, he is responsible for performing constructability
reviews; providing bidding assistance; supervising and managing the
construction project field office; supervising field personnel; full contract
administration; leading project meetings; responding to contractor
correspondence, RFIs, and submittals; CPM scheduling; shop drawing
reviews; preparing and reviewing cost estimates; negotiating settlements for
changes and claims; recommending extra work and claims settlements to
Owners; negotiating and recommending monthly progress payments;
preparing monthly progress reports; maintaining a daily diary of events;
reviewing and approving materials, equipment, and testing procedures;
coordinating with Owner operations personnel, PM staff, and stakeholders;
and project start-up, acceptance, and close-out.
Relevant Experience
Project Manager, South Main Street Corridor Improvements Project, City
of Santa Ana, Public Works Agency (Completion: 2022; Value: $12.8
million) —The project will create a safer and more vibrant street for the
community by revitalizing a 2.5-mile stretch of Main Street from First Street to
Dyer Road. The improvements consist of monument signs, enhanced
lighting, decorative sidewalk extensions / bulb outs, landscaping, irrigation,
traffic signals, signing, striping, street pavement rehabilitation, and railroad
coordination that is taking place concurrently as part of a Water Resources
Division project. In addition, the improvements include replacing aging and
deficient water mains, sewer mains, fire hydrants, sewer maintenance holes,
water services, and sewer laterals within the project limits.
BLUE MOUNTAIN
DEVELOPMENT
Omar M. Dandash i, P.E.
Project Manager
Program Manager / Construction Manager, Ontario Ranch, City of
Ontario (Duration: Planning / Design 2005 — 2014, Construction 2014-
2017; Value: $500 Million) —Ontario Ranch included the development of a
master planned infrastructure program for a 4,000-acre major expansion, also
known as the New Model Colony, in the City of Ontario. The development
was a joint partnership with multiple land developers, homebuilders, and the
City of Ontario. The program included $500 million of infrastructure
components, including over 35 miles of new roadways, underground
infrastructure, bridges, water distribution system, and parks for a new
19,000 home community. Program Management services included the
following: planning; grant management; design development; construction
drawings; preparation of bid packages; the development of an interactive
communications plan; detailed right-of-way acquisition program for over 200
individual property owners; and the development of a comprehensive
partnering relationship with Southern California Edison to enable forward
planning on major electrical transmission relocations, distribution conversion,
new business distribution, easement and right-of-way purchases.
Additionally, project management services included the development of the
team to build the concept and design of the 150-acre New Model Colony
Great Park including passive and active park elements, which include formal
gardens, a three -acre lake, tot lots, passive green space, outdoor
amphitheater, community center, active soccer/baseball fields, and
basketball/tennis courts.
Construction Management for individual projects included the following:
Francis Water Loop Transmission Line Construction — The
construction scope of work included over 2.5 miles of 36-inch and 24-
inch domestic water transmission mains valued over $11 Million.
Archibald / Edison Avenues Street Construction — The
construction scope of work included over 5 miles of major arterials,
including a 96-inch storm drain, 24-inch sewer, 12-inch domestic
water, 12-inch recycled water, and relocation of 25 66KV SCE
Transmission Poles valued over $54 Million.
Archibald / Edison Avenues Landscape Median Construction —
The construction scope of work included over 5 miles of major arterial
landscape medians, including a signature monument valued over $5
Million.
Program Manager / Construction Manager, The Mill Creek Wetlands,
City of Ontario (Duration: Planning / Design 2006 — 2011, Construction
2012- 2014; Value: $20 Million) —The Mill Creek Wetlands is the first
Regional Storm Water Treatment System in the Inland Empire currently
treating a watershed of over 77 square miles of several cities in San
Bernardino County, including Rancho Cucamonga, Upland, Montclair,
Ontario, and Chino. Located in the City of Chino in the Prado Basin, with the
BLUE MOUNTAIN
DEVELOPMENT
Omar M. Dandashi, P.E.
Project Manager
City of Ontario as lead agency, the project represents the culmination of
almost a decade of developing public and private partnerships.
With over 52 acres of wetlands, the project provides over 23 acres of open
water, 2.5 miles of recreation trails, additional storm water storage capacity
for the Prado Basin, and includes the creation of over 20 acres of California
native habitat for over 300 species, including endangered species such as
the Least Bells Vireo.
During the project's implementation phase, a comprehensive federal, state,
regional, and local government relations program was developed that
included direct project advocacy before the United States Congress, U.S.
Army Corps of Engineers, and a variety of pertinent departments. The project
received approximately $7.5 million in grant funding directly and indirectly
from the following programs:
US Bureau of Reclamation
• US EPA / CaIEPA
• Bureau of Reclamation's WaterSMART Program
• State Water Resources Control Board Revolving Fund
• Department of Water Resources (Integrated Watershed Program / SAWPA)
• Natural Resources Agency
Construction Manager, Balboa Village Improvement Project, City of
Newport Beach (Duration: Construction 2001- 2003; Value: $8.5
Million) —The Balboa Village Improvement Project included a four -square
block area in the vicinity of the "Balboa Pier and Fun Zone" on the Balboa
Peninsula. The major revitalization of the aging Village provided a draw to the
public and promoted redevelopment of the area.
The project included upgraded streets and alleys, the addition of traffic
calming elements, widening and resurfacing sidewalks, extensive ADA
compliance implementation, expanding parking facilities, the addition of new
storm drainage, landscaping, lighting, and street furniture to achieve a unified
theme and character for the Village.
The project was delivered in three-year phases addressing the complex
nature of active businesses and residents, circulation, and mass transit to an
annual active tourist attraction. Community outreach was a critical
element of the project delivery and success. The City staff and construction
management developed a unique up -front communications style that
allowed a proactive community driven partnership with local businesses
and residents. Nominated for ASCE Orange County Project of the Year.
BUTIER
Construction Managers, Cwmdting Engineers
EDUCATION
B.S., Construction
Engineering, Arizona
State University, 1977
Graduate Studies,
Arizona State
University
Casey Harris
Senior Scheduler Claims Analysis
Professional Summary
Mr. Harris has 45 years of varied experience as a project manager,
construction manager, resident engineer, and senior scheduler. As the on-
site/owner representative for major municipal, public agency, and special
district capital improvement projects, Mr. Harris has successfully managed the
construction of multi -million -dollar water and wastewater treatment, pipeline,
airport, solid waste landfill, and port facilities. Collectively, this project
experience represents over $700 million in construction costs.
Mr. Harris' expertise is in contract administration for design/build,
design/bid/build, and construction management programs. He is an expert
CPM scheduler, has established and implemented effective change order
control systems, negotiated change orders with design/build contractors,
performed routine shop drawing reviews, and resolved contractor claims.
Project Experience
Senior Scheduler, San Lorenzo Sewer Lift Station; Santa Ana, CA; City
of Santa Ana, Public Works (Completion: 04/2021; Value: $7.6 million) —
The San Lorenzo Sewage Lift Station Project consists of construction of the
following: lift station —below ground dry and wet wells; aboveground CMU
block building; three (3) 15 hp dry pit sewage pumps; piping, fittings, valves,
flow meter, in -line grinders, rail and hoist system; HVAC, ventilation and
ducting; electrical and instrumentation; site grading and improvements; 560
(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of
10" force main; sewer manholes and appurtenances; and abandonment of
existing Segerstrom Lift Station.
Senior Scheduler, Mesa Water District Wells No. 12 and 14, South
Croddy Way and West Chandler Avenue; Santa Ana, CA; (Estimated
Completion: June 2022; Value: $18,500,000) Butier is providing
constructability review, project coordination, resident engineering and
construction inspection services for the drilling and construction of two 3000
to 4000 GMP municipal water supply wells that will produce groundwater
from selected water -bearing zones using the reverse -circulation rotary drilling
technique. Both wells are being constructed in compliance with local codes
and regulations and in accordance with the California Water Code, and
American Water Works Association (AWWA) Standard for Water Wells
(AWWA A100-15).
Senior Scheduler, Mid -Basin Injection: Centennial Park Project; Santa
Ana, CA; Orange County Water District (Completion: 03/2020; Value:
$29.5 million) —The Mid -Basin Injection project consisted of the construction
of the following: four groundwater injection wells in below grade vaults; two
(2) monitoring wells; a purified recycled water injection supply pipeline
approximately 5,700 feet long that connects to the District's existing
Groundwater Replenishment System (GWRS) pipeline and crosses the Santa
Ana River; a backflush discharge pipeline approximately 4,200 feet long that
discharges to the Greenville -Banning Channel and Centennial Park Lake;
BUTIER
C—sf,—twn W-gprs, Consulting Engineers
Casey Harris
Senior Scheduler/ Claims Analysis
installation of submersible pumps within the four injection wells; replacement
of approximately 9.6 acres of paving within the Park; demolishing an existing
City of Santa Ana restroom facility; and constructing two new buildings with
shared City and District uses. Butier coordinated closely with the City of
Santa Ana, Santa Ana Unified School District, Heritage Museum, and state
and federal agencies.
Senior Scheduler, EW-1 Well Equipping Project; Fullerton, CA; Orange
County Water District (Estimated Completion: September 2017)— EW-1,
which is located on private property in Fullerton Industrial Park, the project
included rehabilitation and redevelopment of the well, completing construction
of the wellhead, installing a submersible pump and shroud, and constructing
piping and a connection to a nearby OCSD sewer trunk line in State College
Blvd. for discharge of the pumped groundwater. The Butier Team is
coordinating with OCWD, the Contractor, and the property owner's
association to select an acceptable temporary piping route to the nearest
storm drain. In addition, a grade separation project is being constructed
concurrently in State College Blvd. adjacent to Fullerton Industrial Park. The
Butier Team is the main point of contact between the Contractor and the City
of Fullerton, OCTA and OCSD, to assist in coordinating project construction
activities.
Senior Scheduler, South Main Street Corridor Improvements; Santa
Ana, CA; City of Santa Ana Public Works Agency (Completion: 2022)—
Butier is providing CM, inspection, and public outreach services for the
revitalization of a 2.5-mile stretch of Main Street from First Street to Dyer
Road. The scope of work includes monument signs, lighting, decorative
sidewalk extensions / bulb outs landscaping, irrigation, traffic signals, signing,
striping, street pavement rehabilitation, and railroad coordination. The
improvements will replace aging and deficient water mains, sewer mains,
fire hydrants, sewer maintenance holes, water services, and sewer
laterals. The improvements consist of five individual projects, including South
Main Sewer Improvements, South Main Street Corridor Improvements, Main
Street Rehabilitation from Edinger Avenue to First Street, Main Street
Rehabilitation from Warner Avenue to Edinger Avenue, and Main Street
Rehabilitation from Dyer Road to Warner Avenue.
Project Manager, Multiple Safe Drinking Wellhead Treatment Project —
California American Water Company Arlington Well, Lynwood Well No.
11, and Huntington Park Well No. 15; Los Angeles, CA; Water
Replenishment District of Southern California (Combined Duration:
07/2018 — 04/2021; Combined Value: $4,823,064)—Mr. Harris is
responsible for providing construction management services for the Multiple
Safe Drinking Wellhead Treatment Project. The project is a part of WRD's
Safe Drinking Water Program. The scope of work includes the installation of
wellhead treatment equipment on wells that have been contaminated with
volatile organic compounds (VOCs).
BUTIERin� Eng�ncers
EDUCATION
01/08/2020, OSHA 29
CFR Training, Permit -
Required Confined
Space Entry
2002 CPN Training
Course, Radiation
Safety and Nuclear
Gauges
2002 ACI Re -
Certification Course
2001 OSHPD
Preparation Course
2001 ICBO Re -
Certification Course
1998 ICBO Re -
Certification Course
1996 ACI Re -
Certification Course
LICENSES /
CERTIFICATIONS
American Concrete
Institute, ACI Concrete
Field Testing
Technician, Grade I,
Exp. 03/16/2024
ICC Reinforced
Concrete Special
Inspector -Legacy,
No. 0884971,
Exp. 12/05/2022
ICC Structural Masonry
Special Inspector,
No. 0884971
Exp. 12/05/2022
ICC Spray -Applied
Fireproofing Special
Inspector,
No. 884971
Exp. 12/05/2022
Steve Naylor
Lead Field Inspector
Professional Summary
Mr. Naylor brings over 30 years of field construction experience. As a civil /
structural / mechanical inspector for Butier, Mr. Naylor works primarily on
water capital improvement and public facility projects. He is ICC certified in
reinforced concrete with specific experience in code enforcement, performing
inspections on reinforcement and concrete placement, shotcrete, high -
strength non -shrink grout and epoxy work on retrofitting.
His ability to read plans and knowledge of building code interpretation and
enforcement facilitate the execution of inspection duties typically assigned,
including utility / agency coordination, preparation of daily reports, overseeing
specialty subcontractors, reviewing and responding to RFIs and field memo
responses, interpretation of drawings, and general correspondence with
design engineers.
Mr. Naylor's broad range of work experience has included multi -level parking
structures, schools, commercial and government structures, bridges, water
reservoirs, and pouring in -place caissons throughout Orange, Los Angeles,
and Riverside counties. He has served as apprentice, journeyman, and
foreman running crews for his family -owned plastering business, as well as
partner responsible for quality control, payroll, finance, and bidding.
Project Experience
Field Inspector, Lynwood Well No. 11 Treatment Project; Lynwood, CA;
Water Replenishment District of Southern California (Value: $932,306)—
Steve was responsible for providing field inspection services for the Lynwood
Well No. 11 Treatment Project. The project is a part of WRD's Safe Drinking
Water Program, which promotes the cleanup of groundwater resources at
specific well locations that have been adversely affected by years of improper
disposal of industrial solvents. The scope of work included the installation of
wellhead treatment equipment on wells that have been contaminated with
volatile organic compounds (VOCs). The contaminant for all of the wells is
Trichloroethylene (TCE) and the proposed treatment system for each is the
Granular Activated Carbon (GAC) System.
Field Inspector, Chino Creek Well Field Equipping -Wells 1-16, 1-17, and I-
18; Chino, CA; Chino Basin Desalter Authority (Value: $1.5 million) —
Steve provided inspection services for the Equipping of Chino Creek Well
Field Wells 1-16, 1-17 & 1-18 project, which is a part of the Chino Desalter
Phase 3 Expansion. The groundwater wells were equipped as part of the
CDA Phase 3 Expansion Project. In addition to well equipping, the project
included the installation of 625 LF of 8" diameter HDPE corrugated storm
drain pipe and the grading and paving of the well sites. Coordination with
other projects was required, including connection of well discharge lines to
the Chino Creek Well Field Raw Water Pipeline. The project also involved
coordination with the City of Chino to secure the required permits.
Field Inspector, Groundwater Replenishment System Final Expansion
Project; Fountain Valley, CA; Orange County Water District (Value:
$196,214,745)—The GWRSFE is a water supply project designed to provide
BUTLER
Consfruclron Managers. Consulting Engineers
Steve Naylor
Lead Field Inspector
an additional 31,000 AFY of advanced treated wastewater (recycled water) to
the groundwater basin in north and central Orange County. The GWRSFE
scope of work includes upgrading the existing 100 MGD Advanced Water
Purification Facility (AWPF) by adding 30 MGD of additional capacity;
constructing Plant No. 2 Secondary Effluent Conveyance Facilities; and
rehabilitating an existing pipeline between Plant No. 2 and Plant No. 1 to
bring secondary effluent to the GWRS.
Field QA/QC Representative, Ridgeline Booster Pump Station; Lake
Forest, CA; Trabuco Canyon Water District (Value: $2,073,600)—Butier
provided construction management, inspection, specialty inspection, and
materials testing services. The scope of work included installation of three (3)
2 CFS turbine pumps; upgrade of one 2 CFS pump with a VFD and
replacement of associated discharge piping and valving; removal of portions
of the existing floor slabs, interior walls, and interior and perimeter wall
footings; trenching below the existing walls and footings of the booster pump
station; demolition of an existing concrete pad and its surrounding CMU
walls; installation of new underground suction piping; construction of an
electrical control room and electrical upgrades to include an on -site generator
with an automatic transfer switch; construction of a new generator equipment
pad; improvements to the existing underground flow meter vault; replacement
and extension of the existing asphalt pavement; and installation of a new
ornamental steel truck gate and ornamental steel fencing.
Field Inspector, Milliken 1010 Zone Pump Station; Chino, CA; Chino
Basin Desalter Authority (Value: $1.3 million) —Provided inspection
services for the construction of the Milliken 1010 Zone Pump Station located
in Chino, CA. The pump station was constructed as a part of the CDA Phase
III Expansion Project. The scope of work included the following potable water
improvements: construction of a ventilated CMU Pump Station, 198 LF of 16-
inch discharge piping and interconnection to an existing 30-inch transmission
line, and 24-inch suction piping and interconnection to an existing 24-inch
transmission line; installation of 3 vertical turbine pumps and associated
piping, fittings, valves, appurtenances, electrical instrumentation, and
controls; and site improvements, including grading and paving and restoration
of existing improvements.
QC Inspector, Edward C. Little Water Recycling Facility, Phase IV
Design -Build Expansion, El Segundo, CA; West Basin Municipal Water
District (Value: $53 million) —New facilities increased the capacity of Barrier
water to 12.5 MGD, and Title 22 water to 40 MGD. The expansion to the
Barrier Water Treatment System included cartridge filters, chemical addition,
microfiltration, reverse osmosis, ultraviolet irradiation, and product water
pump station. The expansion of the Title 22 Treatment System included
conversion of an existing clarifier and existing filters, an additional 5.0 MG
pre -stressed concrete product water storage tank, pump station, and
modifications to the existing disinfection system. Steve verified QC
procedures to ensure that adequate methods of QC inspection were
employed.
BUTTER
Const"'Clion Managers, Consul
EDUCATION/
TRAINING
Graduate of
IBEW/NECA Local 11
Apprenticeship 1986
Graduate of
Instrumentation I & II
(1989), Electrical
Training Institute
Completed Foremanship
Class (ETI)
LICENSES /
CERTIFICATIONS
Master Electrician,
State of Colorado
Contractor's License
(Inactive), California,
Arizona and Nevada
SOFTWARE
Estimating (McCormick
Estimating Software)
Project Scheduling/Cost
Control (Microsoft
Projects)
MS Excel, Word,
PowerPoint
AFFILIATIONS
Member, Occupational
Safety Council of
America (OSCA)
AREAS OF
EXPERTISE
Field Engineering and
Electrical Design
Electrical Inspection and
Specification
Acceptance
Client/Construction
Representative
Integrator of Ray -Chem
and Chromalox Heat
Trace Products
Bruce Phillips
Electrical Inspector
Professional Summary
Mr. Phillips brings over 30 years of experience in industrial and commercial
construction to Butier Engineering, Inc. He has focused the last 20 years of
his career on providing construction cost estimating, project management,
human resources (craft), client development and client management
services. His skills include a comprehensive array of experience in
operations, management, project management, estimating and start-
up/commissioning services in upstream oil and gas production, petroleum
refining, petro-chemical, wastewater treatment, food processing and power
generation.
Project Experience
Electrical Inspector, Groundwater Replenishment System Final
Expansion Project; Fountain Valley, CA; Orange County Water District
(Duration: 2019 —2023; Value: $193,977,148)— The GWRSFE is a water
supply project designed to provide an additional 31,000 AFY of advanced
treated wastewater (recycled water) to the groundwater basin in north and
central Orange County. The GWRSFE scope of work includes upgrading the
existing 100 MGD Advanced Water Purification Facility (AWPF) by adding 30
MGD of additional capacity; constructing Plant No. 2 Secondary Effluent
Conveyance Facilities; and rehabilitating an existing pipeline between Plant
No. 2 and Plant No. 1 to bring secondary effluent to the GWRS.
Pacific Gas and Electric — EPC: Guernsey 20 MW Solar Project
Project Magnitude: $ 85,000,000
Chevron SJBU — Cymric Lease Managed Maintenance and
New Construction Projects
Project Magnitude: $ 12,000,000
Ormat Geo Thermal Project; Brawley, CA — Installation of 4 — 10 MW
Geothermal Steam Turbines
Project Magnitude: $ 3,300,000
Occidental Petroleum; Clayton, NM — Installation of 2 - CO2
Compressor
Project Magnitude: $2,800,000
Tech Conveyor; Memphis, TN — Installation of 5 miles of Box Conveyor
Project Magnitude: $ 4,500,000
Big West of California; Bakersfield, CA — Tank Gauging Project
Project Magnitude: $ 1,200,000
BUTIERng Enginaers
EDUCATION
Health and Safety
Program (OSHA)
Management Skills
Program
Trench Shoring
Program
Hazard Material
Program
(40-hour course)
Dust Control (8-hour
course)
Frankie Alonso
Inspector
Professional Summary
Mr. Alonso is a results -oriented, hands-on construction professional with 35
years of expertise in all facets of heavy civil infrastructure, particularly
underground pipeline construction. He has a verifiable track record for the
successful completion of projects through planning, organizing, and
managing overall daily operations. He has the ability to identify, isolate, and
eliminate work hazards.
Mr. Alonso has over 20 years of experience as a Foreman Supervisor in
which he has been responsible for hiring, scheduling, and supervising labor
and developing and enforcing company policies, procedures, and project
safety regulations. Other areas of expertise include heavy equipment
operation and the construction of pressure reducing stations, rate of flow
valves, and pump stations.
Relevant Experience / Work History
Field Inspector, Groundwater Replenishment System Final Expansion
Project; Fountain Valley, CA; Orange County Water District (Duration:
2019 —2023; Value: $193,977,148)—Mr. Alonso is providing field inspection
services for the Groundwater Replenishment System Final Expansion
(GWRSFE) Project. The GWRSFE is a water supply project designed to
provide an additional 31,000 AFY of advanced treated wastewater (recycled
water) to the groundwater basin in north and central Orange County. The
GWRSFE scope of work includes upgrading the existing 100 MGD Advanced
Water Purification Facility (AWPF) by adding 30 MGD of additional capacity;
constructing Plant No. 2 Secondary Effluent Conveyance Facilities; and
rehabilitating an existing pipeline between Plant No. 2 and Plant No. 1 to
bring secondary effluent to the GWRS.
Field Inspector, San Lorenzo Sewer Lift Station; Santa Ana, CA; City of
Santa Ana, Public Works (Completion: 04/2021; Value: $7.6 million)
The San Lorenzo Sewage Lift Station Project consists of construction of the
following: lift station —below ground dry and wet wells; aboveground CMU
block building; three (3) 15 hp dry pit sewage pumps; piping, fittings, valves,
flow meter, in -line grinders, rail and hoist system; HVAC, ventilation and
ducting; electrical and instrumentation; site grading and improvements; 560
(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of
10" force main; sewer manholes and appurtenances; and abandonment of
existing Segerstrom Lift Station.
Field Inspector, Claude "Bud" Lewis Carlsbad Desalination Plant —
Intake Modifications Project; Carlsbad, CA; Poseidon Water (Duration:
08/2019 — 09/2020; Value: $18.4 million) —The Intake Modifications Project
includes the design and construction of Phase 1 of a new pumping station to
provide source water to the existing 50 MGD Carlsbad Seawater Desalination
Plant. Phase I utilizes existing NRG facilities to provide source water supply
to the Plant, including the following: a) New brine dilution pumps and
discharge piping; b) Intake structure modifications to accommodate pump
BUTIER,ng Engineers
Frankie Alonso
Inspector
station wet -well; c) Extension of the existing 63-inch HDPE brine line; d)
Modifications to the existing Generation Station forebay including the
replacement of existing Generation Station screen backwash pumps and
discharge piping; e) Electrical building and equipment; f) Modifications to
Generation Station's stormwater and groundwater infiltration modifications;
and g) Tie-in to the 12 kV service at the CDP.
Field Inspector, Rawlings Reservoir Repair and Replacement; Tustin,
CA; City of Tustin (Completion: 2013; Value: $12.5 million) —Mr. Alonso
performed construction inspection services for the replacement of the
Rawlings Reservoir, which required 150,000 CY of grading. The City's former
4.0-million gallon hopper bottom reservoir was taken out of service due to its
age and deteriorating condition. After its decommissioning, the City
proceeded with the design of two 3.0-million gallon pre -stressed concrete
(circular DYK-style) water storage tanks to replace the reservoir. Prior to
bidding, Butier assisted the City with solving construction access and
temporary shoring issues. The project originally required the construction of a
tie -back retaining wall, which would have extended the project into an
adjacent property. At the City's direction, Butier performed a constructability
review and proposed using a cantilevered shoring system, which would keep
the project within the City's property line. In addition, Butier assisted the City
in obtaining a temporary construction easement from the adjacent landowner
to the north. Use of this undeveloped property provided the Project team with
an access road down to the bottom of the tank elevation, as well as laydown
and stockpiling areas.
Field Inspector, Santa Ana River Enhanced Recharge Phase 1A
Sedimentation Basin and Pipeline; Highland, CA; San Bernardino Valley
Municipal Water District (Completion: 11/2018; Value: $14.4 million) —
The project site is located adjacent to the southern flank of the San
Bernardino Mountains on the western side of a relatively large alluvial fan
complex associated with the Santa Ana River. It is also located '/z mile
downstream from the Seven Oaks Dam, which is an earth -fill dam designed
for flood control. A new diversion structure and inlet channel was constructed
to divert water to the new sedimentation basin and the Water Conservation
District Canal. The new sedimentation basin removes fine sand prior to
delivery to Valley District or Metropolitan facilities. It is 200-foot wide and 600-
foot long and 10 feet deep. The new pipeline consists of 1,900 linear feet of
96-inch diameter CMLC welded steel pipe and 1,300 linear feet of 78-inch
diameter CMLC welded steel pipe connecting the new sedimentation basin
and the existing 78-inch diameter SBVMWD Foothill Pipeline.
Field Inspector, Foothill Feeder 78-inch Pipeline Relocation; San Manuel
Casino/San Bernardino, CA; San Bernardino Valley Municipal Water
District (Completion: 11/30/2018; Value: $10 million)—Butier Engineering,
Inc. provided construction management and inspection services for the
Foothill Feeder Pipeline Relocation Project. The project area borders the
west end of the San Manuel Band of Mission Indians (SMBMI) tribal property,
BIJTIER
ConsVucfion Managers, Gmsullinp E,,gme rs
Frankie Alonso
Inspector
starting at the east end of Piedmont Drive and proceeding south along the
western San Manuel Casino (Casino) property line. It then turns east, just
north of the Casino's south perimeter wall, before turning into Marshall
Boulevard where it reconnects with the original Foothill Pipeline. A 1,450 LF
section of the pipeline that ran under the Casino's front entrance was
relocated to an area immediately behind the Casino. The project reduces the
risk of damage to the pipeline from above -ground operations, including the
construction of a new Casino hotel by PENTA Building Group; secures the
safety and continues operation of the pipeline in the event of an earthquake;
and makes it easier for the District to monitor and maintain the pipeline as it
passes through tribal land.
Pipeline Inspector, Joint Transmission Main Unit 1, Reaches 1 and 2, 60-
Inch CML&C Transmission Main Relocation; Lake Forest, CA; South
Coast Water District (Completion: October 2012; Value $2.5 million) —
Mr. Alonso provided inspection services for the relocation of the 60-inch
PCCP transmission main from its existing location into Lake Forest from
Romano to Bake Parkway. The scope of work included providing construction
management and inspection services for the installation of approximately
4,100-LF of pre -purchased 60-in CML&C (welding inside and out); tie-in near
Romano to the tie-in location at Bake Parkway ranging in depth of cover from
5-ft to 17-ft; abandonment of a portion of the existing PCCP; installation of a
new cast -in -place isolation valve vault; installation of District pre -purchased
48-inch isolation valves (2); crossing and support of existing utilities;
repaving; excavation of rock material along a portion of the project;
coordination with other contractors and agencies within The Irvine Company
Property; coordination with contractor's QSP for SWPPP compliance; and
enforcement of environmental constraints.
Pipeline Inspector, Carlsbad 50 MGD Seawater Reverse Osmosis
Desalination Plant ($537 million) and 10-Mile Product Water Pipeline
($159 million); Carlsbad, CA; Poseidon Water (Completion: Fall 2015)—
Mr. Alonso provided pipeline inspection services for the Product Water
Pipeline portion of the Carlsbad Seawater Desalination Plant Project. Butier
was selected to provide Owner's Engineer services for the construction of the
50 MGD seawater reverse osmosis desalination plant at the Encina Power
Station (EPS). The scope also included the construction of a 2.5-million
gallon cast -in -place concrete water storage tank; product pump station; and
conveyance pipeline to deliver the drinking water produced by the project to
water utilities and municipalities in San Diego County. The 10-mile, 54-inch
diameter pipeline was constructed under the Interstate 5 Highway and a
railroad using a jack and bore tunnel method. Butier coordinated closely with
the City of Carlsbad, SDCWA, SDG&E, Poseidon, and the Coastal
Commission during the construction of the tunnel option across Macario
Canyon. The pipeline alignment included over 6,000 feet of tunnels
performed by four different tunneling subcontractors. One of the tunnels was
over 1,700 linear feet, 30 feet below sea level, and required a vertical shaft
over 80 feet in height.
BUTIERnng Enyine
Frankie Alonso
Inspector
Pipeline Inspector, Newport Trunk Sewer and Force Mains, Bitter Point
Pump Station to Coast Trunk Sewer; Newport Beach, CA (Orange
County Sanitation District) --Inspector for the Newport Trunk Sewer and
Force Mains project, which consisted of the construction of two sanitary
sewer force mains and a sanitary sewer gravity main. The scope of work
included construction of the following: 6,600 feet of 36-inch internal diameter
sanitary sewer force main from the Bitter Point Pump Station to Plant No. 2;
2,040 feet of 36-inch internal diameter sanitary sewer force main parallel to
the said force main from the eastern side of the Santa Ana River to Plant No.
2; 3,550 feet of 12-inch internal diameter sanitary gravity sewer from the
Newport oil field to the existing Bitter Point Pump Station; a tunnel 1,400 feet
long crossing underneath Santa Ana River and a tunnel approximately 240
feet long inside Plant No. 2 to install a 96-inch steel casing; a junction
structure and non-standard vortex manhole inside Plant No. 2; and 6,500
lineal feet of fiber optic duct bank.
Pipeline Inspector, Perris Valley Pipeline; Riverside, CA; Metropolitan
Water District of Southern California (Value: $80 million) —Inspector for
the construction management of this $80-million pipeline project, which
provides water reliability and quality benefits to western Riverside County.
The Perris Valley Pipeline has enhanced the water delivery capacity of
MWD's Henry J. Mills Water Treatment Plant by up to 150 million gallons per
day, helping meet retail, municipal, and industrial demands in the region.
Construction consisted of 6.5 miles of 96-inch treated water pipeline; four
service connections from the pipeline; and four pump stations.
Inspector, Colorado River Aqueduct Siphons, Transitions, Canals, and
Tunnels Rehabilitation and Improvements (Metropolitan Water District
of Southern California)—Butier Engineering, Inc. provided a team of 19
construction managers and specialty inspectors to perform construction
management and inspection services for the annual shutdown of the 242-mile
Colorado River Aqueduct. The aqueduct consists of two reservoirs, five
pumping plants, 63 miles of canals, 92 miles of tunnels, and 84 miles of
buried conduit and siphons. Its capacity is 1.3 million acre-feet per year. The
rehabilitation and improvement project required the team to work 12-hour
days, 7 days a week for 21 consecutive days.
EDUCATION
B.S., Engineering
Technology —
Construction, California
State Polytechnic
University, Pomona,
2000
AREAS OF
EXPERTISE
CPM Project
Scheduling
Cost Control
Quality Control
Construction &
Specialty Trade
Estimating
Cost Valuation
Value Engineering
Construction
Inspections
Surveying
Structural Design
Change Order
Negotiation
Cost Segregation
Studies
Project Organization
Engineering
Management
Owner Presentations
Project Review
Bryan Wilson
Contract Administrator
Professional Summary
Mr. Wilson has over 20 years of construction estimating, cost review,
inspection, contract administration, and field engineering management
experience. He has analyzed and reviewed cost estimates for hundreds of
projects ranging from underground pipelines to high-rise office buildings.
These projects involved the training and management of engineers and
estimators to determine and track construction costs and activities. Mr.
Wilson's detailed estimating experience covers all aspects of building and
heavy civil design and construction, including earthwork, structural,
mechanical, electrical, and plumbing components. He has conducted
numerous physical inspections in order to verify the accuracy and scope of
quantities and cost estimates derived from construction blueprints. He also
has experience in organizing and tracking requests for information (RFI),
project scheduling, negotiating construction change orders, and value
engineering analyses.
Mr. Wilson's range of professional experience includes working for and with
construction management firms, general contractors, architecture and
engineering firms, and public accounting and consulting firms. He has also
provided asset valuation and classification consulting services to real estate
appraisers and construction companies. He has prepared construction cost
estimate studies for federal tax depreciation classification and successfully
defended these studies when audited by the Internal Revenue Service.
Project Experience
Office Engineer/Document Control Specialist, Mid -Basin Injection:
Centennial Park Project; Santa Ana, CA; Orange County Water District
(Duration: 07/17 — 03/20; Value: $29.5 million) —The Mid -Basin Injection
project consisted of the construction of the following: four groundwater
injection wells in below grade vaults; two (2) monitoring wells; a purified
recycled water injection supply pipeline approximately 5,700 feet long that
connects to the District's existing Groundwater Replenishment System
(GWRS) pipeline and crosses the Santa Ana River; a backflush discharge
pipeline approximately 4,200 feet long that discharges to the Greenville -
Banning Channel and Centennial Park Lake; installation of submersible
pumps within the four injection wells; replacement of approximately 9.6 acres
of paving within the Park; demolishing an existing City of Santa Ana restroom
facility; and constructing two new buildings.
Field Engineer, Mesa Water District Wells No. 12 and 14, South Croddy
Way and West Chandler Avenue; Santa Ana, CA; (Estimated
Completion: June 2022; Value: $18,500,000) Butier is providing
constructability review, project coordination, resident engineering and
construction inspection services for the drilling and construction of two 3000
to 4000 GMP municipal water supply wells that will produce groundwater
from selected water -bearing zones using the reverse -circulation rotary drilling
technique. Both wells are being constructed in compliance with local codes
and regulations and in accordance with the California Water Code, and
BUTT ER
ConsPruclion Managers, ConsWfing
Bryan Wilson
Contract Administrator
American Water Works Association (AWWA) Standard for Water Wells
(AWWA Al00-15).
Document Control, San Lorenzo Sewer Lift Station; Santa Ana, CA; City
of Santa Ana, Public Works (Completion: 06/2021; Value: $7.6 million) —
The San Lorenzo Sewage Lift Station Project consists of construction of the
following: lift station —below ground dry and wet wells; aboveground CMU
block building; three (3) 15 hp dry pit sewage pumps; piping, fittings, valves,
flow meter, in -line grinders, rail and hoist system; HVAC, ventilation and
ducting; electrical and instrumentation; site grading and improvements; 560
(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of
10" force main; sewer manholes and appurtenances; and abandonment of
existing Segerstrom Lift Station.
Document Control, EW-1 Well Equipping Project; Fullerton, CA; Orange
County Water District (Estimated Completion: September 2017)— EW-1,
which is located on private property in Fullerton Industrial Park, the project
included rehabilitation and redevelopment of the well, completing construction
of the wellhead, installing a submersible pump and shroud, and constructing
piping and a connection to a nearby OCSD sewer trunk line in State College
Blvd. for discharge of the pumped groundwater. The Butier Team is
coordinating with OCWD, the Contractor, and the property owner's
association to select an acceptable temporary piping route to the nearest
storm drain. In addition, a grade separation project is being constructed
concurrently in State College Blvd. adjacent to Fullerton Industrial Park. The
Butier Team is the main point of contact between the Contractor and the City
of Fullerton, OCTA and OCSD, to assist in coordinating project construction
activities.
Field Engineer, 8 MG Peck Reservoir Replacement Project; Manhattan
Beach, CA; City of Manhattan Beach (Completion: 04/29/2022; Value:
$31.1 million) —The Butier Team is providing construction management,
inspection, public relations, environmental impact monitoring, and
soils/materials testing services. The scope of work includes construction of
the following: 8 MG partially -buried cast -in -place concrete reservoir 270 feet
long by 190 feet wide; 925 SF Operations Building for office space and water
quality laboratory; 1,950 SF cast -in place concrete Pump Station and
Electrical Control Building; 3,000 SF of water treatment facilities, including
two (2) horizontal filtration tanks, a protected chlorine and ammonia chemical
storage building, and a glass -fused bolted steel vertical back wash tank;
ancillary facilities, including diesel standby generator, transformer, yard
piping, access vaults, infiltration drywells, retaining wall, access road,
pavement, fencing, gates, and landscaping; and replacement of raw water
transmission pipeline, construction of chemical dosing and containment
piping, new sewer discharge pipeline connection, new utility connections, and
new curb, gutter, and sidewalks.
ON-Si7E
EDUCATION
B.S. Mechanical
Engineering, 1977 —
1982 Cal Poly Pomona
YEARS' EXPERIENCE
32 Years (QA/QC)
25 Years (Inspection
Management and
Coordination)
Kent Kreeger
Mechanical / Start -Up / Commissioning
Professional Summary
Mr. Kent Kreeger has over 25 years of direct QA Management experience
providing inspection and engineering support of projects both domestic and
overseas. Mr. Kreeger's direct experience in the Hydroelectric, Power
Generation, Petrochemical and Water Industry providing engineering support in
all aspects of rotating and stationary equipment operation and reliability. Has a
proven track record managing domestic and overseas fabrication inspection
assignments. Provides technical support to difficult fabrication and construction
problems. Provides Start up support and failure analysis services.
Areas of expertise include inspection of mechanical equipment, welded
structures, pressure vessels, fiberglass reinforced tanks and pipe, large diameter
water pipe, fabricated valves, and engineered equipment. Experienced in the
fabrication and testing and start-up support of hydroelectric power generation
equipment, rotating equipment including pumps, motors, steam and gas turbines,
compressors and generators. Provides failure analysis support and solutions to
difficult performance problems with mechanical systems.
Knowledgeable and experienced in functional testing, debugging, start-up and
commissioning of systems related to water treatment, water distribution, large
pumping stations, electrical equipment, components and instrumentation,
SCADA, and other equipment and systems.
Supported the fabrication inspection of switchgear, transformers, MCCS, control
systems and PLCS; extensive experience in FRP fabrication and testing of
filament wound tanks and pipe, and hand laid up assemblies; has inspected the
application of all types of coating systems used in industrial applications.
Successfully directed international based inspections in the following countries;
Canada, Mexico, Brazil, Korea, Japan, England, Scotland, France, Germany,
Spain, Poland, Sweden, Portugal, Austria, Indonesia, and India. Projects
included large diameter valves, pumps and hydraulic turbine generators, forgings
and welded structures, pressure vessels, and mechanical assemblies.
Project Experience
Mid -Basin Injection: Centennial Park Project; Santa Ana, CA; Orange
County Water District (Duration: 07/17 — 03/20; Value: $29.5 million) —The
Mid -Basin Injection project consisted of the construction of the following: four
groundwater injection wells in below grade vaults; two (2) monitoring wells; a
purified recycled water injection supply pipeline approximately 5,700 feet long
that connects to the District's existing Groundwater Replenishment System
(GWRS) pipeline and crosses the Santa Ana River; a backflush discharge
pipeline approximately 4,200 feet long that discharges to the Greenville -Banning
Channel and Centennial Park Lake; installation of submersible pumps within the
four injection wells; replacement of approximately 9.6 acres of paving within the
Park; demolishing an existing City of Santa Ana restroom facility; and
constructing two new buildings.
Mesa Water District Wells No. 12 and 14, South Croddy Way and West
Chandler Avenue; Santa Ana, CA; (Estimated Completion: June 2022;
Value: $18,500,000) Butier is providing constructability review, project
coordination, resident engineering and construction inspection services for
ON-Si7E
Dent Kreeger
Mechanical / Start -Up / Commissioning
the drilling and construction of two 3000 to 4000 GMP municipal water supply
wells that will produce groundwater from selected water -bearing zones using
the reverse -circulation rotary drilling technique. Both wells are being
constructed in compliance with local codes and regulations and in
accordance with the California Water Code, and American Water Works
Association (AWWA) Standard for Water Wells (AWWA Al00-15).
Edward C. Little Water Recycling Facility Phase V Design -Build
Expansion; El Segundo, CA; West Basin Municipal Water District
(Completion: 05/2013; Value: $61,854,989)—Provided shop fabrication
inspection and field construction inspection support as a sub -consultant to
Butier Engineering, Inc. As a part of the project, West Basin expanded Title
22, Barrier Water and Low Pressure Boiler Feed water treatment processes.
The Phase V project involved expanding the Title 22 pretreatment capacity by
10 MGD to achieve a total treatment capacity of 40 MGD, along with
expanding the Barrier Water production from 12.5 MGD to 17.5 MGD and the
Low Pressure Boiler Feed water production from 1.7 to 2.2 MGD to serve
Single -Pass RO water to NRG's El Segundo Power Plant. The Phase V
project addressed numerous capacity expansion and treatment process
upgrades. The project included, but was not limited to, the following
components: Ozone-Microfiltration Pretreatment Process; West Coast
Barrier; El Segundo Power -Low Pressure Boiler Feed Water; Title 22 Facility -
High Rate Clarifier Expansion; Title 22 Pump Station; Chemical Facilities; and
miscellaneous civil work.
Expansion of the Leo J. Vander Lans Water Treatment Facility; Water
Replenishment District of Southern California (Completion: 07/2014;
Value: $31,588,721)—Provided shop fabrication inspection and field
construction inspection support as a sub -consultant to Butier Engineering,
Inc. The project included upgrading from 3 mgd to 8 mgd capacity;
construction of additional microfiltration (MF), reverse osmosis (RO), and UV
treatment and other systems; and upgrading the wastewater equalization
system and improvements to the electrical and instrumentation and controls.
Carlsbad 50 MGD Seawater RO Desalination Plant; Carlsbad, CA;
Poseidon Resources/SDCWA/Butler Engineering, Inc. (Completion:
12/2015)—As Start -Up Engineer, Mr. Kreeger had overall responsibilities
providing as -needed technical assistance during the fabrication, installation
and commissioning of (18) 7000HP pumps, mechanical equipment, valves
ranging in size from 48" thru 98" diameter, and electrical inspections for the
above referenced project. Knowledgeable and experienced in final testing,
debugging, start-up and commissioning of systems related to chlorination,
fluoridation, fumigation, exfoliation, water treatment, chemical feed, large
pumps and valves, electrical equipment, components and instrumentation,
SCADA, and other equipment and systems.
in
SECTION C
Understanding of Need
Section C. Understanding of Need
Exhibit 1. Project Location/Scope
Butler Engineering, Inc understands (hat the City of Santa Ana
is seeking a professional consultant to perform construction
engineering and management services for the Well 32
Rehabilitation Improvements Project The consultant will work as
an extension of the City's staff through all phases of the project
from pre -construction through closeout and commissioning to
ensure the work is completed in accordance with the contract
documents.
Due to its elevated nitrate levels, the City is planning to perform
a major well rehabilitation project at Well 32. The rehabilitation
will include new well equipment, new building, new chlorination
facilities, and a new pipe to take the well water to John Garthe
Reservoir to be blended with low nitrate groundwater. The
estimated construction cost is approximately $13 million The
City's anticipated construction start date is Summer 2022 with a
duration of 16 months,
Rehabilitation of the existing Well 32, which is located at
Morrison Park, includes construction at the following locations:
1. Morrison Park
• Demolition of the existing
underground well vault, valves,
piping and facilities,
• Raising the well
pump structure to
grade, including associated
well casing, column and is
appurtenances,
New above ground well building with a pump and electrical
room, including well pump/motor, well discharge and well to
waste valves and piping,
• Yard piping, site improvements, irrigation and landscaping
improvements
• Repair and resurfacing of the basketball/ tennis courts.
• Replacement of the tennis court fence enclosure.
• Replacement ofthe court lighting and corresponding
electrical facilities
City of Santa Ana, Public Works Agency
Well 32 Rehebdilelian Imp—menls Conshu 1m Menegemenl end /nspechon Services
2. City Street Rights -of -Way
• 12-inch well discharge piping, with
parallel fiber optic facilities, will be
constructed from the well site at
Morrison Park to the John Garthe
Reservoir site
• The alignment is approximately
3,700 LF and includes removal/
replacement of an existing pipe
within an existing bridge cell for 100 LF.
• Supports, thrust restraints, and attachments
to the bridge as well as the necessary pipeline
appurtenances, pavement replacement and necessary
traffic control
3. John Garthe Reservoir
Construction of a chemical
building/reslroom facility and
associated on -site piping,
including pressure control and
chemical injection vaults I*
• Chemical building will house the
sodium hypochlorite generation
equipment. The building will be constructed of CMU
walls on a concrete pad with a gabled roof including
the coneeponding plumbing, mechanlcal_ Rlocl /toil,
msi umonlAlldn and Contml facildtes
Electrical upgrades to the John Garthe Pump Station
Lvaond
t — 12-inch Class 350 DIP and Fiber Opllc Conduits
Bristol Street Bridge Crossing
RUTIER I C. UNDERSTANDING OF NEED
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
A. Approach to Project Control
Butier Engineering, Inc. understands that the City of Santa Ana is seeking a professional consultant to perform
construction engineering and management services for the Well 32 Rehabilitation Improvements Project. The
Butier Team will work as an extension of the City's staff through all phases of the project from pre -construction
through closeout and commissioning to ensure the work is completed in accordance with the contract
documents. We will use a project control system consisting of the following four elements that will provide
QA/QC procedures and guidelines.
ELEMENTS OF
PROJECT CONTROL
Butier will use a project control system
consisting of the following elements that
will provide QA/QC procedures and
guidelines in the successful execution of
the City's Well 32 project. Our team's
ability to manage relationships with
members of the Project team will also be
essential to minimize conflicts and keeping
the same goals in mind.
Cost Control
Change management
and pricing; force
account tracking and
estimating
QA/QC Control
Respond to RFIs; field ■
documentation of site materials;
dairy progress reports; review as -
built drawings; and permits &
regulatory agency requirements
1. Cost and Schedule Controls
The CM Team's ability to monitor and manage the
Contractor's performance will be critical to
minimizing problems during construction and
potential claims. Contractor schedule requirements
will include substantial completion deadlines and
interim and final completion dates. The construction
progress will be evaluated based on approved,
resource -loaded CPM schedules (Primavera
P6). The Contractor will be required to submit CPM
schedules to the City for acceptance in addition to
timely, detailed status information as the work
progresses. The Butier Team will evaluate the
Contractors' actual performance by comparing
actual qualities completed versus planned.
Anticipated work to be accomplished will be
reviewed based on a three-week "look ahead"
schedule updated weekly by the Contractor.
Available information must be evaluated for
schedule exceptions, available contractual options,
and corrective actions required by the Contractor.
Schedule Control
Schedule Review;
variances addressed at
progress meetings; and
variance identification /
analysis initiates recovery
CM Manual
CM organization; roles and
responsibilities; reporting
relationships: communication
requirements: and construction
management procedures
The CM Team will address schedule variances with
the Contractor at weekly progress meetings. The
CM Team will evaluate each variance, its cause,
and possible corrective actions, and require the
Contractor to provide an action plan to correct
unsatisfactory variances. If a satisfactory resolution
is not achieved and the Contractor falls significantly
behind schedule, the CM Team will require the
Contractor to submit a recovery plan. The plan
should address mitigation efforts that move the
delayed activity off the critical path so that its
completion will not affect critical milestones.
The Butier Team will develop a QA/QC Plan that will
reflect a set of objectives defined by City staff and
assigned CM and field inspection personnel. The
Plan will define requirements and procedures for
checking, reviewing, distributing, tracking, and
controlling documents. The project specific QA/QC
Plan will be submitted and reviewed by the City
prior to submittal of other project deliverables. The
BUTLER 8 C. UNDERSTANDING OF NEED
individuals performing QA/QC reviews will be
clearly indicated in the project organization chart.
Deliverables will contain a statement that the
information contained in the submittal has been
checked in accordance with the QA/QC Plan.
A. Quality Assurance
Quality Assurance is the confirmation process that
all procedures or actions to be confirmed include
the following: construction management plan,
training of staff in QA/QC requirements, submittal
process plan, document control plan, identification
of City approvals at appropriate milestones, control
of testing to determine validity and accuracy of
data, identification of need for corrective action, and
audit to verify compliance with the Plan.
B. Quality Control
activities to be verified include the following: review
by quality control team; identification and
compliance with applicable codes, ordinances,
permits, etc.; review input data and check
calculations; review drawings, specifications,
technical reports, memos, meeting minutes;
perform constructability, operability, maintainability,
and usability reviews; and review design for
compliance with safety standards.
The Project Manager will prepare a CM
Communications Plan to be approved by the City.
The manual will include correspondence and other
forms of communication in accordance with the
City's document formatting standards. The manual
will integrate the interdependent roles of the City,
Construction Manager, Design Engineer, and the
Contractor(s), through all phases of the work. The
Manual will include the following: Project
Organization: Individual assignments, phone
numbers, lines of communication, and methods for
interfacing with the City, stakeholders, and the
Contractor; Project Control: Description of cost,
schedule, and document control systems;
Communication Management: Procedures for
documenting communications; distribution and/or
routing lists; and examples of all required forms;
Meeting/Notice Procedures: Schedules, notices,
agendas, reporting procedures, documentation
requirements, and timely acceptance processes;
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
QA/QC: Procedures, testing, coordination checks,
and construction inspection activities; Contract
Administration: Control systems and procedures
for performing and documenting submittal reviews,
RFIs, change orders, claims management, etc.;
and Records: The CM will maintain records of
inspections, reports, and test results received from
the Contractor, Design Engineer, etc.
Butier utilizes Procore to organize, manage and
control project documentation. As stated previously,
our key personnel are currently using Procore for
the City's South Main Street Corridor Improvements
Project and the San Lorenzo Sewer Lift Station
Project. Procore provides unlimited users and
storage, 24/7 visibility into project status, and a
centralized, comprehensive platform to manage
vital project data. All parties have access to the
system via a web browser on their computer or
mobile device using secure log -in information.
The Butier Team utilizes Procore to store, review,
track, and manage all project documents from
construction drawings, specifications, and
submittals to progress photos, payment
applications, and daily reports. Additionally, our
Contract Administrator can configure Procore to
display the latest Primavera P6 construction
project schedule and weather information, both
current and forecast. Automated emails are
generated by the program to remind personnel of
required documentation reviews and other project
related tasks that need attention. Project
documentation is continuously updated and
available to all involved personnel, with prior
revisions stored for reference. At the conclusion of
the project, project -related documentation is
converted to PDF format and distributed to the
appropriate parties.
B. Special Concerns / Approach
After reviewing the construction documents and
attending the site visit on April 19, 2022, our project
management team has vetted concerns, provided
suggestions, and identified benefits to the City,
which are included in Exhibit 2 on the following
page.
BUTIER 9 C. UNDERSTANDING OF NEED
He
Exhibit 2. Special Concerns / Approach
Schedule Control Review Preliminary Schedule during pre -construction phase
Implement proposed project according to its schedule Conduct Schedule Workshops regarding project constraints with stakeholders
and any constraints.
Quality Control
Follow QC guidelines to minimize rework that could
result in schedule delays.
Follow proven Butier QA/QC plan with experienced inspection staff
Document work activities and distribute to CM members daily
Ensure contractor redlines are updated on a weekly basis
Cost contm I •
Provide CM / Field Engineering budget linked to resource -loaded construction
V1if+ze and follow coy control tnb+lag?mant strdreg+cc to
,
baseline schedule
kelp pfojact mlixfo budget
Quantify and negotiate PCOs to ensure contingent costs are reported to
management
Provide proactive alternatives to construction sequencing
Stakeholder Coordination
Utilize document control tools for 2417 team access
Be responsive to stakeholder coordination requirements
Participate in any partnering workshops proposed by City
to achieve a high confidence level for project success.
Hold issue -specific team meetings / workshops
City of Santa Ana, public Works Agency
Syr cfi AS M6 RFP N+ 22 051
Conslruc(ion Menegement end Inspection Sernces, RFP No 22-051
Identification of key schedule constraints early on to mitigate potential
delays
Minimized cost overruns due to unforeseen construction issues
Meet schedule with fully -functional facility
Concise 3-week look -ahead
• Streamlined sequencing and coordination
Minimize inspection costs
• Provide City staff with current summarized data weekly Create
Management 'dashboard* for Interface with field CM learn
Maintain a "no surprises' result when planning progress payments or
approval of PCOs
Provide a monthly report detailing progress and project risk
• Facilitated, yet secure document filing system for detailed project
progress
• Streamlined communications and accountability for project success
• Plan for maintaining stakeholder involvement
Team Cohesiveness Provide a locally -based team [hat has worked well together on similar projects ' • Adaptive CM and inspection team that is near the project site
Objective: Maintain a sfreamlined team Ihef works well Build from recent CM and inspection activities for other similar projects Proven integration of our combined Team's CM and inspection expertise
together during CM and inspection activities.
Local team that is familiar with local issues and contractors l . Team with knowledge of current bidding climate
Safety Attend contractor's safely meetings. Follow and respect contractor's safety Active management of Contractor Site Safety procedures
Evaluate street traffic safety issues. Invite residents to program Provide City frontline management with information to residents,
offer input on developing a plan that facilitates Active evaluation of traffic control and site construction operations staging commuters, and impact to public recreational facilities
construction phasing and safe practices for the public, - Injury irate eonsuucfion Soo
Community I Environmental Impacts Enforce hours of work, noise levels, and clean work areas Minimize environmental impacts to the local community
Objective: Ensure local stakeholders are informed of Advise construction personnel of community relations responsibilities Minimize complaints and possible complications from access for
project impacts. Engage local residents to offer input on businesses, residents, and commuters
developing mitigation strategies Proactive Community Outreach
I • Timely project updates to local stakeholders Mitigate changes to construction phasing
el -TIER
IN,
C. UNDERSTANDING OF NEED
SECTION D
Relevant Project Experience
J
Section D. Relevant Project Experience
Summary of Relevant Experience
The project experience on the following pages
demonstrates that Butier and its team member
firms are uniquely qualified to provide
construction management and inspection
services to the City of Santa Ana for the Well 32
Rehabilitation Improvements project. Butier's
45-year history demonstrates our focus on
water and wastewater infrastructure. This
focused approach has enabled us to
independently manage over $1.5 billion of
public infrastructure projects. At the field team
level, the key members bring construction
management, inspection, and contract
administration experience for numerous
projects of comparable size and complexity.
Butier has successfully provided construction
management and inspection services for
numerous water production wells and pump
station projects for public agencies and special
districts throughout Southern California. Please
find below a sample list of these projects.
Additional project details can be found on the
following pages.
Water Production Wells
■ Mid -Basin Injection Wells — Centennial
Park Project; Santa Ana, CA (OCWD)
• OC Groundwater Storage Program, 8
Water Production Wells; Santa Ana,
Anaheim, Buena Park, Garden Grove,
Westminster, Cypress, and Placentia, CA
(OCWD)
• Multiple Safe Drinking Wellhead
Treatment Projects —California American
Water Company Arlington Well, Lynwood
Well No. 11, and Huntington Park Well No.
15; Los Angeles, CA (Water Replenishment
District of Southern California)
• Edinger Avenue Well Phase II Equipping;
Tustin, CA (City of Tustin)
• Construction of Wells 21 & 22 and
Reverse Osmosis Water Treatment Plant;
Irvine and Tustin, CA (IRWD)
• EW-1 Well Equipping Projects; Fullerton,
CA (OCWD)
11
• Rehabilitation of Well No. 6; Fountain
Valley, CA (City of Fountain Valley)
• Chino Creek Well Field Equipping, Well
Nos. 1-16, 1-17, 1-18, 1-20, and 1-21; Chino,
CA (Chino Basin Desalter Authority)
• Chino Creek Well Field Equipping, Raw
Water Well Nos. II-10 and II-11; Eastvale
and Ontario, CA (Chino Basin Desalter
Authority)
• Construction of New Water Wells 3A and
5; Huntington Beach, CA (City of Huntington
Beach)
• Baseline Feeder Replacement &
Improvement of Wells; San Bernardino,
CA (San Bernardino Valley MWD)
Pump Stations
■ 8 MG Peck Reservoir Replacement;
Manhattan Beach, CA (City of Manhattan
Beach) —Pump Station and Electrical
Control Building
OCWD Burris Pump Station —
Construction of a new 10,000 SF storm
water pump station and 4 conventional
vertical turbine pumps
Trampas Recycled Water Pump Station;
Rancho Mission Viejo, CA (Santa Margarita
Water District) —new booster pump station
building with pump room and electrical room
Chino Desalter Phase 3 Expansion
Milliken 1010 Zone Pump Station-3
vertical turbine pumps and associated
piping, fittings, valves, appurtenances,
electrical instrumentation, and controls
■ Walnut Storm Drain Pump Station —
Remodel of the existing block building and
construction of a new masonry block wall
control room
Rotating Equipment Expertise
Key personnel from ON -SITE Technical Services
are experts in the areas of fabrication and testing
of rotating equipment, including pumps, motors,
turbines, compressors, and generators.
South Main Street Corridor
Improvements; Santa Ana, CA
City of Santa Ana
Public Works Agency
Sean Thomas, P.E.
Acting Senior Engineer
Tel: (714) 647-5655
sthomas5@santa-ana.org
Value: $12.8 million
Completion: Winter 2022
Proposed Key Personnel
Mark Butier
Omar Dandashi, P.E.
(Blue Mountain Development)
Ryan Weir
Mid -Basin Injection Wells —
Centennial Park Project;
Santa Ana, CA
Orange County Water District
Ben Smith, P.E.
Tel: (714) 378-3211
bsmith@ocwd.com
Value: $29.5 million
Completion: 2020
Proposed Key Personnel
Mark Butier
Casey Harris
Bryan Wilson
Kent Kreeger (ON -SITE Technical)
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements Project
Construction Management and Inspection Services, RFP No. 22-051
The Butier Team is providing construction
management, QA field inspection, and
public outreach services. This project will
create a safer and more vibrant street for
the community by revitalizing a 2.5-mile
stretch of Main Street from First Street to
Dyer Road.
The improvements consist of monument
signs, enhanced lighting, decorative
sidewalk extensions / bulb outs, landscaping, irrigation, traffic signals,
signing, striping, street pavement rehabilitation, and railroad coordination
' which will take place concurrently as part of a Water Resources Division
project. In addition, the improvements will replace aging and deficient
water mains, sewer mains, fire hydrants, sewer maintenance holes, water
services, and sewer laterals within the project limits.
Butier provided constructability review,
resident engineering, and inspection
services. The project required close
coordination with the City of Santa Ana,
Santa Ana Unified School District,
Heritage Museum, and state and federal
The
_�
agencies. project consisted ofv—�
construction of the following:""`
-
• Four (4) groundwater injection wells in
below grade vaults (1,200 feet deep) and all related appurtenances
• SR-13 monitoring well at the Heritage Museum site
• 5,500 LF of purified recycled water injection supply pipeline that
connects to the District's existing GWRS pipeline and crosses the Santa
Ana River
• 4,200 LF of backflush discharge pipeline that discharges to the
Greenville -Banning Channel and Centennial Park Lake
• Two new buildings with shared City of Santa Ana and District uses
• Installation of submersible pumps within the four injection wells
■ Replacement of 9.6 acres of paving within the Park; and demolishing an
existing City of Santa Ana restroom facility.
12 D. RELEVANT PROJECT EXPERIENCE
8 MG Peck Reservoir
Replacement;
Manhattan Beach, CA
City of Manhattan Beach,
Public Works
Gilbert Gamboa
Project Manager
Tel: (310) 802-5356
ggamboa@citymb.info
Value: $31,167,905.00
Estimated Completion.
October 2022
Proposed Key Personnel
Mark Butier
Bryan Wilson
San Lorenzo Sewer Lift Station;
Santa Ana, CA
City of Santa Ana
Michael Ortiz, P.E.
City Construction Manager
Tel: (714) 647-5624
mortiz@santa-ana.org
Value: $7,606,500
Completion: 2022
Proposed Key Personnel
Mark Butier
Casey Harris
Bryan Wilson
Kent Kreeger (ON -SITE Technical)
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements Project
Construction Management and Inspection Services, RFP No. 22-051
Butier is providing construction
management, inspection, public
relations, environmental impact
monitoring, and soils/materials
testing services. The scope of
work includes construction of the
following:
• Reservoir-8 MG partially -
buried cast -in -place concrete
structure approximately 270
feet long by 190 feet wide
located in same footprint.
• Operations Building-925 SF for office space and water quality
laboratory.
• Pump Station and Electrical Control Building-1,950 SF cast -in
place concrete structure.
• Water Treatment Facilities-3,000 SF including two (2) horizontal
filtration tanks, a protected chlorine and ammonia chemical storage
building, and a glass -fused bolted steel vertical back wash tank.
Ancillary Facilities —diesel standby generator, transformer, yard
piping, access vaults, infiltration drywells, retaining wall, access road,
pavement, fencing, gates, and landscaping.
Offsite Work —replacement of raw water transmission pipeline;
construction of chemical dosing and containment piping; new sewer
discharge pipeline connection; new utility connections; and new curb,
gutter, and sidewalks.
Butier is providing construction
management and inspection services for
the San Lorenzo Sewage Lift Station �, j
Project which consisted of the following:
• Lift station —below ground dry and wet r
wells
Aboveground CMU block building
• Three (3) 15 hp dry pit sewage pumps
Piping, fittings, valves, flow meter, in -line grinders, and rail & hoist system
• HVAC, ventilation, and ducting
• Electrical and instrumentation
• Site grading and improvements
560 (LF) of 15" gravity sewer pipe
• 190 (LF) of 12" gravity sewer pipe
• 545 (LF) of 10" force main
• Sewer manholes and appurtenances
Abandonment of existing Segerstrom Lift Station
13 D. RELEVANT PROJECT EXPERIENCE
- ' City of Santa Ana, Public Works Agency
p Well 32 Rehabilitation Improvements Project
Construction Management and Inspection Services, RFP No 22-051
Rawlings Reservoir Repair and
Replacement; Tustin, CA
City of Tustin, Public Works
Douglas S. Stack, P.E.
Director, Public Works
Tel: (714) 573-3150
dstack@tustinca.org
Value: $12,500,000
Proposed Key Personnel
Mark Butier
Steve Naylor
Simon Ranch Reservoir, Booster
Pump Station and Zone 1 and
Zone 3 Pipeline Replacement
Project, Santa Ana, CA
City of Tustin, Public Works
Douglas S. Stack, P.E.
Director, Public Works
Tel: (714) 573-3150
dstack@tustinca.org
Value: $12,770,333
Completion: 02/2022
Proposed Key Personnel
Mark Butier
Ryan Weir
Butier provided construction management
and inspection services. The former
reservoir was a 4 MG hopper bottom
i reservoir located in close proximity to
multi -million dollar family residences and
Foothill High School. Construction
consisted of replacing the former
reservoir with two DYK-style reservoirs,
each with a 3 MG capacity.
Prior to bidding, Butier assisted the City with solving construction access
and temporary shoring issues. The project originally required the
construction of a tie -back retaining wall, which would have extended the
project into an adjacent property. At the City's direction, Butier performed
a constructability review and proposed using a cantilevered shoring
system, which kept the project within the City's property line. In addition,
Butier assisted the City in communicating directly with an adjacent
landowner to obtain a temporary construction easement. This provided the
Project team with an access road down to the bottom of the tank
elevation, as well as laydown and stockpiling areas. Solutions to the
construction access and shoring issues facilitated construction, minimized
off -site hauling, and provided a $1 million cost savings to the City.
This was a high -profile, politically -sensitive project due to the size and
proximity to custom homes and Foothill High School. Butier personnel
assisted the City with construction outreach efforts by distributing "door
hangers" to residents to communicate pre -construction and construction
phase activities. Our personnel also communicated directly with residents
to schedule pre -construction surveys of their homes
Butier is providing construction
management and inspection services for
the replacement of the Simon Ranch
Reservoir, Booster Pump Station, and
Zone 1 and Zone 3 Pipelines. Project
improvements include the following:
• Demolition and removal of existing
reservoir and grading and shoring
• Replacement of existing reservoir with
a 1.0 MG circular prestressed concrete tank
■ Replacement of existing 4-inch, 6-inch, and 8-inch pipelines with new
and upsized pipes to increase system performance
• 400 feet of 16-inch, 1,900 feet of 12-inch, 200 feet of 8-inch Zone 3
piping, as well as 5 new fire hydrants
• Construction of a new on -site booster pump station
• Asphalt replacement
BUTTER 14 D. RELEVANT PROJECT EXPERIENCE
SECTION E
References
Section E. References
Mid -Basin Injection
Wells —Centennial Park
Project; Santa Ana, CA
Value: $29.5 million
8 MG Peck Reservoir
Replacement; Manhattan
Beach, CA
Value: $31.2 million
San Lorenzo Sewer Lift
Station; Santa Ana, CA
Value: $7.6 million
Simon Ranch Reservoir,
Booster Pump Station and
Zone 1 and Zone 3 Pipeline
Replacement Project;
Santa Ana, CA
Value: $12.8 million
Chino II Well Field
Equipping of Raw Water
Well Nos. II-10 and II-11;
Eastvale and Ontario, CA
Value: $3.9 million
Orange County ' Mark Butier
Water District Casey Harris
Bryan Wilson
Kent Kreeger
City of Manhattan Mark Butier
Beach Bryan Wilson
City of Santa Ana Mark Butier
Casey Harris
City of Tustin,
Public Works
Bryan Wilson
Kent Kreeger
Mark Butier
Ryan Weir
Chino Basin j Mark Butier
Desalter Authority ;Ryan Weir
15
Ben Smith, P.E.
Project Manager
Tel: (714) 378-3211
bsmith &-ocwd.com
Gilbert Gamboa
Project Manager
Tel: (310) 802-5356
ggamboa a@citymb.info
Michael Ortiz, P.E.
City Construction Manager
Tel: (714) 647-5624
1 mortiz@santa-ana.org
Douglas S. Stack, P.E.
Director, Public Works
Tel: (714) 573-3150
dstack@tustinca.org
Cindy Miller, P.E.
Hazen & Sawyer
(CDA Program Manager)
Tel: (949) 557-8550
cmiller(@hazenandsawyer.co m
SECTION F
Scope of Services & Schedule
Section F. scope of Services & Schedule
Scope of Services
The Butier Team will serve as an extension of
City staff to assist in the overall delivery of the
Well 32 Rehabilitation Improvements project,
including pre -construction tasks, managing
construction, and ensuring the work is
completed in accordance with the contract
documents, project closeout and warranty
phase. The Butier Team will report directly to
the City's Construction Manager.
The proposed Scope of Services and
Schedule (provided at the end of this section)
includes Butier's understanding of the project
management and coordination, project
administration, and field inspection needs of
the City as related to this contract. We have
provided sufficient detail to demonstrate that
we grasp the magnitude of the project and are
experienced in providing the necessary
services.
I. Review of Contract Documents
The PM will perform a thorough review of the
contract documents. The review will include,
but not be limited to, the appropriateness of the
number of working days allowed, and the
appropriateness of the number of liquidated
damages and timely coordination with other
agencies. If any ambiguities, errors, omissions,
or conflicts exist, the PM will advise the City's
Construction Manager of the need for
document content revision, as appropriate.
2. Bid Analysis
The PM will review the submitted bids for
responsiveness and completeness, including
verifying licensing, insurance, and bonding,
and will assist in performing reference
checking. The PM will evaluate bids to ensure
they are balanced and not front-end "loaded."
Upon completion of the bid reviews, Butier will
assist the City in determining the apparent
responsible and responsive low bidder for the
project. The PM will prepare a formal
memorandum detailing the bid proposal review
and the recommendation for
award.
16
3. Pre -Construction Meetings
The Butier Team will attend a pre -
construction meeting with the public to
introduce the CM team and discuss major
anticipated construction impacts. In addition,
the CM team will attend a pre -construction
meeting with the City and project stakeholders
to discuss the scope of work, project team,
project schedule, contract administration
guidelines; contractual roles; and
reinforcement of specific requirements for
safety, access, and coordination issues for the
work. The PM will provide a meeting agenda
three (3) days in advance of the meeting and
transmit meeting minutes to all attendees
within three (3) business days.
4. Construction Schedule / Budget
The PM and Senior Scheduler will utilize
Oracle Primavera P6 to perform detailed
monitoring of the Contractor's master schedule.
The PM will establish a cost control system for
monitoring and updating project costs and
budget. The PM and Senior Scheduler will
utilize Primavera P6 to prepare an independent
construction cost estimate and construction
schedule based on a standard five-day
workweek. The cost -loaded CPM schedule will
provide the PM with the basis for cash flow
projections. The budget will be reviewed with
the design team and consultants and submitted
to the City for acceptance. The PM will revise
the budget as directed by the City.
5. Public Outreach
The Butier Team will attend and co -lead a
preconstruction meeting with the community. At
this meeting we will introduce the Butier team
to the community and discuss major
anticipated construction impacts. As stated
previously, Omar Dandashi. P.E. has managed
extensive community outreach efforts for high -
profile, politically -sensitive projects, including
the City of Santa Ana's South Main Street
Corridor Improvements Project.
1. Construction Progress Reports
The PM will prepare monthly progress reports that
will include the following items: summary of the prior
month's main accomplishments and current
construction activities; reconciliation of contract time,
work progress, and manpower usage by the
Contractor; project costs to date; overall contractor's
conformance to quality requirements; identification
of major issues addressed or arising from the project
requiring resolution; summary of progress payments,
certified payrolls, change order disputes, submittals,
RFIs and responses, and notices of noncompliance;
and daily photographs of representative project
activities.
2. Weekly Development
Team/Construction Meetings
The PM will schedule and lead weekly meetings with
the Contractor, the City's assigned Construction
Manager, and other representatives to resolve all
project matters and assess responsibilities for
response to respective participants. The PM will
implement action monitoring to ensure compliance
and timely response. The Contractor Administrator
(CA) will distribute the minutes to the attendees
within two working days and include the minutes in
the monthly progress reports.
3. Shop Drawings and Submittals
The Butier Team will be responsible for processing
and monitoring the status of submittals. In meeting
the City's internal timeframes, submittals will be
processed on a one -week turnaround basis or
sooner. Submittal tracking will be introduced into
the electronic document control system and status
of submittals will be known at all times. This system
will be coordinated with the Contractor per contract
document requirements. The PM will review the
completeness and quantity of all required shop
drawings, product data, samples and other
submittals received during the construction phase
and transmit to City staffing for review and
approval.
4. Requests for Information
The PM will coordinate the RFI review process and
route all RFIs to the appropriate reviewer. The
documentation will be logged, tracked, maintained,
UL) I ILK
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
and organized in the electronic document control
system in PDF format. All responses will be
monitored with suspense action dates and follow-
up procedures implemented to ensure timely action
by all parties to project issues including input from
City staff.
5. Permits
The Butier Team will verify that the Contractor has
secured all building permits and special permits
required by the contact documents.
6. Change Order Requests
The City or Contractor may initiate a change or
request for changes, or modifications may arise
due to differing site conditions. The PM will track,
document, and negotiate all changes for added
costs or credits with the Contractor. The PM will
evaluate all schedule impacts in addition to
advising the City of equitable cost and time
adjustments for proposed or authorized changes
including credits that are due.
The PM will coordinate change order procedures
for preparation of documents to be executed by the
Contractor and the City. The PM and claims
support will evaluate Contractor claims seeking
additional costs or time for contract modifications.
The PM will assess if the claim has merit and make
recommendations. Unresolved claims will be
administered through the remedies clauses of the
construction contract under the direction of the City.
7. Contractor's Safety Program
The Contractor will be required to prepare and
submit a safety program to the City. The Contractor
is responsible for site safety. The CM team will
monitor the Contractor's safety program and take
necessary steps to ensure the jobsite conditions
comply with OSHA regulations. They will periodically
attend the Contractor's site safety meetings to
validate the submitted plan is being monitored and
complies with OSHA regulations.
8. Cost Accounting Records
The Butier Team will maintain cost accounting
records on authorized work performed under unit
costs and additional work performed based on
actual costs of labor and materials, or other work
required accounting records.
17 F. SCOPE OF SERVICES S SCHEDULE
9. Progress and Final Payments
The PM will receive, check, and verify all
Contractor monthly progress payment requests and
other project -related invoices based upon the cost -
loaded schedule. The progress payment worksheet
will be based on an approved schedule of values.
Progress pay requests will be checked against the
approved schedule of assigned values and actual
in -place quantities verified at the end of the pay
period. The project team will establish the pay
request format to expedite checking, processing,
and subsequent updating of project budgets and
cost projections and forwarded to the City's
Construction Manager for approval and payment to
the Contractor.
10. Prevailing Wage & CWA Forms
The Butier Team will monitor prevailing wage forms
and requirements for conformation to the prevailing
wage rates on a weekly basis. The Butier Team will
verify that all Trade personnel listed in the daily log
are also listed in the certified payroll and will
conduct weekly employee interviews for each trade.
The Butier Team will also monitor the City's
Community Workforce Agreement (CWA) forms
and requirements to ensure compliance.
Verification of prevailing wage and CWA will be
provided with the monthly progress payments.
11. Contract Documents
The Butier Team will monitor construction activities
to ensure the work adheres to the contract
documents and regulatory agencies. The PM will
bring to the attention of the City's Construction
Manager any errors, omissions, or discrepancies
found in the contract documents. The PM will lead
resolution of day-to-day construction issues raised
and coordinate with the inspectors, Design
Engineer, and Contractor as required.
12. Maintain "As -Built" Records
The Butier Team will utilize Bluebeam as our primary
tool for tracking completeness of as-builts. The PM
and Field Inspectors will maintain, at the job site,
records of contract documents and other
modifications of plans and specifications marked to
show all changes made during construction. They
will also maintain as -built records of underground
utilities, including locations/depths of trenches.
BI ITI ER
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
The PM and Field Inspectors will review the
Contractor's as -built records monthly to ensure that
timely recording is being accomplished. The PM will
ensure that the City's as-builts identify RFIs, shop
drawing revisions, change order modifications, etc.
and that they are updated weekly. The PM will hold
monthly record drawing review meetings with the
City's CM and the Contractor prior to submittal of
monthly progress payments.
13. Construction Inspection
Butier's Lead Field Inspector will ensure that the
Contractor's work complies with the contract
documents, industry standards, applicable codes,
environmental and local regulations, and
construction permits. In addition, the Inspectors will
be responsible for the following:
• Daily Inspection Reports/Statement of
Working Days: Maintain daily inspection
reports and submit to the City weekly. The
reports will document construction activities,
including the date, day of week, and weather
conditions; hours of work; personnel on site;
equipment being used; idle or inoperable
equipment; details of each activity; controversial
matters/disputes; deficiencies and violations;
instructions issued to the construction
contractor; safety concerns; description of
accidents; major material and equipment
deliveries to the site; names of visitors to the
site; and delays and extra work. Prepare and
send Weekly Statement of Working Days to the
Contractor.
• Schedule Review: Review Contractor's two -
week "look ahead" schedule.
• RFIs: Discuss responses to RFIs with Butier's
PM and coordinate replies to the Contractor;
review submittals; and provide non-
conformance reports and documentation of
construction activities, duration of activities,
workforce, and equipment allocation.
• Photographic Records: Provide monthly
digital photographic records. Log photographs
daily. Maintain a photographic library of
significant activities. Label photographs with the
date, location, and narrative information.
Additional photographs will be taken of change
order and claim items.
18 F. SCOPE OF SERVICES & SCHEDULE
14. Special Inspection / Testing
The PM and Lead Inspector will schedule and
coordinate special inspection and material testing
with the County of Orange, or other consultants and
make recommendations to the City regarding
special inspection or testing of work not in
compliance with the contract documents.
1. Detailed Project Punch Lists
The Butier Team will prepare a project punch list at
substantial completion and coordinate the
correction of deficiencies by the Contractor. Upon
correction of deficiencies, the PM will coordinate
and conduct a final walk-through prior to the
acceptance of work with the Design Engineer,
City's Construction Manager, and other staff as
directed.
2. Final Payment Requests
Track stop notices until releases are obtained from
all outstanding stop notices. Recommend final
payment in the form of release of retention to the
Contractor in accordance with contract
requirements. Verify that the Contractor has made
all payments to the subcontractors and vendors
and that any stop notices or liens have been
released. Verify final documentation has been
received and obtain a Conditional Waiver of Lien
from the Contractor prior to recommending final
payment.
3. Verify Contractor's Project
Record Drawings
The PM will review the Contractor's project record
drawings for completeness.
4. Commissioning & Warranty
The Butier Team will be responsible for additional
close-out items, including As -Built plans and related
documentation, punch list completion,
commissioning and warranty requests during the
one-year period, scheduling and overseeing the
warranty repair, and performing site visits as
requested by the City to look at defects of
imperfection to determine if it is a warranty issue.
City of Santa Ana, Public Works Agency
Well 32 Rehabilitation Improvements
Construction Management and Inspection Services, RFP No. 22-051
5. O&M Materials
The Butier Team will deliver the following to the
City: O&M Manuals; the Major Equipment Warranty
Expiration Record spreadsheet compiled, reviewed,
and approved in writing by the City; and spare
parts, equipment, and maintenance materials upon
acceptance.
6. Final Report
The PM will prepare and submit a final progress
report to the City no later than 60 calendar days
following the filing of the Notice of Completion. The
report will include a complete overview of the
contract, Contractor's performance,
accomplishments, preliminary and final project
costs, cash flows, schedules, and
recommendations for alleviating problems
experienced on the project.
7. Turn Over All Documents and Files
The Butier Team will furnish all contract
documents, as -built records, and final reports to the
City's CM within 60 calendar days following filing of
the Notice of Completion. The files will also be
scanned and provided to the City in electronic
format.
8. Construction Management Software
The Butier Team utilizes Procore to organize,
manage, and control project documentation. The
advantages of Procore include unlimited users,
unlimited storage, 24/7 visibility into project status,
and a centralized, comprehensive platform to
manage vital project data. All parties involved have
access to the system, and each user can access
the program via a web browser on their computer
or mobile device using secure log -in information.
Additionally, Procore can be configured to display
the latest Primavera P6 construction project
schedule and weather information, both current and
forecast. We are currently using this cloud -
based construction project management
solution on the City of Santa Ana's South Main
Corridor Improvements Project and the San
Lorenzo Sewer Lift Station Project.
19 F. SCOPE OF SERVICES & SCHEDULE
City of Santa Ana
Well 32 Improvements Proposal
Schedule
f J
nH
❑S 104
101 02 W 04
41 02 03 a Or 02
t'cll 32.RohahHI,1J0W Well 32 Rehabllltalion lmprovumorite
war a: Rehadln-tlaao.l Phew
1 25
110Jun-22
18-Jul-22
A1090
Bid Analysis for Lowest Responsible Bidder
10
10Jun-22"
23Jun-22
A1100
Generate Staff Report to Recommend Award
5
24Jun-22
3DJun22
A1110
Obtain Bonds, Insurance, Vendor Packet, City Business License
10
01Jul-22
16JW-22
A1112
Notice to Proceed
0
18Jul-22
ra�lplicetoq/orged
Well 32 Rehablllt-1.10002 Canstrucll—Phase
355
18Jul-22
14-Dec23
r i-
A1490
Submittal Review, Logging and Transmit (ProCore) for City Review
355
18Jul-22
14-Dec-23
!
A1500
Pre -construction and Weekly Project Meetings
355
18Jul-22
14-Dec-23
A1510
Ensure Building and Special Perils Fees Paid / Jurisdiction Approvals
60
18Jul-22
10dct-22
A1520
Baseline and Update Schedule Reviews
355
18Jul-22
14-Deo-23
'
A1530
Change Order Reviews/Recommendations and Budget Reports
355
18Jul-22
14-Dec,23
A1540
Monitor Contractor's Safety Program
356
18Jul-22
14-Dec-23
A1550
Maintain Cost Accounting Record of Unit Cost Items and Additional Work
355
18Jul-22
14-Dec-23
A1560
Process and Make Recommendations for Payment
355
18Jul-22
14-Dec-23
i -
A1570
Inspect Work and Make Recommenations for Non Conforming Work
365
18Jul-22
14-Dec-23
I
A1580
Notify City's CM of Errors and Omissions Prior to Work "Starts"
355
18Jul-22
14-Dec-23
- -
A1590
Consult with the City on Contractor RFIs and Assist with Resolution
355
1"ul-22
14-Dec-23
A1600
Prep and Submit Daily Prog Rprts
355
18Jul-22
14-Dec-23
A1610
Maintain Record Documents and Drawings, Submit to the City at Completion
355
18Jul-22
14-Dec 23
:
A1630
Facilitate and Coordinate Inspection by OtherAgencies
355
18Jul-22
14-Cec-23
A1640
Schedule and Coordinate Special Inspection, Material Testing by OtherAgencies
3%
18Jul-22
14-Dec-23
A1650
Enforce Submittal of Prevailing Wage Forms Weekly
355
18Jul-22
14-Dec-23
;
A1660
Monilorand Enforce City's Community Workforce Agreement
355
18Jul-22
14-Dec-23
-
A1602
Prepare and Submit Weekly Statements of Working Days
355
18Jul-22
14-Dec-23
-
A1604
Monitor Labor Compliance
355
18Jul-22
14-Dec-23
A1620
Assess Work Completion and Assist the City With Making Final Inspections
30
31-Oct-23
14-Dec-23
,
Well 32 Rehablllt-1 1000.3 PosM—kuc im Phase
365
' 15-0ec-23
13-0eo-24
A1680
Submit Project Closeout Items
10
15-Dec-23
01Jan 24
A1690
Schedule and Oversee Warranty Repair
366
15-Dec-23
13-Dec-24
1
BUTIER
City of Santa Ana Well 32
Rehabilitation Improvements
20
SECTION C
Certifications
a
0
Appendix
ATTACHMENT 3-1: NON -COLLUSION AFFIDAVIT
CERTIFICATIONS
NON -COLLUSION AFF AVIT
(Title 23 United States Code Section l 12 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham
bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone
else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any
manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the
bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price,
or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract
of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or
the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to
any corporation, partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Note: The above Non -collusion Affidav' is part of the Proposal. Signing this Proposal on the
signature portion thereof shall also con • to signature of this Non -collusion Affidavit. BIDDERS
are cautioned that making a false cc ' c• ion may subject the certifier to criminal prosecution.
Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of 20_, by
proved to me on the basis of satisfactory evidence to be the person(s) who appeared
before me.
Notary Mblic Signature
fv�k a&CC4
Notary Public Seal
City of Santa Ana RFP 21-131
Page A3-1
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed
the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ORANGE
SUBSCRIBED AND SWORN TO (or affirmed) before me on this 21" day of April, 2022 by
Mark M. Butier Jr., proved to me on the basis of satisfactory evidence to be the persons who
appeared before me.
CYkTHIA 1, GILLESPIE
�. p}�� * Notary Public - California Orange County z C thI�
ia L. Gillespie, Not Public
t+6 =- - >
z Commission # 2274925
My Comm, Expires Feb 8, 2023
Appendix
ATTACHMENT 3-2: NON -LOBBYING CERTIFICATION
CERTIFICATIONS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her
knowledge and belief, that:
No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to
any person for influencing or attempting to influence an officer or employee of any federal agency, a
Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress
in connection with the awarding of any federal contract, the making of any federal grant, the making
of any federal loan, the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
2. If any funds other than federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence any officer or employee of any federal agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned
shall complete and submit a "Disclosure of Lobbying Activities".
This certification is a material representation of fact upon which reliance was placed when this transaction was made
or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed
by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification shall be subject to a civil
penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the
language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub
recipients shall certify and disclose accordingly.
Firm Butier Engineering, Inc.
Signed and Printed Name: Mark M. Butier Jr,
Title President/CFO
Date 04/18/2022
City of Santa Ana RFP 21-131
Page A3-2
Appendix
ATTACHMENT 3-3: NON-DISCRIMINATION CERTIFICATION
CERTIFICATIONS
The undersigned consultant or corporate officer, during the performance of this contract, certifies as
follows:
The Consultant shall not discriminate against any employee or applicant for employment because of
race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure
that applicants are employed, and that employees are treated during employment without, regard to
their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising;
layoff or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. The Consultant agrees to post in conspicuous places, available to
employees and applicants for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of
the Consultant, state that all qualified applicants will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
3. The Consultant shall send to each labor union or representative of workers with which he/she has a
collective bargaining agreement or other contract or understanding, a notice to be provided advising
the said labor union or workers' representatives of the Consultant's commitments under this section,
and shall post copies of the notice in conspicuous places available to employees and applicants for
employment.
4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965,
and of the rules, regulations, and relevant orders of the Secretary of Labor.
The Consultant shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering agency
and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules,
regulations, and orders.
6. In the event of the Consultant's non-compliance with the nondiscrimination clauses of this contract
or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or
suspended in whole or in part and the Consultant may be declared ineligible for further Government
contracts or federally assisted construction contracts in accordance with procedures authorized in
Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and
remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule,
regulations, or order of the Secretary of Labor, or as otherwise provided by law.
7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and
the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted
City of Santa Ana RFP 21-131
Page A3-3
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive
Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract
or purchase order as the administering agency may direct as means of enforcing such provisions,
including sanctions for noncompliance; provided, however, that in the event the Consultant becomes
involved in, or is threatened with, litigation with a sub -consultant or vendor as a result of such
direction by the administering agency, the Consultant may request that the United States enter into
such litigation to protect the interests of the United States,
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended,
No discrimination shall be made in the employment of persons upon public works because of race,
religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or
sex of such persons, except as provided in Section 1420, and any consultant of public works violating
this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title: President/CFO
Firm: Butier Engineering, Inc.
Date: 04/18/2022
City of Santa Ana RFP 21-131
Page A3-4
EXHIBIT C
Page 13 of 13
OWN
Butier Engineering Inc. Proposed Fee Well 32
Rehabilitation
Rates
Project
Director
$ 225.00
SeniorCMIRE
$ 220.00
Field Engineer
$ 165.00
Lead
Inspector
$ 150.00
Senior
Scheduler
$ 205.00
Total Proposed
Cost
Units
Hours
Hours
Hours
1 Hours
I Hours
Dollars
Pre-OohSlAitti6h Phase
lfi
24
0
IC-;.
:c67,`q7.;
2
Bid Anal ysis for Lowest R espo nsibla Bidder
8
16
0
t
r)
S 5.320,00
2
Generate Staff Report to Recommend Award
8
8
0
0
0
3.560.00
2
Obtain Bonds, Insurance, Vendor Packet. City Business License
0
0
0
0
0
S
Notice to Proceed
0
0
0
fy
0
0
Canstructian:P.haae
144
1362
1180
2720
160
$ 967,540.00
3
Submittal Review, Loqoinq and Transmit Procore) for City Review
0
180
110%)
0
U
$ 105.600.00
4
Pre -construction and Weekly Project Meetings
64
J 320
192
128
0
$ 135.680.00
5
Ensure Building and Special Permits Fees Paid / Jurisdiction Approvals
0
12
0
0
0
$ 2.640.00
6
Baseline and Update Schedule Reviews
16
160
0
0
160
$ 71.600.00
7
Change Order Reviews/Recommendations and Budget Reports
64
160
100
0
0
$ 66,100.00
8
Monitor Contractor's Safety Program
0
8
0
0
0
$ 1.760.00
9
Maintain Cost Accounting Record of Unit Cost Items and Additional Work
0
8
128
0
0
$ 22,880.00
10
Process and Make Recommendations for Pavments
0
128
0
64
0
S 37.760.00
11
Inspect Work and Make Recommendations for Non -Conforming Work
0
100
0
2400
U
J S 382.000.00
12
Notify Cit 's CM of Errors and Omissions Prior to Work "Starts"
0
1 100
0
0
0
5 22,000.00
13
Consult with the Citv on Contractor RFIs and Assist with Resolution
0
128
0
0
0
$ 28.160.00
14
Prepare and Submit Daily Progress Reports and Weekly Statements of Working
Days/Monitor Labor Compliance
0
8
128
0
0
$ 22.880.00
15
Maintain Record Documents and Drawin s & Submit to the 2Z Upon Completion
0
48
100
128
0
5 46,260.00
16
Assess Work Completion and Assist the City with Making Final Inspections
0
2
4
0
0
5 1.100.00
17
Facilitate and Coordinate Inspection by Other Agencies
0
0
0
0
0
$
18
Schedule and Coordinate Special Inspection, Material Testin2 by Other Agencies
0
0
0
6
0
1 5 -
19
Enforce Submittal of Prevailing Wage Forms Weekly
0
0
128
0
0
$ 21,120.00
20
MoniIof and Enforr,P C i t 's C 0 rn M Un I IV 'No kforce reemen1
0
0
0
0
0
$
Start UpICOMMISslaning
120
40
0
0
S 33
27
Slarr UP CommissrQF11nq + In -Plant FabnCation Testmo
0
120
40
$ 33.000.00
Post ConStruclion Phase
0
40 1
40
0
0
$ 15400.00
221
ubmit Project Closeout Items and Oversee 1-Year Warranty Period
0
40 1
40
0
0
$ 15.400.00
En Tnee ring Services Total's 1
160 1
1548 1
1260
2720 1
160
$ .024;820,00