HomeMy WebLinkAboutItem 21 - Flower Street Sewer Main ImprovementsPublic Works Agency
www.santa-ana.org/pw
Item # 21
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
December 7, 2021
TOPIC: Flower Street Sewer Main Improvements
AGENDA TITLE
Approve an Appropriation Adjustment and Award a Construction Contract to Colich &
Sons L.P. in the Amount of $3,581,155.00 for the Flower Street Sewer Main
Improvements Project with an Estimated Project Delivery Cost of $4,655,501.50 (Project
No. 18-6616) (Non -General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment to recognize $1,685,502 of prior year fund
balance in the Sanitary Sewer Fund, Capital Recovery Charges, Prior Year
Carryforward revenue account and appropriate the same amount to the Sanitary
Sewer Fund, Capital Recovery Charges, Improvements Other Than Building
expenditure account. (Requires five affirmative votes)
2. Approve an amendment to the Fiscal Year 2021-22 Capital Improvement Program to
include $1,685,502 in construction funds for the Flower Street Sewer Main
Improvements Project (Project No. 18-6616).
3. Award a construction contract to Colich & Sons, the lowest responsible bidder, in
accordance with the base bid in the amount of $3,581,155.00, for construction of the
Flower Street Sewer Main Improvements, for the term beginning January 3, 2022 and
ending upon project completion, and authorize the City Manager to execute the
contract subject to non -substantive changes approved by the City Manager and the
City Attorney.
4. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$4,655,501.50, which includes $3,581,155.00 for the construction contract,
$537,173.25 for contract administration, inspection and testing, and a $537,173.25
project contingency for unanticipated or unforeseen work.
Flower Street Sewer Main Improvements
November 16, 2021
Page 2
DISCUSSION
The work to be performed consists of removing existing 8-inch, 10-inch, and 12-inch VCP
Sewer Main and replacing them with approximately 127 linear feet of 8-inch PVC,15 linear
feet of 10-inch PVC, 692 linear feet of 12-inch PVC, and 2,361 linear feet of 15-inch PVC
Sewer Main, as well as all appurtenant work, in accordance with the project plans as
specified hereinafter, project specifications as specified hereinafter, and in accordance
with the Standard Specifications for Public Works Construction (The Green -book), latest
Edition, Including all supplements. The contractor shall furnish all necessary labor, tools,
materials, appliances, and equipment to complete the project.
This project is required to maintain effective operation of the City's sanitary sewer system,
eliminate sewer main obstructions, reduce sewer maintenance requirements, enhance
sewer flows, and prevent sewer system overflows.
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of
250 regional vendors via PlanetBids, many of which are Santa Ana based. Sixteen
vendors requested bidding documents, and a total of nine bids were received. Bids were
not received from any Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on August 02 and August 03, of 2021. The project was also advertised in
PlanetBids from July 30, 2021 through September 09, 2021. Bids were received
electronically via PlanetBids on September 09, 2021.
Bid Results Summ
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Colich & Sons L.P.
Gardena
$3,581,155.00
2
Vasilj Inc
Irwindale
$3,790,140.00
3
MNR Construction Inc
La Verne
$3,886.860.00
4
GRBCON, Inc
Baldwin Park
$3,889,042.00
5
CEM Construction Corp
Montebello
$4,022,010.00
6
Vido Artukovich & Son inc.
South El Monte
$4,213,800.00
7
Vido Samarzich, Inc.
Rancho
Cucamonga
$4,306,216.00
8
Christensen Brothers General
Engineering, Inc.
Apple Valley
$4,788,815.00
Flower Street Sewer Main Improvements
November 16, 2021
Page 3
9 Ramona Inc. Baldwin Park $5,068,725.00
A total of 11 bids were received, and all were deemed responsive. Colich & Sons L.P.
submitted the lowest responsive base bid in the amount of $3,581,155.00 (Exhibit 2). As
specified in the bid documents, the lowest bid shall be determined on the basis of the
Base Bid. Based on the bid analysis and a contractor's reference check, staff
recommends awarding the construction contract to Colich & Sons L.P., in the amount of
the base bid totaling $3,581,155.00 (Exhibit 3). Colich & Sons L.P. has not performed any
work recently in the City of Santa Ana.
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen conditions.
Construction administration and inspection includes construction management;
implementation of the City's Community Workforce Agreement requirements; inspection
of the Contractor's work to ensure contract compliance, workmanship, and quality; and
materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the
table below, the estimated total construction delivery cost of the project is $4,655,501.50.
Project Item
Total
Construction Contract
$3,581,155.00
Construction Administration, Inspection, Testing
$537,173.25
Contingencies
$537,173.25
TOTAL CONSTRUCTION DELIVERY COST
$4,655,501.50
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2020-29 was filed for the project.
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $4,655,501.50 which includes construction, contract administration, inspection,
testing, and an authorized contingency.
Approval of the requested Appropriation Adjustment will recognize $1,685,502 of prior
year fund balance in the Sanitary Sewer Fund, Capital Recovery Charges, Prior Year
Carryforward revenue account (No. 05417002-50001) and appropriate the same amount
to the Sanitary Sewer Fund, Capital Recovery Charges, Improvements Other Than
Building expenditure account (No. 05417647-66220). All funds are available for
expenditure in Fiscal Year 2021-22; however, any remaining balances not expended at
the end of the fiscal year will be carried forward into FY 2022-23 for expenditure.
Flower Street Sewer Main Improvements
November 16, 2021
Page 4
The following table summarizes the funds budgeted and available for expenditure to
deliver construction of this project.
Fiscal
Accounting Unit -
Fund
Accounting Unit -
Y
Year
Account No.
Description
Account No.
Amount
(Project No.)
Description
APPROPRIATION ADJUSTMENT
Sanitary
Capital Recovery
2021-22
05417647-66220
Sewer
Charges,
$1,685,502.00
(18-6616)
Capital
Improvements Other
Than Building
EXISTING PROJECT APPROVED BUDGET
Sewer
Sewer Connection
2021-22
05517660-66220
Connection
Projects,
$2,000,000.00
(18-6616)
Fee
Improvements Other
Than Building
05417647 -
Sanitary
Capital Recovery
2021-22
66220
Sewer
Charges,
$970,000.00
(18-6616)
Capital
Improvements Other
Than Building
Total
$4,655,502.00
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
5. Amendment to Fiscal Year 2021-22 CIP
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Kristine Ridge, City Manager
EXHIBIT 1
EXHIBIT 1
VICINITY MAP
NOT TO SCALE
® PROJECT LOCATION
pT1oN A
SANT�CITY COUNCIL PROJECT NO. 18-6616
P W A AGENDA DATE FLOWER STREET
PUBLIC WORKS AGENCY SEWER MAIN IMPROVEMENTS
City of Santa Ana
Flower St. Sewer Main Improvements (18-6616), bidding on 09/09/2021 2:00 PM (PDT)
Page 1 of 3
Printed 09/21/2021
Exhibit A
Bid Results
Bidder Details
Vendor Name
Colich & Sons L.P.
Address
547 W 140th Street
Gardena, California 90248
United States
Respondee
Paul Majich
Respondee Title
General Manager
Phone
310-516-6346
Email
pmajich@colich.com
Vendor Type
License #
Bid Detail
Bid Format
Electronic
Submitted
09/09/2021 12:19 PM (PDT)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
264869
Respondee Comment
Buyer Comment
Attachments
File Title
Executed Non -Coll usionAffidavit-
SantaAna.pdf
Executed Ownersh i pAffidavit-
SantaAna.pdf
Executed Bid Proposal-SantaAna.pdf
Executed Bid Bond-SantaAna.pdf
File Name
ExecutedNon-CollusionAffidavit-
SantaAna.pdf
Exec utedOwners h i pAffidavit-
SantaAna.pdf
ExecutedBi d Pro posal-SantaAna. pdf
ExecutedBi d Bon d-SantaAna. pdf
File Type
Non -Collusion Affidavit (Notary Public) - REQ Original Hard Copy
Submittal in Addition
Ownership Affidavit (Notary Public) - REQ Original Hard Copy Submittal
in Addition
Proposal Documents
Bid Bond Guaranty (Notary Public) - REQ Original Hard Copy Submittal
in Addition
PlanetBids, Inc.
City of Santa Ana Page 2 of 3
Flower St. Sewer Main Improvements (18-6616), bidding on 09/09/2021 2:00 PM (PDT) Printed 09/21/2021
Line Items
Discount Terms No Discount
Item Item Type
Item Description
UOM
QTY
Unit Price
Line Total
Response Comment
# Code
Section 1
$3,581,155.00
1
Mobilization/Demobilization (No morethan 5%total bid)
LS
1
S150,000.00
$150,000.00
Yes
2
Prepare and Implement Traffic Control Plan
LS
1
5150,000.00
$150,000.00
Yes
3
Stormwater Best Management Practices (BMP)
LS
1
515,000.00
$15,000.00
Yes
4
Furnish Temporary Sewer By-pass Pumping System
LS
1
$125,000.00
$125,000.00
Yes
5
Remove and Dispose Existing 8" VCP Sewer Pipe
LF
707
$40.00
$28,280.00
Yes
6
Remove and Dispose Existing 10" VCP Sewer Pipe
LF
508
$50.00
$25,400.00
Yes
7
Remove and Dispose Existing 12" VCP Sewer Pipe
LF
1665
$50.00
$83,250.00
Yes
8
Construct 8" PVC (SDR 26) Sewer Pipe
LF
127
$375.00
$47,625.00
Yes
9
Construct 10" PVC (SDR 26) Sewer Pipe
LF
15
$390.00
$5,850.00
Yes
10
Construct 12" PVC (SDR 26) Sewer Pipe
LF
692
$405.00
$280,260.00
Yes
11
Construct 15" PVC (SDR 26) Sewer Pipe
LF
2361
$440.00
$1,038,840.00
Yes
12
Construct New 48" Precast Concrete Eccentric Cone Manhole Per City Std. Plan No. 1201 ADFASDF
EA
11
$7,000.00
$77,000.00
Yes
13
Construct New P.C.C. Drop Sewer Manhole Per City Std. Plan 1201A
EA
1
$8,500.00
$8,500.00
Yes
14
NOTUSED
_
0
$0.00
$0.00
Yes
15
Pressure Wash And Protect Existing Manhole In Place. Clean Existing Manhole And Coat Manhole Interior With 125 MIL.
EA
3
$4,000.00
$12,000.00
Yes
Epoxy/Polyurethane Lining System Including The Base
16
Reconnect All Existing Live Sewer Main To New Manhole
EA
5
$3,000.00
$15,000.00
Yes
17
Protect Existing Sewer In Place
LS
1
$15,000.00
$15,000.00
Yes
is
Abandon Existing Sewer Main In Place
LS
1
$15,000.00
$15,000.00
Yes
19
Remove and Dispose of Existing Sewer Manhole
EA
11
$2,500.00
$27,500.00
Yes
20
Remove And Replace Like -For -Like Existing Improvements Including But Not Limited To Curb And Gutter, PCC Side Walk, Grass And
LS
1
$80,000.00
$80,000.00
Yes
Other Landscaping
21
Abandon Existing Manhole, Remove The Top 18", Break Base Per Std. Plan No. 1209 And Fill The Manhole Barrel With 1 Sack Slurry,
EA
2
$2,500.00
$5,000.00
Yes
Back Fill To The Natural Ground, Match Existing Finish Surface Salvage Manhole Cover And Frame TOThe City
22
Construct New Sewer Lateral To Back To Right Of Way Connect To Existing 4" VCP Lateral With Eccentric Reducer Couplings Per City
EA
81
$4,000.00
$324,000.00
Yes
Std. Plan No. 1204
23
Construct Sewer Pipe Casing Per City Std. Plan No. 1203. Replace Existing Median, Irrigation System, And Tree As Necessary
LF
70
$350.00
$24,500.00
Yes
24
Clearing and Grubbing
LS
1
$20,000.00
$20,000.00
Yes
25
Cold Mill Existing Pavement
SF
154000
$0.30
$46,200.00
Yes
26
Remove Existing and construct AC Dig Out
SF
400
$12.00
$4,800.00
Yes
27
Construct 2" Asphalt Rubber Hot Mix (ARHM)
TON
1900
$115.00
$218,500.00
Yes
28
Sawcut, Remove and Construct PCC Pavement
SF
24500
$18.00
$441,000.00
Yes
29
Sawcut, Remove and Construct Curb Ramp
EA
2
$8,500.00
$17,000.00
Yes
30
Sawcut, Remove and Construct Sidewalk
SF
2000
$14.00
$28,000.00
Yes
31
Sawcut & Remove and construct Curb and Gutter
LF
100
$100.00
$10,000.00
Yes
32
Remove Existing and construct 6" Median Curb, including 4" thick Fill in Concrete
LS
1
$37,000.00
$37,000.00
Yes
33
Adjust to Grade Sewer Manhole
EA
8
$750.00
$6,000.00
Yes
34
Adjust to Grade Water Valve
EA
22
$450.00
$9,900.00
Yes
35
Adjust to Grade Storm Drain Manhole
EA
1
$750.00
$750.00
Yes
36
Install Traffic Signal Loops
EA
36
$750.00
$27,000.00
Yes
37
Signing, Striping, Markings & Pavement Legends
LS
1
518,000.00
$18,000.00
Yes
38
Create Planting & Irrigation Plan for Median at Station 46+50 to 48+75
LS
1
$23,000.00
$23,000.00
Yes
39
Planting Work for Median at Station 46+50 to 48+75
LS
1
$30,000.00
$30,000.00
Yes
40
Re -Establish 1" Irrigation Water Service for Median at Station 46+50 to 48+75
LS
1
$25,000.00
$25,000.00
Yes
41
Construction Permit
LS
1
$15,000.00
$15,000.00
Yes
42
Import Backfill Material and Dispose Native Soil*
CY
800
$45.00
$36,000.00
Yes
43
Sewer Flow Level Monitoring & Alarming Device
EA
2
$5,000.00
$10,000.00
Yes
44
Sawcut, Remove and Construct PCC Bus Pad Per City Std. Plan No. 1108
SF
200
$25.00
$5,000.00
Yes
PlanetBids, Inc.
City of Santa Ana
Flower St. Sewer Main Improvements (18-6616), bidding on 09/09/2021 2:00 PM (PDT)
Page 3 of 3
Printed 09/21/2021
Line Item Subtotals
Section Title
Section 1
Grand Total
Line Total
$3,581,155.00
$3,581,155.00
PlanetBids, Inc.
EXHIBIT 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 18-6616
PLOWER ST. SEWER MAIN IMPROVEMENTS
This CONSTRUCTION CONTRACT is made and entered into this 71" day of December, 2021 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California. (hereinafter "CITY"), and Colich & Sons L.P.
(hereinafter "CONTRACTOR").
WITNESSETH,
The CITY and the CONTRACTOR, for the consideration hereinafter nained, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Flower St. Sewer Main Improvements (hereinafter referred to
as the "WORD OF IMPROVEMENT") identified in and in accordance with the Contract Documents
prepared by the City°s Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form.
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Three Million Five Hundred Eighty -One
Thousand One Hundred FiRy-Five Dollars and No Cents ($3,581,155,00), as set forth and identified
in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable,
rov. 09/01/2017 Page 1 of 3
4, CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvenic ats section of the BID PROPOSAL (Exhibit "A') including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5, The CONTRACTOR will pay, and will require all subcontmaors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
b. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes tha labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the '!FORK OF
IMPROVEMENT as more fully described in the CWA. The CWA maybe found on the City's website
at: littn://www.saganna or wa/docunients/CWA, f
7o CONTRACTOR shall, after award of this Contrast, famish two bonds to be approved by the CITY,
ane in the amount of OneIundred Percent (100°/a) of the Contract price, to guarantee the faithful
performance of the work (Performance Band), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond), This Contract shall not become effective until such bonds are supplied to and approved by the
CITY,
S, CONTRACTOR, shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a wmi my performance and payment band (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ton Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One hundred Thousand Dollars
(S 100,000) or Too. Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation, Insurance as outlined in the General Provisions, to be approved by the CI ry.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indenuffy, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemrutees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following;
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or ,on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of -Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic lass to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Stxbcontraetors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or easy other hideninitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST,
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO .FORM:
SONIA R. CARVALHO
City Attorney
By-
JOHN FUNK
Senior Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NABIL SABA, PE
Bxecutive Director
Public Works Agency
CITY OF S.ANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
Colich & Sans E.P.
NAME:►muf 16ds11oh
TITLE: Vks P"dent of C rations
CWGIM Inc., eens+at Peer
Page 3 of 3
Oily of Santa Ana
Flower St. Se1ver Main IMprovemanis (1$-6$161, 6lddkrg on 09M12021 2',00 PM (POT)
Page 1 of 3
Printed 00/2112021
Exhibit A
Bid F-Results
Bidder Details
Vendor Name
Colich & Sons L.P.
Address
547 W 140th Street
Gardena, California 90248
United States
Respondee
Paul Majich
Respondee Title
General Manager
Phone
310-516-5346
Email
pmajich@colich.com
colich.com
Vendor Type
License #
Bid ire a13
Bid Format
Electronic
Submitted
09/09/2021 12:19 PM (PDT)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation 4
264869
Respondee Curriment
Bljyei,,, Comment
File Title
Executed Non-CollusionAffidavit-
SantaAna.pdf
Executed Owners hipAffidavit-
SantaAna.pdf
ExecutedBidProposal-SantaAna.pdf
ExecutedBidBond-SantaAna.pdf
File Name
Executed Non-Co11usionAffidavit-
SantaAna.pdf
Executed Own ershipAffidavit-
Santaka.pdf
Executed Bid Proposal-SantaAna.pdf
ExecutedBidBond-SantaAna.pdf
File Type
Non -Collusion Affidavit (Notary Public) - REQ Original Hard Copy
Submittal in Additlon
Ownership Affidavit (Notary Public) - REQ Original Hard Copy Submittal
in Addition
Proposal Documents
Bid Bond Guaranty (Notary Public) - REQ Original Hard Copy Submittal
in Addition
PlaretBid3, Inc.
Clly of Santa Ana Page 2 of 3
Flower 5t. Sewer Uain Improvements (78-8818), bidding on C910912021 2'.00 PM (PDT) Printed 0912112021
Lire Items
DiscountTerms No Nscount
'.11emi
Item Type Item Description
UOM
qTY
Unit Price I'., Line Total
:Response, Commend,
# -Code
Section
1�
$3,581,155.00
,
1
Mobillzatlon/Demoblllzatan(No more than 5%total bid)
LS
1
$1o0,000.00 $150,000.00
Yes
2
Propore and Implement Traffic Control Plan - - _
LS
, 1
', $150,000.00 $150,006.00
Yes
3
Stomiwater Best Management Practices(BMP)
...._.... _...
LS
1
- ...
$16,000.00 $1610DO.00
Yes
....... ...
4 -
............... ......._........ ..._... ........ ..._....... .................... .. .... ...... ..... .......... ......... ... .....
Furn€sh TemporarySewer By-pass Pumping System
...
LS
1
.........
$125,000.00 ', $125,060�00
Yes
5
- Remove and Dispose Existing 8"VCP Sewer Pipe
LF
707
$40.00 $29,280.00
Yes'
6
Remove end Dispose Exlsting 10" VCP Sewsr Pipe
LF
BOB
Sao go $25,400.00
Yes
7
I Remove and Dispose Existing 12" VCP Sewer Pipe
LF
1665
S60.00 - $53,250.00
Yes
8
Construct 8" PVC (SDR 26) Sewer Plpe
! LF',
127
$376.00 $47,625.00
Yes
9
Construct 10' PVC (SOR 26) Sewer Pipe
LF
i 15
1 $390 00 $6,86C.00
Yes
10
! Construct'12"PVC(SDR 26}Sewerielpe
j LF
692
�'� $405.00 : $2BO,260.00
Yes '
17
!I Construct 15" PVC (SUR 26) Sewer Pipe
LF
11 2361
$440.00 : $1,030,040.00
Yes
12
,, construct New 48" Precast Concrete 5ccantrlc Cane Manhole Par City std, plan No, 1201 ADFAspF
CA
71
', $7,000.Otl $77,000,aa
Yes
19
Construct New P.C.C. Drop Sewer Manhole Per City Std. Plan 1201A
EA
1,
$8,500.00 98,500.00
yes {
14
1 NOT USED
_
', 0
$0.00 $0.00
Yes
- is
Pressure Wash And Protect Exlsting Manhole In Place, clean Existing Manhole And Coal Manhole Interior With 125 ML
: EA
3
1 $4,900DO $72,000.00
Yes
Epoxy/Polyurethane Lining System Including The Base
' 16
Reconnect All Existing Live Sewer Main To New Manhole
EA
5
: $3,000.00 ! $15,000.00
Yea
17
'...-........
Protect FelPlace
ct Existing
r ctiing Sewer In
i.
L3
'......
1
$78,000.00 $15,0
00.00
-.
Yes
;.............i
18
.. ..... ... ................. .. ................ ............. .. .................... .......... ..... ... ..... .... ......... .........
Abandon Existing Sewer Main In Place
LS
.............
1
...........t .............
$15,000.00 $15,000.00
.........
Yes
19
Remove and Olsposeof Existing Sewer Manhole
EA
11
$2,500 00 $27,500.00
. Yes
20
Remove And Replace Like -For -Like Existing Improvements Including But Not Llmlted To Curb And Gutter, PCC Side Walk, Grass And
LS
-1
;$80,000.00 $80,000.00
!Yes
Otheriandscaping
21
Abandon Existing Maahole, Remove The Tap 19", Break Base Per Sid. Plan Ns. 1200 And Fill The Manhole Barrel With 1 sack Slurry,
EA.2
�$2,5G0.00 $5,000.00
Yes
Back Fill To The Natural Ground, Match Existing Finish Surface Salvage Manhole Cover And Frame To The City
22
Construct New Sewer Lateral To Back To Right Oi Way Connect To Existing 4' VCP Lateral With Eccentric Reducer Couplings Per City
EA
: 81
$4,000.00 $324,000AO
Yes
Std. Plan No. 1204
!
23
Construct Sewer Pipe Casing Per City Bid. Plan No. 1203. Replace Existing Median, Irrigatton System, And Tree As Necessary
__.. _.. __... _. _.. _. _. _.. _.. _. _ -_. _.
LF
70
__.
$35o.0o $24,500.00
Yes -
24
Clearing and Grubbing
L3
1
, $20,000.00. $20,000.00
Yes
25
Cold MITI Existing Pavement
SF
154000
: $0.30 046,200.00
: Yes
26
Remove Existing and construct AC Dig Out
SF
400
: $12,00 $4,S00.00
- -
: Yes
- -
27
Construct 2'Asphalt Rubber Hot Wx(ARHM)
- -
TON
1900
$115.00 $218,500,00
Yes
28
Salvcut, Remove and Construct PCC Pavement
SF
24600
$igloo $441,000.00
: Yes
20
- - Sawcut, Remove and Construct Curb Ramp
EA
. 2
$6,500.00 $17,000.041
Yes
30
: Sawcut, Remove and Construct Sidewalk
SF
: 2000
. $1400 $20,00.0.00.
: Yes
31
Sawcut& Remove and construct Curb and Gutter
LF
100
$100,00 .$10,00,M)
Yea
32
Remove Existing and canstruot 6" Median curd, 1hcluding 4" thick Fill in concrete
ES
1
$37 euo.00 $37,000.00
Yes
33
Adjust to Grade Sewer Manhole
EA
8
- $750.00 $6,000.00
- Yes -
34
Adjust to Grade Water Valve
EA
22
$450.D0 $9,900.00
Yes
35
Adjust to Grade Storm Brain Manhole
EA
1
$750.DO $750.D0
Yes
36
Install Traffic Signal Loops
EA
36
$750.00 - $27,C80.00
Yes
37
Signing, Striping, Markings & Pavement Legends
LS
1
$18,000.00 $18,000.00
Yes
38
Create Planting & Irrigation Plan for Median at Station 46+50 to 48+75
LS
1
- $23,000.DC $23,000.00
Yes
39
Planting Work for Median at Station 46+50 to 48+75
LS
1
$30,GOD.00 $30,000.00
Yes
4C
Re-Establlsh 1"Irrigallen Water Service for Median at Station 46+50 to 48+75
LS
1
. $25,000.00 $25,000.00
Yea
41
Construction Permit
Ls
1
$15,000,00 $15,a00,00
Yea
42
Import Backtitl Material and Dispose Native Solf"
CY
Soo
$45.00 $36,000.00
Yes
43
Sewer Flow Level Monitoring & Alarming Device
EA
2
$5,000.0D $1D,900.00
Yes
44
Sawcut, Remove and construct PCC Bus Pad Per city Sid. Plan No. 1108
SF
200
$25.u0 $6,000,ub
Yes
PlanotBids. Inc.
City of Santa Ana Page 3 of 3
Plow®r St. Sewer Main Improvements (18-6616}, nidding on OW09/2021 2,00 PM )Pw) Printed W2'112021
Line Item Subtotals
Section Title Line Total
Section 1 $3,581,155.00
Grand Ti 0,581,155.00:
PlanetBicEs_ Inc.
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO.: 18-6616
FLOWER ST. SEWER MAIN IMPROVEMENTS
Bid Items 141 TOTAL BASE BID $ 4 o 0
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications, The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
# This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LI UIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within number 180) working days after the commencement date stated in the
Notice to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $1,500 per calendar day.
Name of Firm Colich & Sons, LP
Signature of
Title Paul Majich, VP of Operations, Coretco Inc., GP
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
IV
EXHIBIT 4
COST ANALYSIS
CONSTRUCTION OF PROJECT NO. 18-6616: Flower St. Sewer Main
Improvements
Construction Contract
$
3,581,155.00
Contract Administration, Inspection and Testing
$
537,173.25
Contingencies
$
537,173.25
TOTAL ESTIMATED CONSTRUCTION COSTS
1 $
4,655,501.50
\
�
C
�
\
C4
�
� 04 04
j \ §
LL �r
¢
R
O
R
m
e
@
O
u
R 0
U w � ]
� 7
w \
a
/
0
./
G
L a
02 \
w .@ m
o
k f
w2 E
(.)
«
w2%
w�%
w.2§\
LLI
Ok§
O§§
CL
a///
d
�
\
�
d
C%l
�
§ ^ k
j \ §
LL r
�
R
0
§ j R
2
LL j
b /m
w e\
U LULU
k LU \j
m
\
\