Loading...
HomeMy WebLinkAboutItem 14 - Award Construction Contract for Traffic Calming Improvements Phase 1Public Works Agency www.santa-ana.org/public-works Item # 14 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report September 19, 2023 TOPIC: Traffic Calming Improvements Phase 1 AGENDA TITLE Approve an Amendment to the Fiscal Year 2023-24 Capital Improvement Program for $53,000 and Award a Construction Contract to Hardy & Harper, Inc. in the Amount of $540,000 for the Traffic Calming Phase 1 in Five Separate Locations on Grovemont St., Civic Center Dr., Walnut St., Myrtle St., and Cypress Ave., with an Estimated Project Delivery Cost of $648,000 (Project No. 23-6034) (General Fund) RECOMMENDED ACTION 1. Approve an amendment to the FY 2023-24 Capital improvement Program to include $53,000 in construction funds for the Traffic Calming Phase 1 (Project No. 23- 6034). 2. Authorize the City Manager to reject the bid submitted by HZS Engineering and Construction as non -responsive and award a construction contract to Hardy & Harper, Inc. the lowest responsible bidder, in accordance with the base bid in the amount of $540,000 for construction of the Traffic Calming Phase 1, for a term beginning September 19, 2023 and ending upon project completion , and authorize the City Manager to execute the contract subject to non -substantive changes approved by the City Manager and the City Attorney. 3. Approve the Project Cost Analysis for a total estimated construction delivery cost of $648,000, which includes $540,000 for the construction contract; $54,000 for contract administration, inspection, and testing; and a $54,000 project contingency for unanticipated or unforeseen work. 4. Determine that the recommended actions are exempt from further review in accordance with the California Environmental Quality Act as Categorical Exemption Environmental Review No. ER-2023-35 was filed for the project. DISCUSSION The City has identified the need to undertake the installation of traffic calming and traffic safety devices at six different locations throughout the city (Exhibit 1). This project meets the intent of the funding source by constructing new wheelchair ramps, Rectangular Rapid Flashing Beacon (RRFB), angular parking, crosswalks, raised Award Construction Contract for Traffic Calming Improvements Phase 1 September 19, 2023 Page 2 crosswalk, speed cushions, and enhancing pedestrian crossings through implementation of new signage and striping. Once these pedestrian and mobility improvements are completed, it will increase traffic safety for pedestrians and all road users. Public Outreach and Contractor Particiaation To provide an opportunity for local vendors to submit bids, the City notified a total of 900 regional vendors via PlanetBids, many of which are Santa Ana based. Thirty-three vendors requested bidding documents and a total of four bids were received. The lowest responsive bid was received from Hardy & Harper, Inc. As legally required, a Notice Inviting Bids was advertised in the Orange County Register newspaper on May 26, 2023 and June 2, 2023. The project was also advertised in PlanetBids from May 26, 2023 through June 15, 2023. Bids were received electronically via PlanetBids on June 15, 2023. Bid Results Summary Rank Bidder's Name Location Base Bid 1 Hardy & Harper, Inc. Lake Forest, CA $540,000 2 EBS General Engineering Inc. Corona, CA $646,181 3 Excel Paving Co Long Beach, CA $689,680 NR HZS Engineering and Construction Santa Ana, CA Non -Responsive A total of four bids were received, three bids were responsive, and one bid was deemed non -responsive. Hardy & Harper, Inc. submitted the lowest responsive base bid in the amount of $540,000 (Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the basis of the Base Bid. Based on the bid analysis and a contractor's reference check, Staff recommends awarding the construction contract to Hardy & Harper, Inc., in the amount of the base bid totaling $540,000 (Exhibit 3). Hardy & Harper, Inc. is currently the contractor for the Santa Clara Avenue Bike Lane and Pedestrian Improvements, Project 22-6997. The construction inspector and project manager are satisfied with the quality of work performed for the City. Project Delivery To deliver a complete project, in addition to the construction contract, the estimated total project delivery cost includes construction administration, inspection, and testing, along Award Construction Contract for Traffic Calming Improvements Phase 1 September 19, 2023 Page 3 with an allowance for contingencies to account for unexpected or unforeseen conditions. Construction administration and inspection includes construction management, and materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the table below, the estimated total construction delivery cost of the project is $648,000. Project Item Total Construction Contract Bid Amount $540,000 Construction Administration, Inspection, Testing $54,000 Contract Contingencies $54,000 TOTAL ESTIMATED CONSTRUCTION DELIVERY COST $648,000 ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER- 2023-35 was filed for the project. FISCAL IMPACT Project No. 23-6034 is the number assigned to the funding for tracking of all expenditures to deliver the construction of this project. As indicated in the Cost Analysis, the total estimated construction delivery cost of the project is $648,000, which includes construction, contract administration, inspection, testing, and contingency. The proposed contract enables Staff to authorize a construction cost increase of up to 25% if necessary for contingencies. Staff expect to utilize other available Public Works appropriations if a contingency becomes necessary to complete the project. If there are no other available appropriations, then Staff will return to City Council with a project update and recommendations. The following table summarizes the funds budgeted and available in current FY 2023-24 (Exhibit 5) for expenditure to deliver construction of this project. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers to FY 2024-25. Fiscal Accounting Unit Fund Accounting Unit, Year - Account No. Description Account No. Amount (Project No.) Description Existing Budget PW-Traffic/Trans — 2023-24 01117620-66220 General Fund Service Enhancement, $595,000 (23-6034) Improvement Other Than Buildings Award Construction Contract for Traffic Calming Improvements Phase 1 September 19, 2023 Page 4 Additional Budget PW-Traffic/Trans — 01117620-66220 Service 2023-24 (23-6034) General Fund Enhancement, $53,000 Improvement Other Than Buildings Total $648,000 EXHIBIT(S) 1. Location Map 2. Bid Proposal 3. Construction Contract 4. Cost Analysis 5. CIP Project Sheet Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency Approved By: Kristine Ridge, City Manager EXHIBIT 1 SANTA ANA ,LN GR•Ary6P F Project No. 22-6034: A P� WA Traffic Calming Improvements Phase I PUBLIC WORKS AGENCY EXHIBIT 2 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6034 TRAFFIC CALMING IMPROVEMENTS PHASE I BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Hardy & Harper, Inc. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Price Amount I Remove and Construct PCC 630 SF $ $ Sidewalk (T=4") 2-5-00 151 -750 2 Construct PCC Curb Ramp 525 SF $ $ yid Qo 21,Gov 3 Remove Fire Hydrant Assembly 3 EA $ $ 12, 000 - 00 0oo 4 Potholing (As -Needed)* 6 EA $ $ 8C0 • o o 4, suo 5 Vertical Offset (As -Needed)* 3 EA $ $ 3, 5co . ob 10, S00 6 Construct New Fire Hydrant 3 EA $ $ Assembly 29, 00o-oc' `75, wo 7 install Raised Crosswalk at Adams 1 LS $ $ St and Artesia St f 0' 000 00 0 $ Install Raised Crosswalk at Adams I LS $ $ St and Spruce St 10, cxx o0 10,000 9 Install Speed Cushions at 1 LS $ $ Grovemont St Between Tustin Ave 115, Ow GO I5, DOp and Deodar St 10 Install Speed Cushions at Cypress I LS $ $ Ave Between Edinger Ave and St 25 2-5, 000 Andrew PI I I Install Speed Cushions at Myrtle St 1 LS $ $ Between Raitt St and Bristol St 20'OCO- oG 20,000 12 Signing and Striping 1 LS $ $ 2-02,4Gv-pD 2_W,450. 13 Furnish & Install Complete I LS $ $ Functioning Carmanah RRFB System per Plan at the Intersection 20, DOO, p{' 20, 000 of Civic Center Dr and French St P-I of P-16 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6034 TRAFFIC CALMING IMPROVEMENTS PHASE I Item Description Qty Unit Unit Price Amount 14 Project Advertisement Sign I EA $ 3; Doc). 00 $ 3, 000 15 As -Built Plans 1 LS $5,000 $ 5, w() 16 Constniction Permit(s) 1 LS $6,500 $ (0,600 TOTAL BASE BID — BID ITEMS I-16 $ 540, DoD The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the " 25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. i This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within Eighty (80) working days after the commencement date stated in the Notice to Proceed. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $3,600 per calendar day. Name of Firm Hardv & Hamer. Inc. Signature of BIDDER Title Michael Murray,Vice President' (if an individual, so state. If a firm or co -pa ip, state the firm name and give the names of all individual co-partners composing the firrK If a corporation, state legal name of corporation, and names of President, Secretary. Treasurer and Manager, thereof.) P-2 of P-16 EXHIBIT 3 CITY OF SANTA ANA CONSTRUCTION CONTRACT PROJECT 23-6034 TRAFFIC CALMING IMPROVEMENTS PHASE I This CONSTRUCTION CONTRACT is made and entered into this 1911, day of September, 2023 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Hardy & Harper, Inc. (hereinafter "CONTRACTOR"). W ITNES SETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Traffic Calming Improvements Phase 1 (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sure total amount not to exceed Five Hundred Forty Thousand Dollars and No Cents ($540,000.00), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A," and in accordance with Section 2-7.1 of the Greenbook: Standard Specifications for Public Works Construction. The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. rev. 09/01/2017 Page I of 3 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: http://www.santa-ana.org_/pwa/documents/CWA.pd 7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to hive Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attorney's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of any of the obligations under the Contract Documents; Page 2 of 3 (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work of Improvement. (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee. IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: JENNIFER L. HALL City Clerk APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney JOSE MONTOYA Assistant City Attorney RECOMMENDED FOR APPROVAL: NABIL SABA, PE Executive Director Public Works Agency CITY OF SANTA ANA KRISTINE RIDGE City Manager CONTRACTOR: Harpy & Harper, Inc. : Vice Y Page 3 of 3 EXHIBIT A CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6034 TRAFFIC CALMING IMPROVEMENTS PHASE I BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Hardy & Harper, Inc. _ REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Price Amount l Remove and Construct PCC 630 SF $ Z5• a0 S 150,750 Sidewalk (T-r) 2 Construct PCC Curb Ramp 525 SF S +,•�, o0 $ 21,coo 3 Remove Fire Hydrant Assembly 3 EA $ $ 12,oco • co 3to,OM 4 Potholing (As -Needed)* 6 EA $ S 800 • 00 4. 800 5 Vertical Offset (As -Needed)* 3 EA S S 3, 5co • od 10,500 6 Construct New Fire Hydrant 3 EA S S Assembly 2-5, 000. c+G ?5, 000 7 Install Raised Crosswalk at Adams I LS $ S St and Artesia St 101000. 00 10,000 8 Install Raised Crosswalk at Adams 1 LS S S St and Spruce St 10, 000• oo lot coo 9 Install Speed Cushions at 1 LS S S Grovemont St Between Tustin Ave 15 J 0O0 , 00 I5, Coo and Deodar St 10 Install Speed Cushions at Cypress I LS S S Ave Between Edinger Ave and St 25, 000 00 2-5100O Andrew PI 1 1 Install Speed Cushions at Myrtle St I LS $ $ Between Raitt St and Bristol St 20,C00 • e o 20, 000 12 Signing and Striping I LS $ $ 2-W) 46D • coo 9,02,450. 13 Furnish & Install Complete 1 LS S $ Functioning Carmanah RRF8 D ODa. 0t?D System per Plan at the Intersection 00 of Civic Center Dr and French St P- l of P-16 EXHIBIT A CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6034 TRAFFIC CALMING IMPROVEMENTS PHASE Item Description Qty Unit Unit Price Amount 14 Project Advertisement Sign I EA S 3, 000 S 3, aao 15 As -Built Plans I Ls S5.000 S 5,Wv 16 Construction Permit(s) 1 1.1% $6.500 5 � TOTAL BASE BID -- BID ITEMS 1-16 S '340, oop The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). ' The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the " 25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within Eight), (80) working days after the commencement date stated in the Notice to Proceed. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $3,600 per calendar day. Name of Firm Hard & Harper, Inc. Signature of BIDDER Title Michael Murray. Vice Preside (If an individual, so state. 11'a firm or co -pa ip, state the firm name and give the names of all individual co-partners composing the firrV If a corporation, state legal name of corporation. and names of President. Secretarv. Treasurer and Manager, thereof.) P-2 of P-16 EXHIBIT 4 COST ANALYSIS CONSTRUCTION OF PROJECT NO. 23-6034: Traffic Calming Improvements Phase 1 Construction Contract $ 540,000.00 Contract Administration, Inspection and Testing $ 54,000.00 Contingencies $ 54,000.00 TOTAL ESTIMATED CONSTRUCTION COSTS $ 648,000.00 EXHIBIT 5 PROJECT TITLE: Traffic Calming Improvements - Phase 1 PROJECT CATEGORY: Traffic Improvements Traffic Improvements LOCATION MAP N CITY OF SANTA ANA FY 23/24CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET do PROJECT DESCRIPTION: Installation of traffic calming or traffic safety devices at various locations. Raised Crosswalk: Adams St & Spruce St, Adams St & Artesia St. Speed Humps: Deodar St. from Avalon Ave to 17th St; Grovemont from Ponderosa St. to Deodar St; Cypress from St. Andrew to Edinger Ave; Myrtle from Raitt St. to Bristol St. Parking Improvements: Angled Parking on Walnut St. Flashing Beacon Crosswalk: Civic Center and French St. IPROJECT NEED: Project is designed to increase pedestrian and bicyclist traffic safety. PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 Construction 53,000 - - - - - - TOTAL 53,000 - - CITYWIDE SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 GENERAL FUND 53,000 - - - - - - TOTAL 53,000 - - - - AGENCY: Public Works DIVISION: Traffic Engineering CONTACT: Ruben Castaneda, Senior Engineer DATE: 19-Sep-2023