HomeMy WebLinkAboutItem 21 - Main Library Renovation ProjectLibrary
www.santa-ana.org/library
Item # 21
o`7, City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
August 20, 2024
TOPIC: Main Library Renovation Project
AGENDA TITLE
Amendment to Agreement with Group 4 Architecture, Research + Planning, Inc. for the
Main Library Renovation Project (22-1380) (Revive Santa Ana)
RECOMMENDED ACTION
Approve a first amendment to an agreement with Group 4 Architecture, Research +
Planning, Inc. for additional design and engineering services, increasing the
compensation amount by $499,383, for a total not -to -exceed amount of $2,657,948
(Agreement No. A-2024-XXX).
GOVERNMENT CODE 484308 APPLIES: Yes
DISCUSSION
On April 19, 2022, the City entered into an Agreement with Group 4 Architecture,
Research + Planning Inc. for design and engineering services for the Main Library
Renovation Project. The project will enhance the Library's physical, digital, and
technological environment that will expand access and provide free innovative and
interactive spaces for children, teens, and their families. The scope of work includes site
work for surface parking, site utility improvements, entrance walkways, pedestrian
lighting, renovation of exterior public spaces, site furnishings, irrigation, and
landscaping. The Main Library building consists of 39,790 square feet and has two
floors and a below -grade basement. Additional improvements will include, but are not
limited to, hazardous material removal, demolition, repair and restoration of exterior
marble facade, addition of an accessible elevator, repair and revitalization of north -
facing windows, a full historic restoration of interior spaces, mechanical improvements,
plumbing improvements, electrical improvements, low -voltage, communications, and
electrical security.
The amendment includes additional compensation for the following:
• Additional historical restoration support services due to the complexity of the
exterior marble restoration and other historic building features.
Main Library Renovation Project
August 20, 2024
Page 2
Evaluation of existing elevator to address any needed repairs.
Construction administration services, including a six-month extension of services
to mirror current construction duration projections.
The extension can be contributed to an expansion of project scope stemming from the
California State Library Building Forward Grant, awarded after the agreement with
Group 4 Architecture was approved.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Funds are budgeted and available in the following account, and will be presented to City
Council for approval of carryforward to FY 2024-25 as part of the citywide carryforward
process. Additional proposed carryovers of unspent funds to future fiscal years will be
presented to City Council for approval as needed.
The following table summarizes the funds budgeted for expenditure for the additional
design and engineering services:
Fiscal
Accounting Unit
Fund
Accounting Unit,
Year
- Account No.
Description
Account No. Description
Amount
(Project No.)
EXISTING BUDGET TO CARRYFORWARD TO FY 24-25
18111013-66200
American
ARPA — LIBRARY -
2024-25
(22-1380)
Rescue Plan
Buildings & Building
$499,383
Act (ARPA)
Improvements
TOTAL
$499,383
EXHIBIT(S)
1. Amendment
Submitted By: Brian Sternberg, Executive Director of Library Services
Approved By: Alvaro Nunez, City Manager
FIRST AMENDMENT TO AGREEMENT TO PROVIDE FULL DESIGN
FOR THE SANTA ANA MAIN LIBRARY RENOVATION
THIS FIRST AMENDMENT to the above -referenced agreement is entered into on August 20,
2024, by and between Group 4 Architecture, Research + Planning, Inc., a California corporation
("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California ("City").
RECITALS
A. Following Request for Proposal ("RFP") No. 21-118, the parties entered into Agreement
No. A-2022-060 ("Agreement") dated April 19, 2022, to retain a qualified consultant
having special skill and knowledge in the field of library renovation to prepare full
conceptual plans for the Santa Ana City Library.
B. To support extensive upgrades during the renovation, on December 21, 2022, the City
approved a reallocation of scope and fees that deferred Task 5 of the scope of work to the
Agreement, which included bidding, construction administration, and record drawings.
C. The Agreement is in full force and effect through April 18, 2025.
D. With the award of a contract for construction, the City now desires to reinstate the original
Task 5 services that were deferred on December 21, 2022 and include Additional Services
Requests within the scope of work.
E. The parties now wish to amend the Agreement to expand the scope and increase
compensation.
The Parties therefore agree:
1. Section 1, Scope of Services, is hereby amended to include Exhibit A-1 of this First
Amendment. This amended scope of services includes:
a. Additional Service Request ("ASR") 04 Reinstated Task 5 Construction
Administration ("CA"). With the award of a contract for construction, the City now
desires to reinstate the original Task 5 services that were deferred on December 21,
2022. ASR 04 reinstates these services.
b. ASR 05 Supplemental Services for Historic Restoration. As part of ASR 03
Materials Testing — the historic specialist, Page & Turnbull, has developed an
extensive marble restoration repair and rehabilitation scope. For a new ASR 05
Page & Turnbull has proposed a scope of services that can be provided as directed
by the City on a time and material basis. Page & Turnbull Task 5 services have
been removed from ASR 04 and ASR 07 and are fully provided for in ASR 5.
c. ASR 06 Existing Elevator Evaluation and Repair Recommendations. The City has
requested that the existing elevator be evaluated by a specialty sub -consultant to
determine the scope of repairs needed. Through ASR 06, the services of J.E. Sellen
Page 1 of 2
have been engaged by Consultant and an evaluation of the elevator has been
performed and an allowance specification for its repair.
d. ASR 07 Extended CA for Months 13-18. Through ASR 07, the City desires to have
Consultant support the construction phase services.
2. Section 2.a., Compensation, is hereby amended to include Exhibit D-1 of this First
Amendment. The compensation for services provided is increased by $499,383 for a
total Agreement amount not to exceed $2,657,948.
3. Except as modified by this First Amendment, all terms and conditions of the
Agreement shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the
Agreement on the date and year first written above.
Jennifer L. Hall
City Clerk
APPROVED AS TO FORM
SONIA R. CARVALHO, City Attorney
By. ' dL -
B n Salvatierra
Deputy City Attorney
RECOMMENDED FOR APPROVAL
Brian Stern g 5, 202416:18 PDT)
Brian Sternberg
Executive Director
Library Services Agency
Alvaro Nunez
Acting City Manager
CONSULTANT
David Schnee
Principal
Page 2 of 2
EXHIBIT A-1
27 June 2024
ADD S; "T [CI -;7 XW•'T T
G R O U P 4
Jason Gabriel
CLIENT CONTR #: A-2022-060
ARCH ITECTU RE
City of Santa Ana
R E S E A R C H +
Public Works Agency
ADD SERVICE #: 04 Reisntated Task 5
PLANNING, INC
20 Civic Center Plaza PO Box 1988
Santa Ana, CA 92702
BILLING TYPE: Lump Sum
211 LINDEN AVENUE
PROJECT NAME:
G4 PROJECT #: GROUP 4 PHASE #:
so. SAN FRANCISCO
Santa Ana Library Renovation
22575-01 I04
CA 9 4 0 a 0 USA
SCOPE SUMMARY:
T : 6 5 0 • a 71 • 0 7 0 9
Reinstate Original Executed Contract Task 5: Bid Advertisement, Construction Admin, Record Drawings
scope and fee that had been deferred on 12/22/2022. Page & Turnbull scope excluded - see ASR 05 for its
F: 6 5 0- a 7 1- 7 9 1 1
replacement.
w w w.g4arch.com
ADD SERVICE
Task 5 - All Original Basic Services Disciplines except
P&T excluded (See ASR 05) See Fee Hour Backup
DESIGN FEE SUB -TOTAL:
6/27/2024
David Schnee Date
Principal in Charge
Jason Gabriel
Acting City Engineer
Date
LUMP SUM FEE
$355,287
$355,287
G:\22575-01 Santa Ana Libra ry\Y-Contract\CLI E NT\Amend ment\Amen d me nt 1 2024-XX-XX\Santa Ana Fee -hours 2024-06-27 Amendment 01
ASR 04 Reinstate CA 2024-06-27
27 June 2024
ADD S;�U[N
N Q1I1 i T
G R O U P 4
Jason Gabriel
CLIENT CONTR #:
A-2022-060
ARCH ITECTU RE
City of Santa Ana
R E S E A R C H +
PLANNING, INC
05 Hlst. Restoration
Public Works Agency
ADD SERVICE #:
Support
20 Civic Center Plaza PO Box 1988
211 LINDEN AVENUE
Santa Ana, CA 92702
BILLING TYPE:
T&M
SO. SAN FRANCISCO
PROJECT NAME:
G4 PROJECT #:
GROUP 4 PHASE #:
CA 9 4 0 8 0 USA
Santa Ana Library Renovation
22575-01
I05
T:650.871.0709
SCOPE SUMMARY:
F : 6 5 0.8 7 1 • 7 91 1
Page & Turnbull Task 5 services (bid, construction admin, closeout) related to historic preservation
scope. Providing support to Owner, CM and AOR on reviewing General Contractor and Speciality
www.g4arch. com
restoration sub contractor qualifications, approach,
submittals, and work.
TIME &
MATERIAL FEE
ADD SERVICE
NTE MARKUP
EXTENSION
Supplemental Historic Restoration Page &
Support Turnbull
$88,350 $8,835
$97,185
DESIGN FEE SUB -TOTAL:
$97,185
,-T 70s���� 6/27/2024
David Schnee Date
Principal in Charge
Jason Gabriel
Acting City Engineer
Date
G:\22575-01 Santa Ana Libra ry\Y-Contract\CLI E NT\Amend ment\Amen d me nt 1 2024-XX-XX\Santa Ana Fee -hours 2024-06-27 Amendment 01
ASR 05 Hist CA Svs 2024-06-27
13 June 2024
01
41;7 X0111*'S
G R O U P 4
Jason Gabriel
CLIENT CONTR #:
A-2022-060
ARCH ITECTU RE
City of Santa Ana
R E S E A R C H +
06 Exist Elevator
PLANNING, INC
Public Works Agency
ADD SERVICE #:
Survey
20 Civic Center Plaza PO Box 1988
Santa Ana, CA 92702
BILLING TYPE:
Lump Sum & T&M
211 LINDEN AVENUE
50. SAN FRANCISCO
PROJECT NAME:
G4 PROJECT #:
GROUP 4 PHASE #:
Santa Ana Library Renovation
22575-01
I06
CA 9 4 0 a 0 USA
T: 6 5 0• 8 7 1• 0 7 0 9
SCOPE SUMMARY:
Evaluation of existing passenger elevator, preparation of bid allowance specification, repair
F650.871.7911
:
recommendations, and supplemental services.
www. g4 a rc h. com
LUMP SUM
ADD SERVICE
FEE MARKUP
EXTENSION
Elevator Allowance Specification J.E. Sellen
$2,440 S244
$2,684
On -Site elev. Evaluation incl travel J.E. Sellen
$7,910 $791
$8,701
TIME &
MATERIAL FEE
ADD SERVICE
NTE MARKUP
EXTENSION
Other Repair support services J.E. Sellen
$7,500 $750
$8,250
DESIGN FEE SUB -TOTAL:
$19,635
/ 6/13/2024
David Schnee Date
Principal in Charge
Jason Gabriel Date
Acting City Engineer
G:\22575-01 Santa Ana Library\Y-Contract\CLIENT\Amendment\Amendment 1 2024-XX-XX\Draft to City 2024-06-13\Santa Ana Fee -hours 2024-06-13 Amendment 01
ASR 06 Exist Elev S2024-06-13
27 June 2024 � 4 AVA [« 41N 4M 1 i
G R O U P 4
Jason Gabriel CLIENT CONTR #: A-2022-060
ARCH ITECTU RE
City of Santa Ana
R E S E A R C H +
PLANNING, INC
Public Works Agency ADD SERVICE #: 07 Supplemental CA
20 Civic Center Plaza PO Box 1988
Santa Ana, CA 92702 BILLING TYPE: Lump Sum
211 LINDEN AVENUE
SO. SAN FRANCISCO
PROJECT NAME: G4 PROJECT #: GROUP 4 PHASE #:
Santa Ana Library Renovation 22575-01 I07
CA 9 4 0 a 0 USA
T: 6 5 0• 8 7 1• 0 7 0 9
SCOPE SUMMARY:
Extension of CA services for another 6 months beyond original 12 month duration outlined in
F:650.871.7911
Prime Agreement to a new total of 18 months. Excludes Page & Turnbull included in ASR 05.
w w w g 4 a r c h . c o m
Excludes basic shop drawing review included in ASR 04 Reinstated Task 5. Includes virtual
attendence in weekly OAC meetings and monthly in -person attendence and field walk for full 18
months. Further extension of CA duration or supplemental travels will be Additional Services.
LUMP SUM
ADD SERVICE FEE MARKUP EXTENSION
6 months Additional CA, see
attached breakdown $122,861 incl $122,860.86
6/27/2024
David Schnee Date
Principal in Charge
Jason Gabriel
Acting City Engineer
Date
DESIGN FEE SUB -TOTAL: $122,860.86
G:\22575-01 Santa Ana Library\Y-Contract\CLIENT\Amendment\Amendment 1 2024-XX-XX\Santa Ana Fee -hours 2024-06-27 Amendment 01
ASR 07 Supp CA 2024-06-27
EXHIBIT D-1
City of Santa Ana
Santa Ana Main Library Renovation
Group 4 Agreement Amenclement 1
Construction Phase services
Original Contract
Post 12/21/2022
12/21/2022 Status after execution of this
Completed/Invoiced as of
Balance Remaining
Post Amendment 1
Exhibit D Recap 2024.06.07
Amount
Authorization
authorization
2024-06-13
as of
2024-06-13
Authorization Comment
1.A Compensation for Basic Services
Task 1 Pre -design
$ 93,214.00
$
93,214.00
completed
$
93,214.00
$
-
Task 2 Schematic Design
$ 241,724.00
$
241,724.00
completed
$
241,724.00
$
-
Task 3 Design Development
$ 322,300.00
$
322,300.00
completed
$
322,300.00
$
-
Task 4 Construction Documents
$ 564,023.00
$
564,023.00
completed
$
564,023.00
$
-
Task 5 Bidding, CA, Record Documents (12 months) $ 402,871.00
$
-
deferred, pending future ASR 04 approval
$
-
$
-
Total Basic Compensation
$ 1,624,132.00
$
1,221,261.00
$
1,221,261.00
$
-
$
1,221,261.00 No change, no balance left
2.A Compensation for Optional Services
Option 1: Children's Thematics
$ 65,000.00
$
65,000.00
completed
$
65,000.00
$
-
Option 2: Elevator Design
$ 38,200.00
$
38,200.00
completed
$
38,200.00
$
-
$ 103,200.00
$
103,200.00
$
103,200.00
$
-
$
103,200.00 No Change, no balance left
3.B Additional Services Allowance
$ 200,000.00
ASR 01 Scan to BIM Lump Sum
$
43,450.00
completed
$
43,450.00
$
ASR 02 Supplemental Scope Lump Sum
$
443,975.00
completed
$
443,975.00
$
-
ASR 03 Supplemental Material TestingT&M
$
168,200.00
completed T&M task only used $72,615.14
$
72,615.14
$
95,584.86
$ 200,000.00
$
655,625.00
$
560,040.14
$
95,584.86
$
560,040.14 Reduced to Actual amount completed - no balance left
4.B Reimbursable Expense Allowance
$ 35,000.00
$
35,000.00
no change
$
10,559.72
$
24,440.28
$
35,000.00 No Change, "$24k balance as of 6/13/20024
5.A Contract Contingency
$ 196,233.00
$
143,479.00
adjusted balance - not used
$
-
$
143,479.00
$
143,479.00 Maintained at post ASR 03, all funds remaining as of 6/13/2024
Total Contract
$ 2,158,565.00
$
2,158,565.00
no change- will need to be amended at
$
2,062,980.14 Updated Total of Tasks 1-4 and Contingency
$ 1,895,060.86 + $ 263,504.14
time of construction contract award to
fund deferred Task 5 services
Total Contract Pre Amend > $
2,158,565.00
6. AMENDMENT 1 CONSTRUCTION PHASE SERVICES
ASR 04 Reinstated Deferred Basic Services Task 5
Lump Sum w P&T fee removed
$
355,287.00 ASR 04 Reinstated Deferred Basic Services Task 5
ASR 05 Supplemental Services for Historic Restorati T&M for P&T through 18 months
$
97,185.00 ASR 05 Supplemental Services for Historic Restoration
ASR 06 Elevator Survey & Repair Spec
Lump Sum and T&M
$
19,635.00 ASR 06 Elevator Survey & Repair Spec
ASR 07 Extended CA services for months 13-18
Lump Sum, excludes P&T
$
122,860.86 ASR 07 Extended CA services for months 13-18
NEW CONTRACT TOTAL
$
2,657,948.00 NEW CONTRACT TOTAL
Amendement 1 Additional Fee Lump Sum &T&M
$
499,383.00 Amendement 1 Additional Fee Lump Sum &T&M
GA22575-01 Santa Ana Li brary\Y-Contract\CLIENT\Amendment\Amendment 1 2024-XX-XX\Santa Ana Fee -hours 2024-06-27 Amendment 01 Amend 1 Exhibit D recap 6-27