HomeMy WebLinkAboutItem 18 - Local Street Sidewalk ImprovementsPublic Works Agency
www.santa-ana.org/pw
Item # 18
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 19, 2022
TOPIC: Local Street Sidewalk Improvements
AGENDA TITLE
Award a Construction Contract to CJ Concrete Construction Inc. in the Amount of
$276,430 for the Local Street Sidewalk Improvements FY 2021-22 Project with an
Estimated Project Delivery Cost of $373,060 (Project No. 22-7535) (Non -General Fund)
RECOMMENDED ACTION
1. Award a construction contract to CJ Concrete Construction Inc., the lowest
responsible bidder, in accordance with the base bid in the amount of $276,430, for
construction of the Local Street Sidewalk Improvements FY 2021-22, for the term
beginning April 19, 2022 and ending upon project completion, and authorize the City
Manager to execute the contract subject to non -substantive changes approved by the
City Manager and the City Attorney.
2. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$373,060, which includes $276,430 for the construction contract, $41,465 for contract
administration, inspection and testing, and a $55,165 project contingency for
unanticipated or unforeseen work.
3. Approve an amendment to the Fiscal Year 2021-22 Capital Improvement Program
adding the Residential Street Repair Program FY 2021-22 Project with a budget of
$373,060 in Community Development Block Grant (CDBG) funds.
DISCUSSION
Staff evaluates the condition of damaged sidewalks, curbs, gutters and driveways to
identify uneven surfaces and cracks that may pose a risk to pedestrians. The goal is to
improve accessibility for pedestrians and increase active modes of transportation, such
as walking and biking.
The Local Street Sidewalk Improvements project involves replacement of existing
damaged concrete sidewalks in residential neighborhoods and will include the removal
and replacement of adjacent damaged concrete curbs, gutters and driveways. The project
will focus on areas with the highest concentration of needed repairs to help mitigate trip
Award Construction Contract to CJ Concrete Construction Inc.
April 19, 2022
Page 2
and fall hazards, and assist in complying with regulations set forth by the American with
Disabilities Act (Exhibit 1).
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was
advertised in the Orange County Register newspaper on January 31 and February 8,
2022. The project was also advertised on PlanetBids, and bids were received
electronically via PlanetBids on February 22, 2022.
The City notified a total of 1,360 regional vendors via PlanetBids, 81 of which are Santa
Ana based. Forty-one vendors requested bidding documents. A total of 7 bids were
received, one of which was received from a Santa Ana contractor.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
CJ Concrete Construction Inc.
Santa Fe Springs
$276,430
2
EBS General Engineering Inc.
Corona
$300,900
3
Diamond Construction and Design
La Habra
$368,460
4
DOJA Inc.
Ontario
$374,050
5
Aneen Construction Inc.
Riverside
$388,620
6
HZS Engineering and Construction
Santa Ana
$622,550
7
CT&T Concrete Paving Inc.
Diamond Bar
$626,500
A total of seven bids were received, and all were deemed responsive. CJ Concrete
Construction Inc. submitted the lowest responsive base bid in the amount of $276,430
(Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the
basis of the Base Bid. Based on the bid analysis and a contractor's reference check, staff
recommends awarding the construction contract to CJ Concrete Construction Inc. in the
amount of the base bid totaling $276,430 (Exhibit 3). In the past five years, CJ Concrete
Construction has performed concrete repairs throughout the City.
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen conditions.
Construction administration and inspection includes the following: construction
management; implementation of the City's Community Workforce Agreement
requirements; inspection of the Contractor's work to ensure contract compliance,
Award Construction Contract to CJ Concrete Construction Inc.
April 19, 2022
Page 3
workmanship, and quality; and materials testing. As indicated in the Cost Analysis (Exhibit
4) and as summarized in the table below, the estimated total construction delivery cost of
the project is $373,060. Because the construction bids came in lower than anticipated,
the contingency was increased to take advantage of lower costs and to maximize the
allocation of CDBG funding. This will allow additional street improvements to be
completed beyond the anticipated scope.
Project Item
Total
Construction Contract
$276,430
Construction Administration, Inspection, Testing
$41,465
Contingencies
$55,165
TOTAL CONSTRUCTION DELIVERY COST
$373,060
Approval of the amendment to the FY 2021-22 Capital Improvement Program (Exhibit 5)
will officially incorporate this project into the program.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2022-3 was filed for the project. Additionally, a National Environmental Policy Act (NEPA),
Environmental Review was conducted and was determined that project was Categorically
Excluded (Not Subject to 58.5).
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $373,060.00, which includes construction, contract administration, inspection,
testing, and an authorized contingency. With the approval of the amendment to the Fiscal
Year 2021-22 Capital Improvement Program will officially incorporate this project into the
program. Funding in the amount of $373,060 is available from Community Development
Block Grant (CDBG) funds to deliver this project. All Funds are available for expenditure
in Fiscal Year 2021-22, however any remaining balances not expended at the end of the
fiscal year will be carried forward into FY 2022-23.
The following table summarizes the funds budgeted and available for expenditure to
deliver construction of this project.
Fiscal
Accounting Unit -
Fund
Accounting Unit -Account
Year
Account No.
Description
No. Description
Amount
(project No.)
Award Construction Contract to CJ Concrete Construction Inc.
April 19, 2022
Page 4
13518783-66220
Community
CDBG Programs,
2021-22
(22-7535)
Development
Improvements Other Than
$373,060
Block Grant
Building
Total
$373,060
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
5. Amend FY 2021-22 CIP Project Street
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
SANTAANA Project No. 22-7535.
j. I Local Street Sidewalk Improvements
PUBLIC WORKS AGENCY
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 22--7535
LOCAL STREET SIDEWALK IMPROVEMENTS
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: C-�- 1 V 4 cr li C cln"-yu ` ) c)o T G.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with
said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the
following schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Unclassified Excavation*
310
CY
$ C3
V
$
23,2r� Qa
2
PCC Sidewalk(T=4")*
24,400
SF
$
$
9. 20
a 2-90$0
3
Root Shave`
56
EA
$
$
c�
Z a0 -'
11 Z 00. Ga
4
Adjust Sewer cleanout valve
10
EA
$
$
frame and cover to finished
5-00 '
OGO 'moo
grade*
5
Project Advertisement Sign
1
EA
$ uv
$
I
I's
6
Construction Permit
$10,000
$
10 vo 'UU
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 22-7535
LOCAL STREET SIDEWALK IMPROVEMENTS
TOTAL BASE BID (Items 1-6) $ 'L��� 1� p W
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within number (30) working days after the commencement date stated in the
Notice to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $1,500 per calendar day.
Name of Firm CT ('Oncr-e-fi6 (1n St(U C-7 U y-?
Signature of BIDDER v
Title Yr f j 011(►,
(If an individual, so state. If a finn or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
EXHIBIT 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 22-7535
LOCAL STREET SIDEWALK IMPROVEMENTS
This CONSTRUCTION CONTRACT is made and entered into this 15"' day of April, 2022 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California (hereinafter "CITY"), and CJ Concrete
Construction, Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Local Street Sidewalk Improvements (hereinafter referred to as
the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents
prepared by the City's Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
+ Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Two Hundred Seventy Six Thousand Four
Hundred Thirty Dollars and No Cents ($276,430.00), as set forth and identified in the BID
PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rm 09/0112017 Page I of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timefrarne therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S. Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: htt ://www,santa-ana.or wa/documents/CWA. df
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (1000/0)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: )Jvft llv
JOH6/N FUNK
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
CJ Concrete Construction, Inc.
JG 1j� L• ,SGrha
t
1L.
reSlciZ r)-�"
Page 3 of 3
CITY OF SANTA ANA EXHIBIT A
PROPOSAL
PROJECT NO.: 22-7535
LOCAL STREET SIDEWALK IMPROVEMENTS
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ARIA
FROM: o— u nc c c it n,- �ruc--t)-oo
REQUIREMENT:
The undersigned bidden declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and Hereby proposes to
furnish all material and do all the work required to complete the said work in accordance witli
said }Mans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the
following schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Unclassified Excavation*
310
CY
$ ��
$
2
PCC Sidewallc(T=4")*
24,400
SF
$
$
3
Root Shave*
56
EA
$
$
c o
4
Adjust Sewer cleanout valve
10
EA
$
$
frame and cover to finished
grade*
5
Project Advertisement Sign
1
EA
$ mac,
$
.215 co
6
Construction Permit
1
LS
$10,000
$
10,()u0 vU
CITY Or SANTA ANA
PROPOSAL
PROJECT NO.: 22-7535
LOCAL STREET SIDEWALK IMPROVEMENTS
TOTAL BASE BID (Items 1-6) $ /f3 a
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for hid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
Fight to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Itenn per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid ainount
shown above, within number (30J..,working days after the commencement date stated in the
Notice to Proceed.
The liquidated damages amount, its lieu of the amount specified in Subsection 6--9 of the
Standard Specifications, shall be $1,500 per calendar day.
Name of Firm G ,��C r ��i n �1' U Ch, 0 K7
Signature of BIDDER
Title P Yt J 0V 0
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
EXHIBIT 4
COST ANALYSIS
CONSTRUCTION OF PROJECT NO. 22-7535: Local Street Sidewalk
Improvements
Construction Contract
$
276,430.00
Contract Administration, Inspection and Testing
$
41,465.00
Contingencies
$
55,165.00
TOTAL ESTIMATED CONSTRUCTION COSTS
1 $
373,060.00
PROJECT TITLE:
Local Street Sidewalk Improvements
PROJECT CATEGORY:
Street Improvements
Street/Bridge Improvements &
Widening
LOCATION MAP A
N
AGENCY:
Public Works
CITY OF SANTA ANA FY21/22CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Project involves replacement of existing damaged concrete
sidewalks in residential neighborhoods and will include the removal
and replacement of adjacent damaged concrete curbs, gutter and
driveways. Project will focus on areas with the highest concentration
of needed repairs, to help mitigate trip and fall hazards and reducing
potential of liability claims and assist in complying with regulations
set forth by the American with Disabilities Act.
PROJECT NEED:
Staff evaluates the condition of damaged sidewalks, curbs, gutters and
driveways to identify uneven surfaces and cracks that may pose a risk
to pedestrians. The goal is to improve safe walking accessibility for
pedestrians and increase active modes of transportation, such as
walking and biking.
PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28
Construction 373,064 - - - - - -
TOTAL 373,064 -
SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28
CDBG Programs 373,064 - - - - - -
TOTAL 373,064 - - - -
DIVISION:
C/P Engineering
CONTACT:
Gilbert Castillo, Senior Engineer
DATE:
22-Mar-2022