r,,(,)\,��,�,A",MEND M:ENT NO. I TO PROJECT INIRLEMENTATION AGREEMENT
j
THIS AMENDMENT NO. I TO PROJECT IMPLEMENTATION
AGREEMENT ("Amendment") is made and entered into this 3 day of August,
1998 by and between the City of Santa Ana, a charter city and municipal corporation,
duly organized and existing tinder the Constitution and laws of the State of California
("City") and J`HE FIRST AMERICAN FINANCIAL CORPORATION, a California
corporation ("First American").
RECITALS
A. City, First American, and MacArthur Place, LLC, a California limited
liability company ("MacArthur Place") entered into that certain Project Implementation
Agreement, dated as of April 6, 1998 ("Agreement"). All defined terms used in the
Agreement are used in this Amendment unless otherwise stated.
B. Pursuant to the Second Purchase Agreement, First American acquired all of
MacArthur Place's right, title, and interest in the Alternative First American Acquisition
Area and thus is the successor -in -interest to all of MacArthur Place's right, title, and
interest in and to the Agreement.
C. City and First American desire to amend the Agreement as set forth
hereinbelow.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals, and the mutual
covenants and promises hereinafter contained, and for good and valuable consideration,
the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as
follows:
I. Recitals Incorporated. The foregoing Recitals are incorporated herein
and made a part hereof.
2. Replacement of Exhibit "B-I". Exhibit "B-l" to the Agreement, titled
"Project Site Map" is hereby deleted and replaced with the Exhibit "B-l" to this
Amendment as Attachment No. 1.
3. Replacement of Exhibit "C". Exhibit "C" to the Agreement, titled
"Off -Site Improvements" is hereby deleted and replaced with the Exhibit "C" to this
Amendment as Attachment No. 2.
4. Counterparts. This Amendment may be executed in counterparts
which, when both of the parties hereto have signed this Amendment, shall constitute an
original.
5. Effective Date. The Effective Date of this Amendment, when both
parties hereto have signed this Amendment, shall be the latest of the dates set next to the
signatures of the parties below, and such date shall be inserted into the preamble of this
Amendment.
6. Ag7eement as Amended. Except as amended by this Amendment No. 1,
the Agreement shall remain in Rill force and effect.
IN WITNESS WFIEREOF, the parties hereto have entered into this
Amendment as of the Effective Date.
Date: 9- �' 'r
ATTEST:
Clerk
I /tfc,
VED AS TO I'MM:
ttorney
"CITY"
CITY OF SANTA ANA, a charter city
and municipal corporation
By:
-
or
Date:
Date:
THE FIRS"I'AMEMCAN FINANCIAL
CORPORATION, a California
corporation
By:
arker S. Kei4edy
President
By:
Mark Amesen
Secretary
MAIN STREET
f f
0
I
f '
nl
cou
01
l I �z
�m
I
_ IMPERIAL PR ENAD
I
nn
r-
1 a
,
f
f
m
I
r
f
1[[[
f
-
C] 0
FIRST AMERICAN WAY
�rOD
fK
`n
m
rq D
�
z
00
ST19
IFS
ATTACSMENTU B-1
LEVEL I - 810,000 square feet
1A2
Provide eastbound widening on MacArthur to form the
160,000
continuation of the number 3 eastbound lane, east of
Hutton Center Drive directly into the southbound SR-55
on -ramp eliminating the current "pinch".
1C
Complete Columbine widening to four lanes including landscaped
340,000
median, street lights, sidewalk & parkway landscaping.
1N*
At southeast corner Main/MacArthur intersection, add a northbound right
200,000
turn lane. Right-of-way and construction costs are to be shared with
Hutton Center Development.
2A1 & 2A2
Route the southbound SR-55 off -ramp, desiring to travel west
300,000
west on MacArthur Blvd. through an enlarged signalized inter-
section rather than long the existing right -turn diagonal roadway.
These improvements will require the addition of two lanes and
the modification of the traffic signal. These improvements will
require Caltrans approval.
2D
Widen MacArthur Blvd. to add a third westbound lane between
400,000
the southbound SR-55 Freeway off -ramp and the full width
improvement east of Imprerial Promendade. Resurface/reconstruct the
westbound lanes on MacArthur Blvd. between Main Street and the
southbound SR-55 off -ramp per the material report. This work must
be coordinated with Caltrans and may need to be constructed
in two phases.
IL
At SR-55 northbound off -ramp to Dyer add a third lane to off -ramp.
100,000
2E
Provide a minor signal modification by installing traffic loops and
50,000
signal heads and restriping on the northbound approach of Hutton
Centre Drive at MacArthurto create a dual northbound right -turn lane
and right -turn signal overlap.
On -site improvements:
1,427,537
Cap First American Way with asphalt concrete between Imperial
Promenade and existing terminus. Construct storm drain from Orange
County Flood Control Channel to Columbine and between First American
Way and Orange County Flood Control Channel; reactivate traffic signal
at First American Way and Imperial Promenade including loops on west-
bound approach, signal modification to provide northbound right turn
overlap with westbound left turn and restriping; construct First American
between existing terminus and Columbine and Majestic between
Majestic East and First American Way**. The construction of First
American Way and Majestic shall include four lanes, landscaped
medians, street lights, sidewalks and parkway landscaping.
`fi 5 .`_♦ :Y k .' �y �. �W }, �eh S N �`�Y4 f�_. -
SUBTOTAL-..
.{;3.5$^J',4'���!�Qi
.S'.'.tN.'-0�[V,L/VD
14-Aug-98
ATTACHMENT ".C"
PAGE 1 of 2
George1Fatco.xls
LEVEL II - 240,000 square feet
1 K
At Hallday/Dyer intersection, convert existing westbound right turn lane
200,000
to a third westbound through lane at intersection
1 H*
At southwest corner Main/MacArthur intersection, add an eastbound
250,000
120,000
right -turn lane and modify traffic signal as needed
SUBTOTAL .
LEVEL III - 300,000 square feet
1J
At intersection of Main and Dyer convert existing northbound right -turn
300,000
lane to a through lane.
La1 y'l-i j.,
m .99"OPQ
LEVEL IV - 300,000 square feet
3A
Construct Alton overpass at SR-55 and widen to four lanes between
12,000,000
Standard and Main Street.
3131
Widen Halladay to four lanes between Columbine and Alton.
7,500,000
3B2***
Install a traffic signal at Halladay and Alton
120,000
3C
Widen Main Street to six lanes between Columbine and Warner.
1,700,000
3D
Widen Dyer (southside) to provide three lanes between Halladay
2,100,000
and Main.
***
Install traffic signals at the following impacted intersection when
360,000
warranted:
Majestic Drive @ Imperial Promenade
Majestic Drive @ Majestic East
Drive @ Halladay Street
vv
:�i'��p V}.`I.'��-�. ��.��.WN'f
� (Columbine
SUI3TOTAL'��.���:,i��.� �....)_ •4 t _�Y Y,.f,. ,��. 3 ?��„_ ..c\�: �^�d�v"�14'wi �,
-r �3�9„'i..Yi�v1i��i��.
n
{�/OL/
TOTAL
3,347,530
24,280,000
* = Denotes fee in lieu of constructing improvement or not to exceed cost to do as
agreed between Developer and City.
** = The extension of Majestic shall be improved with development of that portion of lot 2 of
of LLA 98-001, bounded by First American Way, Columbine and Majestic East.
*** = Maximum contribution per intersection will be $120,000
ATTACHMENT "C"
PAGE 2 of 2
George/Fatco.xls