Loading...
HomeMy WebLinkAboutItem 14 - Purchase Order Contract for Shade Canopies at Fitness Courts at City Parks Parks, Recreation, and Community Services https://www.santa-ana.org/parks Item # 14 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report April 20, 2021 TOPIC: Purchase Order Contract for Shade Canopies at Fitness Courts at City Parks AGENDA TITLE: Award a Purchase Order Contract to Dave Bang Associates, Inc. to Provide Fabric Shade Canopies over the Fitness Courts Located at Cabrillo, Delhi, El Salvador, Heritage, Jerome, Lillie King, Rosita and Thornton Parks, in an Amount Not to Exceed $151,401.62 (Non-General Fund) RECOMMENDED ACTION Award a purchase order contract to Dave Bang Associates, Inc. to provide custom fabric shade canopies over the fitness courts located at Cabrillo, Delhi, El Salvador, Heritage, Jerome, Lillie King, Rosita and Thornton Parks in an amount not to exceed $151,401.62, subject to non-substantive changes approved by the City Manager and City Attorney. DISCUSSION There are eight fitness courts located in City parks (Cabrillo, Delhi, El Salvador, Heritage, Jerome, Lillie King, Rosita and Thornton Parks) throughout the city. The installation of shade canopies over the fitness courts is essential in protecting participants from the harmful effects of sun exposure experienced in Santa Ana. In addition, the shade canopies will significantly lower temperatures and provide up to 98 percent UV protection, help keep the equipment surfaces cool, and ultimately make the fitness court more comfortable for users. Santa Ana City Ordinance No. NS-2312 authorizes the City to purchase against contracts from any public agency utilizing a competitive bid process. The Colton Joint Unified School District contract with Dave Bang Associates, Inc. for playground equipment & DSA (division of shade architects) shade shelters was awarded as a result of open, competitive bidding, and meets the City’s requirements. ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT Funds are budgeted and made available in the following accounts for the specified year: Purchase Order Contract for Shade Canopies at Fitness Courts at City Parks April 20, 2021 Page 2 6 3 4 Fiscal Year Accounting Unit- Account # Fund Description Accounting Unit, Account Description Amount FY 20-21 01213020-66220 Cannabis Public Benefit Fund PRCSA, Improvements Other Than Building $116,392.76 FY 20-21 05113263-66220 Capital Outlay Fund Capital Improvements, Improvements Other Than Building $35,008.86 EXHIBIT(S) 1. Quote Submitted By: Lisa Rudloff, Executive Director of Parks, Recreation and Community Services Approved By: Kristine Ridge, City Manager Estimate CA246359 P.O. Box 1088, TUSTIN, CA 92781 1-800-669-2585 DAVEBANG.COM INFO@DAVEBANG.COM LIC #795052 Page 1 / 4 To: City of Santa Ana Attn: Ali Borujerdi 20 Civic Center Plaza RM 429Santa Ana, CA 92701 Estimate Date Salesperson 04/01/2021 Marc Gutfeld City of Santa Ana - Fabric Shade Estimated Shipping Date Shipped Via FOB Terms 6-8 Weeks Truck - CA Santa Ana Net 30 Colton Joint Bid #18-02 Quantity Description Unit Price Total Extended 7 Custom Canopies, 54' x 40' x 40' Triangular Sails FabricShadewith 4 Post, 2 Top and 10'/16/22 Entry Height $15,300.00 $107,100.00 Less Colton Discount  ($5,355.00) 1 Engineering $1,100.00 $1,100.00 15 Rebar Cages and Threaded Rod Assemblies for Fabric Shade Shelters $530.00 $7,950.00 1 Custom Canopies, 54' x 40' x 40' / 56' x 45' x 30' Triangular Sails FabricShade with 6 Post, 3Top and 10'/16/22 Entry Height $23,107.00 $23,107.00 Less Colton Discount  ($1,155.35) 1 Engineering $1,100.00 $1,100.00 6 Rebar Cages and Threaded Rod Assemblies for Fabric Shade Shelters $530.00 $3,180.00 1 Shipping $1,700.00 $1,700.00 THIS ESTIMATE IS SUBJECT TO THE ATTACHED TERMS AND CONDITIONS Subtotal $138,726.65 THANK YOU FOR THIS CHANCE TO ESTIMATE Dave Bang Associate, INC. IS PLEASED TO SUBMIT THE ABOVE ESTIMATE FOR YOUR CONSIDERATION. SHOULD YOU PLACE AN ORDER, BE ASSURED IT WILL RECEIVE OUR PROMPT ATTENTION. THIS ESTIMATE IS SUBJECT TO THE ATTACHED TERMS AND CONDITIONS, AND IS VALID FOR 30 DAYS. THEREAFTER, IT IS SUBJECT TO CHANGE WITHOUT NOTICE. Tax (9.25%)$12,674.97 Total $151,401.62 Accepted ByPrint Name: Signature: Date:  PLEASE SIGN AND RETURN ONE COPY WHEN ORDERING.THANK YOU! Exhibit 1 Estimate CA246359 P.O. Box 1088, TUSTIN, CA 92781 1-800-669-2585 DAVEBANG.COM INFO@DAVEBANG.COM LIC #795052 Page 2 / 4   Terms & Conditions    1. General Notes *Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired. 2. Payment / Ordering *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays. Fax or email copy deemed to be legal equivalent of original. If Payment with Order is required, please sign quote below and return with payment. All past due accounts subject to 1 ½% monthly finance charge. In the event legal action is required to effect collection venue shall be Orange, CA. 3. Shipping / Unloading *Shipped by Common Carrier – Customer will need 2-4 people to unload. Liftgate NOT included. Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading. Delivery Drivers do NOT unload **IMPORTANT: Customer is responsible for receiving and checking quantities and condition at time of delivery - Please note any shortages or damages on delivery copy. *Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only. We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments 4. Engineered Wood Fiber *Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal. If Compaction of the Engineered Wood Fiber was purchased, a high capacity water source such as a hydrant must be available. If applicable, the cost of a meter and / or the cost of the water is NOT included in the proposal. If we need to acquire the meter and / or pay for the water, please request an updated proposal 5. General Notes for Purchased Installation *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply. *ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included. Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high. If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Installation to include marking of utilities by Dig Alert. Dig Alert CANNOT locate any private lines, PVC or plastic water lines. Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc. Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2-ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly. Please call for details. *Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted. Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering. Please call for details. *Area MUST have normal soil conditions and be level. *All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased Exhibit 1 Estimate CA246359 P.O. Box 1088, TUSTIN, CA 92781 1-800-669-2585 DAVEBANG.COM INFO@DAVEBANG.COM LIC #795052 Page 3 / 4 6. Temporary Fencing *Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote. If desired, the installers can put up caution tape, but Temporary Fencing is recommended. Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer. We are not responsible for any vandalism or injuries even with the provision of the fencing. 7. ADA Access *Play Equipment MUST be installed over an impact-absorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details. *This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details. 8. Poured-in-Place Rubber Surfacing *Rubber Surfacing cure time is normally 48-72 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48-Hour Manned Security is NOT included for rubber. 9. Shade Shelters (non DSA) *Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote - engineering, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City. *Shade Shelter manufacture time is 6-8 weeks. Permitting can add 2-4 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued! *Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted. 10. Shade Shelters (DSA) **6-8 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter. If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us *Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA in-plant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. 11. Prevailing Wages *Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included - Additional Labor Charges may apply if alternate labor is required. *If DIR Project Registration is required, work may not begin until we receive DIR Project ID number 12. Indemnity Provision *Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents. 13. Insurance Available Insurance Umbrella / Excess Liability: Each Occurrence - $2,000,000.00 Aggregate - $2,000,000.00 General Liability Limits: Deductible - $2,500.00 Each Occurrence - $1,000,000.00 Damage to Rented Premises - $100,000.00 Exhibit 1 Estimate CA246359 P.O. Box 1088, TUSTIN, CA 92781 1-800-669-2585 DAVEBANG.COM INFO@DAVEBANG.COM LIC #795052 Page 4 / 4 Medical Expense - $5,000.00 Personal & Adv Injury - $1,000,000.00 General Aggregate (per project) - $2,000,000.00 Products Comp/OP Agg - $2,000,000.00 Excludes Contractual Liability Available Endorsements: Additional Insured Ongoing Operations CG2010 Additional Insured Completed Operations CG 2037 Primary Noncontributory IFG-G-0094 Waiver of Subrogation CG 2404 Per Project Aggregate IFG-G-0065 Per Location Aggregate IFG-G-0064 Auto Liability Limits: (Any Auto, Hired Autos, Non-Owned Autos) Combined Single Limit $1,000,000.00 Available Endorsements: Auto Blanket Additional Insured/Waiver of Subrogation CAT353 Workers Compensation and Employers Liability: Each Accident - $1,000,000.00 Disease (Ea Employee) - $1,000,000.00 Disease (Policy Limit) - $1,000,000.00 Waiver of Subrogation Endorsement available upon request CA WC040306     Initial:  Exhibit 1 Exhibit 1