HomeMy WebLinkAboutItem 18 - Campesino, Memorial, and Madison Park Restroom ProjectsPublic Works Agency https://www.santa-ana.org/pw Item # 20 o`7, City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report October 19, 2021 TOPIC: Campesino Park, Memorial Park, and Madison Park Restroom Projects AGENDA TITLE Award a Construction Contract to Build Spectrum, Inc. in the Amount of $1,408,575, for the Campesino Park, Memorial Park, and Madison Park Restrooms Fiscal Year 2021-22 Projects, with an Estimated Project Delivery Cost of $1,640,000, and Amend the Fiscal Year 2021-22 Capital Improvement Program (Project Nos. 21-7533, 21-7534, 21-7535) (Non -General Fund) (Revive Santa Ana Program) RECOMMENDED ACTION 1. Award a construction contract to Build Spectrum, Inc., the lowest responsible bidder, in accordance with the base bid in the amount of $1,408,575, for construction of the Campesino Park, Memorial Park, and Madison Park Restroom Projects, for the term beginning September 21, 2021, and ending upon project completion, and authorize the City Manager to execute the contract subject to non -substantive changes approved by the City Manager and the City Attorney. 2. Approve the Project Cost Analysis for a total estimated construction delivery cost of $1,640,000, which includes $1,408,575 for the construction contract, $91,072 for contract administration, inspection and testing, and a $140,353 project contingency for unanticipated or unforeseen work. 3. Approve an amendment to the Fiscal Year 2021-22 Capital Improvement Program to add the Campesino Park, Memorial Park, and Madison Park Restroom Projects, for the total amount of $1,731,072, which includes $1,640,000 in construction funds and an additional $91,072 for preliminary design engineering. DISCUSSION The City has identified three park restrooms (Exhibit 1) that are a target for vandalism and require major efforts to maintain due to the old age and existing conditions. This project scope includes: demolishing the existing restroom buildings, installing new pre- fabricated restroom buildings, and some site improvements to provide an accessible path of travel to these facilities. Award Construction Contract to iBuild Spectrum, Inc. October 19, 2021 Page 2 Public Outreach and Contractor Participation To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in the Orange County Register newspaper on February 26 and March 5, 2021. The project was also advertised on PlanetBids, and bids were received electronically via PlanetBids on April 15, 2021. The City notified a total of 580 regional vendors via PlanetBids, two of which were Santa Ana based, and 52 vendors requested bidding documents. The lowest responsive bid was received from a Santa Ana contractor. Bid Results Summary RANK BIDDER'S NAME LOCATION BASE BID 1 iBuild Spectrum, Inc. Santa Ana $1,408,575.00 2 HYM Engineering, Inc. Fullerton $1,478,200.00 3 C.S. Legacy Construction, Inc. Chino $1,541,850.00 4 JF Engineering Pomona $1,582,006.74 5 Aneen Construction, Inc. Riverside $1,643,340.00 6 AG Construction Tarzana $1,649,115.00 A total of six bids were received, and all were deemed responsive. iBuild Spectrum, Inc., submitted the lowest responsive base bid, in the amount of $1,408,575 (Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the basis of the Base Bid. Based on the bid analysis and a contractor's reference check, staff recommends awarding the construction contract to iBuild Spectrum, Inc., in the amount of the base bid totaling $1,408,575 (Exhibit 3). Project Delivery To deliver a complete project, in addition to the construction contract, the estimated total project delivery cost includes: construction administration, inspection, and testing, along with an allowance for contingencies to account for unexpected or unforeseen conditions. Construction administration and inspection includes: construction management, implementation of the City's Community Workforce Agreement requirements, inspection of the Contractor's work to ensure contract compliance, workmanship, and quality, and materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the table below, the estimated total construction delivery cost of the project is $1,640,000. Award Construction Contract to iBuild Spectrum, Inc. October 19, 2021 Page 3 Project Item Total Construction Contract $1,408,575 Construction Administration, Inspection, Testing $91,072 Contingencies $140,353 TOTAL CONSTRUCTION DELIVERY COST $1,640,000 ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER- 2021-093 will be filed for the project. FISCAL IMPACT As indicated in the Cost Analysis, the estimated total construction delivery cost of the project is $1,640,000, which includes construction, contract administration, inspection, testing, and an authorized contingency. Project Nos. 21-7533, 21-7534, and 21-7535 have been assigned for tracking of all expenditures to deliver the construction of these projects. Funds for these projects were appropriated in Fiscal Year 2020-21. Approval of the amendment to the FY 2021-22 Capital Improvement Program (Exhibit 5) will officially incorporate these projects into the program. As part of the Citywide budget carry -forward process, the Community Development Agency submitted to the Finance Department a request for these funds to be carried forward into Fiscal Year 2021-22. This carry -forward request was compiled with requests from other departments and is being presented for City Council approval on this same agenda under a separate agenda item. The following table summarizes the funds budgeted and available for expenditure to deliver construction of these projects. Fiscal Accounting Unit - Accounting Unit - Year Account No. Fund Description Account No. Amount (Project No.) Description 13518783-66200 Community CDBG Programs, 2021-22 (21-7533) Development Building $223,214 Block Grant Improvements 13518783-66200 Community CDBG Programs, 2021-22 (21-7534) Development Building $510,786 Block Grant Improvements 13518783-66200 Community CDBG Programs, 2021-22 (21-7535) Development Building $24,928 Block Grant Improvements Award Construction Contract to iBuild Spectrum, Inc. October 19, 2021 Page 4 Fiscal Accounting Unit - Accounting Unit - Year Account No. Fund Description Account No. Amount (Project No.) Description 2021-22 18113013-66200 American ARPA-PRCSA, Building $303,572 (21-7533) Rescue Plan Act Improvements 2021-22 18113013-66200 American ARPA-PRCSA, Building $577,500 (21-7535) Rescue Plan Act Improvements Total $1,640,000 EXHIBIT(S) 1. Location Map 2. Bid Results 3. Construction Contract 4. Cost Analysis 5. FY 2021-22 Capital Improvement Program Sheets Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency and Lisa Rudloff, Executive Director — Parks, Recreation, and Community Services Approved By: Kristine Ridge, City Manager Exhibit 1 o�N oRAf, SANTAANA Project No. 21-7533: �� P�i Campesino Park Restroom u . . PUBLIC WORKS AGENCY T � Exhibit 1 o�H oRgry0e � SANTAANA Project No. 21-7535: ���, 0 PMadison Park ; PUBLICWORKS AGENCY Restroom Exhibit 1 O�H oRgry0e � SANTAANA Project No. 21-7534: ���, 0 PMemorial Park ; PUBLICWORKS AGENCY Restroom Exhibit 1 PROJECT REF#: I W27-1 ] 1212D2a5 :nawr w,rxwinn�rrnmwsnworrcwremmxawurc wwmcermm Z 7fl SNMPA6 AY I.UnC81 I lEYP NAM P.8 2 i:BB&C8&1Y SANTAANA Project No. 21-7533: P�1 Campesino, Memorial, & Madison Park Restroom Rendering PUBLIC WGRKS AGENCY Exhibit 1 Hqw PROJECT REF#: W927-111212020-5 EW FLOOR PLAN s [-E ana-IV o�,A ORANGE \ F SMTAMA 11 Project No. 21-7533: 0 x Pl Campesino, Memorial, & Madison Park Restroom ; PUBLIC WORKSAGENCY Rendering Exhibit 1 SCOREI V_T GRAFT ELEVATION 1 scueane•-r-0• ELEVATION 2 SCALE:NIF-Y JECT REF#: 10927- ! 11212a20 5 O�ty ORANG E 5MTAMA1 Project No. 21-7533: �� x Pl Campesino, Memorial, & Madison Park Restroom PUBLIC WORKSAGENCY Rendering EXTUZZ ME Exhibit 1 scaRFJ VI1 GRA' i.WtiL ..T.Odam _ SCORED BLOCKS W! VRROCEM Mill GRAFFITI COATING ELEVATION 3 ELEVATION 4 PROJECT REF#:10827-I?1212020-5 SANTAANA Project No. 21-7533: ua1 Campesino, Memorial, & Madison Park Restroom , Rendering PUBLIC WORKSAGENCY City of Santa Ana Campesino Park, Memorial Park, & Madison Park Restrooms (21-7533, 21-7534, 21-5735), bidding on 04/15/2021 2:00 PM (PDT) Page 1 of 3 Printed 07/28/2021 Exhibit 2 Bid Results Bidder Details Vendor Name iBuild Spectrum Address 540 N. Golden Circle Dr STE 201 Santa Ana, California 92705 United States Respondee Farshad Farahani Respondee Title RMO I Director Phone 714-661-9474 Email farshad@ibuildspectrum.com Vendor Type CADIR License # 858445 Bid Detail Bid Format Electronic Submitted 04/15/2021 1:50 PM (PDT) Delivery Method Bid Responsive Bid Status Submitted Confirmation # 249563 Respondee Comment Buyer Comment Attachments File Title Bid Package.pdf File Name Bid Package.pdf File Type General Attachment PlanetBids, Inc. City of Santa Ana Campesino Park, Memorial Park, & Madison Park Restrooms (21-7533, 21-7534, 21-5735), bidding on 04/15/2021 2:00 PM (PDT) Page 2 of 3 Printed 07/28/2021 Exhibit 2 Line Items Discount Terms No Discount Item # Item Code Base Bid 1 2 3 4 5 Type Item Description Demolition (Campesino Park) Demolition (Memorial Park) Demolition (Madison Park) I Utilities -Water I Utilities -Sewer 6 I Utilities -Electrical 7 I Furnish P-1.bneated 11-Iroom Building 8 I Site Preparation and Installation of Pre -Fabricated Building (Campesino Park) 9 I Site Preparation and Installation of Pre -Fabricated Building (Memorial Park) 10 I Site Preparation and Installation of Pre -Fabricated Building (Madison Park) 11 I AC Pavemenl 12 I PCC Walkway 13 I PCC Border 14 I PCC Mow Curb 15 1-Gallon Shrub 16 5-Gallon Shrub 17 24" Box Tree 18 Hydroseed 19 As -Built Plans 20 Construction Permit UOM QTY 1 Unit Price $35,000A000 $29,000A000 $45,000A000 $3&0000 $35,0000 $40.0000 $356,000.0000 $18,500.0000 $19,500.0000 $26,500A000 $21A000 $12A000 $1 OA000 Line Total Response Comment $1,408,575.0000 $35,000.0000 I Yes $29,000.0000 Yes $45,000.0000 Yes $11,400.0000 Yes $10,500A000 I Yes $12,000.0000 Yes $1,068,000.0000 Yes $18,500.0000 Yes $19,500.0000 I Yes $26,500.0000 I Yes $10,500.0000 I Ves $39,600.0000 Yes $6,000A000 Yes LS LS 1 LS 1 LF 300 LF 300 LF 300 EA 3 LS 1 LS 1 LS 1 SF 500 SF 3300 SF 600 LF 50 $550000 $2,750A000 I Ves I� EA 700 $16A000 $11,200.0000 I Ves EA 150 $725000 $750.0000 $3.5000 $30,000.0000 $10,00a0000 $11,625.000o $4,500.0000 $7,000.0000 $30,000.0000 $10,000.0000 Ves Yes Yes Yes Yes EA 6 SF 2000 LS 1 LS 1 PlanetBids, Inc. City of Santa Ana Page 3 of 3 Campesino Park, Memorial Park, & Madison Park Restrooms (21-7533, 21-7534, 21-5735), bidding on 04/15/2021 2:00 PM (PDT) Printed 07/28/2021 Exhibit 2 Line Item Subtotals Section Title Line Total Base Bid $1,408,575.0000 Grand Totall $1,408,575.0000 PlanetBids, Inc. CITY OF SANTA ANA Exhibit 3 CONSTRUCTION CONTRACT AGREEMENT PROJECT 21-7533, 21-7534, 21-5735 CAMPESINO PARK, MEMORIAL PARK & MADISON PARK RESTROOMS This CONSTRUCTION CONTRACT is made and entered into this 21" day of September, 2021 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and iBuild Spectrum (hereinafter "CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Campesino, Memorial, and Madison Park Restroom Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contracts Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Docuunents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed One Million Four Hundred Eight Thousand Five Hundred Seventy -Five Dollars and No Cents ($1,408,575), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as "Exhibit A." The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. 1 of 3 CITY OF SANTA ANA Exhibit 3 CONSTRUCTION CONTRACT AGREEMENT PROJECT 21-7533, 21-7534, 21-5735 CAMPESINO PARK, MEMORIAL PARK & MADISON PARK RESTROOMS 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY' S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: littp://www.santa-ana.org/pwa/documeiits/CWA.pdf 7. CONTRACTOR shall, after awardof this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. S. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attorney's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, 2of3 CITY OF SANTA ANA Exhibit 3 CONSTRUCTION CONTRACT AGREEMENT PROJECT 21-7533, 21-7534, 21-5735 CAMPESINO PARK, MEMORIAL PARK & MADISON PARK RESTROOMS of any of the obligations under the Contract Documents; (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work of Improvement. (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee. IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: CITY OF SANTA ANA DAISY GOMEZ Clerk of the Council APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney JOCN FUNK Assistant City Attorney RECOMMENDED FOR APPROVAL: NABIL SABA, PE Executive Director Public Works Agency KRISTINE RIDGE City Manager CONTRACTOR: Company: iBuild Spectrum Inc. Farshad FarahaniJRMO-Director NAME: Title: 3 of 3 EXHIBIT 4 COST ANALYSIS CONSTRUCTION OF PROJECT NO. 21-7533, 21-7534, 21-7535: CAMPESINO PARK, MEMORIAL PARK, MADISON PARK RESTROOMS Construction Contract $ 1,408,575.00 Contract Administration, Inspection and Testing $ 91,072.00 Contingencies $ 140,353.00 TOTAL ESTIMATED CONSTRUCTION COSTS 1 $ 1,640,000.00 PROJECT TITLE: Madison Pre -Fab Restroom PROJECT CATEGORY: Park Facility Improvements Park Facility LOCATION MAP A N CITY OF SANTA ANA FY21/22CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: Project scope includes demolishing the existing restroom building, installing a new pre -fabricated restroom building and site improvements to provide an accessible path of travel to these facilities. Exhib PROJECT NEED: The restroom at Madison Park is one of three restrooms that has been identified as a target for vandalism and would require major efforts to maintain due to old age and existing conditions. PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 Construction 564,928 - - - - - - Engineering 75,000 TOTAL 639,928 - - - - - - SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 Revive Santa Ana 577,500 - - - - - - CDBG Programs 62,428 TOTAL 639,928 - - - - AGENCY: DIVISION: CONTACT: DATE: Parks, Rec. & Community Services Administration Ron Ono, Administrative Services Manager 31-Aug-2021 PROJECT TITLE: Campesino Pre -Fab Restroom PROJECT CATEGORY: Park Facility Improvements Park Facility LOCATION MAP A N CITY OF SANTA ANA FY21/22CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: Project scope includes demolishing the existing restroom building, installing a new pre -fabricated restroom building, and site improvements to provide an accessible path of travel to these facilities. 4" PROJECT NEED: The restroom at Campesino Park is one of three restrooms that has been identified as a target for vandalism and would require major efforts to maintain due to old age and existing conditions. PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 Construction 500,000 - - - - - - Engineering 53,572 TOTAL 553,572 - - - - - - SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 Revive Santa Ana 303,572 - - - - - - CDBG Programs 250,000 TOTAL 553,572 - - - - AGENCY: DIVISION: CONTACT: DATE: Parks, Rec. & Community Services Administration Ron Ono, Administrative Services Manager 31-Aug-2021 PROJECT TITLE: Memorial Pre -Fab Restroom PROJECT CATEGORY: Park Facility Improvements Park Facility LOCATION MAP A N CITY OF SANTA ANA FY21/22CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: Project scope includes demolishing the existing restroom building, installing a new pre -fabricated restroom building and site improvements to provide an accessible path of travel to these facilities. Exhibit 5 PROJECT NEED: The restroom at Memorial Park is one of three restrooms that has been identified as a target for vandalism and would require major efforts to maintain due to old age and existing conditions. PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 Construction 484,000 - - - - - - Engineering 53,572 TOTAL 537,572 - - - - SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 CDBG Programs 537,572 - - - - - - TOTAL 537,572 - - - - AGENCY: DIVISION: CONTACT: DATE: Parks, Rec. & Community Services Administration Ron Ono, Administrative Services Manager 31-Aug-2021