Item # 10
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
August 29, 2023
TOPIC: Alley Improvements Program
AGENDA TITLE
Award a Construction Contract to Kalban, Inc. in the Amount of $3,037,800 for the Alley
Improvements Program with an Estimated Project Delivery Cost of $4,252,820 (Project
No. 23-6910) (M2 Local Fairshare) (General Fund)
RECOMMENDED ACTION
1. Authorize the reallocation of unspent Measure M2 Local Fairshare funds from
various projects: $143,017 from Alley Improvement Program FY2018-19, $818,083
from Alley Improvement Program FY2021-22 for a total of $961,100 to the Alley
Improvements Program Project to complete the project’s funding requirement.
2. Award a construction contract to Kalban, Inc., the lowest responsible bidder, in
accordance with the base bid in the amount of $3,037,800, subject to a change
order (not-to-exceed 25 percent of the base bid) in accordance with the 2021
Greenbook: Standard Specifications for Public Works Construction for construction
of the Alley Improvements Program Project, for the term beginning August 29, 2023
and ending upon project completion, and authorize the City Manager to execute the
contract subject to non-substantive changes approved by the City Manager and the
City Attorney.
3. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$4,252,820, which includes $3,037,800 for the construction contract; $455,670 for
contract administration, inspection, and testing; and a $759,350 project contingency
for unanticipated or unforeseen work.
4. Determine that the recommended actions are exempt from further review in
accordance with the California Environmental Quality Act as Categorical Exemption
Environmental Review No. ER-2022-118 was filed for the project 23-6910.
DISCUSSION
The City has an alley network of 30 miles. Many of the alleys are in need of
replacement. The Alley Improvements Program project will reconstruct alleys with new
concrete pavement throughout the City (Exhibit 1). The scope of work includes
excavation, grading, removal of asphalt concrete pavement, installing Portland cement
Construction Contract for Alley Improvements Program
August 29, 2023
Page 2
3
6
8
5
concrete alley pavement, sidewalk and driveway approaches with curb and gutter,
adjusting utility covers to finished grade, and signing.
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of 52
regional vendors via PlanetBids, many of which are Santa Ana based. A total of six bids
were received. No bids were received from any Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on June 2, 2023 and July 10, 2023. The project was also advertised in
PlanetBids from June 2 through July 10, 2023. Bids were received electronically via
PlanetBids on July 10, 2023. No bid protest was submitted by any of the bidders during
the bid protest period.
Bid Results Summary
Rank Bidder’s Name Location Base Bid
1 M.S. Construction
Management Group Dana Point, CA withdrew bid
2 Kalban, Inc.Santa Clarita, CA $3,037,800
3 CJ Concrete Construction,
Inc.
Santa Fe Springs,
CA $3,534,300
4 CT&T Concrete Paving, Inc.Diamond Bar, CA $4,628,838
5 Kazoni Construction Costa Mesa, CA $5,209,550
6 Nationwide Contracting
Services, Inc.
Huntington Beach,
CA $6,354,800
A total of six bids were received. M.S. Construction Management Group, the lowest
apparent bidder, had withdrew their bid and were deemed non-responsive. Kalban Inc.
submitted the lowest responsive base bid in the amount of $3,037,800 (Exhibit 2). As
specified in the bid documents, the lowest bid shall be determined on the basis of the
Base Bid. Based on the bid analysis and a contractor’s reference check, Staff
recommends awarding the construction contract to Kalban, Inc, in the amount of the
base bid totaling $3,037,800 (Exhibit 3). Kalban, Inc. has not performed work in the City
of Santa Ana in previous years and this project will be the first.
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen
conditions. Construction administration and inspection includes construction
management and materials testing. As indicated in the Cost Analysis (Exhibit 4) and as
Construction Contract for Alley Improvements Program
August 29, 2023
Page 3
3
6
8
5
summarized in the table below, the estimated total construction delivery cost of the
project is $4,252,820.
Project Item Total
Construction Contract Bid Amount $ 3,037,800
Construction Administration, Inspection, Testing $ 455,670
Contract Contingencies $ 759,350
TOTAL ESTIMATED CONSTRUCTION
DELIVERY COST $ 4,252,820
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review No. ER-
2022-118 was filed for the project 23-6910.
FISCAL IMPACT
Project No. 23-6910 is the number assigned to the funding for tracking of all
expenditures to deliver the construction of this project. As indicated in the Cost Analysis,
the total construction delivery cost of the project is $4,252,820 which includes
construction, contract administration, inspection, testing, and an authorized
contingency.
The proposed contract enables staff to authorize a change order (not to exceed 25
percent of the base bid) in accordance with the 2021 Greenbook: Standard
Specifications for Public Works Construction if necessary, for contingencies. Staff
expects to utilize other available Public Works appropriations if a contingency becomes
necessary to complete the project. If there are no other available appropriations, Staff
will return to City Council with a project update and recommendations.
The following table summarizes the funds budgeted and available through the carry-
forward process in current FY 2023-24 for expenditure to deliver construction of this
project (Exhibit 5). Any unspent budget in FY 2023-24 will be included in future year
carry-forward for City Council consideration.
Fiscal
Year
Accounting
Unit - Account
No.
(Project No.)
Fund
Description
Accounting Unit -
Account No.
Description
Amount
BUDGET REALLOCATION
2023-24
03217662-
66220
(from 19-6910
to 23-6910)
Measure M-
Street
Construction
Measure M2 Local
Fairshare St,
Improvements Other
Than Building
$143,017
Construction Contract for Alley Improvements Program
August 29, 2023
Page 4
3
6
8
5
Fiscal
Year
Accounting
Unit - Account
No.
(Project No.)
Fund
Description
Accounting Unit -
Account No.
Description
Amount
2023-24
03217662-
66220
(from 22-6910
to 23-6910)
Measure M-
Street
Construction
Measure M2 Local
Fairshare,
Improvements Other
Than Building
$145,915
2023-24
01117017-
66220
(from 22-6910
to 23-6910)
General
Fund
Public Works –
Traffic/Transportation
– Service
Enhancement
$672,168
EXISTING BUDGET
2023-24
01117660-
66220
(23-6910)
General
Fund
Public Works –
Traffic/Transportation
– Service
Enhancement
$3,291,720
Total $4,252,820
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
5. FY 2022-23 Capital Improvement Program Sheet
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency
Approved By: Kristine Ridge, City Manager
PWA
SANTA ANA
PUBLIC WORKS AGENCY
Project Nos. 19-6910, 22-6910, and 23-6910:
Alley Improvements Program
EXHIBIT 1
EXHIBIT 2
EXHIBIT 2
MAYOR CITY MANAGER
Kristine Ridge
CITY AHORNEY
Sonia R Carvalho
CLERK OF THE COUNCIL
Jennifer L. Hall
Valerie Amezwa
ꢀ·fꢁꢂꢃꢄ PRO TEM
Jessie Lopez
COUNCllMEMBERS
Phil Bacerra
Johnathan ꢄyan Heꢅaꢆdez
David Penaloza
Thai Viet Phan
Benjamin Vazquez CIꢀ OF SANTA ANA
PUBLIC WORKS AGENCY
20 Civic Center Plaza • P.O. Box 1988
Santa Ana, California 92702
v:ww.santa-ana.orq
June 29, 2023
ADDENDUM No. TWO
SꢀJECT:PROJECT NO. 23-6910 - Alley Improvements Program
The ꢀlꢁowing changes/clarifications have been made to the PLANS ofthe subject project:
PLANS
Replaced and added sheets 9-13 (DA08-DAI2) and sheet 19 (DA 18) of 21. Bid due date is
July IO, 2023
ꢀ
ALL OTHER ITEMS REMAIN THE SAꢂ
This Addendum No. Two contains a totaJ of22 pages.
FOR Tꢃ CITY OF SANTA ANA
�ꢀ-ꢁ�
City Engineer
SANTA ANA CITY COUNCIL
\:afeM� ꢀ.mꢁzc1ꢂ
ꢃꢄ+ꢅꢆꢇꢈ
ꢉꢊtꢋUꢌiCꢍsꢎnꢏꢐ-ꢑꢒrꢓꢔꢕoꢖꢗ
J&ss4e Lc•pez Tꢘ·ꢙꢚꢛ Viet ?Daw1
l'ꢜꢝꢞꢟ
ꢠꢡhꢢꢣꢤꢥꢦꢧꢨꢩBꢪꢫꢬꢭ! ꢮꢯꢰ
ꢱꢲꢳjꢴꢵꢶꢷ -./arquez
\\'ard2
ꢸ,ꢹꢺꢻꢼ9ꢽꢾꢿꣀꣁꣂꣃ꣄ꣅ ore
"h1l ꣎꣏꣐꣑꣒꣓꣔
r r 1 ꣕꣖꣗꣘꣙
j�����c����:���a���:,�(1 >b꣠꣡꣢꣣꣤꣥꣦꣧꣨꣩ ꣫꣬꣭꣮-꣯꣰꣱ ꣲꣳꣴꣵꣶ
EXHIBIT 2
EXHIBIT 3
EXHIBIT 4
Construction Contract 3,037,800.00$
Contract Administration, Inspection and Testing 455,670.00$
Contingencies 759,350.00$
TOTAL ESTIMATED CONSTRUCTION COSTS 4,252,820.00$
CONSTRUCTION OF PROJECT NO's. 19-6910, 22-6910, and 23-6910: Alley
Improvements Program
COST ANALYSIS
EXHIBIT 5
17