HomeMy WebLinkAboutItem 15 - First Street / Bolsa Avenue Corridor Traffic Signal Synchronization Project Public Works Agency
www.santa-ana.org/pw
Item # 15
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
November 2, 2021
TOPIC: First Street / Bolsa Avenue Corridor Traffic Signal Synchronization Project
AGENDA TITLE
Approve a Cooperative Agreement with Orange County Transportation Authority and
Partnering Cities for the First Street / Bolsa Avenue Corridor Traffic Signal
Synchronization Project, in an Amount Not to Exceed $370,642 (Project 22-6993) (Non-
General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute a Cooperative Agreement (C-1-3598) with the
Orange County Transportation Authority and the cities of Huntington Beach, Tustin,
Westminster, and the County of Orange, which identifies each participating agency’s
roles and responsibilities, including Santa Ana’s match requirement of $370,642, to
implement the First Street / Bolsa Avenue Corridor Traffic Signal Synchronization
Project, for the term beginning upon full approval of the agreement by all parties and
effective until December 31, 2026, with the option to be extended by mutual consent of
all parties, subject to non-substantive changes approved by the City Manager and City
Attorney.
DISCUSSION
On November 17, 2020, the City Council authorized staff to submit joint applications with
participating agencies to the Orange County Transportation Authority (OCTA) to request
funding consideration of the renewed Measure M2 Regional Traffic Signal
Synchronization Program. The cooperative agreement for the First Street/ Bolsa Avenue
project would provide for inter-jurisdictional traffic signal synchronization and
improvements along the corridor traversing Santa Ana, Huntington Beach, Tustin,
Westminster, and County of Orange jurisdictions (Exhibit 1).
On March 24, 2021, the OCTA Board approved the Measure M2 funding request for the
First Street / Bolsa Avenue project. While OCTA will act as lead agency for the project, a
cooperative agreement is necessary to identify the roles and responsibilities of each
participating agency to maintain inter-jurisdictional synchronization during the three-year
grant period, which is scheduled to begin by January 2022. Upon project completion,
responsibility for ongoing signal maintenance will revert to the respective local agencies.
First Street / Bolsa Avenue Corridor Project Cooperative Agreement
November 2, 2021
Page 2
2
1
8
5
The Measure M2 grant award provides $3,871,890. The match commitments from the
participating cities will provide a combined total of $774,378. The City of Santa Ana’s
share of the matching funds is $370,642, of which $333,042 is cash and $37,600 is in-
kind staff support. On July 1 2021, City Council approved the Fiscal Year 2021-2022
Capital Improvement Program, which included $380,000 for this project.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with the action.
FISCAL IMPACT
Funds in the amount of $380,000 are budgeted in the approved Fiscal Year 2021-22
Capital Improvement Program and available in the Measure M2 Street Construction Fund
(Account No. 03217662-66220, Project No. 22-6993). $370,642 of the funding is for the
City’s share of the project costs – cash and in-kind staff support – and will be spent in the
fiscal years identified in the following estimated spending plan:
Fiscal
Year
Accounting Unit -
Account No.
(Project No.)
Fund
Description
Accounting Unit -
Account No.
Description
Amount
2021-22 03217662-66220
(22-6993)
Measure M
Street
Construction
Measure M2 Local
Fairshare, Improvements
Other Than Building
$34,000
2022-23 03217662-66220
(22-6993)
Measure M
Street
Construction
Measure M2 Local
Fairshare, Improvements
Other Than Building
$333,042
2023-24 03217662-66220
(22-6993)
Measure M
Street
Construction
Measure M2 Local
Fairshare, Improvements
Other Than Building
$3,600
Total $370,642
EXHIBIT(S)
1. Project Location Map
2. Cooperative Agreement
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency
Approved By: Kristine Ridge, City Manager
NORTHNORTH
EXHIBIT 1
Euclid St1st St
17th St
City Council
Agenda Date
November 2, 2021
PWA
SANTA ANA
PUBLIC WORKS AGENCY
5
22
55
405
Edinger Ave Main StRaitt StProject No. 22-6993:
First Street/ Bolsa Avenue
Traffic Signal Synchronization
Segerstrom Ave
MacArthur Blvd.
Warner Ave Grand AveHarbor BlvdFairview StFlower StTustin AveNewhope StCivic Center Dr
Bristol St5th St
Santa Ana Blvd
Bear StWestminster Ave
Alton Ave
First Street/ Bolsa
Avenue Corridor
Traffic Signal
Synchronization
Improvements
Dyer Rd
17th St
4th St
1st St
Page 1 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
COOPERATIVE AGREEMENT NO. C-1-3598
BETWEEN
ORANGE COUNTY TRANSPORTATION AUTHORITY
AND
CITIES OF HUNTINGTON BEACH, SANTA ANA, TUSTIN, WESTMINSTER,
AND THE COUNTY OF ORANGE
FOR
FIRST STREET / BOLSA AVENUE REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION
PROGRAM PROJECT
THIS COOPERATIVE AGREEMENT (Agreement), is effective this _______ day of
_________________, 2021 , by and between the Orange County Transportation
Authority, 550 South Main Street, P.O. Box 14184, Orange California 92863-1584, a public corporation
the cities of Huntington Beach, Santa
Ana, Tustin, Westminster, and the County of Orange PARTICIPATING
AGENCIES .
RECITALS:
WHEREAS, the AUTHORITY in cooperation with the PARTICIPATING AGENCIES is working
together in coordinating traffic signals across multiple jurisdictional boundaries as a part of the Renewed
Measure M (M2) Regional Traffic Signal Synchronization Program (RTSSP or Project P) to enhance
countywide traffic flow and reduce congestion; and
WHEREAS, the AUTHORITY has completed the competitive 2021 Call for Projects
21
Santa Ana (hereinafter referred to as the
for the implementation of signal synchronization of traffic signals along First
Street / Bolsa Avenue between the intersections of Bolsa Chica Street located in the City of Huntington
Beach and Newport Avenue located in the City of Tustin
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 2 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
WHEREAS, the PARTICIPATING AGENCIES agree to abide by the Comprehensive
Transportation Funding Program Guidelines and M2 Ordinance, including all revisions; and
WHEREAS, the PARTICIPATING AGENCIES in their approved APPLICATION have elected to
designate the AUTHORITY and the AUTHORITY agrees to act as the implementing agency to carry out
the PROJECT; and
WHEREAS, the PROJECT will include approximately fifty five (55) traffic signalized
intersections along the main corridor and five (5) offset from the main corridor as identified in the
APPLICATION; and
WHEREAS, the PROJECT will include Intelligent Transportation System (ITS) elements as
identified in the APPLICATION and other associated systems (hereinafter collectively referred to as
that will be constructed and/or installed and implemented as part of the PROJECT
as identified in the APPLICATION; and
WHEREAS, the AUTHORITY agrees to work with PARTICIPATING AGENCIES to coordinate
the inclusion of other ITS ELEMENTS (hereinafter OTHER ELEMENTS) that should be installed
before or at the same time as the construction of the PROJECT and are not part of this Agreement;
and
WHEREAS, all costs associated with the inclusion of these OTHER ELEMENTS, if any, are
the sole responsibility of the AGENCY owning each and any of those OTHER ELEMENTS; and
WHEREAS, AUTHORITY and each respective Party acknowledges and understands that
in-house resources (staff hours) from Party will provide various services for the PROJECT per the
APPLICATION; and
WHEREAS, AUTHORITY and each respective Party acknowledge and understand that
PROJECT costs for various types of additional work required by each respective Party may not have
been included in the original application and therefore costs are not included in the PROJECT
allocation; and
/
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 3 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
WHEREAS, AUTHORITY and each respective Party agree that these additional costs will be
paid by the PROJECT with written approval by AUTHORITY, which may result in additional dollar
match; and
WHEREAS, Parties acknowledge and understand that the costs for the additional work may
be reversed by AUTHORITY Audit; and
WHEREAS, based on Board of Directors approved PROJECT ALLOCATION and
APPLICATION, the AUTHORITY agrees to implement the PROJECT; and
WHEREAS, the AUTHORITY and the PARTICIPATING AGENCIES desire to enter into this
Agreement to implement the PROJECT in support of Project P; and
WHEREAS, this Agreement defines the specific terms, conditions, and funding responsibilities
between the AUTHORITY and the PARTICIPATING AGENCIES for the implementation of the
PROJECT; and
WHEREAS, the Board of Directors authorized funding for the PROJECT on
May 10, 2021; and
WHEREAS authorized this cooperative agreement on
August 9, 2021.
WHEREAS, the City of City Council approved this Agreement on the _____
day of ___________________, 20_____.
WHEREAS, the City of City Council approved this Agreement on the _____ day
of ___________________, 20_____.
WHEREAS, the City of City Council approved this Agreement on the _____day of
___________________, 20_____.
WHEREAS, the City of City Council approved this Agreement on the _____day of
___________________, 20_____.
/
/
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 4 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
WHEREAS Director of Public Works, with authority delegated by the
Board of Supervisors approved this Agreement on the _____day of
___________________, 20_____.
NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and the
PARTICIPATING AGENCIES as follows:
ARTICLE 1. COMPLETE AGREEMENT
A. This Agreement, including any attachments incorporated herein and made applicable by
reference, constitutes the complete and exclusive statement of the term(s) and conditions(s) of this
Agreement between AUTHORITY and PARTICIPATING AGENCIES and it supersedes all prior
representations, understandings, and communications. The invalidity in whole or in part of any term or
condition of this Agreement shall not affect the validity of other term(s) or conditions(s) of this Agreement.
The above referenced Recitals are true and correct and are incorporated by reference herein.
B. PARTICIPATING AGENCIES
performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver or
relinquishment o
condition(s), and PARTICIPATING AGENCIES obligation in respect thereto shall continue in full force
and effect. Changes to any portion of this Agreement shall not be binding upon AUTHORITY except when
specifically confirmed in writing by an authorized representative of AUTHORITY by way of a written
amendment to this Agreement and issued in accordance with the provisions of this Agreement.
C. PARTICIPATING AGENCIES failure to
performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver or
relinquishment of PARTICIPATING AGENCIES right to such performance or to future performance of
such term(s) or cond
and effect. Changes to any portion of this Agreement shall not be binding upon PARTICIPATING
AGENCIES except when specifically confirmed in writing by an authorized representative of
/
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 5 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PARTICIPATING AGENCIES by way of a written amendment to this Agreement and issued in
accordance with the provisions of this Agreement.
ARTICLE 2. SCOPE OF AGREEMENT
This Agreement specifies the roles and responsibilities of the Parties as they pertain to the
subjects and projects addressed herein. Both AUTHORITY and Parties agree that each will cooperate
and coordinate with the other in all activities covered by this Agreement and any other supplemental
agreements that may be required to facilitate purposes thereof.
ARTICLE 3. RESPONSIBILITIES OF AUTHORITY
AUTHORITY agrees to the following responsibilities for funding of the PROJECT:
A. AUTHORITY shall implement the PROJECT based on the intent of the usage in the
APPLICATION, prepared by the APPLICANT AGENCY in accordance with the policies and procedures
contained in the Comprehensive Transportation Funding Program (CTFP) Guidelines.
B. AUTHORITY shall provide oversight to maintain inter-jurisdictional traffic signal
operational integrity between PROJECT and other similar type projects not older than three (3) years.
C. AUTHORITY shall provide formats, templates, and guidance in reporting requirements as
described in the CTFP Guidelines.
D. AUTHORITY, or agents of AUTHORITY, under this Agreement and upon closeout of
PROJECT, may perform a technical and/or field review to ensure that the CTFP Guidelines, policies, and
procedures were followed. Such a review may be performed one hundred and eighty (180) days after the
PROJECT three-year grant period is complete. If the technical and or field review determines that any of
the activities performed are ineligible for CTFP funding, PARTICIPATING AGENCIES must reimburse
and return the amount of funding used to perform the ineligible activity to AUTHORITY.
E. AUTHORITY shall invoice the PARTICIPATING AGENCIES for twenty percent (20%) of
actual costs at the end of the Primary Implementation phase or at a mutually agreed upon time to
facilitate any respective Party funding timeframes. The estimated match per the APPLICATION is
outlined in Attachment A.
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 6 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
F. AUTHORITY shall request updates for the PROJECT as part of the semi-annual review
process, including documentation of in-kind match conforming to Attachment A and will include the
PROJECT in the list of active projects in OCFundTracker until completion of the three-year grant period.
Documents to be provided include, but are not limited to, payroll records, contracts, and purchase orders.
ARTICLE 4. RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY
The AUTHORITY, as the LEAD AGENCY, agrees to the following responsibilities for the
implementation of the PROJECT:
A. AUTHORITY, or agents of the AUTHORITY, shall manage, procure, implement, and
complete all aspects of the PROJECT as identified in the APPLICATION, including filing all
documentation necessary to comply with the California Environmental Quality Act (CEQA) regulations for
the PROJECT.
B. AUTHORITY, or agents of the AUTHORITY, shall coordinate outreach with
PARTICIPATING AGENCIES for the PROJECT.
C. AUTHORITY, or agents of the AUTHORITY, shall collect all data necessary to provide
new optimized timing plans including, but not limited to, manual or video all movement counts at each
PROJECT signalized intersection, and a mutually agreed upon number and location of twenty four (24)
hour / seven (7) day automated machine traffic counts with vehicle classification.
D. AUTHORITY, or agents of the AUTHORITY, shall develop and implement new timing
plans optimized for signal synchronization.
E. AUTHORITY, or agents of the AUTHORITY, shall provide updated timing plans for all
control systems and all relevant data used to develop said plans to the PARTICIPATING AGENCIES.
F. AUTHORITY, or agents of the AUTHORITY, shall p Primary Implementation
the PROJECT as described in the Measure M2
Eligibility Guidelines and CTFP Guidelines adopted by the AUTHORITY. The AUTHORITY shall provide
the reports to the PARTICIPATING AGENCIES in draft and final formats for review and comment.
AGENCY comments shall be noted in the final study. If specified in the APPLICATION, AUTHORITY, or
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 7 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
agents of the AUTHORITY,
PROJECT at up to two (2) public meetings.
ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES
PARTICIPATING AGENCIES agree to the following responsibilities for implementation and
funding of the PROJECT:
A. PARTICIPATING AGENCIES shall provide a technical representative to meet and
participate as a member of the PROJECT
B. PARTICIPATING AGENCIES shall authorize the AUTHORITY to manage, procure,
and implement all aspects of the PROJECT.
C. PARTICIPATING AGENCIES shall participate and support the PROJECT
implementation within the timeframe outlined in the APPLICATION and consistent with the CTFP
Guidelines adopted by the AUTHORITY.
D. PARTICIPATING AGENCIES shall provide AUTHORITY, or agents of the
AUTHORITY, all current intersection as-built drawings, all current intersections controller assembly
plans as provided by the manufacturer and modified by Party since original installation, local field
master, local controller, and Advanced Traffic Management System timing plans and other ITS related
data upon request.
E. PARTICIPATING AGENCIES shall each provide the AUTHORITY with a combined
dollar and in-kind services match, totaling at least twenty percent (20%) of actual PROJECT costs.
The APPLICATION estimated this amount to be Seven Hundred Seventy Four Thousand Three
Hundred Seventy Eight Dollars ($774,378.00) as shown in Attachment A. PARTICIPATING
AGENCIES shall work with AUTHORITY to address and mitigate budget impacts. Failure to provide
local dollar match and/or evidence of in-kind services match may result in the ineligibility of future
participation in competitive funding opportunities.
F. PARTICIPATING AGENCIES shall provide payment for the dollar match to
AUTHORITY within thirty (30) calendar days of receipt of an invoice.
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 8 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
G. PARTICIPATING AGENCIES that have included an in-kind services match, as
identified in Attachment A, shall provide documentation of conformance as part of the semi-annual
review process or as requested by the AUTHORITY, or agents of the AUTHORITY.
H. PARTICIPATING AGENCIES shall waive all fees associated with any local agency
permits that may be required of the consultant, subconsultants, and/or service or equipment providers
in the performance of the PROJECT.
I. PARTICIPATING AGENCIES shall provide updates on PROJECT to AUTHORITY, or
agents of the AUTHORITY, as part of semi-annual review process until completion of the three-year
PROJECT grant period. Documents to be provided include, but are not limited to, payroll records,
contracts, and purchase orders.
J. PARTICIPATING AGENCIES shall, if specified in APPLICATION, continue Operations
and Maintenance after the three-year grant period is complete and continue until the end of the
PROJECT per additional maintenance of effort in APPLICATION.
ARTICLE 6. DELEGATED AUTHORITY
The actions required to be taken by PARTICIPATING AGENCIES in the implementation of this
Agreement are delegated to their respective City Manager, or designee, and the actions required to be
taken by AUTHORITY in the implementation of this Agreement are delegated
Executive Officer or designee.
ARTICLE 7. AUDIT AND INSPECTION
AUTHORITY and PARTICIPATING AGENCIES shall maintain a complete set of records in
accordance with generally accepted accounting principles. Upon reasonable notice, PARTICIPATING
AGENCIES shall permit the authorized representatives of AUTHORITY to inspect and audit all work,
materials, payroll, books, accounts, and other data and records of PARTICIPATING AGENCIES for a
period of five (5) years after final payment, final closeout, or until any on-going audit is completed,
whichever is later. For purposes of audit, the date of completion of this Agreement shall be the date of
AUTHORITY c paid invoice) under this Agreement.
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 9 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
AUTHORITY shall have the right to reproduce any such books, records, and accounts. The above
provision with respect to audits shall extend to and/or be included in contracts with PARTICIPATING
contractor.
ARTICLE 8. INDEMNIFICATION
A. To the fullest extent permitted by law, PARTICIPATING AGENCIES shall defend
(at PARTICIPATING AGENCIES sole cost and expense with legal counsel reasonably acceptable to
AUTHORITY), indemnify, protect, and hold harmless AUTHORITY, and its officers, directors, employees,
against any and all liabilities, actions, suits,
claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, orders,
penalties, and expenses ot
limited to Claims arising from injuries to or death of persons (PARTICIPATING AGENCIES employees
included), for damage to property, including property owned by AUTHORITY, or from any violation of any
federal, state, or local law or ordinance, alleged to be caused by the negligent acts, omissions or willful
misconduct of PARTICIPATING AGENCIES, its officers, directors, employees or agents in connection
with or arising out of the performance of this Agreement.
B. To the fullest extent permitted by
cost and expense with legal counsel reasonably acceptable to PARTICIPATING AGENCIES), indemnify,
protect, and hold harmless PARTICIPATING AGENCIES, including their officers, directors, employees,
and agents
claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, orders,
penalties, and expenses including legal costs and atto
damage to property, including property owned by PARTICIPATING AGENCIES, or from any violation of
any federal, state, or local law or ordinance, alleged to be caused by the negligent acts, omissions or
willful misconduct of AUTHORITY, its officers, directors, employees or agents in connection with or arising
out of the performance of this Agreement.
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 10 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
C. The indemnification and defense obligations of this Agreement shall survive its expiration
or termination.
ARTICLE 9. ADDITIONAL PROVISIONS
A. Term of Agreement: This Agreement shall be in full force and effect through
December 31, 2026.
B. Amendment: This Agreement may be extended or amended in writing at any time by the
mutual consent of all Parties and AUTHORITY. No amendment shall have any force or effect unless
executed in writing by all Parties and AUTHORITY.
C. Termination: In the event any Party defaults in the performance of their respective
obligations under this Agreement or breaches any of the provisions of this Agreement, a non-defaulting
Party(s) shall have the option to terminate this Agreement upon thirty (30) calendar days prior written
notice to the Party in default.
D. Termination for Convenience: Either Party may terminate this Agreement for its
convenience by providing thirty (30) calendar days prior written notice of its intent to terminate for
convenience to the other Party.
E. AUTHORITY and Parties shall comply with all applicable federal, state, and local laws,
statues, ordinances, and regulations of any governmental authority having jurisdiction over the
PROJECT.
F. Legal Authority: AUTHORITY and Parties hereto consent that they are authorized to
execute this Agreement on behalf of said Parties and that, by so executing this Agreement, the Parties
hereto are formally bound to the provisions of this Agreement.
G. Severability: If any term, provision, covenant or condition of this Agreement is held to be
invalid, void or otherwise unenforceable, to any extent, by any court of competent jurisdiction, the
remainder of this Agreement shall not be affected thereby, and each term, provision, covenant or
condition of this Agreement shall be valid and enforceable to the fullest extent permitted by law.
/
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 11 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
H. Counterparts of Agreement: This Agreement may be executed and delivered in any
number of counterparts, each of which, when executed and delivered shall be deemed an original and all
of which together shall constitute the same agreement. Facsimile signatures shall be permitted.
I. Assignment: Neither this Agreement, nor any of the Parties rights, obligations, duties, or
authority hereunder may be assigned in whole or in part by either Party without the prior written consent
of the other Party in its sole and absolute discretion. Any such attempt of assignment shall be deemed
void and of no force and effect. Consent to one assignment shall not be deemed consent to any
subsequent assignment, nor the waiver of any right to consent to such subsequent assignment.
J. Governing Law: The laws of the State of California and applicable local and federal laws,
regulations, and guidelines shall govern this Agreement.
K. Litigation fees: Should litigation arise out of this Agreement for the performance thereof,
the court shall award costs and expenses, inc
L. Notices: Any notices, requests, or demands made between the Parties pursuant to this
Agreement are to be directed as follows:
/
/
/
/
/
/
/
/
/
/
/
/
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 12 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
To SANTA ANA: To AUTHORITY:
City of Santa Ana Orange County Transportation Authority
20 Civic Center Plaza
Santa Ana, CA 92701
550 South Main Street
P. O. Box 14184
Orange, CA 92863-1584
Attention: Cesar Rodriguez
Senior Civil Engineer
Tel: (714) 647-5626
Email: crodriguez5@santa-ana.org
Attention: Michael Le
Senior Contract Administrator
Tel: (714) 560-5314
Email: mle1@octa.net
CC: Alicia Yang
Project Manager
Tel: (714) 560-5362
Email: ayang@octa.net
To HUNTINGTON BEACH: To TUSTIN:
City of Huntington Beach City of Tustin
2000 Main Street, P.O. Box 190
Huntington Beach, CA 92648
300 Centennial Way
Tustin, CA 92780
Attention: William Janusz
Principal Civil Engineer
Tel: (714) 374-1628
Email: wjanusz@surfcity-hb.org
/
/
/
/
/
Attention: Krys Saldivar
Public Works Manager Traffic/Transportation
Tel: (714) 573-3172
Email: ksaldivar@tustinca.org
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 13 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
To WESTMINSTER: To COUNTY OF ORANGE:
City of Westminster County of Orange
8200 Westminster Boulevard
Westminster, CA 92863
601 North Ross Street
Santa Ana, CA 92701
Attention: Adolfo Ozaeta
Transportation Manager
Tel: (714) 548-3462
Email: aozaeta@westminster-ca.gov
Attention: Rick Diaz
Senior Civil Engineer
Tel: (714) 245-4581
Email: rick.diaz@ocpw.ocgov.com
M. Force Majeure: Either Party shall be excused from performing its obligations under this
Agreement during the time and to the extent that it is prevented from performing by an unforeseeable
cause beyond its control, including but not limited to: any incidence of fire, flood; acts of God;
commandeering of material, products, plants or facilities by the federal, state or local government; national
fuel shortage; or a material act or omission by the other Party, when satisfactory evidence of such cause
is presented to the other Party, and provided further that such nonperformance is unforeseeable, beyond
the control and is not due to the fault or negligence of the Party not performing.
/
/
/
/
/
/
/
/
/
/
/
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 14 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
This Agreement shall be made effective upon execution by all Parties.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to
be executed as of the date of the last signature below.
CITY OF HUNTINGTON BEACH ORANGE COUNTY TRANSPORTATION
AUTHORITY
By: ___________________________ By: __________________________________
Kim Carr Darrell E. Johnson
Mayor Chief Executive Officer
Dated: _________________________ Dated: _________________________
ATTEST: APPROVED AS TO FORM:
By: ___________________________ By: __________________________________
Robin Estanislau James M. Donich
City Clerk General Counsel
Dated: _________________________ Dated: _________________________
APPROVED AS TO FORM APPROVAL RECOMMENDED
By: ___________________________ By: ___________________________
Michael E. Gates Kia Mortazavi
City Attorney Executive Director, Planning
Dated: _________________________ Dated: _________________________
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 15 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
This Agreement shall be made effective upon execution by all Parties.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to
be executed as of the date of the last signature below.
CITY OF SANTA ANA
By: ___________________________
Kristine Ridge
City Manager
Dated: _________________________
ATTEST:
By: ___________________________
Daisy Gomez
Clerk of the Council
Dated: _________________________
APPROVED AS TO FORM
Sonia R. Carvalho, City Attorney
By: ___________________________
John M. Funk
Assistant City Attorney
Dated: _________________________
RECOMMENDED FOR APPROVAL
By: ___________________________
Nabil Saba, PE
Executive Director
Public Works Agency
Dated: _________________________
September 16, 2021
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 16 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
This Agreement shall be made effective upon execution by all Parties.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to
be executed as of the date of the last signature below.
CITY OF TUSTIN
By: ___________________________
Letitia Clark
Mayor
Dated: _________________________
ATTEST:
By: ___________________________
Erica N. Yasuda
City Clerk
Dated: _________________________
APPROVED AS TO FORM
By: ___________________________
David E. Kendig
City Attorney
Dated: _________________________
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 17 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
This Agreement shall be made effective upon execution by all Parties.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to
be executed as of the date of the last signature below.
CITY OF WESTMINSTER
By: ___________________________
Tri Ta
Mayor
Dated: _________________________
ATTEST:
By: ___________________________
Christine Cordon
City Clerk
Dated: _________________________
APPROVED AS TO FORM
By: ___________________________
Christian Bettenhausen
City Attorney
Dated: _________________________
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET / BOLSA AVENUE RTSSP PROJECT
Page 18 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
This Agreement shall be made effective upon execution by all Parties.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement No. C-1-3598 to
be executed as of the date of the last signature below.
COUNTY OF ORANGE
By: ___________________________
James Treadaway
Director of Public Works
Dated: _________________________
APPROVED AS TO FORM
By: ___________________________
Deputy County Counsel
Dated: _________________________
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET/ BOLSA AVENUE RTSSP
ATTACHMENT A
Page A - 1
ESTIMATED LOCAL MATCH COMMITMENT
SECTION 1: AGENCY TOTAL MATCH SUMMARY
AGENCY
CASH MATCH IN-KIND MATCH* TOTAL MATCH
PI O & M PI O & M PI O & M
City of
Huntington
Beach
$ 43,852.00 $ 2,600.00 $ 0.00 $ 0.00 $ 43,852.00 $ 2,600.00
$ 46,452.00 $ 0.00 $ 46,452.00
City of Santa
Ana
$ 321,042.00 $ 12,000.00 $ 34,000.00 $ 3,600.00 $ 355,042.00 $ 15,600.00
$ 333,042.00 $ 37,600.00 $ 370,642.00
City of Tustin
$ 129,734.00 $ 3,290.00 $ 15,050.00 $ 350.00 $ 144,784.00 $ 3,640.00
$ 133,024.00 $ 15,400.00 $ 148,424.00
City
of Westminster
$ 139,620.00 $ 8,190.00 $ 0.00 $ 0.00 $ 139,620.00 $ 8,190.00
$ 147,810.00 $ 0.00 $ 147,810.00
County of
Orange
$ 59,880.00 $ 1,170.00 $ 0.00 $ 0.00 $ 59,880.00 $ 1,170.00
$ 61,050.00 $ 0.00 $ 61,050.00
TOTAL
MATCH
$ 694,128.00 $ 27,250.00 $ 49,050.00 $ 3,950.00 $ 743,178.00 $ 31,200.00
$ 721,378.00 $ 53,000.00 $ 774,378.00
*In-kind match may be converted to cash match if agency does not satisfy in-kind match commitment by the end of the
respective phase. However, Cash Match is NOT allowed to be converted to in-kind match.
SECTION 2: MATCH BREAKDOWN (CASH VS IN-KIND SERVICES)
A. Cash Match
AGENCY FUNDING SOURCE AMOUNT OF CASH
CONTRIBUTION
City of Huntington Beach AQMD $ 46,452.00
City of Santa Ana M2 Fairshare $ 333,042.00
City of Tustin Transportation Funds / General
Fund / M2 Fairshare $ 133,024.00
City of Westminster Traffic Impact Fee $ 147,810.00
County of Orange Road Funds $ 61,050.00
TOTAL CASH MATCH: $ 721,378.00
COOPERATIVE AGREEMENT NO. C-1-3598
FIRST STREET/ BOLSA AVENUE RTSSP
ATTACHMENT A
Page A - 2
B. In-Kind Services
i. Specific Improvements (List items and Cost):
AGENCY IMPROVEMENT DATE OF CONSTRUCTION EXPENDITURE
N/A
TOTAL FOR SPECIFIC IMPROVEMENTS (i): $ 0.00
ii. Staffing Commitment:
AGENCY STAFF POSITION TYPE OF SERVICE TO
PROJECT
NO. OF
HOURS
FULLY
BURDENED
HOURLY
RATE
TOTAL**
City of Santa
Ana
Sr. Civil Engineer Project Oversight, Plan
Review, Signal Timing 150 $ 110 $ 16,500.00
Assistant Engineer
Project Design Review/
Implement Timing /
Construction Engineering
120 $ 90 $ 10,800.00
Construction
Inspector Construction Engineering 120 $ 70 $ 8,400.00
Engineering Intern General Project Support 95 $ 20 $ 1,900.00
Total for City of Santa Ana: $ 37,600.00
City of Tustin
Consultant Principal
Engineer
Project Oversight, Plan
Review, Signal Timing 40 $ 175 $ 7,000.00
Traffic Engineering
Consultant
Project Management,
O&M Review and
Coordination
30 $ 145 $ 4,350.00
PW Inspector
(Consultant) Construction Inspection 30 $ 135 $ 4,050.00
Total for City of Tustin: $ 15,400.00
TOTAL FOR STAFFING COMMITMENT (ii): $ 53,000.00
TOTAL IN-KIND MATCH (i + ii): $ 53,000.00
**Total amount is the required participation by the identified agency. The number of hours and hourly rate will be based on
rs.
Each agency will be responsible for keeping detailed records of hours worked and description of work. An accounting record
of personnel, hours at fully burdened rate is expected to be included with the final submittal. Records will be subject to
auditing.