Loading...
HomeMy WebLinkAboutORANGE, COUNTY OF (43)'N AG REEMENT 4 5 6 7 9 121 i 13, 14 15 16 17 is 19 20 21 22 23 24 25 26 27 281 29 30 'u. 321 THIS A�.,REK=F, made and entered into this 12th day of March BY AND BETWEEN, CITY Or, SANTA ANA a municipal corporation hereinafter designated as "CITY", and COUNTY OF ORWGE, a political subdivision of the State of California, hereinafter designated as "CO72TZY" WFMESSETH: WHEREAS, considerable traffic presently exists and is progressively in- creasing on Red Hill Avenue between Barranca Road (Dyer Road) and Warner Avenue; and WHEREAS, traffic conditions warrant the addition of interconnect and other equipment at existing traffic signals to provide a system of coordinated intersections for the benefit of traffic progression hereafter referred to as the "System"; and WHEREAS, traffic conditions at the intersection of Red Hill Avenue and Warner Avenue -viarrant the installation of traffic control signals and highway intersection lighting to facilitate the safe and orderly movement of traffic; and WHEREAS, CITY is willing to cooperate with CCTL7_1TTY for the construction of said System 9-nd the traffic signal and highway intersection lighting installation hcroina�4't-cr referred -to as the "Pf-oject". NOW, THE RTEFORE, IT IS AGREED by the parties hereto as follows: 1. The Project shall include: A. Said System, which encompasses installation of telephone inter- connect equipment and all traffic signal modifications listed on Exhibit "A" attached and made a part hereof. B. Said traffic signal and highway lighting system at the intersection of Red Hill Avenue with Warner Avenue, which shall include a three phase type 90 controller with two (2) volume density modules, one (1) left turn mod -,ale, one (1) standard :module with integrated pedestrian timing, and three dial coordination unit. 11. COUNTY SHALL: A. Prepare the detailed plans, specifications and estimate for the Project. B. Have Jurisdiction of the construction area on the project within CI7.7 r6so-IS IJ —1— -73-4,3 C. Be and is hereby designated as the contracting and construction 2 agent for the parties to do and perform all acts necessary or 3 repaired in order to construct the Project in accordance with the 4 plans and specifications, including material control, inspection 5 of the construction work, and to execute and deliver aU documents 6 necessary or required in connection with the construction and 7 completion of said Project, including certificate of day labor, equipment and material cost and certification of completion of the 9 Project. 10 III. CITY SHALL: 11 A. Approve plans and specifications as to design and construction 1.2 features affecting the construction operation and maintenance of 13 the portion of the Project within CITY. 1.4 B. At all time during the progress of construction of the Project 15 have access to the work for the purpose of inspection thereof and 16 should CITY deem any remedial measure; to be necessary, CITY shall 17 notify the Road Commissioner of CO-WTY thereof. 7 III, Upon completion of the Project, CITY's share of the cost of sa4d- 19 A. System, -shall be based on the contract lump sum bid price for 20 said portion of the contract, and be in the ratio of the number of 21 traffic legs of highways under its jurisdiction to the total. number 22 of legs entering all of the signalized intersections within the 23 System limits, all as shoian more particularly on Exhibit "A", as 24 the city limits exist at the time the Board of Supervisors advertise 25 the contract for the Project. 26 B. Traffic signal and intersection lighting at Red Hill Avenue and 27 Warner Avenue shall be based on the contract lump seam bid price 28 for said portion of the contract, and be in the ratio of the num'oer 29 of traffic legs of the intersection lying within its jurisdiction to 3C� the total nurcoer of legs entering the intersection, all as more 31 particularly sho-w*n. on Exhibit "A", as the city limits exist at the 32 time the Board of Supervisors advertise the contract for the Project. I _2_ 173-473 I' i 12 13 14 15 161 171 19 20 21 22 23 24 25 26 27 28 29 30 31 32 V. CITY's share of design, survey and construct�.on '�rgineering costs shall be the actual costs accrued to the CIT, portion based on the percentage of the total contract unit costs billed to CITY. VI. Upon completion of the Project, COUNTY agrees to submit full, true and correct copies of documents, certificates and itemized bills to CITY and CITY shall reirnburse COTJWFf within ninety (90) days upon submission of startement of such costs for the CITY portion of the construction as defined by paragraphs IV, V, and VI hereof. Such bills shall be based on the actual quantities of construction and the contract bid prices, and shall include a charge for overhead on the engineering and inspection performed by COUNTY. VII. It is mutually understood that Project will be financed with TOPICS funds. CITY hereby authorizes transfer of $5,140 more or less in CITY TOPICS funds to COUNTY for 'CITY's TOPICS portion of Project. VIII. The total cost to CITY is presently estimated to be $7,130 and the total cost to CO-ONTY is presently estimated to be $27,370. IX. It is mutually agreed by the parties hereto that: A. COUT11TY shall maintain said System and P-11 traffic signls therein. B. The maintenance and operational costs for said System and traffic signal and intersection lighting installation shall be borne by the parties hereto in accordance with the terms of the traffic signal and highway lighting maintenance agreement No. 369-313. C. That neither COUNTY nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of any -thing done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, CITY shall fully indemnity and hold COUNTY harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of any -thing done or omitted to be done by CITY under or in connectic -3- FOS01118 173 473 R 1I 2i 3 .4 �I 71I 8i 9l lOj 11'ii 12'I 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 - 28 29 30 31 32 with any work, authority or jurisdiction delegated to CITY under this agreement. D. That neither CITY nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by COUNTY under or in connection with any work, authority or jurisdiction not delegated to CITY under this agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, Cou=- shall fully indemnify and hold CITY harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by COC71iTY under or in connection with any work, authority or jurisdiction not delegated to CITY under this agreement. IN WITNESS-WHMRE, CITY has caused this agreement to be executed by its Mayor FIRSO-1S 173-473 ' duly authorized by Minute Order or Resolution of the City Col.ncil and the Board of 2 Supervisors, respectively, on the date written opposite their signatures. 11 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 lU 19 20 21 22 23 24 25 26 27 28 29, 30 31 32 CITY OF SANTAANA, a municipal corporation By Mayor Dated:__ March 12 1973 ATTEST: -C-lork of—t—he Council COUNTY OF ORANCTIE a political subdivision of the State of California Dated: 1973 By Zt Chairm-a­�n,Band of Supervisots ATT,E2T: W. E. S T J C-Tv Clerk of the Board of Supervisors By 4* APPROVED AS TOrORM. James A. Withers City Attomey APPROVED AS TO FOE4- ADRIAN KUYPER, COUNTY CC)UNSE.F, ORANGE COUNTY, CALIFORNIA By -5- F850-13 173-473 E=IT 'TAfr ESTMATn COST Santa Location Item Tustin Ana, co'anty Total System Edinger Ave. to Install Inter- Ba-t-ranca Ave. connect Barranca Ave. Install Inter- connect equip. $1,000 $3,000 $4,000 Waxner Ave. Construct Traffic Signal - 3 Dial Coord. Unit and Decoder 5,200 $5,200 $20,800 $31,200 Sub Total $ 5,200 $6,200 $23,80o $352200 Contingencies & Engineering (15%) 780 930 3,570 5,280 Total $ 5,980 $7,130 $27,370 $4o,48o 7