HomeMy WebLinkAboutItem 30 - Adopt OCTA Funding Program Eligibility RequirementsPublic Works Agency
www.santa-ana.org/pw
Item # 30
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
December 7, 2021
TOPIC: Adopt OCTA Funding Program Eligibility Requirements
AGENDA TITLE:
Fiscal Year 2020-21 Measure M2 Year -End Expenditure Report and Measure M2 Seven -
Year CIP
RECOMMENDED ACTION
1. Adopt a resolution approving the Measure M2 Annual Expenditure Report for Fiscal
Year 2019-20 and authorize submission of the report to the Orange County
Transportation Authority as required by Measure M2 Funding Eligibility Guidelines.
2. Update the Measure M2 Seven Year CIP for Fiscal Years 2021-2022 through 2027-
2028.
DISCUSSION
In November 1990, Orange County voters approved Measure M, a 20-year one -half -cent
sales tax to fund transportation projects in Orange County. Sixteen years later, in
November 2006, the voters again approved the Renewal of Measure M, referred to as
M2, for an additional thirty years. M2 became effective in April 2011. The net revenues
generated by M2 contribute to two types of grant funding: Local Fair Share (LFS) and
Competitive. All Orange County cities are eligible for LFS funding, which is distributed
based on population, number of existing Master Plan of Arterial Highways centerline
miles, and taxable sales. Under the competitive component of M2 funding, cities must
compete and demonstrate support of regional transportation to successfully qualify for
grant monies. Fulfilling M2 eligibility requirements also allows the City to qualify for other
regional competitive OC Go M2 grant funding opportunities.
Each year, local agencies are required to submit documentation to the Orange County
Transportation Authority (OCTA) that includes the End -of -Year Expenditure Report
adopted via resolution. The Expenditure Report is a detailed financial document
submitted by each jurisdiction which is used to track and validate financial activity related
to the Renewed Measure M2 and other improvement funds. The report accounts for
receipt, interest earned, and use of Measure M2 and other funds, while delineating the
distribution of actual revenue and expenditures consistent with Maintenance of Effort
requirements. Adoption of the Measure M2 Annual Expenditure Report by resolution
Fiscal Year 2020-21 Measure M2 Year -End Expenditure Report and Measure M2 Seven -
Year CIP
December 7, 2021
Page 2
(Exhibit 1) is a required reporting element that must be submitted within six months of the
jurisdiction's fiscal year end.
On June 3, 2021, the City Council approved the City's Seven -Year CIP, and approved
and authorized the Director of Public Works/City Engineer to Submit the City of Santa
Ana's Measure M2 eligibility submittals to OCTA by the June 30, 2021 deadline.
On August 23, 2021, OCTA notified the City of its review of the City's submittal, and
recommended that a revision be submitted for the M2 Seven -Year CIP. The requested
revision is necessary in order to re -authorize expenditures of two grant allocations for
current fiscal year expenditure.
As requested by OCTA, staff recommends that the City Council approve the Updated
Measure M2 Seven -Year CIP Project Report (Exhibit 2) to maintain eligibility for funding
under the Orange County Renewed Measure M Programs.
The revised M2 Seven -Year CIP Project Report is being updated to include the following
projects with M2 funding: Bristol Street Improvements, Phases 3A and 4.
Staff recommends that the City Council approve both Recommended Actions to continue
with the flow of project funding, while maximizing grant compliance under the grant
eligibility requirements presented.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Approval of the Recommended Action will maintain the City's eligibility to receive Measure
M2 funds annually. Upon renewal of Measure M2 eligibility, the City of Santa Ana is
anticipated to receive an estimated $4.7 million in LFS funds and potentially over $11
million in M2 competitive grant funds for Fiscal Year 2021-22. In the past, the City has
received an average of $20 million dollars in combined annual revenue from M2 LFS and
competitive fund program allocations. If the Recommended Actions are not approved, the
City will lose Measure M2 LFS revenue, along with the ability to apply for and receive
future OCTA Comprehensive Transportation Funding Program competitive grant funds.
EXHIBIT(S)
1. Resolution — M2 Year -End Expenditure Report
2. Updated Measure M2 Seven -Year CIP
Submitted By: Nabil Saba, Executive Dir Public Works
Approved By: Kristine Ridge, City Manager
RESOLUTION NO. 2021-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA CONCERNING THE MEASURE M2
EXPENDITURE REPORT FOR THE CITY OF SANTA ANA
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA
AS FOLLOWS:
Section 1. The City Council of the City of Santa Ana hereby finds, determines
and declares as follows:
A. Local jurisdictions are required to meet eligibility requirements and submit
eligibility verification packages to the Orange County Transportation
Authority (OCTA) in order to remain eligible to receive M2 funds.
B. Local jurisdictions are required to adopt an annual M2 Expenditure Report
as part of one of the eligibility requirements.
C. Local jurisdictions are required to account for Net Revenues,
developer/traffic impact fees, and funds expended by the local jurisdiction
in the M2 Expenditure Report that satisfy the Maintenance of Effort
requirements.
D. The M2 Expenditure Report shall include all Net Revenue fund balances,
interest earned, and expenditures identified by type and program or project.
E. The M2 Expenditure Report must be adopted and submitted to the OCTA
each year within six months of the end of the local jurisdiction's fiscal year
to be eligible to receive Net Revenues as part of M2.
Section 2. The City Council of the City of Santa Ana hereby finds that the
FY 2020/21 Measure M2 Expenditure Report is in conformance with the template
provided in the Measure M2 Eligibility Guidelines and accounts for Net Revenues
including interest earned, expenditures during the fiscal year, and balances at the end
of fiscal year.
Section 3. The M2 Expenditure Report is hereby adopted by the City of
Santa Ana.
Section 4. The Finance Director of the City of Santa Ana is hereby
authorized to sign and submit the Measure M2 Expenditure Report to OCTA for the
fiscal year 2020/21.
Resolution No. 2021-XXX
Page 1 of 2
Section 5. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this day of
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
John M. Funk
Sr. Assistant City Attorney
AYES:
NOES:
ABSTAIN:
NOT PRESENT
Councilmembers
Councilmembers
Councilmembers
Councilmembers
2021.
Vicente Sarmiento
Mayor
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, DAISY GOMEZ, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2021-XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on
Date:
Clerk of the Council
City of Santa Ana
Resolution No. 2021-XXX
Page 2 of 2
Orange County Transportation Authority
FY 2021/22 - FY 2027/28 Capital Improvement Program
TIP ID CP-11671
IMPLEMENTING AGENCY Santa Ana, City
Local Project Number:
Project Title
Additional Project IDs:
Alley Improvement Program
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance -
This project will provide for the removal of existing damaged
pavement and reconstruction with
Alleys
Portland Cement Concrete (PCC) for alleys citywide.
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Citywide
YEAR
ESCALATED
Project Notes
2022 Measure M2 Local $10,800 $0
$135,115 $0 $145,915 $150,104
Fairshare
Totals: $10,800 $0
$135,115 $0 $145,915 $150,104
LabL revised: 21-00 - Approved
Total Programmed: $145,915
TIP ID CP-11236
IMPLEMENTING AGENCY
Santa Ana, Citv of
Local Project Number: N/A
Project Title
Additional Project IDs:
Bike Lane Project Development
Type of Work: Bikeways
Project Description
Provides for the engineering services
that are necessary
for grant applications,
Type of Work Description: Bikeways - Planning
development/preparation
of plans, specifications, bike
but maintenance
and estimates related to bike
lane projects.
Limits
FISCAL
FUND TYPE
ENG
ROW CON/IMP O&M TOTAL
TOTAL
City wide
YEAR
ESCALATED
Project Notes
2022
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
2023
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
2024
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
2025
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
2026
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
2027
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
2028
Measure M2 Local
$80,000
$0
$0
$0 $80,000
$80,000
Fairshare
Totals: $560,000
$0
$0
$0 $560,000 $560,000
Last Revised: 21-00 - Approved
Total Programmed: $560,000
TIP 1^ r'Q--';rPr
IMPLEMENTING AGENCY Santa Ana, City of
Local Project Number: 21-SNTA-ICE-3995
Project Title
Additional Project IDs: 21-SNTA-ICE-3995
Bristol St. and Memory Ln. Intersection Improvements
Type of Work: Intersection
Project Description
Type of Work Description: Intersection -Add
Widening of the intersection at Bristol Street and Memory Lane. The proposed project would include
through lane(s) to intersection
adding a southbound through lane by replacement/installation or curbs, gutters, sidewalk, driveway
approaches, pavement, landscaping, curb ramps, and a
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Bristol St. north of Memory Lane
Project Notes
2022 Intersection Capacity $0 $0 $1,012,500 $0 $1,012,500 $1,043,887
Enhancements (ICE)
Sept. SAR- updated ENG scheduled
completion date and ROW scheduled completion
2022 Other $0 $0 $337,500 $0 $337,500 $347,962
date. Updated CON start and completion dates.
SEPT 2021 SAR REVIEW: NO PROJECT
AMENDMENT REQUESTED; SCHEDULE
Totals: $0 $0 $1,350,000 $0 $1,350,000 $1,391,849
UPDATED: CA 09/27/21 REMINDER: Award
Deadline is 06/30/22.
Last Revised: 21-00 -
Total Programmed: $1,350,000�
Local Project Number: 20-SNTA-ACE-3968 Project Title
Additional Project IDs: 20-SNTA-ACE-3968 Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Add Bristol Street from Civic Center Drive to Washington Avenue would be widened to a total of six lanes
1 lane to existing roadway in project limits (three lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation
Element and the County of Orange Master Plan of
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Civic Center Drive to Washington Avenue YEAR ESCALATED
Project Notes 2023 Federal $0 $0 $793,760 $0 $793,760 $843,736
SEPT 2021 SAR REVIEW: PROJECT 2023 Arterial Capacity
AMENDMENT REQUESTED (24-MONTH FUNDS Enhancements (ACE)
EXTENSION). CITY ADVISED BY OCTA TO 2023 Other
POSTPONE FUNDS EXTENSION REQUEST TO
A LATER SEMI-ANNUAL REVIEW CYCLE
AFTER AWARDING A
CONTRACT/ENCUMBERING PROJECT FUNDS;
SCHEDULE UPDATED; CITY STATES ON
TRACK TO AWARD BY THE JUNE 30, 2023
DEADLINE: CA 09/27/21
Last Revised: 21-00 - Submitted
$0 $0 $3,273,573 $0 $3,273,573 $3,479,680
$0 $0 $297,431 $0 $297,431 $316,158
Totals: $0 $0 $4,364,764 $0 $4,364,764 $4,639,574
Total Programmed: $4,364,764I
Local Project Number: 20-SNTA-ACE-3969
Project Title
Additional Project IDs: 20-SNTA-ACE-3969
Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place
Type of Work: Road Widening
Project Description
Type of Work Description: Road Widening - Add Bristol Street from Warner Avenue to St. Andrew Place would be widened to a total of six lanes (three
2 lanes to existing roadway in project limits
lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation
Element
and the County of Orange Master Plan of Arteri
Limits
FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR
TOTAL
ESCALATED
Warner Avenue to St. Andrew Place
Project Notes
2023 Other $0 $0 $992,357 $0 $992,357
$1,054,837
SEPT 2021 SAR REVIEW: NO PROJECT
2023 Federal $0 $0 $1,508,045 $0 $1,508,045
$1,602,993
AMENDMENT REQUESTED; NO SCHEDULE
2023 Arterial Capacity $0 $0 $7,501,206 $0 $7,501,206
$7,973,489
CHANGES: CA 09/27/21 REMINDER: Award
Enhancements (ACE)
Deadline is 06/30/23.
Lagt Revised: 21-00 - Submitted
Totals: $0 $0 $10,001,608 $0 $10,001,608 $10,631,319
Total Programmed: $10,001,608�
Local Project Number: N/A Project Title
Additional Project IDs: Citywide Speed Limit Study
Type of Work: Transportation Planning Project Description
Type of Work Description: Transportation This project will provide for the hiring of a traffic engineering consultant to conduct an engineering and
Planning - Engineering traffic survey to update speed limits Citywide in accordance with state law requirements. Project scope
includes installation of new signs as
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Citywide YEAR ESCALATED
Project Notes 2022 Measure M2 Local $70,000 $0 $0 $0 $70,000 $70,000
Fairshare
Last Revised: 21-00 -
Totals: $70,000 $0 $0 $0 $70,000 $70,000
Total Programmed: $70,000
Local Project Number: 21-SNTA-ACE-3996 Project Title
Additional Project IDs: 21-SNTA-ACE-3996 Fairview Street Improvements from 9th St. to 16th St.
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Add Fairview Street is classified as a north -south Major Arterial per the City's General Plan Circulation
2 lanes to existing roadway in project limits Element (GPCE) and the County of Orange's Master Plan of Arterial Highway (MPAH). The proposed
improvements would include widening Fairview Street b
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
9th St. to 16th St. YEAR ESCALATED
Project Notes 2022 Arterial Capacity $0 $1,937,250 $0 $0 $1,937,250 $1,997,305
Enhancements (ACE)
2021 and updated ROW Improv start and end Sept. 2021 SAR- updated ENG completion Step 2022 Federal $0 $645,750 $0 $0 $645,750 $665,768
dates from July to October 2021 and from March 2023 Arterial Capacity $0 $0 $3,721,590 $0 $3,721,590 $3,955,905
to June 2022. SEPT 2021 SAR REVIEW: NO Enhancements (ACE)
PROJECT AMENDMENT REQUESTED; 2023 Federal $0 $0 $21,089,012 $0 $21,089,012 $22,416,797
SCHEDULE UPDATED: CA 09/27/21 REMINDER:
ROW Award Deadline is 06/30/22.
Totals: $0 $2,583,000 $24,810,602 $0 $27,393,602 $29,035,775
Last Revised: 21-00 - Approved Total Programmed: $27,393,602
TIP ID CP-11673
IMPLEMENTING AGENCY Santa Ana, City
Local Project Number:
Project Title
Additional Project IDs:
First Street Corridor Traffic Signal Synchronization
Type of Work: Traffic Signals
Project Description
Type of Work Description: Traffic Signals -
To provide inter -agency traffic signal coordination and infrastructure upgrades on First Street/ Bolsa
Interconnect traffic signals to improve coordination
Avenue from Bolsa Chica Street in City of Huntington Beach through the Cities of Westminster, Santa
and communications
Ana and County of Orange to Newport Avenue.
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Bolsa Chica Street in City of Huntington Beach to
Newport Avenue in City of Tustin.
2022 Measure M2 Local $40,000 $0 $340,000 $0 $380,000 $390,540
Project Notes
Fairshare
2022 Measure M2 Local $40,000 $0 $340,000 $0 $380,000 $390,540
Fairshare
Local Project Number: 20-OCTA-TSP-4002
Additional Project IDs:
Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Interconnect traffic signals to improve coordination
and communications
Limits
Bolsa Chica Street in City of Huntington Beach to
Newport Avenue in City of Tustin.
Project Notes
Project led by OCTA as First/Bolsa signal
coordination.
Last Revised: 21-00 - Approved
Totals: $80,000 $0 $680,000 $0 $760,000 $781,080
Total Programmed: $760,000
Project Title
First Street Corridor Traffic Signal Synchronization
Project Description
To provide inter -agency traffic signal coordination and infrastructure upgrades on First Street/ Bolsa
Avenue from Bolsa Chica Street in City of Huntington Beach through the Cities of Westminster, Santa
Ana and County of Orange to Newport Avenue.
FISCAL TOTAL
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
2022 Measure M2 Local $40,000 $0 $340,000 $0 $380,000 $390,540
Fairshare
Totals: $40,000 $0 $340,000 $0 $380,000 $390,540
Total Programmed: $380,000
Local Project Number: N/A
Project Title
Additional Project IDs:
Local Street
Preventative Maintenance
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance -
This project provides for the application
of crack seal
and slurry seal to various streets
City wide.
Slurry seal of roadway
Limits
FISCAL
FUND TYPE
ENG
ROW CON/IMP
O&M TOTAL
TOTAL
City wide
YEAR
ESCALATED
Project Notes
2022
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,086,118
Fairshare
2023
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,174,906
Fairshare
2024
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,266,446
Fairshare
2025
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,360,824
Fairshare
2026
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,458,127
Fairshare
2027
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,558,447
Fairshare
2028
Measure M2 Local
$222,000
$0
$2,778,000
$0
$3,000,000
$3,661,877
Fairshare
Totals: $1,554,000 $0
$19,446,000
$0
$21,000,000 $23,566,745
Total Programmed: $21,000,000
4na, City
Local Project Number: N/A
Project Title
Additional Project IDs:
Pavement Management
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance -
The City's Pavement Management System was first prepared in 1992. This
project provides for a
Studies or PMP updates
Citywide inventory of street pavement
to identify any
changes in condition
and record any damage.
Limits
FISCAL FUND TYPE
ENG
ROW CON/IMP O&M TOTAL
TOTAL
Citywide
YEAR
ESCALATED
Project Notes
2022 Measure M2 Local
$325,000
$0
$0
$0
$325,000
$325,000
Fairshare
Amended $50k originally listed as Gas Tax
revenue to the existing $200k Local Fairshare M2
2023 Measure M2 Local
$250,000
$0
$0
$0
$250,000
$250,000
revenue for the same aggregate total of $250k -
Fairshare
7/6/20 [gas tax was erroneously listed as funding
2024 Measure M2 Local
$400,000
$0
$0
$0
$400,000
$400,000
source in first input]
Fairshare
2025 Measure M2 Local
$250,000
$0
$0
$0
$250,000
$250,000
Fairshare
2026 Measure M2 Local
$400,000
$0
$0
$0
$400,000
$400,000
Fairshare
2027 Measure M2 Local
$250,000
$0
$0
$0
$250,000
$250,000
Fairshare
2028 Measure M2 Local
$400,000
$0
$0
$0
$400,000
$400,000
Fairshare
Totals: $2,275,000 $0 $0 $0 $2,275,000 $2,275,000
Total Programmed: $2,275,000
Local Project Number: N/A
Project Title
Additional Project IDs:
Project Development
Type of Work: Administration
Project Description
Type of Work Description: Administration -
Grant This project includes staff coordination related to grant
application
preparation and submittal.
It also
application services
entails staff response to City Council, resident, and business
inquires.
It includes
environmental,
preliminary engineering, and right-of-way.
Limits
FISCAL FUND TYPE
ENG
ROW CON/IMP O&M TOTAL
TOTAL
City wide
YEAR
ESCALATED
Project Notes
2022 Measure M2 Local
$125,000
$0
$0
$0
$125,000
$125,000
Fairshare
2023 Measure M2 Local
$150,000
$0
$0
$0
$150,000
$150,000
Fairshare
2024 Measure M2 Local
$150,000
$0
$0
$0
$150,000
$150,000
Fairshare
2025 Measure M2 Local
$150,000
$0
$0
$0
$150,000
$150,000
Fairshare
2026 Measure M2 Local
$150,000
$0
$0
$0
$150,000
$150,000
Fairshare
2027 Measure M2 Local
$150,000
$0
$0
$0
$150,000
$150,000
Fairshare
2028 Measure M2 Local
$150,000
$0
$0
$0
$150,000
$150,000
Fairshare
_ast Revised: 21-00 - Approved
Totals: $1,025,000 $0 $0 $0 $1,025,000 $1,025,000
Total Programmed: $1,025,000�
77 nta Ana,
Local Project Number: Project Title
Additional Project IDs: Project W Bus Shelter Project
Type of Work: Transit Project Description
Type of Work Description: Transit - Stops, Install new bus shelters with integral benches, trash receptacles and advertisement panels.
shelters, benches, amenities, etc.
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Citywide YEAR ESCALATED
Project Notes 2022 Measure M2 Local $0 $0 $1,030,000 $0 $1,030,000 $1,061,930
Fairshare
Totals: $0 $0 $1,030,000 $0 $1,030,000 $1,061,930
.astRevised: 21-00-Approved Total Programmed: $1,030,000�
Local Project Number: N/A
Project Title
Additional Project IDs:
Right -of -Way
Management
Type of Work: Administration
Project Description
This project provides
for the management and administration
of right-of-way
acquisitions/real estate
Type of Work Description: Administration - Other transactions,
which requires coordination
of activities
with the City Attorney's Office and other
agencies.
Limits
FISCAL
FUND TYPE
ENG
ROW CON/IMP O&M TOTAL TOTAL
City wide
YEAR
ESCALATED
Project Notes
2022
Measure M2 Local
$350,000
$0
$0
$0 $350,000 $350,000
Fairshare
2023
Measure M2 Local
$150,000
$0
$0
$0 $150,000 $150,000
Fairshare
2024
Measure M2 Local
$150,000
$0
$0
$0 $150,000 $150,000
Fairshare
2025
Measure M2 Local
$150,000
$0
$0
$0 $150,000 $150,000
Fairshare
2026
Measure M2 Local
$150,000
$0
$0
$0 $150,000 $150,000
Fairshare
2027
Measure M2 Local
$150,000
$0
$0
$0 $150,000 $150,000
Fairshare
2028
Measure M2 Local
$150,000
$0
$0
$0 $150,000 $150,000
Fairshare
Totals: $1,250,000 $0
$0
$0 $1,250,000 $1,250,000
_ast Revised: 21-00 - Approved
Total Programmed: $1,250,000
78
Local Project Number:
Project Title
Additional Project IDs:
Safe Mobility Santa Ana Update
Type of Work: Safety
Project Description
Safe Mobility Santa Ana Update will re-evaluate citywide traffic safety. The study will analyze traffic
Type of Work Description: Safety - Other
collisions, identify contributing factors or patterns, recommend improvements, develop cost estimates
and prioritize recommended improvements.
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Citywide
Project Notes
2022 Agency Contribution $147,000 $0 $0 $0 $147,000 $147,000
2022 Measure M2 Local $33,000 $0 $0 $0 $33,000 $33,000
Fairshare
Totals: $180,000 $0 $0 $0 $180,000 $180,000
Last Revised: 21-00 - Approved Total Programmed: $180,000
Local Project Number:
Project Title
Additional Project IDs:
Traffic Management Plans
Type of Work: Transportation Planning
Project Description
Type of Work Description: Transportation
Conduct a variety of traffic counts at various locations
Citywide
to
collect data needed for traffic
Planning - Studies
management planning, signal priority
studies, signal
timing, etc., preparation
of aerial
maps, and to
maintain the storage and management
of accident
Limits
FISCAL FUND TYPE
ENG
ROW CON/IMP O&M TOTAL
TOTAL
City wide
YEAR
ESCALATED
Project Notes
2022 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2023 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2024 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2025 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2026 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2027 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2028 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
Totals: $350,000 $0 $0 $0 $350,000 $350,000
Total Programmed: $350,000
Local Project Number: N/A
Project Title
Additional Project IDs:
Traffic Safety Project Development
Type of Work: Administration
Project Description
Type of Work Description: Administration -
Provides for the engineering design services that are
necessary for grant applications, environmental
Transportation planning/engineering studies
documents, development/preparation
of plans, specifications, and estimates related to traffic safety
improvement projects.
Limits
FISCAL FUND TYPE
YEAR
ENG
ROW CON/IMP O&M TOTAL
TOTAL
ESCALATED
City wide
Project Notes
2022 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2023 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2024 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2025 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2026 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2027 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
2028 Measure M2 Local
$50,000
$0
$0
$0
$50,000
$50,000
Fairshare
Totals: $350,000 $0 $0 $0 $350,000 $350,000
Total Programmed: $350,000
Local Project Number: N/A
Project Title
Additional Project IDs:
Traffic Signal Equipment Replacement
Type of Work: Traffic Signals
Project Description
Type of Work Description: Traffic Signals -
Replace outdated traffic signal and monitoring equipment,
such as cabinets, conflict monitors,
Install new traffic signals and equipment
controllers, CCTV,
and communication equipment both in the field and
in the traffic management
center.
Limits
FISCAL
FUND TYPE
ENG ROW CON/IMP O&M TOTAL TOTAL
City wide
YEAR
ESCALATED
Project Notes
2022
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $103,100
Fairshare
2023
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $106,296
Fairshare
2024
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $109,591
Fairshare
2025
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $112,989
Fairshare
2026
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $116,491
Fairshare
2027
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $120,102
Fairshare
2028
Measure M2 Local
$0
$0
$100,000 $0
$100,000 $123,826
Fairshare
Totals: $0 $0 $700,000 $0 $700,000 $792,395
Total Programmed: $700,000
Local Project Number: 21-SNTA-ACE-3997
Project Title
Additional Project IDs: 21-SNTA-ACE-3997
Warner Avenue Improvements - Oak Street to Grand Avenue
Type of Work: Road Widening
Project Description
Type of Work Description: Road Widening - Add This segment (Oak Street to Grand Avenue) is part of the Warner Avenue Improvements project from
2 lanes to existing roadway in project limits
Main Street to Grand Avenue which would be widened to a total of six lanes (three lanes in each
direction) to be consistent with the City of Santa Ana Ge
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Oak Street to Grand Avenue
Project Notes
$0 $0 $9,076,305 $0 $9,076,305 $9,357,670
2022 Arterial CapacityEnhancements
(ACE)
Sept. SAR- no changes. SEPT SAR
REVIEW:W: NO PROJECT AMENDMENTNT
2022 Other $0 $0 $3,025,435 $0 $3,025,435 $3,119,223
REQUESTED; NO SCHEDULE CHANGES: CA
09/27/21
Totals: $0 $0 $12,101,740 $0 $12,101,740 $12,476,893
Total Programmed: $12,101,740�