Loading...
HomeMy WebLinkAboutItem 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water21. Agreement with Griswold Industries, dba Cla-Val, for Flow Control Valve Maintenance, Rehabilitation, and Replacement Services at City Water Facilities (Non -General Fund) Department(s): Recommended Action: Authorize the City Manager to execute an agreement with Griswold Industries, dba Cla-Val, to provide flow control valve maintenance, rehabilitation, and replacement services for City water facilities, for a total amount not to exceed $1,250,000, for a three-year term beginning August 6, 2024 and expiring August 5, 2027, with a provision for one, two-year extension (Agreement No. A-2024-XXX). Public Works Agency www.santa-ana.org/public-works Item # 21 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report August 6, 2024 TOPIC: Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water Facilities AGENDA TITLE Agreement with Griswold Industries, dba Cla-Val, for Flow Control Valve Maintenance, Rehabilitation, and Replacement Services at City Water Facilities (Non -General Fund) RECOMMENDED ACTION Authorize the City Manager to execute an agreement with Griswold Industries, dba Cla- Val, to provide flow control valve maintenance, rehabilitation, and replacement services for City water facilities, for a total amount not to exceed $1,250,000, for a three-year term beginning August 6, 2024 and expiring August 5, 2027, with a provision for one, two-year extension (Agreement No. A-2024-XXX). GOVERNMENT CODE §84308 APPLIES: Yes DISCUSSION The Public Works Agency's Water Resources Division (PWA) oversees the daily operations and maintenance of the City's water and sanitary sewer systems. The City's water production system consists of 21 wells, four pressure control stations, seven Metropolitan Water District connections, seven water booster stations, ten reservoirs, and two sanitary sewer lift stations. Over 120 flow control valves are located throughout the City at water system facilities, such as wells and pump stations, to effectively control of the introduction of water in to the distribution system and sustain desired pressures. As with other water system assets, flow control valves must be regularly maintained, and periodically rehabilitated or replaced, in order for the water system to function correctly. Due to the complex characteristics of flow control valves, it is ideal to have manufacturer -certified technicians perform inspection, maintenance, rehabilitation, and replacement services. On April 11, 2024, PWA released Request for Proposals (RFP) No. 24-050 (Exhibit 1) for qualified firms to provide preventative maintenance, rehabilitation, and replacement services for the City's water pressure reducing and pressure sustaining valves. The RFP was advertised on the City's online bid management and publication system, PlanetBids, with proposals due on May 2, 2024. System records indicate a total of 264 Flow Control Valve Maintenance and August 6, 2024 Page 2 Rehabilitation at City Water Facilities vendors were notified, with 15 downloading the bidding documents, and one proposal was received. Staff recommends awarding an agreement to Griswold Industries, dba Cla-Val, to provide flow control valve maintenance, rehabilitation, and replacement services for the City's water pressure reducing and pressure sustaining valves (Exhibit 2). Cla-Vat's work experience and proposal demonstrate that the firm has the necessary technical capacity and expertise to complete the required services outlined in the RFP. The firm's rates are reasonable and within industry standard and the proposal was determined to provide the best value for the City. ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT Funding is available in the current FY 2024-25 budget and future fiscal year funding will be included in the proposed budgets for City Council consideration. Fiscal Year Accounting Fund Accounting Unit, Unit - Description Account Description Amount Account # Contract (3-Year Term) 06017640- Water Water Production & $250,000 2024-25 62300 Supply, Contract Services - Professional 06017640- Water Water Production & $250,000 2025-26 62300 Supply, Contract Services - Professional 06017640- Water Water Production & $250,000 2026-27 62300 Supply, Contract Services - Professional Optional One -Year Extensions 06017640- Water Water Production & $250,000 2027-28 62300 Supply, Contract Services - Professional 06017640- Water Water Production & $250,000 2028-29 62300 Supply, Contract Services - Professional TOTAL $1,250,000 Flow Control Valve Maintenance and Rehabilitation at City Water Facilities August 6, 2024 Page 3 EXHIBIT(S) 1. RFP 24-050 2. Agreement with Griswold Industries, dba Cla-Val Submitted By: Nabil Saba, Executive Director of Public Works Approved By: Alvaro Nunez, Acting City Manager REQUEST FOR PROPOSALS (RFP) FOR FLOW CONTROL VALVE MAINTENANCE AND REHABILITATION PROGRAM RFP NO,: 24-050 CITY OF SANTA ANA PUBLIC WORKS AGENCY 220 S. Daisy Avenue, Bldg A Santa Ana, CA 92703 James Burk Project Manager (714) 647-3315 Office jburk@santa-ana.org Approved for Release: KA G a W7 Nabi! Saba, P.E. Executive Director Public Works Agency KEY RFP DATES Subject to change at discretion of City): Issue Date: Deadline for Requests for Information Proposal Due Date: Projected Award Date (anticipated): Thursday, April 11, 2024 Thursday, April 25, 2024 at 4:00 P.M. Thursday, May 2, 2024 at 4:00 P.M. Thursday, June 11, 2024 City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 1 NOTICE INVITING PROPOSALS NOTICE IS HEREBY GIVEN that proposals will be received from qualified firms for Flow Control Valve Maintenance and Rehabilitation Program. Responses to this Request for Proposals (RFP) will be accepted until Thursday, May 2, 2024 at 4:00 P.M. Responses to this Request for Proposals (RFP) must be submitted electronically to the PlanetBids system. It is the responsibility of the proposer to ensure that any proposals submitted have been uploaded to PlanetBids prior to this proposal due date and time. All notifications, updates and addenda will be posted online on PlanetBids at https://www.planetbids.com/portal/portal.cfm?CompanylD=20137 and on the City's RFP Bid page at www.santa-ana.org/bids-rfps. Proposers shall be responsible for monitoring PlanetBids and the City's RFP Bid page to obtain information regarding this solicitation. Failure to respond to required updates may result in a determination of a nonresponsive proposal. LETTER OF INTENT: As a courtesy to the City, all interested firms are encouraged to submit a Letter of Intent of their pending proposal to the noted Project Manager by the required date as shown on the cover page of this RFP. Letters shall be sent via certified mail or email. A decision, by an interested firm, not to submit a Letter of Intent would not lead to the disqualification of the firm. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 2 TABLE OF CONTENTS GENERAL......................................................................................................... ERROR! BOOKMARK NOT DEFINED. A. NATURE OF WORK: .......................................................................................................................................... 5 B. SUBMITTAL OF PROPOSAL: ........................................................................................................................... 5 C. PROPOSAL EVALUATION AND RATING: ..................................................................................................... 5 D. PROJECT FUNDING: ......................................................................................................................................... 5 E. TERM OF CONTRACT AGREEMENT: ........................................................................................................... 5 PROPOSAL TERMS AND CONDITIONS.....................................................................................................................6 A. EXAMINATION....................................................................................................................................................6 B. EXECUTION OF AGREEMENT........................................................................................................................6 C. PROPOSAL VALIDITY.......................................................................................................................................6 D. PRE -CONTRACTUAL EXPENSES..................................................................................................................6 E. JOINT OFFERS/SUBCONSULTANTS............................................................................................................6 F. SAFETY PROGRAM REQUIREMENTS.........................................................................................................6 INSTRUCTIONSTO PROPOSERS...............................................................................................................................7 A. CITY RESPONSIBILITIES.................................................................................................................................7 B. PROPOSER RESPONSIBILITIES....................................................................................................................7 C. REQUEST FOR INFORMATION OR CLARIFICATION................................................................................8 D. ADDENDA............................................................................................................................................................8 E. LICENSES & PERMITS.....................................................................................................................................8 F. INSURANCE........................................................................................................................................................8 G. PAYMENT INFORMATION PACKET..............................................................................................................8 H. PRE -PROPOSAL MEETING.............................................................................................................................8 I. CITY RIGHT TO REJECT..................................................................................................................................9 J. PROTESTS..........................................................................................................................................................9 III. SUBMITTAL REQUIREMENTS......................................................................................................................................9 A. GENERAL.............................................................................................................................................................9 1. DEADLINE.............................................................................................................................................9 B. PROPOSAL CONTENTS...................................................................................................................................9 1. STATEMENT OF QUALIFICATIONS................................................................................................9 2. SCOPE OF SERVICES......................................................................................................................11 3. FEE PROPOSAL.................................................................................................................................11 4. CERTIFICATIONS..............................................................................................................................11 IV. PROPOSAL REVIEW (CONSULTANT/CONTRACTOR SELECTION).................................................................11 A. EVALUATION AND RATING........................................................................................................................... I I B. SELECTION....................................................................................................................................................... 11 V. AWARD OF AGREEMENT............................................................................................................................................12 A. REQUEST FOR COUNCIL ACTION.............................................................................................................. 12 B. EXECUTION OF AGREEMENT...................................................................................................................... 12 VI. IMPLEMENTATION........................................................................................................................................................12 A. KICK-OFF MEETING........................................................................................................................................ 12 B. NOTICE TO PROCEED...................................................................................................................................12 VII. PUBLIC RECORDS........................................................................................................................................................12 APPENDIX ATTACHMENT 1: SCOPE OF WORK ATTACHMENT 2: FEE PROPOSAL ATTACHMENT 3: REFERENCES ATTACHMENT 4: STANDARD AGREEMENT (SAMPLE) ATTACHMENT 5: CERTIFICATIONS City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 3 APPENDIX A: VALVE LIST City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 4 I. GENERAL The City of Santa Ana ("Santa Ana" or "City") is the county seat and second most populous city in Orange County, California, with over 310,000 residents. It is the 62nd most -populous city in the United States. Santa Ana is located in Southern California, adjacent to the Santa Ana River, about 10 miles away from the California coast. Founded in 1869, the City is part of the Greater Los Angeles Area, the second largest metropolitan area in the United States. A. NATURE OF WORK: The City of Santa Ana is seeking a firm to provide preventative maintenance, rehabilitation and replacement services for the City's water pressure reducing and pressure sustaining valves. The City intends to enter into agreements with a single firm to provide the described services. A detailed Scope of Work is included in ATTACHMENT 1: SCOPE OF WORK in the Appendix of this RFP. B. SUBMITTAL OF PROPOSAL: Responses to this Request for Proposals (RFP) must be submitted electronically to the PlanetBids system. It is the responsibility of the proposer to ensure that any proposals submitted have been uploaded to PlanetBids prior to this proposal due date and time. The Fee Proposal shall be submitted separately and electronically to the PlanetBids system prior to this proposal due date and time. C. PROPOSAL EVALUATION AND RATING: The criteria for evaluating the proposals submitted will take the following items into consideration: • Firm/Team Experience 35% • Relevant Project Experience 30% • Understanding of Need 25% • References 10% The City has established a proposal review committee to evaluate proposers based on the response to the RFP, which includes adherence to outlined directions and format, and the City evaluation criteria set forth above. A final score will be calculated for each submitted proposal and used to rank the proposers. D. PROJECT FUNDING: Project is funded by local funds. E. TERM OF CONTRACT AGREEMENT: This term is outlined in the Standard Consultant Agreement, as contained in ATTACHMENT 2: STANDARD AGREEMENT in the Appendix of this RFP. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 5 II. PROPOSAL TERMS AND CONDITIONS By submitting a Proposal, the Proposer acknowledges that it has thoroughly examined and accepts the Terms and Conditions of this RFP as described below: A. EXAMINATION Proposer represent that it has thoroughly examined and become familiar with the services and responsibilities required this RFP and that it is capable of effectively and efficiently performing quality work to achieve the City's objectives. Any attachments referenced herein or any interpretations, clarifications or amendments subsequently posted in the relation to this RFP are fully incorporated. B. EXECUTION OF AGREEMENT The City and the selected Proposer will enter into an Agreement similar to that as shown in ATTACHMENT 4: STANDARD AGREEMENT in the Appendix of this RFP. If a Proposer is unwilling or unable to execute an Agreement within thirty (30) days after being notified of selection under this RFP, the City reserves the right to select the next most qualified Proposer or call for new Proposals, whichever the City deems most appropriate. C. PROPOSAL VALIDITY Services, pricing and warranties indicated in a respondent's Proposal must be valid for a period of 120 days after the submission of the Proposal. D. PRE -CONTRACTUAL EXPENSES Santa Ana shall not, in any event, be liable for any pre -contractual expenses incurred by Proposers in the preparation of its proposal. E. JOINT OFFERS/SUBCONSULTANTS Where two or more Proposers desire to submit a single Proposal in response to this RFP, they should do so on a prime sub -consultant basis. The City intends to contract with a single firm and not with multiple firms doing business as a joint venture. Should the use of sub -consultants be offered, the Proposer shall provide the same assurances of competence for the sub -consultant plus the demonstrated ability to manage and supervise the subcontracted work. Sub -consultants shall not be allowed to further subcontract with others for work under the Agreement. The provisions of the Agreement shall apply to all sub -consultants in the same manner as the Proposer. F. SAFETY PROGRAM REQUIREMENTS Work Site Safety shall be as defined by the Standard Specifications and these special provisions: The Proposer shall be solely responsible for ensuring that all work performed under the contract is performed in strict compliance with all applicable Federal, State and local occupational safety regulations. The Consultant/Contractor shall provide at its expense City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 6 all safeguards, safety devices and protective equipment, and shall take any and all actions appropriate to providing a safe Project site. The following is required in addition to the requirements of the Standard Specification: 1. The Proposer shall train all employees, or subcontractor personnel in the work practices necessary to safely perform his or her job. 2. The Proposer shall identify all known potential hazards related to the work performed and train all employees and subcontractor personnel on how to handle the potential hazards. 3. The Proposer, their employees and subcontractors shall follow all safety rules and safe work practices. 4. The Proposer will immediately notify the City of any significant and/or unusual hazards found during the course of work. 5. The Proposer shall submit copies of Safety Data Sheets (SDS) for all hazardous materials to be utilized on site in the performance of work. The Proposer is solely responsible for the legal disposal of hazardous waste generated in the performance of their work. Safety Indemnification: To the extent allowed by law, the Proposer agrees to defend, indemnify and hold harmless the City, its officers, employees and agents from and against any and all investigations, complaints, citations, liability, expense (including defense costs and legal fees), claims and/or causes of action for damages of any nature whatsoever, including but not limited to injury or death to employees of the Proposer, its subcontractors or City, attributable to any alleged act or omission of the Proposer or its subcontractors which is in violation of any Cal OSHA regulation. The obligation to defend, indemnify and hold harmless includes all investigations and proceedings associated with purported violations of Section 336.10 of Title 8 of the California Code of Regulations pertaining to multi -employer work sites. The City may deduct from any payment otherwise due the Proposer any costs incurred or anticipated to be incurred by the Agency, including legal fees and staff costs, associated with any investigation or enforcement proceedings brought by Cal OSHA arising out of the assigned work. II. INSTRUCTIONS TO PROPOSERS A. CITY RESPONSIBILITIES The City will provide information in its possession relevant to preparation of required information in RFP. The City will provide only the staff assistance and documentation specifically referred to herein. B. PROPOSER RESPONSIBILITIES Point of Contact: The selected proposer will assume responsibility for all services in its proposal. The selected proposer shall identify a sole point of contact with the greatest City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 7 knowledge in regard to the required service operations and contractual matters, including payment of any and all charges resulting from the Agreement. Evidence of Financial Capacity: Proposer may be requested to submit its most recent audited financial statement, evidencing proposer's financial capacity to fully perform the required services, including provision of equipment and personnel expenses over a ninety (90) day period. If said financial statement does not reflect full ninety (90) day operational capacity, proposer may include a letter of credit as evidence of supplemental capacity. C. REQUEST FOR INFORMATION OR CLARIFICATION All questions or requested clarifications shall be made in writing via e-mail to the Project Manager (contact information as noted on the cover page to this RFP) by or before the "Deadline for Requests for Information" date noted on the cover page of this RFP. No verbal requests or responses will be accepted. Significant interpretations or clarifications will be addressed via addenda to this RFP, as indicated below in SUB -SECTION II.D "ADDENDA". 91 -9- ►IT Any changes in RFP from the date of release to date of submittal will result in an addendum or amendment. Notification of such addendum or amendment shall be posted on City's PlanetBids system: https://www.planetbids.com/portal/portal.cfm?CompanylD=20137. E. LICENSES & PERMITS The selected Proposer shall be required to obtain a City of Santa Ana Business license within ten (10) business days of selection and must provide a copy to the City Project Manager or designee prior to commencing any work in Santa Ana. Additionally, Proposer will be responsible for obtaining any licenses/permits required by the Scope of Work. F. INSURANCE The selected Proposer shall provide the required evidence of insurance coverage as set forth in the standard agreement within ten (10) business days after receipt of notice of award. G. PAYMENT INFORMATION PACKET The selected Proposer shall return a completed payment information packet within ten (10) business days after the successful Proposer has received notice that the agreement has been awarded. The packet is available on the City's website: www.santa-ana.org/bidsrfps - H. PRE -PROPOSAL MEETING A pre -proposal meeting, if scheduled, will occur on the date, time and location identified on the cover page of this RFP. The meeting will include discussion of the project scope City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 8 and a question -and -answer session. It is highly recommended that the Proposer's key team members attend this meeting. Significant interpretations or clarifications will be addressed via addenda to this RFP, as described above in SUB -SECTION II.D "ADDENDA". I. CITY RIGHT TO REJECT The City reserves the right to reject any or all proposals submitted and no representation is made hereby that any agreement will be awarded pursuant to this RFP or otherwise. The City reserves the right to accept or reject the combined or separate components of this proposal in part or in its entirety or to waive any minor inconsistency, informality or technical defect in the proposal. The City reserves the right to reject, replace and approve any and all subcontractors. All subcontractor(s) shall be identified in the response to the RFP. Subcontractors shall be the responsibility of the successful Proposer and the City shall assume no liability of such subcontractors. J. PROTESTS Proposers with concerns or rebuttal of any staff determination of non -responsiveness or non -responsibility may submit, in writing within five (5) business days, to the Project Manager, any concerns regarding the RFP process or staff determination. Such writing shall be considered by the City Manager or his designated representative, and may be acted upon within five (5) business days. If no action is taken within such time, there shall be no change to the staff determination. The exercise by Proposer of its right to submit written concerns shall be a condition precedent to seeking judicial review of any award of a contract hereunder. III. SUBMITTAL REQUIREMENTS A. GENERAL I. DEADLINE Proposals are due to the City of Santa Ana, at the date, time, and location set forth above in the Notice Inviting Proposals. B. PROPOSAL CONTENTS A responsive proposal shall contain the following documentation: I. STATEMENT OF QUALIFICATIONS The Statement of Qualifications shall be limited to a MAXIMUM of (10) DOUBLE - SIDED PAGES (excluding front and back covers, section dividers and attachments City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 9 such as resumes, forms). Font size shall be minimum 11-point Arial. Proposal exhibits shall be maximum 11" x 17". The Statement of Qualifications includes the following: a. Cover Letter Proposals shall include a letter signed by a principal or authorized representative who can make legally binding commitments for the entity. Include type of business entity. b. Agreement Statement Proposal shall include a statement outlining your concurrence or concerns with any and all provisions as contained in the standard agreement attached as ATTACHMENT 4: STANDARD AGREEMENT in the Appendix of this RFP. Insurance requirements subject to change. c. Firm and Team Experience Proposal shall include a profile of the firm's experience. Include resumes of project team/sub-contractors that outline their technical and design experience. At a minimum, this should include the project manager/principal agent, associates in charge when project manager/principal agent is unavailable, key personnel, firm size, and an organization chart identifying only those who will perform work for the proposed project and the percentage of each individual's time devoted to this project. The project manager/principal agent shall be the primary contact person to represent your firm. d. Understanding Scope of Services Proposal shall include an outline which demonstrates the firm's understanding of the scope of work. This outline should include anticipated approach, tasks necessary for successful completion, and suggestions or special concerns that the City should be made aware of. The Respondent should describe the ongoing support, management, and resources that will be provided to the City throughout the development agreement contract period, including any unique value-added services that it wishes to highlight. e. Relevant Project Experience Proposal shall include a list of relevant projects which your firm or personnel have completed within the last five (5) years, including significant work with public agencies. Project information should include project description, year completed, client name, along with a person to contact and their telephone number. f. References Proposal shall include references for three public entities for which Proposer has performed similar work within the past five (5) years. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 10 g. Fee Fees may or may not be included as part of evaluation criteria. Refer to SECTION "GENERAL" above and SUB -SECTION III.B.3 "FEE PROPOSAL" below. (this item not part of page limit) II. SCOPE OF SERVICES Proposal shall include a Scope of Services which details the work phases to be completed, the tasks to be accomplished and the deliverables to be provided based upon the requested Scope of Work, detailed in ATTACHMENT 1: SCOPE OF WORK in the Appendix of this RFP. III. FEE PROPOSAL Proposer's fee proposal shall be submitted concurrently with the technical proposal, but in a separate submission to the PlanetBids system. This shall include the proposed Total Fee, firm's Standard Hourly Fee Schedule, and/or a Project Fee Schedule where applicable and as outlined in the Scope of Work. Where fees are NOT included as part of evaluation criteria, the fee proposal will not be opened until the proposals have been evaluated by the proposal selection committee. The City will select the consultant based on qualifications, and then negotiate a contract price based on available funding. Where fees ARE included as part of the evaluation criteria, the fee proposal will be opened and reviewed concurrently with the proposal, and weighted per the percentage identified in SECTION I "GENERAL" above. IV. CERTIFICATIONS The following forms, included in ATTACHMENT 5: CERTIFICATIONS in the Appendix of this RFP, shall be signed and included as part of the proposal submittal package: • Non -Collusion Affidavit • Non -Lobbying Certification • Non -Discrimination Certification IV. PROPOSAL REVIEW (CONSULTANT/CONTRACTOR SELECTION) A. EVALUATION AND RATING Refer to SECTION I "GENERAL" above. B. SELECTION The committee may interview the top ranking proposers. The City will recommend award of the agreement to the Proposer who will provide the best quality and value to the City. City reserves the right to begin negotiations and enter into an agreement without interview or further discussions. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 11 V. AWARD OF AGREEMENT A. REQUEST FOR COUNCIL ACTION Following evaluation and rating by the proposal review committee, the Executive Director will recommend award of an agreement to the proposer providing the best quality and value to the City. B. EXECUTION OF AGREEMENT A standard agreement is included as ATTACHMENT 4: STANDARD AGREEMENT in the Appendix of this RFP. "Proposer" will hereinafter be referred to as "Consultant" in standard agreement. The term of the agreement will begin after the agreement is fully executed, and all required bonds, insurance documents and contents of the payment information packet have been received and approved. VI. IMPLEMENTATION A. KICK-OFF MEETING A kick-off meeting will be held after award of contract. Consultant and its team will meet with City of Santa Ana staff to conduct introductions, discuss scope of services, and implementation process. B. NOTICE TO PROCEED Following the kick-off meeting, a formal Notice to Proceed (NTP) may be issued after the agreement is fully executed, and all insurance documents and contents of the Payment Information Packet have been received and approved. VII. PUBLIC RECORDS All responses to the RFP shall become property of the City, and proposals will become public record after award of agreement. Proposer information identified as proprietary information shall be maintained confidential, to the extent allowed under the California Public Records Act. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 12 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Appendix ATTACHMENT 1: SCOPE OF WORK CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM SCOPE OF WORK Introduction and Background: The City of Santa Ana is located in the heart of Orange County, California and is approximately 27 square miles. The City provides potable drinking water for all of the City's residents and businesses. The City's water production system consists of 22 wells, 4 pressure control stations, 7 Metropolitan Water District connections, 7 water booster stations and 8 reservoirs and 2 sanitary sewer lift stations. Control and monitoring of the water system and sewer facilities is coordinated via the City SCADA system using a series of radios to send and receive data from remote locations to the City Home SCADA control room. Flow and pressure control through the water system is achieved using Cla-Val valves per Appendix A. Description of Work: The City is requesting proposals for the purpose of rehabilitating, replacing and maintaining all Cla-Val pressure control valves within the water production facilities. All replacement and procured valves in the contract shall be Cla-Val, no exceptions. The contract term shall be for three years with a City option to renew for one additional 2-year term. The Contractor will be expected to hold firm pricing on all contract items supplied for the duration of the contract. Labor increases shall be subject to mutually agreeable terms between the City and the Contractor. The Contractor shall provide all labor, materials, services, and equipment necessary for flow control valve maintenance, repair, and procurement services. All work shall be in accordance with applicable practices and shall conform to all applicable laws, codes and regulations. In addition, the Contractor must be able to respond to City's request for emergency repair work on a timely manner. Business hours are considered from 7:00 A.M. to 5:00 P.M. (Monday through Friday). Any time outside of business hours of operation may be considered after hours/weekends. All services, equipment and materials provided by the Consultant must be in accordance with all applicable Federal, State and local regulations, laws, and codes. The City reserves the right to modify the scope of the project at any time. Contractor Responsibilities: I. INSPECTION/PREVENTATIVE MAINTANENCE SERVICES (BID ITEMS 1-3) Inspection services shall include annual examination of all valves and any pilot valve systems associated with the valves listed in Appendix A. The Contractor shall perform preventative maintenance every 12 months at each valve system in order to elongate the lifespan of the valves and to determine how the operating conditions of the system are affecting the valve. In addition to preventative maintenance, the Contractor shall, upon request from the City, deploy to any valve and/or pilot valve site and perform a working inspection of the existing valve if the City encounters any valve operational issues. The preventative maintenance inspection shall verify the working condition of the valve. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 14 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Preventative maintenance should consist of, but is not limited to the following: a. Removal of lime deposits/mineral buildup from the valve stem and other metal parts b. Inspect parts (diaphragm, pilot valves, disk plate, solenoids, valve body, tubing, anti -cavitation parts (knock -outs), etc.) c. Calibrate pilot control settings (pressure and flow, altitude valves, etc.) d. Maintain and clean the strainers and valve body e. Exercise the valves f. Check the pilot tubing for leaks g. Inspect pilot disc retainers h. Confirm that the diaphragm assembly is properly functioning Preferably, preventative maintenance should be accomplished without removing the valve from the line. However, if removal of the valve is required, the Contractor shall notify City staff prior to performing the work. Upon completion of inspection and maintenance services, the Contractor shall also ensure all tags and/or reference markers on valves and appurtenances are up to date with the most accurate information such as model number, serial number, etc. In the event, the Contractor encounters outdated valves in need of replacement, the Contractor shall recommend retrofitting old valves with up to date new valves that meet or surpass industry standards. Within ten (10) business days of completing maintenance services on the City's Cla-Val's, the Contractor shall provide a service report to the City of Santa Ana. The Contractor shall follow up with City personnel and notify City staff on any issues encountered in the field regarding requiring additional parts. The Contractor shall state all findings, if any, along with a proposed scope of work and complete cost estimates for any recommended equipment repairs and/or replacement. II. REPAIR SERVICES (BID ITEMS 4-9) The Contractor shall repair or replace any parts of the valve found to be worn or otherwise in need of replacement. All internal parts of the valve shall be cleaned of mineral deposits prior to reassembly of the valve. When required (typically every 5 years), complete valve rebuilds/rehabilitations should be performed in which the main valve and its respective pilot controls are cleaned internally, all rubber parts are replaced, and all metal parts replaced where needed. All repairs and rehabilitations shall be made in accordance with Cla-Val guidelines and as directed by the City. The Contractor shall be factory trained in maintaining all piloting systems offered by Cla-Val and shall fix/repair all piloting systems in accordance with Cla-Val guidelines and as directed by the City. Work under this section shall also include full valve replacement complete with all necessary pilot systems and/or electronic controls. Valves listed in Appendix A are representative of the majority of the Cla-Val valves in use in the City but is not a complete listing. The City acknowledges that additional costs will be incurred for City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 15 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM pilot system repairs and will vary depending upon the type of piloting system on each valve. Assume that a full repair of the valve will include costs for replacement of all parts that could be replaced in a standard Cla-Val diaphragm valve. For bidding purposes, assume repair of the following components; replacement of disk and seat on Cla-Val on the following models for various sizes as listed on the Fee Schedule: 1. Model90-01 2. Model50-01 3. Model52-03 4. Model 61-02 5. Model100-01 The Contractor shall solely use Cla-Val parts for replacement, repair, and maintenance of all components of the City's valves. III. NEW VALVES AND PROCUREMENT SERVICES (BID ITEMS 10-11) If the Contractor has determined rehabilitation of a valve system is not feasible or at the City's direction, replacement of the valve with a new valve shall take place. Furthermore, if the cost to repair the valve exceeds 50% of the cost to replace, replacement of the valve with a new valve shall take precedence. When work includes the replacement of valves, the Contractor shall be responsible for removal of the existing valve and installation of the new replacement valve. The Contractor shall also be responsible for supply, installation, calibration and testing of the new replacement valve. IV. INSTRUMENTATION AND CONTROL SERVICES The Contractor shall also have experience incorporating instrumentation and remote/local valve control on existing and future valve components in the City. The City currently utilizes electronic valve controllers (Model VC-22D), which serves as an interface between the City's SCADA system, the valve, and other devices installed on or around the valve. The Contractor shall have expertise in customizing the aforementioned valve controller with the Cla-Val trademarked standard and customized ValvApps to meet the City's operational requirements specific to each site. The Contractor shall be able to provide the following customization inputs and outputs for the valve controllers upon City request: 1. Valve Regulation 2. Differential Pressure Monitoring 3. Retransmission (1) Analog Inputs (2) Digital Inputs 4. Solenoid Outputs 5. Relay Outputs 6. Actions/Alarms 7. Communication City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 16 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 8. Control Logic V. VALVES TRAINING SERVICES Upon request, the Contractor shall provide in depth training on flow control valve operation, maintenance, and repair techniques that optimize staff management of the system. Classes shall include training materials and resources to further assist City Staff in the operation and maintenance of the flow control valves specific to the system. Upon request, the Contractor shall provide training classes in the field and/or in a controlled class setting at certified Cla-Val facilities following the manufacture's guidelines and operating techniques. VI. VALUE ADDED RELATED SERVICES The Contractor may propose additional related services that the City has not specifically identified in this RFP to accomplish the stated goals of this RFP. Value added related services will be considered by the City and may or may not be incorporated in the agreement. All parts and materials must be supplied new and Cla-Val factory approved. VII. SUBCONTRACTORS The use of Subcontractors is allowed, but will require approval by City prior to start of any assigned work. Upon commencement of work, the Contractor shall be responsible for services provided by any subcontractor as if Contractor were providing the services with its own organization. When a Subcontractor performs all or any part of the work, a markup shall be applied to the Subcontractor's actual cost of such work. The Contractor may add a markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the work may be added by the Contractor. VIII. PROJECT MANAGEMENT & COORDINATION When a request for service is issued to the City, the Contractor shall issue an estimate to the City's designated Project Manager. The Contractor shall not proceed with any work without the approval of the City's designated project manager. Contractors shall invoice the City on a monthly basis for all work performed during the period or provide a one-time invoice at the completion of work issued. Each invoice shall be accompanied by a summary of tasks performed, contract agreement number, results and progress on long- term tasks if any. IX. CODE COMPLIANCE All materials and workmanship shall be in strict conformity with standards of the latest editions including revisions of the following: • American Society of Civil Engineers (ASCE) City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 17 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM • American Society of Mechanical Engineers (ASME) • State Department of Industrial Safety (CAL/OSHA) • California Code of Regulations (CCR) • Local, State, and Federal Building Codes • City of Santa Ana Standards X. MINIMUM QUALIFICATIONS The Contractor shall meet the following minimum qualifications: 1. All work is to be performed in compliance with all applicable codes, ordinances, laws, standards, due care, and Occupational Safety and Health Administration (OSHA) safety requirements. 2. Be factory authorized, trained and knowledgeable in Cla-Val valves for maintenance, operation and installation. (Provide proof of training upon issuance of a contract with the City) 3. The Consultant shall have a minimum of five (5) years of experience in the services described in ATTACHMENT 1: SCOPE OF SERVICES. 4. Be confined space entry certified as well as possess state and local permits, licenses and certificates required by law to commence, carry, and complete the work. 5. Have access to factory direct inventory for replacement parts, new valves and related appurtenances. 6. Provide all necessary equipment to competently perform and complete work as specified. XI. SAFETY Proposer shall be solely and completely responsible for the condition of the project site, including safety of all persons and properties during the performance of the work. In addition, proper safety equipment must be worn at all times. These requirements shall apply continuously until the contract is terminated and shall not be limited to normal working hours. The Contractor/Consultant shall assure that each employee or subcontractor under the contractor's supervision is trained in the work practices necessary to safely perform his or her job. XII. INSURANCE REQUIREMENTS The successful bidders shall furnish the City with original copies of valid insurance policies herein required upon execution of the contract and shall maintain said policies in full force and effect at all times during the term of this contract. Said insurance policies shall comply with all requirements set forth in these specifications. The Contractor shall keep a current certificate of insurance at the City of Santa Ana at all times and shall immediately report any changes to the City. XIII. MARKUP City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 18 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM The following markup percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits (to the sum of the costs and markups, one (1) percent shall be added as compensation for bonding): 1) Labor...................................................................................................... 20 2) Materials................................................................................................15 3) Equipment Rental...................................................................................15 4) Other Items and Expenditures................................................................15 XIV. FEE SCHEDULE: Contractor shall submit a fee schedule as described in Section III.B.3 of RFP. No separately stated freight or deliveries will be considered. Bidders shall include all costs in the unit price bid. Furthermore, the Contractor shall submit additional labor, material and rental equipment rates along with fee schedule. Contractor's labor and equipment rate sheet shall list rates for all labor designations, equipment, rentals, and materials. The bid items specified in the fee schedule are for reference purposes only. Labor increases shall be subject to mutually agreeable terms between the City and the Contractor. The City may request related services that will be paid at the vendor's standard labor and equipment rate submitted. Fee proposal shall be outlined as follows: ---End of SCOPE OF WORK Section --- City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 19 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM APPENDIX ATTACHMENT 2: FEE PROPOSAL Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services (Appendix: Attachment 1) and am familiar with the scope of work. I am familiar with all the existing conditions and limitations that may impact work requests. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposer shall submit hourly rates schedule, which shall include but not limited to, direct and indirect costs for labor, for staff per job classification, material, equipment rates, overhead, incidental supplies, travel, mileage, and fuel. Any special materials will be purchased by the contractor only after discussed and authorized by the City projects manager or designee in writing. Prior to commencement of services, Contractor shall provide separate quotes, upon request by the City, which shall be approved by the City's Public Works Agency. TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Bid Item Unit Quantity Unit Price Amount 1. Labor 1 Man Prevailing Wage HR 200 $ $ 2. Labor 2 Men Prevailing Wage HR 200 $ $ 3. Travel Per Day EA 25 $ $ Model 50-01 4. Repair 4" Pressure Control Valve Rubber EA 20 $ $ Rebuilds for Main Valve and Pilot 5 Repair 6" Pressure Control Valve Rubber EA 5 $ $ Rebuilds for Main Valve and Pilot 6 Repair 8" Pressure Control Valve Rubber EA 5 $ $ Rebuilds for Main Valve and Pilot 7. Repair 10" Pressure Control Valve Rubber EA 2 $ $ Rebuilds for Main Valve and Pilot 8. Complete New 4" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 20 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 20 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 9. Complete New 6" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 5 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 10. Complete New 8" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 5 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 11. Complete New 10" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator Model 52-03 12. Repair 10" Pressure Control Valve Rubber Rebuilds for Main Valve and Pilot EA 4 $ $ 13. Complete New 10" Model 52-03 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 4 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator Model 61-02 14. Repair 10" Pump Control Valve Rubber Rebuilds for Main Valve and Pilot EA 1 $ $ 15. Complete New 10" Model 61-02 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 1 $ $ Controls, Up Stream & Downstream Pressure Gauges, X105 Limit Switch Assembly Model 90-01 Repair 6" Pressure Control Valve Rubber 16. Rebuilds for Main Valve and Pilot EA 5 $ $ 17. Repair 8" Pressure Control Valve Rubber EA 5 $ $ Rebuilds for Main Valve and Pilot 18 Repair 10" Pressure Control Valve Rubber EA 5 $ $ Rebuilds for Main Valve and Pilot City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 21 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 19. Repair 12" Pressure Control Valve Rubber EA 5 $ Rebuilds for Main Valve and Pilot 20 Repair 14" Pressure Control Valve Rubber EA 2 $ Rebuilds for Main Valve and Pilot 21. Repair 16" Pressure Control Valve Rubber EA 2 $ Rebuilds for Main Valve and Pilot 22. Complete New 6" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 23. Complete New 8" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 24. Complete New 10" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 25. Complete New 12" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 26. Complete New 14" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 27. Complete New 16" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot EA 2 $ System, Opening & Closing Speed Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 22 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Model 100-01 28. Repair 8" Pressure Control Valve Rubber EA 2 $ $ Rebuilds for Main Valve and Pilot 29 Repair 10" Pressure Control Valve Rubber EA 2 $ $ Rebuilds for Main Valve and Pilot 30. Repair 12" Pressure Control Valve Rubber EA 2 $ $ Rebuilds for Main Valve and Pilot 31. Repair 14" Pressure Control Valve Rubber EA 2 $ $ Rebuilds for Main Valve and Pilot 32. Repair 16" Pressure Control Valve Rubber EA 2 $ $ Rebuilds for Main Valve and Pilot 33. Complete New 8" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 34. Complete New 10" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 35. Complete New 12" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 36. Complete New 14" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 37. Complete New 16" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 23 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 38. Discount off list price on unforeseen % N/A % replacement parts Total City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 24 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Contractor shall submit additional labor, material and equipment rates along with schedule. Contractor's labor and equipment rate sheet shall list rates for all labor designations, equipment and materials. BIDDER INFORMATION: Legal Company Name: _ Complete address: Phone Number: Email Address: Authorized Signature: Name: Title: City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 25 APPENDIX CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM ATTACHMENT 3: PROPOSER'S REFERENCES List and describe fully the contracts performed by your firm which demonstrate your ability to provide the supplies, equipment or services included in the scope of the proposal specifications. Attach additional pages if required. The City reserves the right to contact each of the references listed for additional information regarding your firm's qualifications. Reference Customer Name: Contact Individual: Address: Phone Number: Facsimile Number: Contract Amount: Year: Description of supplies, equipment, or services provided: Reference Customer Name: Address: Contract Amount: Description of supplies, equipment, or services provided: Reference Customer Name: Address: Contract Amount: Description of supplies, equipment, or services provided: Contact Individual: Phone Number: Facsimile Number: Year: Contact Individual: Phone Number: Facsimile Number: Year: City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 26 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Reference Customer Name: Contact Individual: Address: Contract Amount: Description of supplies, equipment, or services provided: Phone Number: Facsimile Number: Year: THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 27 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Appendix ATTACHMENT 4: STANDARD AGREEMENT (SAMPLE) City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 28 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM CONSULTANT AGREEMENT (SAMPLE) CITY OF SANTA ANA THIS AGREEMENT is made and entered into this day of , 2021 by and between , ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ("City"). RECITALS A. The City desires to retain a Consultant having special skill and knowledge in electrical repair and rehabilitation services. B. Consultant represents that Consultant is able and willing to provide such services to the City. C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional contracting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SCOPE OF SERVICES a. Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Scope of Services - Exhibit A, attached hereto and incorporated by reference. 2. COMPENSATION a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Compensation - Exhibit B. The total amount to be expended under this Agreement shall not exceed $XXX,XXX during the term of this Agreement, including any extension periods exercised under Section 3. b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals and Scope of Work, which may reasonably be expected by City. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 29 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 3. TERM This Agreement shall commence on the date first written above for a number (3) year -term with the option for the City to grant up to a one (2)-year renewal, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 17, below. 4. PREVAILING WAGES Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services being performed are part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 5. INDEPENDENT CONTRACTOR Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer -employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 6. OWNERSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 30 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Contractor by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 7. INSURANCE Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors. a. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has secured all insurance required under this Section. b. Insurance coverage shall be at least as broad as: (i) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. (ii) Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non -owned), with limit no less than $1,000,000.00 per accident for bodily injury and property damage. (iii) Workers' Compensation insurance as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000.00 per accident for bodily injury or disease. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 31 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM (iv) Professional Liability (Errors and Omissions) Insurance appropriates to the Consultant's profession, with limit no less than $1,000,000.00 per occurrence or claim, $2,000,000.00 aggregate. (v) If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. c. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions: (i) Additional Insured Status. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant's insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used). (ii) Primary Coverage. For any claims related to this contract, the Consultant's insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self- insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. (iii) Notice of Cancellation. Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. (iv)Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (v) Self -Insured Retentions. Self -insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self -insured retention may be satisfied by either the named insured or City. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 32 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM (vi)Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City. (vii) Claims Made Policies. If any of the required policies provide coverage on a claims -made basis: • The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work. • Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. • If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase "extended reporting" coverage for a minimum of five (5) years after completion of contract work. (viii)Verification of Coverage. Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant's obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. (ix) Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors. (x) Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. 8. INDEMNIFICATION Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, Consultants, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant or its subcontractors, agents, employees, or other City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 33 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM persons acting on their behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. 9. INTELLECTUAL PROPERTY INDEMNIFICATION Consultant shall defend, indemnify and hold harmless the City, its officers, agents, representatives, and employees against any and all liability, including costs, and attorney's fees, for infringement of any United States' letters patent, trademark, or copyright contained in the work product or documents provided by Consultant to the City pursuant to this Agreement. 10. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 11. CONFIDENTIALITY If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 34 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City. 12. CONFLICT OF INTEREST CLAUSE Consultant covenants that it presently has no interest and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. 13. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Clerk of the City Council City of Santa Ana 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702-1988 Executive Director, Public Works Agency City of Santa Ana 20 Civic Center Plaza (M-21) P.O. Box 1988 Santa Ana, CA 92702 To Consultant: Consultant's Firm Name Address City State, Zip Code Attn : A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 35 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM these timeframes, weekends, federal, state, County or City holidays shall be excluded. 14. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Consultant regarding the subject matter herein, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein. 15. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Consultants retained by City. 16. WAIVER No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies. 17. TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 36 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 18. NON-DISCRIMINATION Consultant shall not discriminate because of race, color, creed, relation, sex, marital status, sexual orientation, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, training, utilization, promotion, termination or other employment related activities or in connection with any activities under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 19. JURISDICTION -VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 20. PROFESSIONAL LICENSES Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 21. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. signatures follow on next page City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 37 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: Clerk of the Council APPROVED AS TO FORM SONIA R. CARVALHO City Attorney Senior Assistant City Attorney RECOMMENDED FOR APPROVAL Nabil Saba, P.E. Executive Director Public Works Agency CITY OF SANTA ANA Acting City Manager CONSULTANT Name: Title: City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 38 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM APPENDIX ATTACHMENT 5: CERTIFICATIONS City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 39 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned that making a false certification may subject the certifier to criminal prosecution. Signed State of California County of Subscribed and sworn to (or affirmed) before me on this day of , 20_, by , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me Notary Public Signature Notary Public Seal City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 40 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM NON -LOBBYING CERTIFICATION The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly. Signed: Title: Firm: Date: City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 41 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM NON-DISCRIMINATION CERTIFICATION The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows: 1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Consultant's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 42 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a subconsultant or vendor as a result of such direction by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter. Signed: Title: Firm: Date: City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 43 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM ***END OF RFP 24-050** City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 44 Appendix A Pressure Regulating Vaults & MWD SA Connections 5013/4 West Memory Lane, Santa Ana CA 92706 PRV - 1 Main Valve Type Model Size inch Function Stock No. Catalog No. North Valve Main Unit Hytrol 50-01 12 Pressure Relief 50-01-11720H 50-01BP Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-02C CRL Main Valve Type Model Size inch Function Stock No. Catalog No. South Valve Main Unit Hytrol 100-20 10 Pressure Relief 27510877H 131-EJBCEPSY Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-02C CRL 309 3/4 E 17th St, Santa Ana CA 92706 PRV-2 Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Hytrol 8 Pressure Relief 50-04-35R 8-50-04B North Valve Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-020 CRL Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Globe 10-10OG 10 Pressure Relief 50-04-36F 10-50-04B South Valve Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-020 CRL 1345 3/4 N Grand Ave, Santa Ana CA 92701 PRV-3 Main Valve Type Model Size inch Function Stock No. Catalog No. East Valve Main Unit Hytrol 100G 8 Pressure Relief 50-04-35H 8-50-04B Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-OC2 CRL Main Valve Type Model Size inch Function Stock No. Catalog No. West Valve Main Unit Globe 100G 12 Pressure Relief 50-04-35D 12-50-04B Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-020 CRL 1668 E 4th St, Santa Ana CA 92701 PRV - 4 Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Globe 300G 10 Pressure Relief 50-04-36F 10-50-04B North Valve Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-02 CRL Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Hytrol 100G 8 Pressure Relief 50-04-35H 8-50-04B West Valve Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressure Sustaining 79222-020 CRL Page 1 Appendix A 2315 N Bristol S, Santa Ana, CA 92706 SA- 1 Main Valve Type Model Size inch Function Stock No. Catalog No. Bypass Main Unit Globe 12 Bypass TV3564 12-90 Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One Pressure Sustaining Main Valve Type Model Size inch Function Stock No. Catalog No. Pressure Main Unit Globe 16 Pressure Reducing 90-01-1747F 16-90-01AB Reducing Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 3/8 30-300 Pressure Reducing 71943-04H CRD SE Corner Bristol St & First St, Santa Ana CA 92701 SA-2 Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Globe 12 TV 8564 96 Size inch Spring Rate (psi) Function Stock No. Catalog No. Bypass Pilot One 1/2 Pressure Sustaining Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot Two 1/2 Flow Control 1300 W McFadden. Santa Ana. CA 92704 SA-3 Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Globe 10 30721 10-91 Bypass Pilot One Size inch Spring Rate (psi) Function Stock No. Catalog No. 1/2 7683002F CDNS11A Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot Two 1/2 Motor Operator CRA 1206 3/4 W. Warner Ave. Santa Ana, CA 92707 SA-4 Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Globe 30 TV 356-2 12-90 Size inch Spring Rate (psi) Function Stock No. Catalog No. Bypass Pilot One 30-300 829130H CRD10A Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot Two 3/8 34857 CDHS2 Page 2 Appendix A 2301 N Tustin Ave, Santa Ana, CA 92705 SA-6 Main Unit Main Valve Type Bailey Model Size inch 16 Function Stock No. Catalog No. North Valve Pilot One Size inch 3/8 Spring Rate (psi) 30-300 Function Pressure Sustaining Stock No. 829130H Catalog No. CRD10A Pilot Two Size inch 3/8 Spring Rate (psi) Function Flow Control Stock No. 7683002F Catalog No. CDHSIIA Main Unit Main Valve Type Globe Model 300G Size (inch) 10 Function Stock No. 2331601B Catalog No. 6-49-01ABDKCE Middle Valve Pilot One Size (inch) 3/8 Spring Rate (psi) 30-300 Function Pressure Sustaining Stock No. 7974404B Catalog No. CRA Pilot Two Size (inch) 3/8 Spring Rate (psi) Function Flow Control Stock No. 7683002F Catalog No. CDHSIIA Main Unit Main Valve Type Hytrol Model 10OG Size inch 6 Function Stock No. 23315001D Catalog No. 6-49-01ABDKCE South Valve Pilot One Size inch 3/8 Spring Rate (psi) 30-300 Function Pressure Sustaining Stock No. 7974404B Catalog No. CRA Pilot Two Size inch 3/8 Spring Rate (psi) Function Flow Control Stock No. 7683002F Catalog No. CDHSIIA Main Unit Main Valve Type Hytrol Model 100G Size (inch) 8 Function Relief Pressure Stock No. 50-01-101D Catalog No. 8-50-01B Pressure Relief Pilot One Size (inch) 1/2 Spring Rate (psi) 20-200 Function Pressure Relief Stock No. 79222-02C Catalog No. CRL Pilot Two Size (inch) 3/8 Spring Rate (psi) Function Flow Control Stock No. 7683002F Catalog No. CDHSIIA 2215 Ritchey St., Santa Ana CA 92705 SA-7 Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit 5 10 2331601E 8-49-01ABDKCE Size inch Spring Rate (psi) Function Stock No. Catalog No. Valve One Pilot One 3/8 1683021 CDNSIIA Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot Two 3/8 30-300 7974404E CRA Main Valve Type Model Size (inch) Function Stock No. Catalog No. Main Unit 10 2331701K 6-49-01ABDKCE Size (inch) Spring Rate (psi) Function Stock No. Catalog No. Middle Valve Pilot One 3/8 7683002F CDNSIIA Size (inch) Spring Rate (psi) Function Stock No. Catalog No. Pilot Two 3/8 30-300 7974404E CRA Main Valve Type Model Size inch Function Stock No. Catalog No. Relief Valve Main Unit S 8 50-01-101D 8-50-01B Size inch Spring Rate (psi) Function Stock No. Catalog No. Pilot One 1/2 20-200 Pressuer Relief 79222-02C CRL Page 3 Cla-Val_Appendix A Pump Stations and Reservoirs 2736 N Cambridge St. Santa Ana, CA 90701 Cambridge Station Main Valve Type Model Size inch Function Stock No. Catalog No. Main Unit Hytrol 100-01 8 Pressure Relief 100-01-4768F 100-01 Bypass Size Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL 1730 S. Santa Fe, Santa Ana, CA 92705 East Station Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 52-03 loin Pressure Relief 73064-06 SOK Pressure Relief Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 Pressure Relief Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Hytrol 131- 14in 72862-06 206-3A-IARC Altitude Size inch Spring Rate Function Stock No. Catalog No. Pilot One 3/8 30-130 psi C9320 CRA 2401 N Bristol St, Santa Ana, CA 92706 Garthe Station Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 12 in Bypass 210-13-37C 12-210-13BH Size inch Spring Rate Function Stock No. Catalog No. Bypass Pilot One 1/2 20-200 psi Pressure Sustaining 79222-02C CRL Size inch Spring Rate Function Stock No. Catalog No. Pilot Two 5-40 psi Level Control 1043801J CDS5 Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 12 in Pressure Relief 50-01-1196 12 50 01 B Pressure Relief Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL 730 E Memory Ln, Santa Ana, CA 92706 Crooke Station Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Hytrol 100G Bin Bypass 58-01-272E 8-58-01B Bypass Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL Page 1 Cla-Val_Appendix A 1727 W Alton Ave, Santa Ana, CA 92705 South Station Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 14in Bypass 62199 206-3A-1RX Size inch Spring Rate Function Stock No. Catalog No. North Bypass Pilot One 3/4 65-180 psi Pressure Sustaining C9294 CRL5 Size inch Spring Rate Function Stock No. Catalog No. Pilot Two 3/8 30-130 psi C9320 CRA Main Valve Type Model Size Function Stock No. Catalog No. Main Unit 14in Bypass 62199 206-3A-1RX South Bypass Size inch Spring Rate Function Stock No. Catalog No. (Out of Service) Pilot One 3/4 65-180 psi Pressure Sustaining C9294 CRL5 Size inch Spring Rate Function Stock No. Catalog No. Pilot Two 3/8 30-130 psi C9320 CRA Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 10 in Pressure Relief 45558 10-6-50-KS Pressure Relief Size inch Spring Rate Function Stock No. Catalog No. Pilot One 3/4 65-180 psi Pressure Relief C9294 CRL5 723 W Walnut St, Santa Ana, CA 92701 Walnut Station Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe Bin Bypass C-8028 8-100 Bypass Size inch Spring Rate Control Settings Function Stock No. Catalog No. Pilot One 1/2 20-200 psi 73 psi Pressure Relief 79222-02 CRL 201 S. Mountain View, Santa Ana, CA 92704 West Station Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 52-03 loin Pressure Relief 73064-06 50K Pressure Relief Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 Pressure Relief Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Hytrol 131-XX 16 in 72862-06 206-3A-IARC Altitude Size inch Spring Rate Function Stock No. Catalog No. Pilot One 3/8 30-130 psi C9320 CRA 14th St. & Poinsetta St, Santa Ana, CA 92701 Elevated Tank Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Globe 210-01 16 in Pressure Relief 73064-06 50K Altitude Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 Pressure Relief Page 2 Cla-Val_Appendix A System Wells 730 E Memory Ln, Santa Ana, CA 92706 Well 28 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Globe 6in Blow Off TV-4940 Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 50-150 psi Pressure Relief C9288 CRL 1718 N Sydney PI, Santa Ana CA 92706 Well 35 Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Angle 2100G 8in Blow Off 50-01-1414C 8-50-018 Blow Off Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL 2007 W McFadden, Santa Ana CA 92704 Well 37 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Angle 2100G 8in Blow Off 50-01-1414C 8-50-018 Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL 2736 N Cambridge St, Santa Ana, CA 90701 Well38(Pending Construction Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Angle 8 Blow Off 136-03-2828B 136-03BMPVY Blow Off Pilot One Size inch Spring Rate Function Stock No. Catalog No. 1/2 20-200 psi Pressure Relief 79222-02C CRL 1753 E. Fruit St, Santa Ana, CA 92701 Well 40 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Deep Well Pump 10" Blowoff 61-02-452F 61-02 Control Main Valve Type Model Size Function Stock No. Catalog No. Main Unit X102 Flow Limiter 10" 52-03-982A 52-03 Surage Size inch Spring Rate Function Stock No. Catalog No. Anticipator Pilot One 1/2" 20-200 psi Pressure Relief Size inch Spring Rate Function Stock No. Catalog No. Pilot Two 3/8" 30-300 psi Pressure Relief Well 40 PFAS Train 1 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Hytrol 50-01 4" Blowoff 50-01-10916C 50-01BP Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Hytrol 50-01 4" Blowoff 50-01-10916C 50-01BP Well 40 PFAS Train 2 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Hytrol 50-01 4" Blowoff 50-01-10916C 50-01BP Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Hytrol 50-01 4" Blowoff 50-01-10916C 50-01BP 907 3/4 N. Flower St, Santa Ana, CA 92703 Well 41 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Deep Well Pump 8" Blow Off 61-02 Control Main Valve Type Model Size Function Stock No. Catalog No. Main Unit X102 Flow Limiter 8" Surage Anticipator 840A 52-03 Surage Size inch Spring Rate Function Stock No. Catalog No. Anticipator Pilot One 1/2 20-200 psi Pressure Relief Size inch Spring Rate Function Stock No. Catalog No. Pilot Two 3/8" 30-300 psi Pressure Relief Cla-Val_Appendix A Reservoir Wells 2736 N Cambridge St, Santa Ana, CA 90701 Well 24 Main Valve Type Model Size Function Stock No. Catalog No. Blow Off Main Unit Angle 2100G 8in Blow Off 50-01-14140 50-01B Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL 907 3/4 N. Flower St, Santa Ana, CA 92703 Well 27 Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Deep Well Pump 8" Blow Off 61-02 Blow Off Control Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL 1727 W Alton Ave, Santa Ana, CA 92705 Well 34 Main Valve Type Model Size Function Stock No. Catalog No. Main Unit Angle 6 in Blow Off 50-01-480B 6-50-01B Blow Off Size inch Spring Rate Function Stock No. Catalog No. Pilot One 1/2 20-200 psi Pressure Relief 79222-02C CRL EXHIBIT 2 AGREEMENT TO PROVIDE FLOW CONTROL VALVE MAINTENANCE, REHABILITATION, AND REPLACEMENT SERVICES THIS AGREEMENT is made and entered into on this 6th day of August 2024 by and between Griswold Industries dba Cla-Val ("Contractor"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ("City"). RFCTTAT,C A. On April 11, 2024, the City issued Request for Proposal No. 24-050, by which it sought a contractor to provide preventative maintenance, rehabilitation, and replacement services for the City's water pressure reducing and pressure sustaining valves. B. Contractor submitted a proposal that was selected by the City. Contractor represents that it is able and willing to provide the services described in the scope of work that was included in RFP No. 24-050. C. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable in its field and that any services performed by Contractor under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SCOPE OF SERVICES Contractor shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Scope of Services - Exhibit A, attached hereto and incorporated by reference. 2. COMPENSATION a. City agrees to pay, and Contractor agrees to accept as total payment for its services for City, the rates and charges identified in Compensation - Exhibit B. The total amount to be expended during the term of this Agreement shall not exceed $1,250,000. b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. 3. TERM This Agreement shall commence on the date first written above for an initial three-year Page 1 of 10 term and terminate on August 5, 2027, unless terminated earlier in accordance with Section 16, below. The term of this Agreement may be extended for a single, two-year extension upon a writing executed by the City Manager and City Attorney. 4. PREVAILING WAGES Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services being performed are part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 5. INDEPENDENT CONTRACTOR Contractor shall, during the entire term of this Agreement, be construed to be an independent Contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer -employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Contractor performs the services which are the subject matter of this Agreement; however, the services to be provided by Contractor shall be provided in a manner consistent with all applicable standards and regulations governing such services. Contractor shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 6. OWNERSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Contractor represents and warrants that Contractor has the legal right to license any and all Documents & Data. Contractor makes no such representation and warranty in regard to Documents & Data which were provided to Contractor by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 7. INSURANCE Page 2 of 10 Prior to undertaking performance of work under this Agreement, Contractor shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below for the entire Term of this Agreement against claims for injuries to persons or damage to property which may arise from or in connection with services, products and materials supplied to City. Total cost of such insurance shall be borne by Contractor. a. Minimum Scope and Limit of Insurance 1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence and $2,000,000 aggregate. Required policy limits can be met with primary and umbrella/excess insurance policies. 2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1) with a limit no less than $1,000,000 combined single limits. 3. Workers' Compensation: as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. 4. Broader Coverage: if the Contractor maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. b. Other Insurance Provisions 1. Additional Insured Status: The City, its City Council, its officers, officials, employees, and volunteers are to be covered as additional insureds on the Contractor's CGL, Professional Liability, and Automobile Liability policies, with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connectionwith such work or operations. 2. Waiver of Subrogation: Contractor hereby grants to City a waiver of any right to subrogation that any insurer of said Contractor may acquire against the City by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. Page 3 of 10 3. Primary Coverage: For any claims related to this contract, the Contractor's insurance coverage shall be primary. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor's insurance and shall not contribute with it. 4. Severability of Interest: A severability of interest provision must apply for all the additional insureds, ensuring that Contractor's insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the insurer's limits of liability. 5. Notice of Cancellation: Each insurance policy required above shall provide that coverage shall not be canceled, voided, reduced in coverage or in limits, non -renewed by the carrier, or materially changed except after thirty (30) days prior written notice has been given to City. Ten (10) days prior written notice shall be provided to City for policy cancellation or non -renewal due to non- payment of premium. 6. Self -Insured Retentions: Self -insured retentions must be declared to and approved by the City. The City may require Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. 7. Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City. 8. Claims Made Policies: If any of the required policies provide coverage on a claims -made basis: (1) the Retroactive Date must be shown and must be before the date of the contract; (2) Insurance must be maintained and evidence of insurance must be provided for at least three years after completion of work; (3) If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, Contractor must purchase "extended reporting" coverage for a minimum of three years after completion of work. 9. Verification of Coverage: Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage requiredby this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor's obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies,including endorsements required by these specifications, at any time. Page 4 of 10 10. Subcontractors: Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. 11. Special Risks or Circumstances: City reserves the right to modify these requirements, including limits, based on the nature of therisk, prior experience, insurer, coverage, or other special circumstances. 8. INDEMNIFICATION Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Contractor, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Contractor's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor. 9. INTELLECTUAL PROPERTY INDEMNIFICATION Contractor shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States' letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Contractor to the City pursuant to this Agreement. 10. RECORDS Contractor shall keep records and invoices in connection with the work to be performed under this Agreement. Contractor shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by Page 5 of 10 law, from the date of final payment to Contractor under this Agreement. All such records and invoices shall be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Contractor under this Agreement. 11. CONFIDENTIALITY If Contractor receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Contractor agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Contractor without reference to information disclosed by the City. 12. CONFLICT OF INTEREST CLAUSE Contractor covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. 13. NON-DISCRIMINATION Contractor shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 14. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Contractor, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument Page 6 of 10 signed by the City and by an authorized representative of Contractor. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein. 15. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Contractor, Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Contractors retained by City. 16. TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor compensation for all services performed by Contractor prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Executive Director may require Contractor to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Contractor consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. 17. WAIVER No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies. 18. JURISDICTION - VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. Page 7 of 10 19. PROFESSIONAL LICENSES Contractor shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 20. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Clerk of the City Council City of Santa Ana 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702-1988 Fax: 714- 647-6956 With courtesy copies to: Executive Director, Water Resources Agency City of Santa Ana 20 Civic Center Plaza (M-21) P.O. Box 1988 Santa Ana, California 92702 To Contractor: Griswold Industries Attn: David Koeblitz, CFO and John Link, EVP 1701 Placentia Avenue Costa Mesa, CA 92627 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, Page 8 of 10 communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. 21. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. The Agreement is the final and complete agreement and any prior or contemporaneous agreements for similar services between the parties is superseded by this Agreement. This shall not apply where the Parties are currently engaged and Contractor is providing services not contemplated by this Agreement. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. [signature page follows] Page 9 of 10 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: Jennifer L. Hall City Clerk APPROVED AS TO FORM: SOMA R. CARVALHO City Attorney By: Kyle Nalesen Assistant City Attorney RECOMMENDED FOR APPROVAL: Nabil Saba Executive Director Public Works Agency CITY OF SANTA ANA Alvaro Nunez, Acting City Manager CONTRACTOR: Digitally signed by David Koeblitz, David Koeblitz, CFO CFO Date: 2024.07.0912:19:24 -0700- David Koeblitz CFO 719124 An Link Executive Vice President Page 10 of 10 EXHIBIT A SCOPE OF SERVICES CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM SCOPE OF WORK Introduction and Background: The City of Santa Ana is located in the heart of Orange County, California and is approximately 27 square miles. The City provides potable drinking water for all of the City's residents and businesses. The City's water production system consists of 22 wells, 4 pressure control stations, 7 Metropolitan Water District connections, 7 water booster stations and 8 reservoirs and 2 sanitary sewer lift stations. Control and monitoring of the water system and sewer facilities is coordinated via the City SCADA system using a series of radios to send and receive data from remote locations to the City Home SCADA control room. Flow and pressure control through the water system is achieved using Cla-Val valves per Appendix A. Description of Work: The City is requesting proposals for the purpose of rehabilitating, replacing and maintaining all Cla-Val pressure control valves within the water production facilities. All replacement and procured valves in the contract shall be Cla-Val, no exceptions. The contract term shall be for three years with a City option to renew for one additional 2-year term. The Contractor will be expected to hold firm pricing on all contract items supplied for the duration of the contract. Labor increases shall be subject to mutually agreeable terms between the City and the Contractor. The Contractor shall provide all labor, materials, services, and equipment necessary for flow control valve maintenance, repair, and procurement services. All work shall be in accordance with applicable practices and shall conform to all applicable laws, codes and regulations. In addition, the Contractor must be able to respond to City's request for emergency repair work on a timely manner. Business hours are considered from 7:00 A.M. to 5:00 P.M. (Monday through Friday). Any time outside of business hours of operation may be considered after hours/weekends. All services, equipment and materials provided by the Consultant must be in accordance with all applicable Federal, State and local regulations, laws, and codes. The City reserves the right to modify the scope of the project at any time. Contractor Responsibilities: I. INSPECTION/PREVENTATIVE MAINTANENCE SERVICES (BID ITEMS 1-3) Inspection services shall include annual examination of all valves and any pilot valve systems associated with the valves listed in Appendix A. The Contractor shall perform preventative maintenance every 12 months at each valve system in order to elongate the lifespan of the valves and to determine how the operating conditions of the system are affecting the valve. In addition to preventative maintenance, the Contractor shall, upon request from the City, deploy to any valve and/or pilot valve site and perform a working inspection of the existing valve if the City encounters any valve operational issues. The preventative maintenance inspection shall verify the working condition of the valve. City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 14 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Preventative maintenance should consist of, but is not limited to the following: a. Removal of lime deposits/mineral buildup from the valve stem and other metal parts b. Inspect parts (diaphragm, pilot valves, disk plate, solenoids, valve body, tubing, anti -cavitation parts (knock -outs), etc.) c. Calibrate pilot control settings (pressure and flow, altitude valves, etc.) d. Maintain and clean the strainers and valve body e. Exercise the valves f. Check the pilot tubing for leaks g. Inspect pilot disc retainers h. Confirm that the diaphragm assembly is properly functioning Preferably, preventative maintenance should be accomplished without removing the valve from the line. However, if removal of the valve is required, the Contractor shall notify City staff prior to performing the work. Upon completion of inspection and maintenance services, the Contractor shall also ensure all tags and/or reference markers on valves and appurtenances are up to date with the most accurate information such as model number, serial number, etc. In the event, the Contractor encounters outdated valves in need of replacement, the Contractor shall recommend retrofitting old valves with up to date new valves that meet or surpass industry standards. Within ten (10) business days of completing maintenance services on the City's Cla-Val's, the Contractor shall provide a service report to the City of Santa Ana. The Contractor shall follow up with City personnel and notify City staff on any issues encountered in the field regarding requiring additional parts. The Contractor shall state all findings, if any, along with a proposed scope of work and complete cost estimates for any recommended equipment repairs and/or replacement. II. REPAIR SERVICES (BID ITEMS 4-9) The Contractor shall repair or replace any parts of the valve found to be worn or otherwise in need of replacement. All internal parts of the valve shall be cleaned of mineral deposits prior to reassembly of the valve. When required (typically every 5 years), complete valve rebuilds/rehabilitations should be performed in which the main valve and its respective pilot controls are cleaned internally, all rubber parts are replaced, and all metal parts replaced where needed. All repairs and rehabilitations shall be made in accordance with Cla-Val guidelines and as directed by the City. The Contractor shall be factory trained in maintaining all piloting systems offered by Cla-Val and shall fix/repair all piloting systems in accordance with Cla-Val guidelines and as directed by the City. Work under this section shall also include full valve replacement complete with all necessary pilot systems and/or electronic controls. Valves listed in Appendix A are representative of the majority of the Cla-Val valves in use in the City but is not a complete listing. The City acknowledges that additional costs will be incurred for City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 15 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM pilot system repairs and will vary depending upon the type of piloting system on each valve. Assume that a full repair of the valve will include costs for replacement of all parts that could be replaced in a standard Cla-Val diaphragm valve. For bidding purposes, assume repair of the following components; replacement of disk and seat on Cla-Val on the following models for various sizes as listed on the Fee Schedule: 1. Model90-01 2. Model50-01 3. Model52-03 4. Model 61-02 5. Model100-01 The Contractor shall solely use Cla-Val parts for replacement, repair, and maintenance of all components of the City's valves. III. NEW VALVES AND PROCUREMENT SERVICES (BID ITEMS 10-11) If the Contractor has determined rehabilitation of a valve system is not feasible or at the City's direction, replacement of the valve with a new valve shall take place. Furthermore, if the cost to repair the valve exceeds 50% of the cost to replace, replacement of the valve with a new valve shall take precedence. When work includes the replacement of valves, the Contractor shall be responsible for removal of the existing valve and installation of the new replacement valve. The Contractor shall also be responsible for supply, installation, calibration and testing of the new replacement valve. IV. INSTRUMENTATION AND CONTROL SERVICES The Contractor shall also have experience incorporating instrumentation and remote/local valve control on existing and future valve components in the City. The City currently utilizes electronic valve controllers (Model VC-22D), which serves as an interface between the City's SCADA system, the valve, and other devices installed on or around the valve. The Contractor shall have expertise in customizing the aforementioned valve controller with the Cla-Val trademarked standard and customized ValvApps to meet the City's operational requirements specific to each site. The Contractor shall be able to provide the following customization inputs and outputs for the valve controllers upon City request: 1. Valve Regulation 2. Differential Pressure Monitoring 3. Retransmission (1) Analog Inputs (2) Digital Inputs 4. Solenoid Outputs 5. Relay Outputs 6. Actions/Alarms 7. Communication City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 16 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 8. Control Logic V. VALVES TRAINING SERVICES Upon request, the Contractor shall provide in depth training on flow control valve operation, maintenance, and repair techniques that optimize staff management of the system. Classes shall include training materials and resources to further assist City Staff in the operation and maintenance of the flow control valves specific to the system. Upon request, the Contractor shall provide training classes in the field and/or in a controlled class setting at certified Cla-Val facilities following the manufacture's guidelines and operating techniques. VI. VALUE ADDED RELATED SERVICES The Contractor may propose additional related services that the City has not specifically identified in this RFP to accomplish the stated goals of this RFP. Value added related services will be considered by the City and may or may not be incorporated in the agreement. All parts and materials must be supplied new and Cla-Val factory approved. VII. SUBCONTRACTORS The use of Subcontractors is allowed, but will require approval by City prior to start of any assigned work. Upon commencement of work, the Contractor shall be responsible for services provided by any subcontractor as if Contractor were providing the services with its own organization. When a Subcontractor performs all or any part of the work, a markup shall be applied to the Subcontractor's actual cost of such work. The Contractor may add a markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the work may be added by the Contractor. VIII. PROJECT MANAGEMENT & COORDINATION When a request for service is issued to the City, the Contractor shall issue an estimate to the City's designated Project Manager. The Contractor shall not proceed with any work without the approval of the City's designated project manager. Contractors shall invoice the City on a monthly basis for all work performed during the period or provide a one-time invoice at the completion of work issued. Each invoice shall be accompanied by a summary of tasks performed, contract agreement number, results and progress on long- term tasks if any. IX. CODE COMPLIANCE All materials and workmanship shall be in strict conformity with standards of the latest editions including revisions of the following: • American Society of Civil Engineers (ASCE) City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 17 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM • American Society of Mechanical Engineers (ASME) • State Department of Industrial Safety (CAL/OSHA) • California Code of Regulations (CCR) • Local, State, and Federal Building Codes • City of Santa Ana Standards X. MINIMUM QUALIFICATIONS The Contractor shall meet the following minimum qualifications: 1. All work is to be performed in compliance with all applicable codes, ordinances, laws, standards, due care, and Occupational Safety and Health Administration (OSHA) safety requirements. 2. Be factory authorized, trained and knowledgeable in Cla-Val valves for maintenance, operation and installation. (Provide proof of training upon issuance of a contract with the City) 3. The Consultant shall have a minimum of five (5) years of experience in the services described in ATTACHMENT 1: SCOPE OF SERVICES. 4. Be confined space entry certified as well as possess state and local permits, licenses and certificates required by law to commence, carry, and complete the work. 5. Have access to factory direct inventory for replacement parts, new valves and related appurtenances. 6. Provide all necessary equipment to competently perform and complete work as specified. XI. SAFETY Proposer shall be solely and completely responsible for the condition of the project site, including safety of all persons and properties during the performance of the work. In addition, proper safety equipment must be worn at all times. These requirements shall apply continuously until the contract is terminated and shall not be limited to normal working hours. The Contractor/Consultant shall assure that each employee or subcontractor under the contractor's supervision is trained in the work practices necessary to safely perform his or her job. XII. INSURANCE REQUIREMENTS The successful bidders shall furnish the City with original copies of valid insurance policies herein required upon execution of the contract and shall maintain said policies in full force and effect at all times during the term of this contract. Said insurance policies shall comply with all requirements set forth in these specifications. The Contractor shall keep a current certificate of insurance at the City of Santa Ana at all times and shall immediately report any changes to the City. XIII. MARKUP City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 18 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM The following markup percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits (to the sum of the costs and markups, one (1) percent shall be added as compensation for bonding): 1) Labor...................................................................................................... 20 2) Materials................................................................................................15 3) Equipment Rental...................................................................................15 4) Other Items and Expenditures................................................................15 XIV. FEE SCHEDULE: Contractor shall submit a fee schedule as described in Section III.B.3 of RFP. No separately stated freight or deliveries will be considered. Bidders shall include all costs in the unit price bid. Furthermore, the Contractor shall submit additional labor, material and rental equipment rates along with fee schedule. Contractor's labor and equipment rate sheet shall list rates for all labor designations, equipment, rentals, and materials. The bid items specified in the fee schedule are for reference purposes only. Labor increases shall be subject to mutually agreeable terms between the City and the Contractor. The City may request related services that will be paid at the vendor's standard labor and equipment rate submitted. Fee proposal shall be outlined as follows: ---End of SCOPE OF WORK Section --- City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 19 EXHIBIT B COMPENSATION CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM APPENDIX ATTACHMENT 2: FEE PROPOSAL Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services (Appendix: Attachment 1) and am familiar with the scope of work. I am familiar with all the existing conditions and limitations that may impact work requests. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposer shall submit hourly rates schedule, which shall include but not limited to, direct and indirect costs for labor, for staff per job classification, material, equipment rates, overhead, incidental supplies, travel, mileage, and fuel. Any special materials will be purchased by the contractor only after discussed and authorized by the City projects manager or designee in writing. Prior to commencement of services, Contractor shall provide separate quotes, upon request by the City, which shall be approved by the City's Public Works Agency. TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: 06swoIJ J"K uWfrl s b6A CIA -Val Bid Item Unit Quantity Unit Price Amount 1, Labor 1 Man Prevailing Wage HR 200 $—L!!�' 00 $ ,3s UOD. 00 2. Labor Men Prevailing Wage HR 200 $ lqD.UU $ 6g9000.00 3. Travel Per Day EA 25 $ 3yO.W $ 00 T Model 50-01 4, Repair 4" Pressure Control Valve Rubber EA 20 $ 3as yy $ b, So g go Rebuilds for Main Valve and Pilot - -J 5 Repair 6" Pressure Control Valve Rubber EA 5 $ SOS �� $mod y/ ao Rebuilds for Main Valve and Pilot 6 Repair 8" Pressure Control Valve Rubber EA 5 1 $ c7k5 �� $ Rebuilds for Main Valve and Pilot 7 Repair 10" Pressure Control Valve Rubber EA 2 o c/ $ 6d 0, /Q $ 1�-31'Q,?0 Rebuilds for Main Valve and Pilot 8. Complete New 4" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot 6 yrvOv $ iagj 680•�O System, Opening &Closing Speed EA 20 $� Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 20 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 9. Complete New 6" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot ''JJ System, Opening &Closing Speed EA 5 $ 7P,00 $ Controls, Up Stream & Downstream T Pressure Gauges, X101 Valve Position Indicator 10. Complete New 8" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 5 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 11. Complete New 10" Model 50-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator Model 52-03 12. Repair 10" Pressure Control Valve Rubber Rebuilds for Main Valve and Pilot EA 4 13. Complete New 10" Model 52-03 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 4 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator Model 61-02 14. Repair 10" Pump Control Valve Rubber Rebuilds for Main Valve and Pilot EA 1 15. Complete New 10" Model 61-02 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 1 Controls, Up Stream & Downstream Pressure Gauges, X105 Limit Switch Assembly $12 00 $ Z10.00 $ 17.� 155 oo $ 3yt 3jo, oo $ Sby Oo $ 9D� 2S6.00 $ 650./b $ bsoj $ jq 09a.00 $a�v9a.00 Model 90-01 16. Repair 6" Pressure Control Valve Rubber EA 5 $ 3 ,�I. 6a $ j/ / 5g' qO Rebuilds for Main Valve and Pilot 17 Repair 8" Pressure Control Valve Rubber EA 5 $ yy9 2 $ a, 2V(O,, qo Rebuilds for Main Valve and Pilot —� 18 Repair 10" Pressure Control Valve Rubber EA 5 $ fo", po $ 3 330, 00 Rebuilds for Main Valve and Pilot 11 City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 21 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Repair 12" Pressure Control Valve Rubber EA 5 $— /Z $ 3, YAX '60 19.Rebuilds for Main Valve and Pilot T— 20. Repair 14" Pressure Control Valve Rubber EA 2 $ 1 2Z(o, u7 �— $�•.302 Rebuilds for Main Valve and Pilot 21- Repair 16" Pressure Control Valve Rubber EA 2 $� .27 9.9 qq $ 0�l�97 74 Rebuilds for Main Valve and Pilot 22. Complete New 6" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 o 0 $ 8, 7o S UU 1 $ 17/ j 70, 00 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 23. Complete New 8" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ia 7,K,OU $ ,25, 570, 00 Controls, Up Stream & Downstream �— Pressure Gauges, X101 Valve Position Indicator 24. Complete New 10" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ f6� SSiS. 00 $ 3110,00 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 25. Complete New 12" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $q?3/, UO $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 26. Complete New 14" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot Yo 999 to ,/ 6w" � O System, Opening & Closing Speed EA 2 $ $ Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 27. Complete New 16" Model 90-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot EA 2 �/ $ 13 �5/, C,iV 91— $ 197 74 00 —T System, Opening & Closing Speed Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 22 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM Model 100-01 28 Repair 8" Pressure Control Valve Rubber EA 2 $ ,DSO. 0 s 701 Z3 Rebuilds for Main Valve and Pilot 29 Repair 10" Pressure Control Valve Rubber EA 2 $ �oZ�� �% $ 1 ��%�, 32 — Rebuilds for Main Valve and Pilot 30. Repair 12" Pressure Control Valve Rubber EA 2 $ '70 7.7(' $ �,yis. 52 Rebuilds for Main Valve and Pilot 31. Repair 14" Pressure Control Valve Rubber EA 2 s 204k Z.y �— $ 2 9 „r W Rebuilds for Main Valve and Pilot 32. p EA 2 Repair 16" Pressure Control Valve Rubber s � � 2-71;. $ Rebuilds for Main Valve and Pilot 33. Complete New 8" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening &Closing Speed EA 2 $ 9 07Y Oo I $ I �jgV1 0(! Controls, Up Stream & Downstream --�— Pressure Gauges, X101 Valve Position Indicator 34. Complete New 10" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 s 13� 3�,?-00 �J $ aI J % V0 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 35. Complete New 12" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 $ Z�27, 0b s 7�1 3� 6511," Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 36. Complete New 14" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot System, Opening & Closing Speed EA 2 s 24, J78,pp $ 7613s%. 00 Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator 37. Complete New 16" Model 100-01 1501b Flanged/Epoxy Coated, Stainless Steel Trim, Complete Stainless Steel Pilot u tGG System, Opening & Closing Speed EA 2 s 7od�90,00 s O% 76o. (2o Controls, Up Stream & Downstream Pressure Gauges, X101 Valve Position Indicator City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 23 CITY OF SANTA ANA RFP NO.: 24-050 FLOW CONTROL VALVE MAINTENANCE PROGRAM 38. Discount off list price on unforeseen % N/A a % replacement parts Total $ Y2 8• Sb City of Santa Ana RFP 24-050 Flow Control Valve Maintenance and Rehabilitation Services Page 24