TOPIC: Carry-Over of Unspent Amounts from FY 2022-23 to FY 2023-24
AGENDA TITLE
Approve Appropriation Adjustment to Carry Over Unspent Amounts from Fiscal Year
2022-23 to Fiscal Year 2023-24
RECOMMENDED ACTION
1. Approve an Appropriation Adjustment to reduce the FY 2022-23 budget for
unspent amounts to be carried over to FY 2023-24. (Requires five affirmative
votes)
2. Approve an Appropriation Adjustment to increase the FY 2023-24 budget for
amounts carried forward from FY 2022-23. (Requires five affirmative votes)
DISCUSSION
Carryover of Unspent Budgets from FY 2022-23
It is common for a City to budget for non-recurring (one-time) expenditures, such as
construction projects, which are not completed by the close of the fiscal year on June
30. When this happens, the City Council may approve the “carry-over” of the unspent
budget from one fiscal year to the next to provide resources for project completion. Staff
typically does not request carry-over for recurring operating budget amounts unless
projects have not begun, with initial maintenance/operating costs, as each annual
budget already includes provisions for operational expenses.
The City Council adopts a budget one year at a time and the City’s Charter requires City
Council approval for appropriation adjustments. Increasing the current year’s budget for
unspent amounts carried over from the prior year constitutes an appropriation
adjustment.
Staff has compiled a list of carry-over requests (Exhibit 1) such as multi-year
capital/grant projects, delayed purchases due to vendor availability, and various one-
time projects approved for FY 2022-23 that were not completed by June 30, 2023. The
largest projects are a combination of Public Works and Community Development
projects for the modernization of the OC Civic Center and land acquisitions such as
1815 E. Carnegie Avenue for the Homeless Navigation Center, as well as various
parcels of land throughout the city to expand the city’s green space.
Carryover of Unspent Amounts from FY 2022-23 to FY 2023-24
September 19, 2023
Page 2
3
7
2
5
The General Fund comprises $52.5 million of the total $514.2 million in carryover
requests and the remainder is restricted funds. The General Fund carry-over amount
consist of capital projects, purchase of equipment, and one-time funding items. The list
includes the accounting unit, project description, status, and amount. All requests were
reviewed with City departments and analyzed to ensure the unspent budget is available
at the accounting unit and fund levels and the allocation is non-recurring.
The carry-over list does include several negative amounts. Our legal level of budgetary
compliance is by fund and department. These negative carryover amounts are
accompanied by positive carry-over amounts within the same fund and department. In
essence, these offsetting negative and positive amounts are being used to true-up the
budget between accounting units within a single department and fund to match
remaining available resources such as grants.
Each amount on the list includes the amount available one month after the end of FY
2022-23. Staff continued to pay FY 2022-23 invoices through the end of August and will
complete the reconciliation of accounts in October. The FY 2022-23 ledger will not be
final and closed until the financial statements have been audited in November.
Therefore, the requested carryovers are “maximum” amounts. The actual amounts
processed for carry-over will be limited to the available budget once the FY 2022-23
ledger is closed. Carryovers are summarized by fund in Exhibit 2. Staff will update FY
2023-24 revenue estimates for reimbursement grants tied to carryover amounts to
reflect reimbursement timing.
FISCAL IMPACT
No fiscal impact is associated with the recommended actions to carry over unspent
appropriations. The previously authorized expenditures will be spent in a later period,
which only impacts the timing of cash flow.
EXHIBIT(S)
1. List of Requests to Carry Over Unspent Appropriations
2. List of Requests to Carry-Over Unspent Appropriations by Fund
Submitted By: Kathryn Downs, FMSA Executive Director
Approved By: Kristine Ridge, City Manager
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24 EXHIBIT 1
As of August 4, 2023
General Fund (Fund 11)
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
01103010
01103010
01103010
City Manager
City Manager
City Manager
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
8th Floor Remodel
Chinatown Memorial
Sister City Visit
Final phase of remodel will be complete by June 30, 2024.
Project scope and location in development.
Expected to be completed by September 2023
290,000
25,000
30,000
Unused FY 22‐23 Employee Compensation
Increases01105015
01105015
01105015
Non‐Departmental
Non‐Departmental
Non‐Departmental
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
Prior year set‐aside for employee compensation increases.2,308,839
1,000,000
1,000,000
Pending purchase of State Building which was approved at August 15,
2023 City Council Meeting.
Notice of Vacancy for Management Analyst scheduled to be posted in
October, 2023.
Civic Center Development
Police Oversight Commission
Project was delayed when IT dept began using conference room for
upgrades to the 2nd Floor. Conference room upgrades cannot begin until
the room is made available for use again.
Project was delayed when IT dept began using conference room for
upgrades to the 2nd Floor. Conference room upgrades cannot begin until
the room is made available for use again.
CAO ‐ Office Upgrades (Working Spaces,
Furniture, Technical Equipment)01108032
01108032
City Attorney
City Attorney
N/A
N/A
GENERAL FUND
GENERAL FUND
46,000
59,000CAO ‐ Office Upgrades (Working Spaces,
Furniture, Technical Equipment)
01110100
01110110
01110110
Finance
Finance
Finance
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
Current Office Furniture Replacement
Separation Cash Out For Delayed Retirement
Current Office Furniture Replacement
Furniture specs are in progress; PO will be issued in September 2023.
145,000
70,000Retirement postponed to 2024; Additional 533 hours of sick leave that
will be paid out.
Furniture specs are in progress; PO will be issued in September 2023.112,000
01110110
01110120
01110130
Finance
Finance
Finance
221401
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
3rd Floor Remodel
New Mail Meter Machine
EMV Chip & Pin Hardware Equipment
Treasury & Customer Service (TCS) Furniture
Replacement
Project completed but still processing invoices.
Purchase Order will be issued in Fall 2023.
Project will be complete by June 30, 2024.
60,000
24,262
20,000
01110130 Finance N/A GENERAL FUND Furniture specs are in progress; PO will be issued in September 2023.25,000
01111017
01111017
01111017
01111017
Library
Library
Library
Library
221380
221381
221802
231382
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
Transform Central Library Active CIP Project, Design, 75% Complete
Active CIP Project, Design, 75% Complete
Active CIP Project, Design, 90% Complete
Active CIP Project, Design, 75% Complete
2,454,800
199,600
1,445,300
135,700
Jerome Park ‐ Library In The Park
Newhope Library Improvements
Delhi Library Project Consultant Services
Opening Day Collection Refresh ‐ Main And Library will purchase books and materials throughout the fiscal year and01111110
01111110
Library
Library
N/A
N/A
GENERAL FUND
GENERAL FUND
122,000
85,000
Newhope Libraries ensure all orders are received prior to June 30, 2024.
The Delhi Library project is anticipated to be complete in June 2024 and
needs furnishings and equipment.Delhi Library Fee
Library Technology Projects ‐ Audio Books For
Youth Services01111160
01111110
Library
Library
N/A GENERAL FUND
GENERAL FUND
All purchases will be made prior to June 30, 2024.20,000
82,500231602Library Technology Projects Started but not completed.
Construction of the Outdoor Library at Jerome Park is currently
anticipated to be completed in June 2024. The Kiosk will be procured at
the start of construction (Feb 2024) to ensure it arrives and can be
installed prior to construction completion.
01111190
01111190
Library
Library
N/A
N/A
GENERAL FUND
GENERAL FUND
Outdoor Library Book Kiosk At Jerome Park
100,000
25,806
Technology Projects For Library Of Things
Collection, Newhope Media Lab And Audio
Books For Youth Services
All purchases will be made prior to June 30, 2024.
The purchase order has been issued and therefore as soon as delivery of
the vehicles is complete, Fleet will equip the vehicles with the additional
equipment.
Contract will be awarded once Carry Forwards are approved with an
expected completion date of June 30, 2024.
Under Construction
01113017
01113017
Parks & Recreation
Parks & Recreation
N/A
N/A
GENERAL FUND
GENERAL FUND
Equipment For Newly Purchased Vehicles
30,000
Security Cameras 130,549
01113017
01113017
01113200
01113220
01113220
01113220
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
212750
232603
N/A
N/A
162658
222764
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
2nd Floor Prcsa Renovation
Lawn Bowling Clubhouse
City‐Wide Credit Card Terminal Project
Zoo Ticketing System
SA Zoo Giant River Otter Habit
SA Zoo Walkway Improvements
944,200
4,900
123,420
61,958
1,300,000
511,800
Under Construction
Project will be complete by June 30, 2024.
Estimated completion date is June 30, 2024.
Under Construction
In Design
Renovation is scheduled to be complete by December 31, 2023. Furniture
will be moved in after completion01113230Parks & Recreation N/A GENERAL FUND Furniture‐2nd Floor Renovation 550,000
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
Funds are committed for the original 10 officers hired during FY 22/23 and
will be paid incrementally upon completion of each milestone.01114402 Police Department N/A GENERAL FUND PD Police Officer Hiring Bonus
75,000
01114403
01114403
01114403
Police Department
Police Department
Police Department
234519
N/A
234522
GENERAL FUND
GENERAL FUND
GENERAL FUND
PD Ups Replacement
PD Jail Control Center
PD Gate Replacements
PO payment in August 2023; items received.100,000
200,000
250,000
Issued RFQ #23‐097 on June 28, 2023 for qualified firms.
Requisition will be entered once Carry Forward will be approved.
PO #125720 issued on 04/17/23 and includes a 10% contingency,
installation will be complete during Fall 2023.01114403 Police Department 234515 GENERAL FUND Pd PAAL HVAC 50,110
01114403
01114403
Police Department
Police Department
N/A
N/A
GENERAL FUND
GENERAL FUND
PD Community Room A/V Equipment
PD Community Room A/V Equipment
Items will be purchased and installed by June 30, 2024.
Items will be purchased and installed by June 30, 2025.
Internal priority list has been established, items will be encumbered by
June 30, 2024.
Requisition will be entered once Carry Forward will be approved.
Quote has been received and PO is ready to be issued upon Carryover
approval
91,000
29,000
01114420
01114425
01114450
Police Department
Police Department
Police Department
N/A GENERAL FUND
GENERAL FUND
GENERAL FUND
PD Vehicle Replacements 730,000
18,240234509
234521
PD Computers/Copiers Replacement
PD Furniture Replacement
200,000
01115017 Fire‐Fire Stations 236626 GENERAL FUND Fire Facilities Bldg Repairs & Improvements Project started but not completed.1,092,500
Contract has been executed with an expected completion date of
December 31, 2023.
Project started but not completed.
01115330
01115330
Fire‐Fire Stations
Fire‐Fire Stations
N/A GENERAL FUND
GENERAL FUND
Ambulance Service Assessment 50,000
226020 Fire‐Removal Storage Tanks 941,500
Delays have occurred as a result of the City Hall second floor remodel;
PRCSA staff is currently occupying 1602. Expected completion date is
February 2024.
Paint proposals have been received; there will be additional purchases for
public computers and other equipment. Expected to complete by June
2024.
01116500
01116500
Planning & Building
Planning & Building
N/A
N/A
GENERAL FUND
GENERAL FUND
Conference Room 1600/1602
50,000
19,500Installation Of New City Hall Reception Area
And Related Furniture/Equipment
PBA is in the second phase of remodeling and upgrading existing second
floor offices and conference rooms. Expected completion is May 2024.01116510
01116510
Planning & Building
Planning & Building
N/A
N/A
GENERAL FUND
GENERAL FUND
Ross Annex 2nd Floor Offices 48,000
Zoning Code Update To Align With The
General Plan
Staff is currently in the process of negotiating terms and agreements with
the selected consultant.1,800,000
Installation Of New City Hall Reception Area Paint proposals have been received; there will be additional purchases for01116520
01116530
01116530
Planning & Building
Planning & Building
Planning & Building
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
52,000
220,000
330,000
And Related Furniture/Equipment
Land Management System
public computers and other equipment.
Estimated completion date is June 30, 3024.
Seismic Study Draft RFP has been finalized and will be released by mid‐September.
Code Enforcement Equipment Related To
New Land Management System01116540
01117017
Planning & Building
Public Works
N/A
N/A
GENERAL FUND
GENERAL FUND
Expected to order new equipment by April 2024.69,000
Requisition will be entered once Carry Fwd is approved; staff did not
obtain pricing until end of fiscal year.
Design Phase, 5% Complete
Construction Phase, 95% Complete
Construction Phase, 0% Complete
Central Stores‐ Shelving & Racks 180,860
01117017
01117017
01117017
01117017
01117017
01117017
01117017
01117017
01117017
01117017
01117017
01117620
01117620
01117620
01117620
01117620
01117620
01117620
01117620
01117620
01117630
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
156827
179001
221377
226023
226910
236001
236031
236032
236038
236039
236041
186919
206963
226018
226988
226995
236026
236034
236036
236037
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
Fairview Bridge & Street Imprv
Peebler (South Main Improvements)
Salgado Center Renovation
Cypress Fire Station
353,300
906,400
152,600
907,800
672,200
54,200
Project started but not completed.
Alley Imprv Program FY 21/22
Grand Central Art Center
Construction Phase, 0% Complete
Project started but not completed.
Ross Annex HVAC Automation
Corbin Center Improvements
Salgado Center Bleachers
Project started but not completed.
Project started but not completed.
Project started but not completed.
143,500
676,300
300,000
337,200
147,600
210,900
130,000
500,000
250,000
320,000
457,800
646,500
820,800
1,300,000
27,270
Salgado Center Floor Replace
Refurbish NH Entry Monuments
1st/Jackson & 5th/Euclid Signal
Kennedy & Villa Srts
Project started but not completed.
Project awarded; agreement being signed. 0% complete
Construction Phase, 90% Complete
Construction Phase, 5% Complete
Flower St & 3rd St Traffic Safety
Main St Rehab: Macarthur‐Dyer
Bristol St & Santa Cl Sign Mod
Citywide Parking Study
Design Phase, 75% Complete
Construction Phase, 30% Completed
Construction Phase, 10% Complete
On‐going. Carry‐forward.
Traffic Calming Imps Phase I
Traffic Calming Imps Phase Ii
Trfc Calm/Memory & Flwr Bikeway
Traffic Signal Rsns Replacement
Construction Phase, 1% Complete. Carry forward
Construction Phase on‐going, 0% Complete. Carry forward
Environmental Phase just started. 0% complete. Carry forward.
Final invoice was submitted on 8/15/2023.
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
01117630
01117630
01117630
01117630
01117630
Public Works
Public Works
Public Works
Public Works
Public Works
N/A GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
Econolite Invoice #518102
Saddleback Street Light Proj
Street Lighting Master Plan
Riverview NH Street Lighting
Street Light Poles Replacement
Delivery of street light poles expected December 2023.
Construction Phase, 10% Complete
Ongoing project
Construction Phase, 0% Complete
Construction Phase, 0% Complete
16,021
226017
236045
236030
236033
735,100
480,700
483,500
863,900
Backlog of work due to Winter 2023 unprecedented storms; new
completion date is December 31, 2023.
Anticipated completion date is December 31, 2023.
Anticipated completion date is December 31, 2024.
Project started but not completed
Started, not completed.
Started, not completed.
Ongoing project
June2023 ‐August 2023 (Summer Program)
RFA's submitted in July and August 2023
Applicant was selected in May 2023; Expected completion date is June
2024.
Application deadline was 07/24/23; Funds will be completely expended
by June 30, 2024.
01117642 Public Works N/A GENERAL FUND After‐Hours Graffiti Abatement 72,000
01117643
01117643
01117650
01117651
01117652
01117660
01118017
01118017
Public Works
Public Works
Public Works
Public Works
Public Works
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
Tree Trimming Cycle/Urgent Response
Tree Trimming Cycle/Urgent Response
SARTC Deferred Maintenance
Park Maintenance Projects
74,000
62,000
226024
Variou
Variou
236910
N/A
3,796,000
1,232,500
118,400
3,458,100
100,000
150,000
Park Maintenance Projects
Public Works Alley Imprv Program Fy 22/23
Youth Employment Program
Start‐Up Grants For Nonprofits
Community Development
Community Development N/A
01118017
01118017
01118810
01118810
01118811
01118810
01118810
01118810
01116540
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Planning & Building
N/A
221323
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
150,000
200,000
25,000
Artist Grant
Artist Grants ‐ GF/ARPA
Business Retention And Welcome Program 50% of 1 yr agreement w/ Chamber of Commerce due in FY23‐24.
Marketing plan will be developed and implemented in FY23‐24.Improvement And Marketing Of South Main
Corridor
Homeless Navigation Shelter Purchase
(Carnegie)
N/A 1,500,000
1,000,000
50,000
Escrow on the building commenced on July 1, 2023 and is expected to
close by November 1, 2023.
Mural Restoration Proposal was issued in August 2023, Power washing
invoices will be paid in FY23‐24.
Additional businesses were approved for funds by the last week of June
2023; the invoices were paid on July 2023.
Mural Restoration Proposal was issued in August 2023, Power washing
invoices will be paid in FY23‐24.
N/A
N/A Mural Restoration/Graffiti Power Washing
N/A 221,930
4,380
Business Interruption Funds ‐ Round 3
N/A Mural Restoration/Graffiti Power Washing
Code Enforcement Overtime Code Enforcement's Overtime will be used to address City Council
priorities for a one‐year special project.N/A 170,000
01117630
01117651
01117651
Public Works
Public Works
Public Works
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
Chevrolet 2500HD Truck
Ford F‐550 Stakebed Truck
Ford F550 Altec AT37M Boom Truck
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
77,967
211,277
232,506
01117651
01117651
Public Works
Public Works
222769
222756
GENERAL FUND
GENERAL FUND
Memorial Park Lighting Installation Services Goods not received or services not performed
Thornton Park Lighting Installation Services Goods not received or services not performed
133,138
344,629
01117651
01117630
01117651
01117017
01117017
01117017
01117621
01117652
01114405
01117017
01117650
01117017
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Police Department
Public Works
Public Works
Public Works
222754
N/A
N/A
N/A
N/A
N/A
N/A
N/A
234504
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
Park Lighting Installation Services
Ford F550 ALTEC AT40G Boom Truck
Ford Transit Plumbers Van
Hydraulic Forklift 30B‐9U
Hydraulic Forklift 20BCS‐9
Hydraulic Forklift 20B‐9
Bus Shelter Bench / Kiosk
Provide And Install Fencing
2023 Chevrolet Colorado Truck
Chevrolet Traverse
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
340,664
150,000
94,058
51,649
47,431
40,482
518,861
220,223
280,419
72,176
1,561,426
745,860
226024
236001
Fan Coil Replacement For SARTC
Fan Coil Relocation
01117652 Public Works N/A GENERAL FUND Thornton Park Lighting Installation Services Goods not received or services not performed 177,919
01114403
01117652
01117017
01111017
01117642
01114475
01113017
Police Department
Public Works
Public Works
Library
Public Works
234515
N/A
236031
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
Split System HVAC Replacement
Utility Cart: Toro Workman GTX
Automate HVAC Bldg Controls
Ford F‐59 Chassis Book Mobile
Pressure Washer Trailer
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
249,888
34,561
267,404
414,922
32,654
Police Department
Parks & Recreation
Kitchen Oven For Santa Ana Jail
2023 Chevrolet Colorado Truck
89,068
229,212222001
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
01117651
01116520
01116540
01117620
01117017
01117643
01117017
Public Works
Planning & Building
Planning & Building
Public Works
Public Works
Public Works
N/A
N/A
N/A
N/A
N/A
N/A
N/A
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
GENERAL FUND
2023 Chevrolet 2500Hd Truck (Qty 5)
2023 Chevrolet Equinox
2023 Chevrolet Colorado Truck
2023 Chevrolet Equinox
2023 Chevrolet Traverse
Aerial/Tree Trimmer Combo Truck
Commercial Diesel Generator Set
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
461,884
55,264
71,949
31,349
40,106
406,128
376,711Public Works
Subtotal for General Fund (Fund 11)52,479,029
American Rescue Plan Act (ARPA)
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDeptFund Description Project Description Project Status
Major projects include the Expand
Communication Methods project, the Food
Supply/Distribution project and Healthy Food Carryforwards are for FY21‐22 grant agreement and will be encumbered18103013City Manager Multiple AMERICAN RESCUE PLAN ACT(ARPA)3,152,000
Access project.by 12/31/24.
Carryforward is for the Legal/Contract
Management Support project.
Carryforward is for the HR Service
Enhancement Program.
Carryforwards are for FY21-22 grant agreement and will be
encumbered by 12/31/24.18108013
18109013
City Attorney Multiple
Multiple
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
474,900
(71,200)Human Resources Reducing adopted budget to match project budgets
Carryforward includes reserve for revenue
loss and funds for the accounting and
compliance project.
Major projects include the Central Library
construction project, Delhi Center Library
Branch construction and Jerome Park Library
construction.
18110013
18111013
Finance
Library
Multiple
Various
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
Carryforwards are for FY21‐22 grant agreement and will be spent by
12/31/24.
10,323,500
25,235,000
Started but not completed
Major projects include the Youth Violence
Prevention Program, Madison Park Restroom
renovation, and the Campesino Park
Restroom renovation.
18113013 Parks & Recreation Various AMERICAN RESCUE PLAN ACT(ARPA)901,400
Ongoing Revive Santa Ana Projects
Ongoing Revive Santa Ana Projects
Major projects include the Youth Violence
Prevention Program and the COVID
Emergency Preparedness program.
18114013
18116013
Police Department
Planning & Building
Various AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
1,131,700
331,600MultipleCarryforwards are for the ongoing Property
Compliance and Assistance Program.
Davis Elementary SRTS
Sanitization/Prev‐Right Of Way
First St Slope Stabilization
Public Health Plaza/Wellness P
Admin Of Federal Reporting Req
Neighborhoodsafetystreetlights
NH Safety Streetlights Ph II
Channel Fencing Upgrades Ph II
Sanitation & Pressure Washing
Bus Shelter Cleaning
Ongoing Revive Santa Ana Projects
Construction Phase, 5% complete
Project 50% complete and on‐going
Construction Phase, 35% complete
Project started but not completed.
Project started but not completed.
Design Phase, 90% complete
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18117013
18118013
18120013
18114013
18114013
18118013
18103013
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
196951
221309
221341
221358
221365
221387
221388
221390
221402
221403
221405
221406
221407
Various
Various
Various
221327
221327
221347
221322
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
2,112,400
2,170,300
4,599,700
877,600
3,745,100
989,100
1,000,000
209,200
377,500
Design Phase, 75% complete
Construction Phase, 95% complete
Project is underway; invoice payment pending
Project is underway; invoice payment pending
Construction Phase, 1% complete
Design Phase, 90% complete
250,000
577,900Ped & Mobility Imps Phase I
Ped & Mobility Imps Phase II 2,310,900
1,000,000
22,767,700
(987,600)
1,796,300
79,519
5,353
282,355
510,533
Ped & Mobility Imps Phase III
American Rescue Plan Act (ARPA) ‐ PWA
American Rescue Plan Act (ARPA) ‐ CDA
American Rescue Plan Act (ARPA) ‐ IT
Chevrolet Express Passenger Van
PAAL Program Supplies
Design Phase, 5% complete
Design Phase, 5% complete
Community Development
Information Technology
Police Department
Police Department
Community Development
City Manager
Reducing adopted budget to match project budgets
Design Phase, 5% complete
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
City Net Homeless Outreach Program
Revive Food Distribution Program
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
18118013
18111013
18110013
18118013
18118013
Community Development
Library
Finance
Community Development
Community Development
221370
221380
221362
221370
221328
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
AMERICAN RESCUE PLAN ACT(ARPA)
Downtown Clean & Safe Program
Design/Engineering Services For Library
ARPA Consulting Services
DTSA Security Services
Rent Stabilization And Just Cause Eviction
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
14,561
706,233
397,473
54,685
276,902
Subtotal for American Rescue Plan Act (ARPA)87,602,613
Construction Projects
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDeptFund Description Project Description Project Status
01211020 Library
Library
221800 CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
PRCSA FEES & DONATION
Library Improvements Active CIP Project, Design, 90% Complete
Active CIP Project, Design, 90% Complete
Awaiting Installation
Awaiting Installation
Under Construction
In Design
In Design
In Design
In Design
In Design
86,000
3,216,300
31,200
01211020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
02213200
02213200
02213200
02213200
02213200
221802
222754
222756
182681
202501
202502
202503
202504
202505
202506
202730
212501
212744
212745
222508
222512
222765
222766
222768
232602
232603
162658
212744
222508
222509
Newhope Improvements
Cap Outlay Dysc Field Lights
Thornton Pk Lighting
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
22,100
Centennial Lake Renovation
Cannabis Fnd‐SA Zoo Splash Pad
Cannabis‐Memorial Splash Pad
Cannabis‐C Chavez Splash Pad
Cannabis‐Thornton Splash Pad
Cannabis‐El Salvador Splash Pad
Cannabis‐Madison Splash Pad
Raitt & Myrtle New Park
Zoo Mobile
Zoo Goat Encounters
Santa Anita Phase II
Zoo Fence
Recreation Mobile
2,478,900
101,000
132,400
924,329
1,351,900
1,349,700
1,350,400
46,300
In Design
Under Construction
Awaiting delivery
Under Construction
Under Construction
Planning
Awaiting delivery
In Design
Under Construction
In Design
In Design
Under Construction
Under Construction
Under Construction
5,300
179,400
489,800
112,000
5,000
1,000,000
726,800
1,000,000
150,500
49,400
Santiago Nat Ctr Reno
Dysc F1 Synth Turf
Jerome Field Irrigation Renova
Playground At Thornton Park
Lawn Bowling Clubhouse
SA Zoo Giant River Otter Habit
Zoo Goat Encounters
PRCSA FEES & DONATION
PRCSA FEES & DONATION
PRCSA FEES & DONATION
PRCSA FEES & DONATION
600,000
180,000
10,000Zoo Fence
Children's Zoo
Planning
Planning 800
Special Gas Tax 29 to Select Street
Construction 59
Highway Users Tax, Roadway Maintenance Rehabilitation Program,
Senate Bill funded on‐going projects
Construction Phase, 75% Completed
Ongoing project
02917019 Public Works N/A SPECIAL GAS TAX 27,565,600
02917660
03117101
03117102
03217662
03217662
03217662
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
226970
Various
Various
146802
176880
176802
SPECIAL GAS TAX Omnibus Concrete Pr FY21/22
Vehicles And Other Projects
Charging Station Phases/ Other Projects
Warner Ave Wdng:Main‐Oak Ph I
Santa Ana Blvd & 5th Bike Lane
Lincoln Pedestrian Trail
1,277,200
320,000
30,200
253,100
41,600
AIR QUALITY IMPR. (AB 2766)
AIR QUALITY IMPR. (AB 2766)
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
Ongoing project
Construction Phase, 50% Complete
Construction Phase, 95% Complete
Project Completed; carryforward for project reconciliation
Construction Complete, Pending Final Payment, City of Costa
Mesa Led Project
Construction Phase, 100% complete. Working on close out with
Caltrans.
On-going, carry forward.
Construction Phase, 99% Complete
Construction Phase. Working with Caltrans to re-advertise.
Construction Complete, Pending Final Payment, City of Costa Mesa Led
Project
43,100
03217662
03217662
Public Works
Public Works
176889
176894
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
56,700
8,000
Fairview Traffic Sig Synch
Euclid St & Hazard Ave Sigl Mo
Traffic Management Plans 17/18
Local St Prevent Maint FY17/18
Citywide Bike Rack & SARTC
Bear St Traffic Signal Synch
03217662
03217662
03217662
Public Works
Public Works
Public Works
186897
186907
186912
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
8,800
142,800
127,800
03217662 Public Works 186913 MEASURE M‐STREET CONSTRUCTION 10,000
03217662
03217662
03217662
03217662
03217662
Public Works
Public Works
Public Works
Public Works
Public Works
186918
196897
196910
196923
196950
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
Main St & 15th St Traffic Sign
Traffic Management Plans 18/19
Alley Improvements FY 18/19
Mcfadden Rehb Fairview ‐ Raitt
GG Blvd/Memory Trffc Sig Synch
Construction Phase, 95% Complete
On‐going, carry forward for future expenditure reconciliation
Construction Phase, 0%
Design Phase, 90% Complete
Construction Complete, Pending Final Payment, OCTA Led project
70,500
600
143,100
1,004,600
15,000
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
03217662
03217662
Public Works
Public Works
206897
206898
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
Traffic Management Plans 19/20
Pavement Management FY 19/20
On‐going, carry forward.2,300
700Design Phase, 99% Complete; keep balance for project reconciliation
On-going, carry forward.
Design Phase, 60% Complete
Design Phase 60% Complete
Construction Phase, 5% Complete
Construction, 50% Complete, OCTA Led Project
Construction, 75% Complete, OCTA Led Project
Construction, 65% Complete, OCTA Led Project
Project Completed; carryforward for project reconciliation
Design Phase, 99% Complete
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
206899
206959
206960
206963
206967
206968
206969
206970
216898
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
Project Development FY 19/20
Main Slurry: Memory‐NCL
Bedford Rehab:Main PL‐City Lim
Kennedy & Villa SRTS
Edinger Ave Traffic Sig Syn
Warner Ave Trff Sig Syn
Macarthur Blvd Trff Sgl Sync
Omnibus Concrete Pr FY19/20
FY20/21 Pavement Management
7,600
385,900
40,000
238,100
100,000
100,000
100,000
1,400
9,700
03217662 Public Works 216982 MEASURE M‐STREET CONSTRUCTION 247,000Segerstrom Ave / Dyer Traffic Signal Sync
Tustin Ave Tarff Syl Sync
Construction, 50% Complete, City of Irvine Led Project
Construction, 50% Complete, City of Orange Led Project
Construction Phase, 0% Complete
On‐going project
Design Phase, 90% Complete
Design Phase, 95% Complete
Reducing budget to match project budgets
On‐going project
Construction Phase, 95% Complete
On‐going, 90% complete. Carry forward.
Construction, 65% Complete, OCTA Led Project
Construction 95% Complete
Design Phase, 60% Complete
On‐going project
On‐going project
Construction Phase, 5% Complete
Construction Phase, 90% Complete
Design Phase, 10% Complete
Design, 15% Complete, City of La Habra Led Project
Construction 95% Complete
On‐going project
On‐going project
Design Phase, 99% Complete
Design Phase, 99% Complete
Construction Phase, 60% Complete
Design Phase, 5% Complete
Design Phase, 50% Complete
Design Phase, 90% Complete
On‐going project
Construction Phase, 5% Complete
Construction Phase, 80% Complete
Construction Phase, 50% Complete
Design Phase, 90% Complete
Design Phase, 95% Complete
Design Phase, 99% Complete
Design Phase 99% Complete
Construction Phase, 50% Complete
Design Phase, 5% Complete
Design Phase, 50% Complete
Design Phase, 90% Complete
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217662
03217663
03217663
03217663
03217663
03217663
03217663
03217663
03217663
03217664
03417660
03417660
03417660
03517660
03517660
03517660
03517660
03517660
03517660
05113263
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Parks & Recreation
216983
226910
226897
226898
226899
226900
226901
226907
226992
226993
226914
236898
236900
236904
236907
236997
236700
236721
236914
236897
236905
136792
116741
146802
156827
176883
186901
196425
226999
176766
146802
186901
206971
116741
136792
146802
156827
176883
186901
152645
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
NEW TRANSPO SYS IMPR AREA E
NEW TRANSPO SYS IMPR AREA E
NEW TRANSPO SYS IMPR AREA E
NEW TRANSPO SYS IMPR AREA F
93,000
146,000
27,900
67,300
4,500
Alley Improv Program FY 21/22
Traffic Management Plans 21/22
FY21/22 Pavement Management
Project Development FY 21/22
Right Of Way Mgmt. FY 21/22
Citywide Sewer Trench Rear PHIII
FY21/22 Loc St Prevent Main
Citywide Speed Limit Study
(3,000)
30,000
158,800
23,000
374,100
100,000
148,300
8,100
First St Corer Tarff Synch
Traffic Signal Equipment Rep21/22
Pavement Management FY 22/23
Right Of Way Mgmt. FY 22/23
Bike Lane Prodi Dev FY 22/23
Loc St Prevent Main FY 22/23
Santa Clara Bk Ln Lincoln‐Tuts
Grand Av Rehab: Edingr‐Mcfadden
Euclid St Corr Traff Sig Sync
78,400
3,681,300
796,600
1,234,000
120,000
100,000
50,000
Traffic Sig Equip Rep 22/23
Traffic Management Plans 22/23
Traffic Safety Pro Dev FY22/23
Bristol Wdng:Cc‐Washngton IIIA
Bristol Wdng‐Wrnr/St Andrw IV
Warner Ave Wdng:Main‐Oak Ph I
Fairview Brdge & Street Imprv
Bristol St&Memory Ln Inter Wid
Warner Ave Imprv Ph2‐Oak‐Grand
Mabury Park Stormwater Capture
Project W Bus Shelter
50,000
3,263,600
7,501,200
2,491,700
3,776,900
1,610,200
9,535,200
15,200
253,500
853,000
209,900
1,063,100
11,500
530,000
375,800
442,600
8,700
181,900
2,100
OC Streetcar
Warner Ave Wdng:Main‐Oak Ph I
Warner Ave Imprv Ph2‐Oak‐Grand
Warner Protect Bk Ln:Oak‐Grand
Bristol Wdng‐Wrnr/St Andrw IV
Bristol Wdng:Cc‐Washngton IIIA
Warner Ave Wdng:Main‐Oak Ph I
Fairview Brdge & Street Imprv
Bristol St&Memory Ln Inter Wid
Warner Ave Imprv Ph2‐Oak‐Grand
Santiago Gas House Area Improv
NEW TRANSPO SYS IMPR AREA F
NEW TRANSPO SYS IMPR AREA F
NEW TRANSPO SYS IMPR AREA F
NEW TRANSPO SYS IMPR AREA F
NEW TRANSPO SYS IMPR AREA F
CAPITAL OUTLAY FUND Under Construction; est. completion. 9/1/23; 96% complete
Planning‐Park Maintenance is assessing the necessary improvements
needed
114,200
05113263
05113263
Parks & Recreation
Parks & Recreation
152646
202709
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
66,700
75,100
Sasser Park Improvements
Adams Pk Sign&Site Furishings Planning‐Park Maintenance is assessing the necessary furnishings needed
Planning‐The Zoo is working with PWA to access the zoo wall to hire a
design consultant05113263
05113263
Parks & Recreation
Parks & Recreation
222508
222754
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
52,000
35,500
Zoo Fence
Cap Outlay Dysc Field Lights Awaiting Installation
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
05113263
05113263
05113263
05117620
05417647
05417647
05417647
05417647
Parks & Recreation
Parks & Recreation
Parks & Recreation
Public Works
Public Works
Public Works
222755
232600
232604
186065
063510
166466
176471
186498
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
Ct Dog Park ‐Centenial
Cell Twr‐Parks Deferred Maint
Stadium Lights
Streetlight Acq & Upgr Project
Segerstrom/San Lorenzo S Lift
Willard Nh Sewer Main Improv
Sewer Lateral Bristol Phase 3A
Washngtn Square Sewer Main Imp
In Design
Pending Final Invoices
Awaiting Installation
828,900
27,700
42,400
1,268,900
500,000
1,454,200
888,900
826,200
Project completed; carryforward for new street light purchase
Active, Construction, 95% complete
Active, Construction, 90% complete
Active, Design 100% Complete
On Hold, Design, 100% complete
Active, Construction, 100% complete, Pending clock on Flower Street for
close‐out
Active, Design, 90% complete
Active, Design, 30% complete
Active, Design, 30% complete
Active, Design, 10% complete
Active, Design, 0% complete
Active, Design, 10% complete
Active, Construction, 100% complete, Pending As-built
Active, Bidding in progress
Active, Construction, 100% complete, Pending As‐built
Active, Construction, 99% complete
Active, Bidding in progress
Active, Construction, 95% complete
Active, Construction, 100% complete, Pending clock on Flower Street for
close‐out
Active, Design, 90% complete
Active, Design, 30% complete
Active, Bidding in progress
Active, Design, 90% complete
On Hold, Planning
Public Works
Public Works
05417647 Public Works 186616 SANITARY SEWER CAPITAL 425,100Flower St Sewer Main Improvement
Wright St Sewer Main Improve
SA Memorl Nghbrhd Swr Main Imp
Rene Dr Sewer Improvements
Bristol‐Warner Nh Sewer Improv
Fairhaven Nh Sewer Imp
Casa Bonita Nh Sewer Improv
South Main St Sewer Impr
NE Annexation Sewer Impr
Santiago Park Gas House Sewer
Lincoln Ave Sewer Main Impr
Santa Ana Bl Swr Lateral Imps
Segerstrom/San Lorenzo S Lift
05417647
05417647
05417647
05417647
05417647
05417647
05417647
05417647
05417647
05417647
05417647
05517660
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
196430
196497
216447
216448
216449
216450
216451
216619
226473
226620
236471
063510
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SANITARY SEWER CAPITAL
SEWER CONNECTION FEE
2,995,000
409,400
83,600
97,600
336,200
177,900
69,500
960,000
50,000
53,200
750,000
1,592,400
05517660 Public Works 186616 SEWER CONNECTION FEE 36,700Flower St Sewer Main Improvement
Wright St Sewer Main Improve
Rene Dr Sewer Improvements
NE Annexation Sewer Impr
05517660
05517660
05517660
05517660
05517660
05717640
05717640
05717640
05717640
05917660
05917660
05917660
05917660
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
196430
216447
216619
236601
236602
226469
226622
236458
236482
146802
156825
156827
176766
SEWER CONNECTION FEE
SEWER CONNECTION FEE
SEWER CONNECTION FEE
SEWER CONNECTION FEE
801,000
590,000
1,035,300
300,000
100,000
358,200
886,700
150,000
250,000
1,966,200
35,200
Hazard Ave Sewer Improvements
Maxine Sewer Lift Station Imps
Stormwater Channel Fencing Upg
DTSA Flood Red & Storwtr Infil
Misc Strmdrn Repairs FY 22/23
Repair Culvert St Gert & Ornge
Warner Ave Wdng:Main‐Oak Ph I
Westmnster Rehab:Harbr Toclint
Fairview Brdge & Street Imprv
OC Streetcar
SEWER CONNECTION FEE
FED CLEAN WATER PROTECTION ENT
FED CLEAN WATER PROTECTION ENT
FED CLEAN WATER PROTECTION ENT
FED CLEAN WATER PROTECTION ENT
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
Active, Construction, 70% complete
Active, Construction, 0% complete
Active, Project out to bid, 0% complete
Active, Construction, 0% complete
Construction Phase, 50% Complete
Ongoing project
Design Phase, 5% Complete
Construction Phase, 80% Complete
Ongoing; grant funding; keep balance for future expenditure
reconciliation
61,200
205,800
05917660 Public Works 176881 SELECT STREET CONSTRUCTION 400Fairview St: Segerstrom To NCL
Westminster Rehab: Clinton‐Frvw
Hazard Ave Protected Bike Lane
Bristol & Edinger Class II Bk
05917660
05917660
05917660
05917660
Public Works
Public Works
Public Works
Public Works
186902
186903
186906
186908
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
Ongoing project
Ongoing project
Ongoing project
Ongoing project
102,800
111,900
70,500
1,700Bristol St Protected Ln Edgr‐1
Design Phase, 90% Complete grant funding; keep balance for future
expenditure reconciliation
Ongoing project
05917660 Public Works 206971 SELECT STREET CONSTRUCTION 200Warner Protect Bk Ln:Oak‐Grand
Citywide Bike Rack & SARTC
Santa Clara Bk LN Lincoln‐Tust
05917660
05917660
05917660
05917661
05917661
05917661
05917661
05917661
05917661
05917661
05917663
05917663
05917663
05917663
05917663
05917663
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
186912
236997
176880
116741
136792
N/A
N/A
N/A
N/A
N/A
116741
136792
196898
206956
206970
216986
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
10,400
1,426,400
337,500
276,000
56,700
550,000
1,175,700
4,110,000
129,300
250,000
678,300
1,896,000
800
Ongoing project
Santa Ana Blvd & 5th Bike Lane
Bristol Wdng‐Wrnr/St Andrw Iv
Bristol Wdng: CC‐Washngton IIIA
Bristol Corridor Improvement Wrnr/17th
Bristol Corridor Improvement Wrnr/17th
Bristol Corridor Improvement Wrnr/17th
Bristol Corridor Improvement Wrnr/17th
Bristol Corridor Improvement Wrnr/17th
Bristol Wdng‐Wrnr/St Andrw IV
Bristol Wdng:Cc‐Washngton IIIA
Pavement Management FY 18/19
Gas Tax Local Street Improv
Construction Phase, 95% Complete
Design Phase, 99% Complete
Design Phase, 99% Complete
Project has not started
Project has not started
Project has not started
Project has not started
Project has not started
Design Phase, 99% Complete
Design Phase, 99% Complete
Ongoing; keep balance for future expenditure reconciliation
Ongoing project 2,200
50,000
32,000
Omnibus Concrete Pr FY19/20
Bridge Peventative Maint Prog
Ongoing project
Ongoing project
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
05917663
05917663
05917663
05917663
05917663
05917663
05917663
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
226989
176883
226996
206970
236702
236701
236708
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
Westminster Rehab: Newhpe‐Harb
Bristol St&Memory Ln Inter Wid
Pedestrian Improvements
Macarthur Resur: Flower‐Main
Grand Ave Rehab ‐ Mcfadden‐1St
Fairview St Imps 17th To Trask
Santiago Creek Ped Bridge Impr
Construction Phase, 0% Complete
Design Phase, 50% Complete
Ongoing project
Project Completed; carryforward to for project reconciliation
Design Phase, 90% Complete
65,500
400,000
285,000
700
13,800
275,000
740,000
Design Phase, 0% Complete
Design Phase, 0% Complete
05917663 Public Works N/A SELECT STREET CONSTRUCTION 200,000Residential Street Repair Program FY 22/23 Project has not started
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917665
05917667
05917667
05917668
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
186915
196921
196922
196923
196940
196941
196943
196944
196945
196946
196947
206953
206954
206955
206957
206958
206961
216975
216976
216977
216978
216979
216980
226990
226987
226988
226989
236704
236705
236706
236707
176893
186922
186901
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
SELECT STREET CONSTRUCTION
Euclid Rehab: Hazard‐Wstmnstr
First St Slurry & Resurfacing
Main St Slurry & Resurfacing
Mcfadden Rehb Fairview ‐ Raitt
Main St Rehab: Dyer To Warner
Alton Rehab: Raitt To Bristol
Brstol St Rehab 18/19 Mcart‐Rr
1st Ped Improv: Flower‐Standar
Raitt Slurry & Resuf Edn‐Mcfad
Edinger Ave Rehab: Raitt‐Brstl
Raitt St Rehab: Mcffdn‐Cvc Cnt
Macarthur Rehab:Sariver‐Harbor
Euclid St Rehab:Mcfadden To1st
Euclid St Rehab:1St To Hazard
Macarthur Resur: Flower‐Main
Main St Rehab: Warner‐Edinger
Euclid Rehab:C Limit‐Mcfadden
Alton Ave Rahab: Main‐Standard
Flower St Rehab: Mcfadden‐1st
Mcarthur Rehab: Fairview‐Raitt
Fairview A Rehab: City L‐Seger
17th St Rehab: Bristol‐Flower
17th St Rehab:Fairview‐Bristol
Bristol St Rehab:Snta Cl‐Memor
Grand Av Rehab: Warner‐Edingr
Main St Rehab: Macarthur‐Dyer
Westminster Rehab: Newhpe‐Harb
1st St Rehab Grand To Tustin
Mcfadden Rehab Harbor‐Fairview
Mcfadden Rehab Raitt To Grand
Standard Ave Rehab 1st‐Warner
Warner Ave & Flower Inters Imp
Citywide Bike Ln Stripng & Mai
Warner Ave Imprv Ph2‐Oak‐Grand
Water Fund 60 To Acquisition&Construction
Fund 66
Ongoing project
Ongoing project
Ongoing project
Design Phase, 90% Complete
Ongoing project
Ongoing project
Ongoing project
Construction Phase, 0% Complete
Ongoing project
Ongoing project
Design Phase, 90% Complete
Ongoing project
Design Phase, 90% Complete
Design Phase, 90% Complete
Ongoing project
79,400
20,200
358,300
51,000
615,900
4,200
104,800
1,150,000
81,200
118,700
903,300
10,500
1,005,700
1,138,900
39,900
124,400
545,300
736,600
92,800
820,500
2,024,900
989,000
729,600
24,200
Ongoing project
Design Phase, 90% Complete
Design Phase, 99% Complete
Ongoing project
Ongoing project
Ongoing project
Ongoing project
Ongoing project
Ongoing project
Construction Phase, 5% Complete
Ongoing project
Construction Phase, 0% Complete
Ongoing project
Design Phase, 90% Complete
Design Phase, 90% Complete
Design Phase, 95% Complete
Ongoing project
1,542,200
1,925,100
1,335,900
868,000
894,200
2,658,400
1,900,000
5,600
Ongoing project
Design Phase, 90% Complete
29,400
2,192,000
06017019 Public Works N/A WATER 20,035,600Transfer to fund water projects under Fund 66
Active, Construction, 20% complete
Active, Construction, 90% complete
Active, Construction to begin Sept 2023
Active, Design, 100% complete, To be constructed as part of Bristol
Widening Project
06017645
06617647
06617647
Public Works
Public Works
Public Works
166460
116413
136433
WATER Advanced Meter Infrastructure
SA‐5 Vault Modifications
Well 32 Rehab
391,000
784,200
11,062,900
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
06617647 Public Works 156445 ACQUISITION & CONSTRUCTION 800,200Bristol Phase 3A Water
06617647
06617647
06617647
06617647
06617647
06617647
06617647
06617647
06617647
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
156446
166460
186424
186491
196423
196433
196438
196439
196440
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
Grand & St Gertrude Water Imp
Advanced Meter Infrastructure
Warner Ave Wide Wtr Main Impr
Well 29 Improvements
Washington Well Site Improveme
East Station Security Improv
Ritchey St Water Main Reloc
SA‐7 Prssure Reducing Reloc
SR‐55 Water Main Reloc
Active, Construction, 100% complete, Pending final payment
Active, Construction, 20% complete
Active, Construction, 80% complete
Active, Construction to begin Fall 2023
Active, Construction to begin Fall 2023
Active, Design, 90% complete
Active, Construction, 70% complete
Active, Construction, 70% complete
Active, Construction, 70% complete
1,212,100
9,299,500
1,056,900
7,832,800
2,102,300
456,800
1,559,500
2,266,500
510,900
Active, Design, 100% complete, To be constructed as part of Bristol
Widening Project06617647Public Works 196499 ACQUISITION & CONSTRUCTION 819,000Bristol Wtr Main Imp‐Phase4
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
06617647
06617647
06617647
06617647
06617647
06617647
06617647
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
216453
216461
216462
226468
226470
226474
236454
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
ACQUISITION & CONSTRUCTION
Ne Annexation Septic Sewer Imp
South Main St Water Main Impro
SA‐1 Hydrogenerator Upgrade
Lincoln Ave Water Main Impr
Well 38 Pfas Facility
Active, Bidding in progress
Active, Construction, 100% complete, Pending As‐built
Active, Design, 75% complete
Active, Construction, 99% complete
Active, Construction to begin Fall 2023
Active, Design, 30% complete
Active, Construction, 90% complete
Active, Construction, 100% complete, Pending clock on Flower Street for
close‐out
1,387,800
1,107,600
650,000
230,900
1,000,000
21,000Pressure Reg Vault Relocation
Willard Nh Water Main Imps 419,900
06617647 Public Works 236474 ACQUISITION & CONSTRUCTION Greenleaf Water Main Imps 33,700
06617647
06817641
08009053
08009053
08009053
08009053
12015330
12514407
12514491
12814407
13518783
13518783
13518783
13518783
13518783
13518783
13518783
13518783
13518783
13518783
Public Works
Public Works
Human Resources
Human Resources
Human Resources
Human Resources
Fire‐Fire Stations
Police Department
236476
236481
220501
220502
220504
220505
236626
Various
Various
Various
227534
227537
237538
237539
237540
237540
237540
237543
237543
237543
ACQUISITION & CONSTRUCTION
SANITATION FUND
Glenwood Place Wtr Improvement
Workspace Restoration Remodel
5Th FL‐ADA Compliance
4Th FL‐ADA Compliance
CChamber‐ADA Compl
Ch‐Security Hardening
Fire Facilities Bldg Rep/Imps
Urban Area Initiative Grant
Active, Construction, 50% complete
Active, Construction, 20% complete
Project started but not completed
Project started but not completed
Project started but not completed
Project started but not completed
Project started but not completed
Project started but not completed
Project started but not completed
1,300,000
285,300
47,700
65,700
90,700
387,500
801,000
4,297,100
183,900
1,128,200
64,600
407,300
276,200
506,300
31,300
LIABILITY AND PROPERTY INS FND
LIABILITY AND PROPERTY INS FND
LIABILITY AND PROPERTY INS FND
LIABILITY AND PROPERTY INS FND
FIRE FACILITIES FUND
OES UASI
OES UASIPolice Department
Police Department
Urban Area Initiative Grant
LAW ENFORCEMENT GRANTS
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
Frontline Law Enforcement Services
Active Transportation Improvement
Sidewalk Improvement
Project started but not completed
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Grant Year 21; Notice of Completion pending
Grant Year 21; Construction to begin in FY 23‐24
Grant Year 20; Design began in FY 22‐23
Grant Year 20; Active in Design phase
Grant Year 18; Active in Design phase
Grant Year 19; Active in Design phase
Grant Year 20; Active in Design phase
Grant Year 20; Construction to begin in FY 23‐24
Grant Year 21; Construction to begin in FY 23‐24
Grant Year 22; Construction to begin in FY 23‐24
PAAL Restroom Improvement‐Design
Active Transp Safety Imp‐Warner
Newhope Library ADA & Facility Imp
Newhope Library ADA & Facility Imp
Newhope Library ADA & Facility Imp
Street Improvement ‐ Heninger
Street Improvement ‐ Heninger
Street Improvement ‐ Heninger
375,700
124,400
661,200
88,000
747,800
14717611
14717611
Public Works
Public Works
176894
186918
FEDERAL AID SAFETY PROGRAM
FEDERAL AID SAFETY PROGRAM
10,900
23,000
Euclid St & Hazard Ave Sigl Mo Construction Phase, 100% complete. Working on close out with Caltrans.
Construction 99% complete. Working on final punch list items, invoicing
and closed out with Caltrans.
85% complete. Carry forward.
85% complete. Carry forward.
Main St & 15th St Traffic Sign
1St/Jackson & 5th/Euclid Signl
Safe Mobility SA Update
Bristol St & Santa Cl Sign Mod
Civic Center Drive Bike Blvd
Lincoln Pedestrian Trail
Santa Ana Blvd & 5th Bike Lane
Edinger Protected Bike Lanes
Raitt St Protected And Buffered Bikeway
1st Ped Improv: Flower‐Standar
14717611
14717611
14717612
14817613
14817613
14817613
14817613
14817613
14817614
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
186919
226994
226995
176801
176802
176880
176885
236998
196944
FEDERAL AID SAFETY PROGRAM
FEDERAL AID SAFETY PROGRAM
FEDERAL AID SAFETY PROGRAM
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
511,300
54,900
287,600
61,400
26,500
526,000
10,600
885,900
53,200
Construction Phase, 10% Complete
Project Completed; pending reconciliation
Project Completed; pending reconciliation
Construction Phase, 95% Complete
Project Completed; pending reconciliation
Project under design. Need to carryover
Construction Phase, 0% Complete
14817614 Public Works 196951 TRAFFIC SYSTEM MGMT GRANT 200Davis Elementary SRTS
Mcfadden Prot Bik Ln Har‐Grand
Kennedy & Villa SRTS
Construction Phase, 5% Complete, keep balance for future reconciliation
Design Phase, 90% Complete
Construction Phase, 5% Complete
Construction Phase, 0% Complete
Design Phase, 95% Complete
Construction Phase, 0% Complete
Construction Phase, 5% Complete
Construction Phase, 60% Complete
In Design
In Design
In Design
In Design
Under Construction
14817614
14817614
14817614
14817614
14817615
14817615
14817615
16113262
16113263
16113263
16113264
16113264
16417640
16417640
16417640
16417641
16417641
Public Works
Public Works
Public Works
Public Works
Public Works
206962
206963
206964
206965
196944
196951
196948
232601
202731
212741
202729
202730
236625
236627
236628
136433
166460
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
TRAFFIC SYSTEM MGMT GRANT
PRCSA CAPITAL GRANTS
PRCSA CAPITAL GRANTS
PRCSA CAPITAL GRANTS
PRCSA CAPITAL GRANTS
PRCSA CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
6,064,600
1,291,000
4,874,200
5,494,800
4,030,700
4,768,400
2,470,900
2,000,000
54,800
480,700
3,323,700
243,700
1,442,900
4,675,000
1,080,000
732,300
Fremont & Spurgeon Srts
Standard Ave Prot Bk Ln: 3‐War
1st Ped Improv: Flower‐Standar
Davis Elementary SRTS
W Willits Protected Bike Lanes
Santa Ana Zoo Educational Hub
Santiago Main St Entrance Desi
17th St Triangle Park Restorat
Standard‐Mcfadden New Park
Raitt & Myrtle New Park
Public Works
Public Works
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Public Works
Public Works
Public Works
Public Works
Public Works
King Street Urban Greening Prj
Rouselle St Flood Protection
Warner Ave Flood Protection
Well 32 Rehab
Active, Construction starting Nov 2023
Active, Design, 5% complete
Active, Construction starting Jan 2024
Active, Construction to begin Sept 2023
Active, Construction, 20% completeAdvanced Meter Infrastructure 1,148,600
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
16417641
16417641
16417641
16417642
16417643
16417644
22317660
22417660
22417660
22417660
22617660
31113260
31213260
31213260
31213260
31213260
31213261
31313260
31313260
31313260
31313260
31313260
31313260
31313260
31313261
31413260
31413260
31513260
41718820
41718820
41718820
41718820
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
196423
216462
226470
166460
226621
226622
236907
206618
146802
116741
236458
197527
152645
202731
222753
222752
152645
162658
202729
212726
212728
212740
222769
232601
162658
182681
197527
197527
167751
227750
227758
237754
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
PWA ENTERPRISE CAPITAL GRANTS
LOCAL DRAINAGE AREA III
LOCAL DRAINAGE AREA IV
LOCAL DRAINAGE AREA IV
LOCAL DRAINAGE AREA IV
LOCAL DRAINAGE AREA VI
RESIDENTIAL DEVELOP DISTRICT 1
RESIDENTIAL DEVELOP DISTRICT 2
RESIDENTIAL DEVELOP DISTRICT 2
RESIDENTIAL DEVELOP DISTRICT 2
RESIDENTIAL DEVELOP DISTRICT 2
RESIDENTIAL DEVELOP DISTRICT 2
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 4
RESIDENTIAL DEVELOP DISTRICT 4
RESIDENTIAL DEV HARBOR SPECFIC
CDA INCLUSIONARY HOUSING FEE
CDA INCLUSIONARY HOUSING FEE
CDA INCLUSIONARY HOUSING FEE
CDA INCLUSIONARY HOUSING FEE
Washington Well Site Improveme
SA‐1 Hydrogenerator Upgrade
Well 38 PFAS Facility
Active, Construction to begin Fall 2023
Active, Design, 75% complete
Active, Construction to begin Fall 2023
Active, Construction, 20% complete
Active, Construction, 90% complete
Active, Construction starting Aug 2023
Construction Phase, 5% Complete
Construction Phase, 60% Complete
Construction Phase, 50% Complete
Design Phase, 99% Complete
Construction Phase, Ongoing
Under Construction
740,000
299,000
2,000,000
115,800
583,800
4,771,900
287,000
4,900
Advanced Meter Infrastructure
Raitt & Myrtle Park Project
DTSA Flood Red & Storwtr Infil
Loc St Prevent Maint FY 22/23
Warner Storm Drain Imp: Ph1
Warner Ave Wdng:Main‐Oak Ph I
Bristol Wdng‐Wrnr/St Andrw IV
Misc Strmdrn Repairs FY 22/23
Santa Anita Soccer Field
21,400
Public Works
Public Works
373,000
150,000
385,300
203,400
133,800
123,400
27,200
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Community Development
Community Development
Community Development
Community Development
Santiago Gas House Area Improv
Santiago Main St Entrance Desi
Stadium Scoreboard
Under Construction; est. compl. 9/1/23; 96% complete
In Design
Pending Final Invoice for Contingency Item
Pending payment of final invoice
Under Construction; est. compl. 9/1/23; 96% complete
Under Construction; est. compl. 9/30/23; 91% complete
In Design; Council award scheduled for 9/19
In Design
Stadium Synthetic Turf
Santiago Gas House Area Improv
SA Zoo Giant River Otter Habit
Standard‐Mcfadden New Park
Pe Bike Trail Phase II
Sandpointe Secur Ltng
Flower St Bike Trail Renovatio
Memorial Park Lights
Santa Ana Zoo Educational Hub
SA Zoo Giant River Otter Habit
Centennial Lake Renovation
Santa Anita Soccer Field
9,100
1,767,100
304,200
453,400
275,400
574,200
54,700
230,300
81,700
26,400
In Design
Under Construction; est. compl. 9/30/23; 85% complete
Awaiting Installation
In Design
Under Construction; est. compl. 9/30/23; 91% complete
Under Construction; Began Potholing
Under Construction
Under Construction
Ongoing project
Ongoing project
Ongoing project
42,400
Santa Anita Soccer Field 1,567,600
775,100
227,800
1,533,300
565,300
Inclusionary Housing Funds
Carnegie Shelter‐Various
Westview House
Vance Lacy Loan Ongoing project
41718820
41718820
41718820
237755
237768
237769
CDA INCLUSIONARY HOUSING FEE
CDA INCLUSIONARY HOUSING FEE
CDA INCLUSIONARY HOUSING FEE
(508,800)
3,753,600
80,000
Community Development
Community Development
Homebuyer Down Payment Asst Loan Prg
Carnegie Real Proprty Purchase
Reducing budget to match project budgets
Ongoing project
Community Development
Community Development
Community Development
Community Development
Homebuyer Down Payment Asst Loan Prg
Peebler (South Main Improvements)
Affordable Housing & Sustainable Comm
Modernization Of SA Civic Center
Ongoing project
Ongoing; est. compl. 9/15/23; 95% complete
Ongoing project
41818830
41818832
41818833
179001
229001
N/A
CDA CAPITAL PROJECTS
CDA CAPITAL PROJECTS
CDA CAPITAL PROJECTS
54,100
1,805,700
9,000,000Ongoing project
99217950
99217950
146802
186901
TRAN SYS IMP AUT AREA B
TRAN SYS IMP AUT AREA B
2,212,200
485,700
Public Works Warner Ave Wdng:Main‐Oak Ph I Construction Phase, 60% Complete
Public Works
Public Works
Public Works
Warner Ave Imprv Ph2‐Oak‐Grand
16 Ch. Traffic Signal Monitor
Shelters‐Benches‐Trsh Receptacle
Safe Mobility Sa Update
Dan Young Soccer Sports Lighting
Stadium Sports Lighting
Installation Services
Bonding
Synthetic Fieldturf
Cell Tower Consultant Serv
Dri‐Prime Sd 150M Diesel Pump
2024 Ford F‐650 Cement Truck
Chevrolet Colorado
Commercial / Industrial Inspections
Barrier Free Park Installation
Memorial Park Sports Lighting
Installation And Services
Design Phase, 90% Complete
03217662
03217663
03217662
05113263
05113263
05113263
05113263
05113263
05113263
05617640
05617640
05717640
05717640
16113262
31313260
31313260
216914
226999
226994
222754
232604
232604
232604
222766
232600
N/A
N/A
N/A
N/A
232602
222769
222769
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
MEASURE M‐STREET CONSTRUCTION
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
CAPITAL OUTLAY FUND
SANITARY SEWER SERVICE
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
20,758
776,527
12,323
382,792
176,515
103,764
1,892
300,000
24,597
55,589
149,989
33,666
408,448
2,000,000
580,400
385,826
Public Works
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Public Works
Public Works
Public Works
Public Works
SANITARY SEWER SERVICE
FED CLEAN WATER PROTECTION ENT
FED CLEAN WATER PROTECTION ENT
PARKS CAPITAL GRANTS
RESIDENTIAL DEVELOP DISTRICT 3
RESIDENTIAL DEVELOP DISTRICT 3
Parks & Recreation
Parks & Recreation
Parks & Recreation
Subtotal for Construction Projects 311,233,413
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description
Fund Description
Project Description
Project Description
Project Status
Project Status
All Other Funds
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDept
01211020 Library
Library
221801
231802
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
Library Ops Cannabis Fnd 21‐22
Library ‐ New Books
Ford F‐59 Chassis Book Mobile (Change
Order)
Active and Ongoing Library Program
Active and Ongoing Library Program
196,442
26,10001211020
01211020 Library 221801 CANNABIS PUBLIC BENEFIT FUND Goods not received or services not performed 16,929
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
01213020
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
232400
212501
222512
212745
222756
222754
222754
222766
232602
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
Cannabis Fund 22/23
Ford Transit T‐350 Crew Van
Ford Transit T350 Van
Synthetic Fieldturf
Thornton Park Sports Lighting
Dan Young Soccer Sports Lighting
Installation And Services
Synthetic Fieldturf
Program in Progress 1,106,800
102,961
68,664
568,598
237,986
337,108
131,709
2,312,067
79,770
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
RFP will be issued prior to June 30, 2024. Delays due to PD‐IT project
workload.
Barrier Free Park Installation
01214010
01214010
Police Department
Police Department
234604
234600
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
PD Mobile Data Computers 1,000,000
98,636Ford F550 Altec AT37G Boom Truck Goods not received or services not performed
Code Enforcement Cannabis/Bus. Regulatory PBA is in the second phase of remodeling existing offices and conference
Office rooms ‐ second phase expected completion is May 2024.01216010 Planning & Building N/A CANNABIS PUBLIC BENEFIT FUND 9,000
Code Enforcement Cannabis/Bus. Regulatory PBA is in the second phase of remodeling existing offices and conference01216010
01216010
Planning & Building
Planning & Building
N/A
N/A
CANNABIS PUBLIC BENEFIT FUND
CANNABIS PUBLIC BENEFIT FUND
38,000Officerooms ‐ second phase expected completion is May 2024.
Code Enforcement's Overtime will be used to address City Council
priorities for a one‐year special project.Code Enforcement Overtime 150,000
02213200
02213200
02213200
02213200
02917620
03109050
03109050
03109050
03109050
03109050
03117102
Parks & Recreation
Parks & Recreation
Parks & Recreation
Parks & Recreation
Public Works
Human Resources
Human Resources
Human Resources
Human Resources
Human Resources
Public Works
222502
222503
222769
232603
N/A
N/A
N/A
N/A
N/A
PRCSA FEES & DONATION
PRCSA FEES & DONATION
PRCSA FEES & DONATION
PRCSA FEES & DONATION
SPECIAL GAS TAX
AIR QUALITY IMPR. (AB 2766)
AIR QUALITY IMPR. (AB 2766)
AIR QUALITY IMPR. (AB 2766)
AIR QUALITY IMPR. (AB 2766)
AIR QUALITY IMPR. (AB 2766)
AIR QUALITY IMPR. (AB 2766)
Movies In The Park
After School Adventur
Program in Progress
Program in Progress
42,500
25,400
10,000
2,410
39,461
844
2,714
566
1,532
838
Memorial Park Sports Lighting
Renovate Lawn Bowling Clubhouse
Econolite Invoice# 518101
Halden Lunch And Cutlery Set
H2GO Ranger Vacuum Bottle
Round Magnet Clip
Baltimore Lunch Bag
Retract Badge Holder (White)
Ford F‐150 Lightning Truck
Goods not received or services not performed
Goods not received or services not performed
Delivery of street light poles expected December 2023.
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
N/A
N/A 229,088
05105015 Public Works N/A CAPITAL OUTLAY FUND ADA Transition Plan Vendor has been selected and study will be complete by June 30, 2024 68,980
06017640
06017640
06017640
06017640
06017640
Public Works
Public Works
Public Works
Public Works
Public Works
N/A
N/A
N/A
N/A
N/A
WATER
WATER
WATER
WATER
WATER
Ford F550 Altec AT37G Boom Truck
Ford F550 Altec AT40G Boom Truck
2023 Chevrolet Colorado Truck
Roof Repairs
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
73,304
16,534
57,115
23,300
185,026John Deere 410 P‐Tier Backhoe
06017640 Public Works N/A WATER Fleet/Purchasing delays. New requisitions will be entered for FY23‐24.663,660Heavy Duty Mechanic Truck & Vacuum Trailer
Cng Water Tank Truck
Custom Saw Trailer
06017641
06017641
06017641
Public Works
Public Works
Public Works
N/A
N/A
N/A
WATER
WATER
WATER
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
280,258
46,680
673,2752024 Ford F550Xl Full‐Size Truck
06017644 Public Works N/A WATER Vehicles For Water Quality Staff Vehicles were no longer available at fiscal year end due to vendor delays.
80,000
06017645
06017645
06017646
Public Works
Public Works
Public Works
N/A
N/A
N/A
WATER
WATER
WATER
Pool Vehicle For Water Admin & Engineering Vehicles were no longer available at fiscal year end due to vendor delays.270,000
191,217Remove Existing Door And Hardware
Meter Box & Vault Replacements
Goods not received or services not performed
Supply shortage of materials caused delays; project now expected to be
complete by December 31, 2023.2,000,000
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
06017646 Public Works N/A WATER Crane Truck Fleet/Purchasing delays. New requisitions will be entered for FY23‐24.117,000
06017646
06017646
06817640
06817640
06817640
06817640
06817641
06817641
06917640
07017100
07017100
07017100
07017100
07017100
07017100
07017100
07017100
07017100
07017100
07017100
08009052
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Human Resources
N/A
N/A
N/A
N/A
N/A
N/A
236481
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
WATER
WATER
SANITATION FUND
SANITATION FUND
SANITATION FUND
SANITATION FUND
SANITATION FUND
SANITATION FUND
REFUSE COLLECTION SERVICE
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
EQUIPMENT REPLACEMENT
LIABILITY AND PROPERTY INS FND
2024 Chevrolet Silverado Truck
2023 Chevrolet Silverado 1500
Ford F‐550 Stakebed Truck
Ford F‐250 Truck
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
September 2023‐ Expected date of completion.
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Installation expected to be complete October, 2023.
Project fully funded in FY22‐23; Carry Forward is to record expenditures
in fiscal year being serviced
100,522
61,388
105,639
104,741
27,115
27,774
134,200
170,819
78,872
83,914
76,339
857,540
172,442
19,647
180,640
187,322
90,081
31,437
38,156
41,661
12,500
Chevrolet Colorado
Portable Restroom Trailers
New Office(S)/Workspace(S) Furniture
Fitness Room Improvements
Ford F‐150 Truck
Ford Police Interceptors
Toro GTX Electric Cart
Ford Interceptor Utility Suv
Ford Interceptor Utlity Suv
Hydraulic Tilt Trailer
2023 BMW RT‐P Motorcycle
Chevrolet Colorado
Chevrolet Colorado
2023 Chevrolet Equinox
2023 Chevrolet Traverse
Portable Restroom Trailers
Lobby Chair Lift To Be Ada Compliant
Meridian Knowledge Systems Learning
Management Software
New Reception Desk Installation
Meridian Knowledge Systems Learning
Management Software
08009052
08009053
08209052
08209052
08809050
08809050
Human Resources
Human Resources
Human Resources
Human Resources
Human Resources
Human Resources
N/A
220505
N/A
LIABILITY AND PROPERTY INS FND
LIABILITY AND PROPERTY INS FND
WORKERS COMPENSATION FUND
WORKERS COMPENSATION FUND
QUALITY SERVICE TRAINING
61,486
36,158
30,743
12,500
60,724
40,200
Goods not received or services not performed
Project fully funded in FY22‐23; Carry Forward is to satisfy GASB software
requirement.
Installation expected to be complete October, 2023.
Project fully funded in FY22‐23; Carry Forward is to satisfy GASB software
requirement.
N/A Lobby Chair Lift To Be Ada Compliant
Meridian Knowledge Systems Learning
Management SoftwareN/A
N/A QUALITY SERVICE TRAINING 4th Floor Training Project started but not completed.
Expected completion date is December 30, 2023; Furniture still has to be
purchased.10920149
10920149
10920149
Information Technology
Information Technology
Information Technology
221201
N/A
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
IT 2nd Floor Remodel 1,500,000
700,000
400,000
ERP System Replacement RFP expected to be finalized in FY23‐24
The Business License Tax Software RFP is scheduled to be released the
first week of October 2023.N/A Replace Business Tax Licensing System
10920149
10920149
10920149
10920149
10920149
Information Technology
Information Technology
Information Technology
Information Technology
Information Technology
N/A
N/A
N/A
N/A
N/A
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
PC Refresh Program Ongoing program to annually replace a portion of computer equipment.150,000
206,000
250,000
1,000,000
100,000
PO has been issued, but delivery is delayed due to supply chain issues.
Installation is expected to be complete in Fall 2023.Data Center AC & Ups Batteries
City Facilities Wireless Upgrade
LMS System Replacement
Timekeeping System
Upgrade would give another 7‐years of life to current system. Project is
in planning phase.
IT working with vendor and PBA to finalize Building Safety, Planning and
Code Enforcement platforms. Expected completion date is June 30, 2024.
Currently in planning phase; next step is development/issuing of RFP.
10920149
10920149
10920149
Information Technology
Information Technology
Information Technology
N/A
N/A
N/A
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY
Selectron/LMS For Telephone Payments And Project currently in planning/evaluation phase.20,000
250,000
206,257
Cybersecurity Protection Program
Replace 15 Tn & 10 Tn Crac Units
Series of incremental additions to Cybersecurity program.
Goods not received or services not performed
City Council recently approved the Purchase and Sale Agreement at the
June 20, 2023 meeting. Escrow will close in FY23‐24.
City Council recently approved the Purchase and Sale Agreement at the
June 20, 2023 meeting. Escrow will close in FY23‐24.
11118800
12218715
Community Development
Community Development
N/A
N/A
OPIOID REMEDIATION
OPIOID REMEDIATION
Property Purchase 1815 E. Carnegie Ave.
Property Purchase 1815 E. Carnegie Ave.
1,100,000
100,000
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
12015330
12015330
12015330
12015330
12015330
Fire‐Fire Stations
Fire‐Fire Stations
Fire‐Fire Stations
Fire‐Fire Stations
Fire‐Fire Stations
236626
236626
236626
N/A
FIRE FACILITIES FUND
FIRE FACILITIES FUND
FIRE FACILITIES FUND
FIRE FACILITIES FUND
FIRE FACILITIES FUND
Roof Replacement At Fire Station 73
Roof Replacement
Install Security Gate Fencing
Flooring Replacement
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
City Council approved a pre‐commitment letter on July 18, 2023
supporting the development of transitional age youth housing. Funds will
be expended once the developer verifies that 100% of secured funding
has been obtained.
116,502
39,653
31,290
51,722
9,283N/A Move Existing Furniture
Precommitment Loan ‐ Illumination
Foundation12218715Community Development N/A EMERGENCY AND HEALTH GRANTS 673,774
12218715
12218716
12218717
12218717
12218717
Community Development
Community Development
Community Development
Community Development
Community Development
Various
227752
Various
227757
237753
EMERGENCY AND HEALTH GRANTS
EMERGENCY AND HEALTH GRANTS
EMERGENCY AND HEALTH GRANTS
EMERGENCY AND HEALTH GRANTS
EMERGENCY AND HEALTH GRANTS
HHAP Grant
Homeless Services Outreach Program
HHAP‐3 Grant
Homeless Services Outreach Program
Homeless Navigation Shelter Services
Ongoing project
Goods not received or services not performed
Ongoing project
Goods not received or services not performed
Goods not received or services not performed
450,000
198,059
1,519,800
1,428,741
718,150
12514491
12814407
12814409
Police Department
Police Department
Police Department
224250
214506
224507
OES UASI Goods not received or services not performed 34,880
203,789
118,200
Grant Project & Fiscal Coordinator Services
Swat Team Uniforms / GearLAW ENFORCEMENT GRANTS
LAW ENFORCEMENT GRANTS
Goods not received or services not performed
Grant ends 09/30/2024‐Pending gang prevention and enforcement
exercisesGang Prevention And Enforcement
Sexual Assault Evidence Submission Grant
Home Grant Program
Home Grant Program
Home Grant Program
12814417
13018780
13018780
13018780
13018780
13018780
Police Department 214601
Various
Various
Various
Various
Various
LAW ENFORCEMENT GRANTS 36% of grant remaining 18,800
186,000
501,300
1,754,000
1,726,700
2,291,200
Community Development
Community Development
Community Development
Community Development
Community Development
HOME PROGRAM FEDERAL GRANT
HOME PROGRAM FEDERAL GRANT
HOME PROGRAM FEDERAL GRANT
HOME PROGRAM FEDERAL GRANT
HOME PROGRAM FEDERAL GRANT
Grant Year 2018; period of performance ends 8/2026
Grant Year 2019; period of performance ends 8/2027
Grant Year 2020; period of performance ends 8/2028
Grant Year 2021; period of performance ends 8/2029
Grant Year 2022; period of performance ends 8/2030
Home Grant Program
Home Grant Program
Community Development Block Grant
Administration
Grant Monitoring & Tech Support Serv
Community Development Block Grant‐
Housing
13518780
13518780
13518782
Community Development
Community Development
Community Development
Various
237500
Various
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
Grant Year 2022; period of performance ends 8/2029
Goods not received or services not performed
196,600
12,291
4,700Grant Year 2019; period of performance ends 8/2026
Community Development Block Grant‐
Housing13518782Community Development Various COMMUNITY DEV BLOCK GRANT/ESG Grant Year 2020; period of performance ends 8/2027 168,800
Community Development Block Grant‐
Housing
Residential Rehabilitation Program Serv
Community Development Block Grant
Programs
13518782
13518782
13518783
Community Development
Community Development
Community Development
Various
237530
Various
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
Grant Year 2022; period of performance ends 8/2029
Goods not received or services not performed
20,000
212,155
9,300Grant Year 2017; period of performance ends 8/2024
Community Development Block Grant
Programs
Community Development Block Grant
Programs
Community Development Block Grant
Programs
13518783
13518783
13518783
13518783
Community Development
Community Development
Community Development
Community Development
Various
Various
Various
237517
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
Grant Year 2018; period of performance ends 8/2025
Grant Year 2021; period of performance ends 8/2028
Grant Year 2022; period of performance ends 8/2029
Goods not received or services not performed
6,000
133,000
577,000
15,588Victim Intervention Program
Emergency Solutions Grant
Homeless Management System Services
Shelter Services
Grant Monitoring & Tech Support Serv
Homeless Prevention Rapid Re‐Housing
Homeless Prevention Rapid Re‐Housing
Community Development Block Grant ‐ Cv
(Covid 19)
Grant Monitoring & Tech Support Serv
Case Management Sa Youth Exp
Homelessness
13518785
13518785
13518785
13518785
13518785
13518785
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Various
237602
237603
237600
237606
237605
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
Grant Year 2022; Period of performance ends 10/2024
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
10,600
63,035
19,949
2,358
41,124
788
13518788
13518788
13518788
Community Development
Community Development
Community Development
Various
219500
219511
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
Grant Year 2020; Period of performance ends 7/2026
Goods not received or services not performed
Goods not received or services not performed
276,200
2,000
80,861
List of Requests to Carryover Unspent Appropriations
FY22‐23 Balances to FY23‐24
As of August 4, 2023
Increase from
Original Funding
Amount
Change in Purpose
from Original
Funding Source
Accounting
Unit
Project
Activity #
Carry Forward
Up To AmountDepartmentFund Description Project Description Project Status
13518789
13518789
13918780
14018760
Community Development
Community Development
Community Development
Community Development
Various
217610
Various
Various
COMMUNITY DEV BLOCK GRANT/ESG
COMMUNITY DEV BLOCK GRANT/ESG
HOUSING AUTHORITY‐NEW CONSTR
HOUSING AUTHORITY‐VOUCHER ADM
Emergency Solutions Grant ‐ Cv (Covid 19)
Grant Monitoring & Tech Support Serv
MS5 Rental Voucher Admin Fees
Sec 8 Admin Fee
Grant Year 2020; Period of performance ends 9/2023
Goods not received or services not performed
Ongoing project
1,484,100
1,000
15,500
Ongoing project 517,500
Westview House Lp ‐ Affordable Housing
Project Loan
10% of loan proceeds held back until completion of construction (90%
disbursed in May 2022)14518760 Community Development 227700 RENTAL REHABILITATION GRANT 38,700
15211150
15211154
15816500
15816501
15818700
15818701
16514414
16517611
16517611
16614450
17718700
17718701
17718701
17718701
17718702
17718702
17718702
17718702
Library
Library
231601
221380
215004
225000
217763
237750
234610
236984
236984
N/A
217759
227753
227753
227753
227756
227756
227756
227756
PUBLIC LIBRARY GRANT FUND
PUBLIC LIBRARY GRANT FUND
PLANNING GRANTS PROGRAM
PLANNING GRANTS PROGRAM
PLANNING GRANTS PROGRAM
PLANNING GRANTS PROGRAM
OFFICE OF SAFETY GRANT
Zip Books Grant
Building Forward ‐ Admin Costs
SB2 Grant
Started but not completed
Active CIP Project, Design, 75% Complete
ongoing; 12/31/2023
ongoing; 06/30/2024
ongoing; 06/30/2030
3,200
9,312,300
11,500
5,300
58,300
149,000
130,500
56,000
24,357
403,800
4,100
495,700
41,413
75,456
81,600
32,663
92,687
2,325,510
Planning & Building
Planning & Building
Community Development
Community Development
Police Department
Public Works
Public Works
Police Department
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Community Development
Leap Grant
Permanent Local Housing Allocation 2
Permanent Local Housing Allocation 2
Office Of Traffic Safety (OTS)
OTS Bicycle & Ped Safety Edu
Bicycle & Pedestrian Safety
US Dept Of Justice‐Aff‐ Asset Forfeiture
Emergency Rental Assistance Program
Emergency Rental Assistance Program 2
Families Together Of OC
Lutheran Social Services Of Southern Ca
Emergency Rental Assistance Program 2
Community Action Partnership
Families Forward Inc
ongoing; 06/30/2030
CFs are for FY 22‐23 grant agreement and will be spent by 9/30/2023.
75% completed; grant ends on 9/30/2023
Goods not received or services not performed
75% completed; grant ends on 9/30/2023
Close out phase
OFFICE OF SAFETY GRANT
OFFICE OF SAFETY GRANT
US DOJ ASSET FORFEITURE FUND
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
EMERGENCY RENTAL ASSISTANCE PG
Ongoing; 09/30/2025
Goods not received or services not performed
Goods not received or services not performed
Ongoing project
Goods not received or services not performed
Goods not received or services not performed
Goods not received or services not performed
Carryforwards are for FY21‐22 grant agreement and will be spent by
12/31/23.
United Way Of Orange County
17803011 City Manager N/A COVID‐19 RESPONSE Health And Equity Literacy 2,154,900
18018760
18018760
18318763
Community Development
Community Development
Community Development
227751
227751
237051
ARPA EHV ADMIN FEES
ARPA EHV ADMIN FEES
ARPA ‐ CA FOR ALL YOUTH WDP
ARPA ‐ EHV Admin Fees
Mercy House Living Centers
CA For All Youth
Ongoing project
Goods not received or services not performed
Grant project ends May 1, 2024
63,900
56,846
1,731,200
18318763 Community Development 237051 ARPA ‐ CA FOR ALL YOUTH WDP Goods not received or services not performed 1,282,476OC Conservation ‐ Operate Youth Program
Working Wardrobes
WIOA Grant Proj
18318763
12318748‐63
Community Development
Community Development
237051
Various
ARPA ‐ CA FOR ALL YOUTH WDP
WORKFORCE INNOV AND OPP ACT
Goods not received or services not performed
Ongoing project
169,675
922,700
14218760‐2
1581870X
16913265
Community Development
Community Development
Parks & Recreation
Various
N/A
NSP FEDERAL GRANT Process of close‐out, pending completion of Cross Roads at Washington 6,600Neighborhood Stabilize Program
City Council recently approved the Purchase and Sale Agreement at the
June 20, 2023 meeting. Escrow will close in FY23‐24.HOUSING & COMMUNITY DEV GRANTS
RECREATION GRANTS FUND
Property Purchase 1815 E. Carnegie Ave.6,796,430
Purchase of Refrigerator for Nutrition
ProgramN/A Grant to be closed out once refrigerator is purchased and received 4,087
Subtotal for All Other Funds
Grand Total for Carry Forward
62,882,480
514,197,534
Summary by Department Summary by Category
CategoryDepartmentCarry Forward Up To Amount Sum of Carry Forward
292,905,214
6,083,070
City Attorney
City Manager
Community Development
Finance
579,900 Construction in Progress
6,162,433 Contract Services
54,554,241 Equipment 18,244,353
1,351,98311,177,235 Furniture
Fire‐Fire Stations
Human Resources
Information Technology
Library
3,133,450 Interfund Transfers for Capital Projects
781,204 One‐Time Employee Compensation
6,578,557 Property Purchase
43,884,132 Software
47,601,200
2,873,839
12,750,030
2,904,911
Non‐Departmental
Parks & Recreation
Planning & Building
Police Department
Public Works
4,308,839 Supplies
39,675,515 Various Grant Programs
3,431,113 Grand Total
11,197,102
328,733,815
403,048
129,079,886
514,197,534
Grand Total 514,197,534
List of Requests to Carryover Unspent Appropriations by Fund
FY22‐23 Balances to FY23‐24
As of August 4, 2023
FY22‐23
Fund Fund Name Budget Expenditures Available Balance as of
August 04, 2023 Carry Forward
011 General Fund ‐ City Manager 3,229,040 2,757,048 471,992 345,000
011 General Fund ‐ General Non‐Departmental 48,170,160 40,359,513 7,810,647 4,308,839
011 General Fund ‐ City Attorney 3,609,860 2,977,127 632,733 105,000
011 General Fund ‐ Finance 13,138,413 11,609,503 1,528,910 456,262
011 General Fund ‐ Library Services 11,551,873 6,346,885 5,204,988 5,085,628
011 General Fund ‐ Recreation & Community Services 16,575,621 12,689,582 3,886,039 3,886,039
011 General Fund ‐ Police Department 145,063,990 139,547,167 5,516,823 2,362,725
011 General Fund ‐ Fire Department 55,006,950 52,156,190 2,850,760 2,084,000
011 General Fund ‐ Planning & Building 20,070,704 16,090,800 3,979,904 2,885,713
011 General Fund ‐ PWA 67,327,421 38,988,199 28,339,222 27,558,512
011 General Fund ‐ Community Development 10,920,090 6,527,437 4,392,653 3,401,310
012 Cannabis Set‐Aside ‐ Library 4,616,100 1,074,328 3,541,772 3,541,771
012 Cannabis Set‐Aside ‐ Parks, Rec, & Comm Serv 22,689,220 5,782,686 16,906,534 16,402,692
012 Cannabis Set‐Aside ‐ Police 4,586,610 3,095,619 1,490,991 1,098,636
012 Cannabis Set‐Aside ‐ Planning & Building 1,460,011 996,806 463,205 197,000
022 PRCSA FEES & DONATION 975,735 30,800 944,935 920,510
029 SPECIAL GAS TAX 41,159,706 10,170,543 30,989,163 28,882,261
031 AIR QUALITY IMPR. (AB 2766)2,301,373 1,381,681 919,692 585,781
032 MEASURE M‐STREET CONSTRUCTION 52,117,896 11,339,920 40,777,976 40,556,807
034 NEW TRANSPO SYS IMPR AREA E 1,291,236 6,900 1,284,336 1,284,500
035 NEW TRANSPO SYS IMPR AREA F 1,733,154 158,468 1,574,686 1,541,100
051 CAPITAL OUTLAY FUND 5,200,189 1,527,783 3,672,406 3,569,940
054 SANITARY SEWER CAPITAL 16,373,531 6,230,818 10,142,713 10,076,800
055 SEWER CONNECTION FEE 8,770,613 4,315,485 4,455,128 4,455,400
056 SANITARY SEWER SERVICE 9,323,415 7,328,844 1,994,571 205,577
057 FED CLEAN WATER PROTECTION ENT 8,168,190 4,561,941 3,606,249 2,087,013
059 SELECT STREET CONSTRUCTION 52,231,415 12,488,715 39,742,700 40,637,300 (A)
060 WATER 116,049,944 82,663,332 33,386,612 25,265,879
066 ACQUISITION & CONSTRUCTION 60,248,882 27,671,205 32,577,677 45,914,500 (B)
068 SANITATION FUND 9,338,336 7,246,608 2,091,728 855,587
069 REFUSE COLLECTION SERVICE 19,584,746 18,990,628 594,118 78,872
070 EQUIPMENT REPLACEMENT 2,980,560 1,090,768 1,889,792 1,779,181
080 LIABILITY AND PROPERTY INS FND 17,960,012 17,144,891 815,121 701,744
082 WORKERS COMPENSATION FUND 10,061,652 8,453,459 1,608,193 43,243
088 QUALITY SERVICE TRAINING 295,927 190,011 105,916 100,924
109 INFORMATION TECHNOLOGY 17,504,990 9,099,682 8,405,308 4,782,257
111 OPIOID REMEDIATION 1,100,000 ‐1,100,000 1,100,000
120 FIRE FACILITIES FUND 2,728,100 1,678,677 1,049,423 1,049,450
122 EMERGENCY AND HEALTH GRANTS 12,331,400 1,727,579 10,603,822 5,088,524
123 WORKFORCE INNOV AND OPP ACT 3,677,043 2,754,422 922,621 922,700
125 OES UASI 9,157,201 4,048,665 5,108,536 4,515,880
128 LAW ENFORCEMENT GRANTS 1,870,401 387,681 1,482,720 1,468,989
130 HOME PROGRAM FEDERAL GRANT 9,566,459 3,107,330 6,459,129 6,459,200
135 COMMUNITY DEV BLOCK GRANT 16,877,242 10,119,010 6,758,232 6,620,249
139 HOUSING AUTHORITY‐NEW CONSTR 360,230 157,178 203,052 15,500
140 HOUSING AUTHORITY‐VOUCHER ADM 4,544,326 3,916,165 628,161 517,500
142 NSP FEDERAL GRANT 1,644,000 1,637,420 6,580 6,600
145 RENTAL REHABILITATION GRANT 38,653 ‐38,653 38,700
147 FEDERAL AID SAFETY PROGRAM 1,961,640 754,870 1,206,770 887,700
148 TRAFFIC SYSTEM MGMT GRANT 31,717,146 1,136,314 30,580,832 30,558,400
152 PUBLIC LIBRARY GRANT FUND 9,339,901 24,822 9,315,079 9,315,500
158 PLANNING GRANTS PROGRAM 10,199,699 2,323,359 7,876,340 7,020,530
161 PRCSA CAPITAL GRANTS 10,528,785 2,426,104 8,102,681 8,102,900
164 PUB WKS‐WTR QUALITY & CONTROL 19,380,522 1,769,010 17,611,512 17,589,300
165 OFFICE OF SAFETY GRANT 900,306 575,154 325,152 210,857
EXHIBIT 2
List of Requests to Carryover Unspent Appropriations by Fund
FY22‐23 Balances to FY23‐24
As of August 4, 2023
FY22‐23
Fund Fund Name Budget Expenditures Available Balance as of
August 04, 2023 Carry Forward
166 US DOJ ASSET FORFEITURE FUND 1,000,670 96,922 903,748 403,800
169 RECREATION GRANTS FUND 304,727 139,123 165,604 4,087
177 EMERGENCY RENTAL ASSISTANCE PG 8,135,746 4,986,618 3,149,128 3,149,129
178 COVID‐19 RESPONSE 3,997,089 1,667,361 2,329,728 2,154,900
180 ARPA EHV ADMIN FEES 452,031 331,334 120,697 120,746
181 AMERICAN RESCUE PLAN ACT(ARPA) 115,979,235 18,359,006 97,620,229 87,602,613
183 ARPA‐CA FOR ALL YOUTH WDP 4,497,520 1,122,512 3,375,008 3,183,351
223 LOCAL DRAINAGE AREA III 412,000 ‐ 412,000 287,000
224 LOCAL DRAINAGE AREA IV 401,396 2,291 399,105 399,300
311 RESIDENTIAL DEVELOP DISTRICT 1 2,793,399 2,389,982 403,417 385,300
312 RESIDENTIAL DEVELOP DISTRICT 2 3,159,914 2,536,140 623,774 496,900
313 RESIDENTIAL DEVELOP DISTRICT 3 8,881,429 4,174,471 4,706,958 4,707,226
314 RESIDENTIAL DEVELOP DISTRICT 4 619,081 550,359 68,722 68,800
417 CDA INCLUSIONARY HOUSING FEE 4,829,417 2,122,423 2,706,994 6,426,300 (C)
418 CDA CAPITAL PROJECTS 1,336,719 1,308,625 28,094 10,859,800 (D)
992 TRAN SYS IMP AUT AREA B 3,167,999 470,181 2,697,818 2,697,900
226 LOCAL DRAINAGE AREA VI 150,000 ‐ 150,000 150,000
315 RESIDENTIAL DEV HARBOR SPECFIC 2,912,013 1,344,472 1,567,541 1,567,600
Total 1,192,641,004 653,236,956 539,404,048 514,197,534
‐
Notes:
(A)Adjustment made to reduce expenditures subsequent to 8/4/23. Enough balance available for carryover.
(B)Projects are funded by Water Revenue Fund. Water Revenue Fund has enough balance available for carryover.
(C)Adjustments made to increase expenditures budget subsequent to 8/4/23. Enough balance available for carryover.
(D)Adjustments made to increase expenditures budget subsequent to 8/4/23. Enough balance available for carryover.