HomeMy WebLinkAboutItem 22 - Agreement for Jail Security and Control System Upgrade Consulting ServicesPolice Department
www.santa-ana.org/pol ice
Item # 22
or City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
August 20, 2024
TOPIC: Jail Security and Control System Upgrade Consulting Services
AGENDA TITLE
Agreement with Pennell Consulting, Inc. for Jail Security Control System Upgrade
Consulting Services (General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute an agreement with Pennell Consulting, Inc. to
provide consulting, system design, and project management services to the City of
Santa Ana Police Department Jail for a three-year term beginning August 20, 2024 and
ending August 19, 2027, with two one-year extension options, in an amount not to
exceed $193,184 (Agreement No. A-2024-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Santa Ana Police Department Jail (SAJ) is a 502-bed, direct supervision
correctional facility designed and constructed from 1996-1997. As with any correctional
facility, the security control system plays a significant role in its safe operation. This
system controls door locks, intercoms, sallyports, facility water and lighting, and
elevators. It must seamlessly integrate with emergency alarms, fire detection devices,
digital video surveillance, and other related systems.
Since its original design in 1996, the security controls system at SAJ has remained
largely unchanged. Incremental improvements have been made to support continued
functionality, but the control hardware has not been significantly upgraded since it was
first installed. Due to the system's age, many components are obsolete and difficult to
maintain or replace.
On September 12, 2023, the Police Department and the Public Works Agency released
Request for Proposal (RFP) No. 23-140, seeking consulting and project management
services from firms with the specialized expertise necessary to assist the City in
planning and designing a contemporary security control system for SAJ. This project
Jail Security and
August 20, 2024
Page 2
Control System Upgrade Consulting Services
phase consists of a focused system inspection and needs assessment, replacement
system design and specification, assistance with the creation and review of the RFP for
the construction phase, and project management services through the end of
construction and acceptance.
The RFP was advertised on the City's online procurement management and publication
system, with Proposals due on October 10, 2023. Three proposals were received and
evaluated by a selection committee. Based on the criteria outlined in the RFP, the
following summarizes the top three responding firms and their ranking:
Firm
City
Rank
Pennell Consulting, Inc.
Lakewood
1
Guidepost Solutions LLC
Los Angeles
2
P2S Inc.
Long Beach
3
Staff recommends awarding an agreement (Exhibit 2) to Pennell Consulting, Inc. to
provide consulting, system design, and project management services based on the
scope of work and selection criteria outlined in RFP 23-140. Their proposal
demonstrated the firm has the necessary capacity and expertise to complete the
required services. The firm's rates are reasonable and within industry standards, the
team qualifications are appropriate for this project, and the proposal was determined to
provide the best value for the City.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Funding will be available in the FY 2024-25 budget upon City Council approval of
carryforward from FY 2023-24. Funding for subsequent fiscal years will be included in
the proposed budgets for City Council consideration as follows:
Accounting Unit —
Fund
Accounting Unit —
Fiscal Year
Account No.
Description
Account No.
Amount
Description
General
Building & Facility,
FY 24-25
01114403-66200
Fund
Buildings & Building
$ 79,715
Improvements
General
Building & Facility,
FY 25-26
01114403-66200
Fund
Buildings & Building
$ 45,906
Improvements
General
Building & Facility,
FY 26-27
01114403-66200
Fund
Buildings & Building
$ 67,563
Improvements
Jail Security and Control System Upgrade Consulting Services
August 20, 2024
Page 3
Total $193,184
The amounts above are estimated projections and are subject to change.
EXHIBIT(S)
1. Location Map
2. Consultant Agreement with Pennell Consulting, Inc.
Submitted By: Robert Rodriguez, Acting Police Chief
Approved By: Alvaro Nunez, City Manager
- PROJECT LOCATION
EXHIBIT 1
SANTA ANA
PWA
PUBLIC WORKS AGENCY
EXHIBIT 1
AGREEMENT BETWEEN PENNELL CONSULTING, INC. AND CITY OF SANTA ANA
TO PROVIDE JAIL SECURITY AND CONTROL SYSTEMS UPGRADE ASSESSMENT
THIS AGREEMENT is made and entered into on this 20th day of August 2024, by and between
Pennell Consulting, Inc. ("Consultant"), and the City of Santa Ana, a charter city and municipal
corporation organized and existing under the Constitution and laws of the State of California ("City").
RECITALS
A. On September 12, 2023, the City issued Request for Proposals No. 23-140, incorporated by
reference herein, seeking consulting firms to perform a jail security and control systems upgrade
assessment. The City desired the consulting firms to have specialized special skills and knowledge
in the fields of consultation, system design, and project management services pertaining to
correctional facility security controls systems and related technologies including but not limited
to; security systems, user interfaces, access control systems, video surveillance systems, intercom
systems, duress alarm systems, telecommunications systems, and system integrations. Services
were to include but not limited to: current and future capabilities assessment, needs evaluation,
review and recommendation of appropriate hardware and software components, request for
proposals creation, evaluation of bids, contract review, and construction project management,
B. Consultant represents it is able and willing to provide such services to the City.
C. In undertaking the performance of this Agreement, Consultant represents it is knowledgeable in
its field and any services performed by Consultant under this Agreement will be performed in
compliance with such standards as may reasonably be expected from a professional consulting
firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms
and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform during the term of this Agreement, the tasks and obligations including
all labor, materials, tools, equipment, and incidental customary work required to fully and adequately
complete the services described and set forth in Scope of Services - Exhibit A, attached hereto and
incorporated by reference.
2. COMPENSATION
a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates
and charges identified in the Cost Proposal - Exhibit B, attached hereto and incorporated by
reference. Payments shall be made under the following schedule:
Upon execution/Upon Start of Phase 1: Site Investigation and Project Design
$61,785
Upon Start of Phase 2: Project Procurement
$17,930
Upon Start of Phase 3: Construction/Installation
$95,906
The total cost for Phases 1 through 3 is $175,621.00. The total amount to be expended during the term
of this Agreement shall not exceed $193,183.10, which includes a 10% contingency fee of $17,562.10.
b. Consultant shall invoice City upon the start of each phase for services performed pursuant to this
Agreement. Payment by City shall be made within forty-five (45) days following receipt of proper
invoice evidencing work performed, subject to City accounting procedures. City and Consultant
agree that all payments due and owing under this Agreement shall be made through Automated
Clearing House (ACH) transfers. Consultant agrees to execute the City's standard ACH Vendor
Payment Authorization and provide required documentation. Upon verification of the data provided,
the City will be authorized to deposit payments directly into Consultant's account(s) with financial
institutions. Payment need not be made for work which fails to meet the standards of performance set
forth in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on the date first written above for three (3) years, with the option
for the City to grant up to two (2), one (1) year renewals, exercisable by a writing by the City Manager
and the City Attorney, unless terminated earlier in accordance with Section 15, below. The total term of
the agreement shall not exceed five (5) years.
4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent
Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to
create an employer -employee relationship, a joint venture relationship, or to allow the City to exercise
discretion or control over the professional manner in which Consultant performs the services which are
the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided
in a manner consistent with all applicable standards and regulations governing such services. Consultant
shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar
taxes relating to employees and shall be responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse,
or sublicense any and all copyrights, designs, and other intellectual property embodied in plans,
specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any
tangible medium of expression, including but not limited to, physical drawings or data magnetically or
otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant
under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in
writing that City is granted a non-exclusive and perpetual license for any Documents & Data the
subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the
legal right to license any and all Documents & Data. Consultant makes no such representation and
warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not
be limited in any way in its use of the Documents and Data at any time, provided that any such use not
within the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Prior to undertaking performance of work under this Agreement, Consultant shall maintain and
shall require any subcontractors to obtain and maintain insurance as described below for the entire Term
of this Agreement against claims for injuries to persons or damage to property which may arise from or
in connection with services, products and materials supplied to City. Total cost of such insurance shall
be borne by Consultant.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property damage,
bodily injury and personal & advertising injury with limits no less than $1,000,000 per
occurrence and $2,000,000 aggregate. Required policy limits can be met with primary and
umbrella/excess insurance policies.
2. Automobile Liability: Insurance Services Office Form CA 00 01 covering Code 1 (any auto),
with limits no less than $1,000,000 combined single limits.
3. Workers' Compensation: as required by the State of California, with Statutory Limits, and
Employer's Liability Insurance with limit of no less than $1,000,000 per accident, policy or
employee, for bodily injury or disease.
4. Professional Liability Insurance: with limits no less than $1,000,000 per occurrence or claim,
and $2,000,000 aggregate.
If Consultant maintains broader coverage and/or higher limits than the minimum requirements for each
line of coverage shown above, City requires and shall be entitled to the broader coverage and/or the
higher limits maintained by Consultant. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The above required insurance policies are to contain or be endorsed to contain the following provisions:
1. City, its City Council, its officers, officials, employees, agents, and volunteers are to be covered
as additional insureds, under Consultant's CGL, and Automobile Liability policies, with respect
to any liability arising out of work or operations performed by or on behalf of the Instructor
including materials, parts, equipment, and personnel furnished in connection with such work or
operations.
2. Consultant's Insurance company(ies) agrees to waive all rights of subrogation against City, its
City Council, its officers, officials, employees, agents, and volunteers for losses paid under the
terms of any policy which arise from work performed by Consultant under this Agreement.
3. For any claims related to this contract, Consultant's insurance coverage shall be primary and any
insurance maintained by City, its City Council, its officers, officials, employees, agents, or
volunteers shall not contribute with it.
4. A severability of interest provision must apply for all the additional insureds, ensuring that
Consultant's insurance shall apply separately to each insured against whom a claim is made or
suit is brought, except with respect to the insurer's limits of liability.
5. Insurance policies required herein shall provide that coverage shall not be canceled, suspended,
voided, reduced in coverage or in limits, non -renewed by the carrier, or materially changed
except after thirty (30) days prior written notice has been given to City. Ten (10) days prior
written notice shall be provided to City for policy cancellation or non -renewal due to non-
payment of premium.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, 20
Civic Center Plaza, Santa Ana, CA 92701. The name and location of project must be included in
the Description of Operations section of each certificate.
Self -Insured Retentions
Self -insured retentions must be declared to and approved by the City. The City may require the
Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and
related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the State of California with a
current A.M. Best rating of no less than ANII, unless otherwise acceptable to City.
Claims Made Policies
If any of the required policies provide coverage on a claims -made basis:
1. The Retroactive Date must be shown and must be before the date of the contract.
2. Insurance must be maintained and evidence of insurance must be provided for at least three (3) years
after completion of work.
3. If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with
a Retroactive Date prior to the contract effective date, Company must purchase "extended reporting"
coverage for a minimum of three (3) years after completion of work.
Verification of Coverage
Consultant shall furnish City with original Certificates of Insurance including all required amendatory
endorsements (or copies of the applicable policy language effecting coverage required by this clause)
and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements
before work begins. However, failure to obtain the required documents prior to the work beginning shall
not waive Consultant's obligation to provide them.
City reserves the right to require complete, certified copies of all required insurance policies, including
endorsements required by these specifications, at any time.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk,
prior experience, insurer, coverage, or other special circumstances.
7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents,
employees, contractors, special counsel, and representatives from liability: (1) for personal injury,
damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal
injury, including death, and claims for property damage, which may arise from the negligent operations
of the Contractor, its subcontractors, agents, employees, or other persons acting on its behalf which relates
to the services described in section 1 of this Agreement; and (2) from any claim that personal injury,
damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or
effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for
damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been
suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising
from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for
the defense of the City, excluding fees and costs for special counsel to be selected by the City, regarding
any action by a third parry challenging the validity of this Agreement, or asserting that personal
injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property
rights arises by reason of the terms of, or effects arising from this Agreement. City may make all
reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the
foregoing, to the extent Contractor's services are subject to Civil Code Section 2782.8, the above
indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out
of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor. Except
for liability arising out of the negligent operations of Contractor, its subcontractors, agents, employees,
or other persons acting on it behalf while performing under this Agreement, in no event will the cost of
the indemnity, including attorney fees, exceed the compensation paid to the Consultant by the City under
the terms of this Agreement.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees
against any and all liability, including costs, for infringement of any United States' letters patent,
trademark, or copyright infringement, including costs, contained in the work product or documents
provided by Consultant to the City pursuant to this Agreement.
9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this
Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred
under this Agreement and any services, expenditures, and disbursements charged to the City for a
minimum period of three (3) years, or for any longer period required by law, from the date of final payment
to Consultant under this Agreement. All such records and invoices shall be clearly identifiable.
Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of
such records and any other documents created pursuant to this Agreement during regular business hours.
Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this
Agreement for a period of three (3) years from the date of final payment to Consultant under this
Agreement.
10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is
reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or
disclose such information except in the performance of this Agreement, and further agrees to exercise the
same degree of care it uses to protect its own information of like importance, but in no event less than
reasonable care. "Confidential Information" shall include all nonpublic information. Confidential
information includes not only written information, but also information transferred orally, visually,
electronically, or by other means. Confidential information disclosed to either party by any subsidiary
and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and
nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources;
(b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful
possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by
operation of law; or (e) is independently developed by the Consultant without reference to information
disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or
indirect, which would conflict in any manner with performance of services specified under this
Agreement.
12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual
orientation, gender identity, gender expression, gender, medical conditions, genetic information, or
military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by
applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other
employment related activities or any services provided under this Agreement. Consultant affirms that it is
an equal opportunity employer and shall comply with all applicable federal, state and local laws and
regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Contractor,
and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict
between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail.
This Agreement may not be modified except by written instrument signed by the City and by an authorized
representative of Contractor. The parties agree that any terms or conditions of any purchase order or other
instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or
obligate Consultant or the City. Each party to this Agreement acknowledges that no representations,
inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting
on behalf of any party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written
consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior
written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit
the City's ability to have any of the services which are the subject to this Agreement performed by City
personnel or by other Contractors retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination.
In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for
all services performed by Consultant prior to receipt of such notice of termination, subject to the following
conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver
to the City all work product(s) completed as of such date, and in such case such work
product shall be the property of the City unless prohibited by law, and Consultant consents
to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance
specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by
the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving
the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed
a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver
constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined
and governed by the laws of the State of California. Both parties further agree that Orange County,
California, shall be the venue for any action or proceeding that may be brought or arise out of, in
connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits,
approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by
the laws and regulations of the United States, the State of California, the City of Santa Ana and all other
governmental agencies. Consultant shall notify the City immediately and in writing of its inability to
obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be
cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be
in writing and shall be deemed to be properly given if delivered in person or mailed by first class or
certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided
in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92701-1988
Facsimile 714- 647-6956
With courtesy copies to:
Chief of Police
City of Santa Ana
60 Civic Center Plaza (M-97)
P.O. Box 1981
Santa Ana, CA 92702
Facsimile (714) 245-8007
To Contractor:
Robert C. Pennell
Pennell Consulting, Inc.
400 S. Jefferson, Suite 301
Spokane, WA 99204
Facsimile: (509)747-1872
A party may change its address by giving notice in writing to the other parry. Thereafter, any
communication shall be addressed and transmitted to the new address. If sent by mail, communication
shall be effective or deemed to have been given three (3) days after it has been deposited in the United
States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by
fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time
set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth
above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays
shall be excluded.
20. MISCELLANEOUS PROVISIONS
Each undersigned represents and warrants that its signature herein below has the power,
authority and right to bind their respective parties to each of the terms of this Agreement,
and shall indemnify City fully, including reasonable costs and attorney's fees, for any
injuries or damages to City in the event that such authority or power is not, in fact, held by
the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth
in the body of this Agreement.
IN WITNESS WHEREOF, the parties hereto have execrated this Agreement the date and year first above
written.
ATTEST:
JENNIFER L. HALL
City Clerk
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
N �—�
TAMARA BOGOSIAN
Senior Assistant City Attorney
RECOMMENDED FOR APPROVAL:
ROBERT RODRIGUEZ
Acting Chief of Police
CITY OF SANTA ANA
ALVARO NUNEZ
Acting City Manager
PENNELL CONSULTING INC.:
ROBERT C. PENNELL
President
(a
EXHIBIT A
CITY OF SANTA ANA
EXHIBIT I
SCOPE OF SERVICES
Consultant shall perform services as set forth below.
Santa Ana Jail Facility Overview and Requirements
A. The PSIM is comprehensive and used to manage and/or interface with the following subsytems:
• 256 regular cells
• 5 temporary holding rooms
• 3 attorney rooms
• 10 booking cells
• 6 elevators
15 interior sliding doors
• 5 sally ports with sliding doors
• 7 sally ports with swinging doors
• 30 swinging doors
• 9 subpanels that operate local power, lighting and paging
• 1 subpanel that controls local cells, power, and lighting
• Duress alarm system
• Existing Fire Control Panel
Existing CCTV System
B. Required Features:
1. Efficient facility control requiring a single operator.
2. Main control room redundancy to mitigate operational impact due to malfunction.
3. Minimized maintenance costs.
4. Ability to upgrade technology as software and systems evolve over time.
II. Phase 1: Consultant Requirements and Project Objectives
A. System Inventory and Assessment — Perform a comprehensive inventory and assessment of the
existing jail access control system and its components as well as other available systems and
components (e.g., subsystems) relevant to meeting project objectives.
B. Conduct onsite inspections and reviews of the security controls system currently in place, including
but not limited to hardware, software, equipment room space and configurations, conduit space
and configurations, and electrical capacity and configuration.
C. Inspect and review of the security controls systems currently in use and, through in-depth
communications and collaboration with City staff, devise a needs assessment for a comprehensive
update of this system.
D. This collaboration will require respondents to identify and explain currently implementable
technology options available for the various aspects of the replacement PSIM.
a
CITY OF SANTA ANA
E. Work with Santa Ana Police Department staff to finalize the preferred option for the PSIM and
related subsystems and any alternates to be included in the Request for Proposal to follow this
assessment.
F. Develop a Cost Projection and Schedule Report for services related to the design, building, and
implementation of replacement PSIM, including services and work related to the removal of the
current jail security and controls system and long-term maintenance services.
G. Develop a project timeline estimate based upon Consultant's experience working with similar size
projects with municipal clients.
H. Integrate knowledge gained from the onsite inspection, needs assessment, PSIM industry
capabilities, and create a capabilities specification and scope of work for a replacement PSIM
system. Assist with combining the capabilities specification and scope of work to be published as
part of the RFP for services of a design/build firm to engineer and install the replacement PSIM
system.
I. Provide project management services throughout the engineering/construction process, assisting
City staff to monitor schedules, timelines, and to observe installation, testing and final acceptance.
J. Deliverables
1. System Inventory and Assessment Report
2. Cost Projection and Schedule Report
3. Project Schedule for rollout and implementation
4. Recommendation Report for PSIM System Replacement, to include the following at minimum:
• Features recommended;
• Future replacement scheduels and costs;
• Subsystem replacemnert/integration/recommendations
• Schematic plan for system modifications
• Quality assurances/vendor qualifications
5. Development of specifications documents for incorporation into RFP documents, including
contractor experience.
III. Phase 2: Procurement Phase(s)
A. Assist City and act as lead in drafting scope of work for a subsequent Request for Proposals
seeking qualified design/build firms to fulfill the needs of the capabilities specification, and provide
assistance in evaluating design/build proposals received if needed.
City will be the final reviewer of RFP documents, will release documents, and facilitate the
solicitation process and communications in accordance with the City's established Purchasing
Policies and Procedures.
a
CITY OF SANTA ANA
B. Collaborate with City staff to identify appropriate RFP rating criteria and weighting factors to ensure
bottom line evaluations can be equitably applied to all proposals. Cost analysis shall include initial,
total implementation and long-term maintenance and support costs.
C. Participate in pre -proposal conference with prospectivbe proposers, provide responses to
contractor questions to the City's Purchaisng Department which may be included in RFP addenda.
Consultant is not to communicate with any prospective proposers upon award of this contract and
while performing services related to this project for the City.
D. Assist City in reviewing bid submittals, finalist interviews, and selection of vendor(s) needed to
implement this upgrade project. City shall make final decisions in selection of awarded contractor
related to any subsequent solicitations.
E. Consultant shall not consult, contract, subconsult/subcontract with any vendor, individual, firm, or
entity that intends to participate in a solicitation related to this project. Any such vendor, individual,
firm or entity that is contracted by the successful consultant of this contract shall be precluded from
any subsequent, related solicitation.
IV. Phase 3: Construction/Installation Period Services
Consultant shall work with City staff to provide support with following tasks:
A. Provide responses to contractor requests for information (RFI's)
B. Review and recommendation for approval, disapproval, or modification of all contractor requests
for payment, contractor submittal documents, and requests for Change Orders.
C. General periodic inspection of contractor's work and progress. Develop schedule for progress
meetings.
D. Participation in periodic project job meetings
E. Development and oversight of a system testing and acceptance ploan
F. Issuance of Substantial Completion Document and punch list for contractto achieve Final
Completion
G. Issuance of Final Completion/Acceptance Document, including review of all contractor submitted
as build documents.
H. Post Construction Phase: The consultant will conduct a six-month Post Construction Warantee
Review that shall include inspection of all system components and operations and development of
a list of warrantee/repair items to be addressed by contractor under warrantee.
EXHIBIT B
Pennell Consulting Inc.
`"`../..�����"""""' Electrical and Electronics
system Design
February 20, 2024
Mr. Kenneth Willard, Correctional Manager
City of Santa Ana — Police Department
PO Box 1981
62 Civic center Plaza
Santa Ana, CA 92701
Subject: Request for Proposals No. 23-140 for Jail Security and Control Systems Upgrade Assessment
Design Contract Amendment Request, DCO #01
Ken,
Per the request to add Construction Management to this project, we will perform the following services
in addition to the Construction Administration included in our our previous proposal:
1. Prepare change orders, as needed to address changes in scope or to address scope changes that
may occur (technical portion).
2. Perform weekly Field Observations during on -site work in conjunction with progress meetings.
3. Facilitate all progress meetings to include but not limited to: (CM)
a. Facilitate site coordination, two -week look ahead
b. Schedule updates
c. Track RFI's
d. Track issues and resolutions
e. Documentation for Litigation prevention
f. Prepare Meeting Notes
4. Review and validate contractor's construction schedule (CM)
5. Track submittals, expected and submitted (CM)
6. Facilitate Shop Testing and acceptance (CM)
7. Facilitate testing by area as completed (CM)
8. Facilitate Systems Commissioning — Two -week Final Continuous Test (CM)
9. Track Punch List corrections/completion (CM)
10. Validate Record Documents
11. Validate contractor training proposal and materials
This will increase the contract value from $123,850 to $175,621. Please let us know if you have any
questions concerning this proposal.
Sincerely,
Robert C. Pennell, P.E.
President
400 S. Jefferson, Suite #301 • Spokane, WA 99204
Telephone: 509-747-1888 9 Fax: 509-747-1872
Pennell Consulting Inc.
1p)rr,7�T Electrical and Electronics
System Design
RFP No. 23-140 Jail Security and Control Systems Upgrade Assessment October 10, 2023
new that has been discovered in a final presentation prior to creating the construction RFP documents.
(Deliverable 5)
Updated project costs and project schedule are included with each submittal (Deliverable 3). Stakeholder
review meetings are held for each DID and CD submittal.
Project Procurement: We will support the Santa Ana City staff with the tasks identified in the consultant RFP. We
can support procurement via on-line meetings, in person with our local staff, or both.
Construction Scope of Work and rating criteria: Using our team's many years of experience with this type of work,
we will collaborate with City staff to review, propose, and develop a comprehensive, coordinated, and
constructible, construction RFP.
Our team will maintain no contact with any potential vendors.
Construction Phase: We will support the Santa Ana City staff with the tasks identified in the consultant RFP. Our
extensive experience in both project and construction management will complement and support the City staff
where needed. Our local presence provides us with the ability to physically respond on -site same day if necessary
to assist in the resolution of issues.
We will respond to RFI's, product data, shop drawing, and substitution (when permitted) submittals, pay requests,
and change orders. Each document is carefully reviewed and responded to.
Site observations and well documented contractor progress meetings lead to successful projects and litigation
prevention. We will participate in progress meetings but can also lead and document them. This is a highly
technical project of which it is extremely difficult for non -technical people to lead or document. We are well
versed in performing these tasks.
Substantial and Final Completion requirements must be clearly stated and defined in the construction RFP
documents. Once well defined, it is much easier to determine if the requirements have been met for both.
Accurate Record Documents are typically difficult to obtain. Our technique is to specify that red -lined or updated
as -built documents are submitted on a periodic basis in exchange for progress payments for this task.
Post construction warrantee site visit is an excellent way to verify contract compliance and determine if extended
warranty RFP should be issued.
Cost Proposal
Lump Sum Fee for Phase 1: $61,785
Lump Sum Fee for Phase 2: $17,930
Lump Sum Fee for Phase 3: $44,135
Attachments
See the following for the requested Attachments A through F.
Electrical and Electronics Systems Engineering Page 13