HomeMy WebLinkAboutItem 20 - Agreement with BlueViolet for Security, Access Control, and Intercom Maintenance Public Works Agency
www.santa-ana.org/public-works
Item # 20
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
October 1, 2024
TOPIC: Security, Access Control, and Intercom System Maintenance Agreement
AGENDA TITLE
Agreement with BlueViolet for Security, Access Control, and Intercom Maintenance
(Non-General and General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute an agreement with BlueViolet to maintain
existing security, access control, and intercom systems for a three-year period
beginning October 1, 2024 through September 30, 2027, with one, two-year renewal
option, in an amount to exceed $208,195 (Agreement No. A-2024-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Public Works Agency’s Parks, Fleet and Facilities Division is responsible for
building maintenance, custodial maintenance, and oversight of security and access
systems in City facilities. Throughout the years, security access of City Hall, Ross
Annex, and the Corporate Yard has been enhanced to ensure the safety and security of
City personnel and property as it aligns with the City’s Policies and Procedures: City
Hall Security. The existing card reader system consists of AMAG hardware which
interfaces with AMAG Symmetry software. AMAG Symmetry hardware and software are
products that integrates with our operational systems. With the upcoming Main Library
and Newhope Library renovations, staff plans to augment security measures by
programming access control panels, card readers, and duress buttons with AMAG
hardware. These security systems and related devices require routine preventative
maintenance, monitoring, and repairs to ensure continuous, reliable, and uninterrupted
operations of the AMAG system. Costs include yearly AMAG Symmetry software, alarm
monitoring, duress monitoring, as-needed maintenance and repair, and one-time fees
for the commissioning and programming of the new Main Library and the Newhope
Library. The Main Library is estimated to open April 2026 and the Newhope Library is
estimated to open January 2026.
Santa Ana Ordinance No. NS-3041 authorizes the City to purchase against contracts
from any public agency employing a competitive bid process. Sourcewell, a cooperative
government purchasing agency awarded a contract to A3 Communications (Contract
Security, Access Control, and Intercom Maintenance Agreement
October 1, 2024
Page 2
4
5
6
9
No. 121923-A3C) as a result of open, competitive bidding on behalf of its members,
including government agencies. A3 Communications owns BlueViolet Networks which is
the Southern California company that would service the City of Santa Ana. BlueViolet
Networks is a full-service provider who supports clients with a staff of consultants,
project managers, trainers, and highly skilled, expert engineers. With over 40 years of
experience, they are certified to support the existing City of Santa Ana AMAG Symmetry
access control system
Staff recommends awarding a maintenance agreement to BlueViolet Networks to
maintain existing security, access control, and intercom systems for a three-year period
beginning October 1, 2024 through September 30, 2027, with one, two-year renewal
option, in an amount not to exceed $208,195.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Funding is available in the FY 2024-25 budget for this expenditure. Funding in Library –
Service Enhancement, Building & Building Improvements (01111017-66200) is
available from FY 2023-24, and will be presented to the City Council for approval of
carry forward to FY 2024-25 as part of the citywide carry forward process. Any
remaining balances not expended at the end of the fiscal year will be presented to City
Council for carry forward to FY 2025-26. Funds will be budgeted in future fiscal years for
City Council consideration.
Fiscal Year
Accounting
Unit - Account
#
Fund
Description Accounting Unit,
Account Description Amount
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$29,631
24-2025 01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$35,224
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$18,819
25-2026 01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$6,806
Security, Access Control, and Intercom Maintenance Agreement
October 1, 2024
Page 3
4
5
6
9
Fiscal Year
Accounting
Unit - Account
#
Fund
Description Accounting Unit,
Account Description Amount
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$18,819
26-2027 01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$18,150
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$2,26927-2028
(July-
September)01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$4,538
Optional Extension
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$16,55027-2028
(October-
June) 01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$13,613
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$18,819
28-2029 01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$18,150
07317100-
62320
Building
Maintenance
Building Maintenance,
Maintenance & Repair
Buildings & Ground
$2,269
29-2030 01111017-
66200
(22-1380)
General Fund
Library – Service
Enhancement, Buildings
& Building Improvements
$4,538
Total:$208,195
Security, Access Control, and Intercom Maintenance Agreement
October 1, 2024
Page 4
4
5
6
9
EXHIBIT(S)
1. Agreement with BlueViolet Networks
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency
Approved By: Alvaro Nuñez, City Manager
-1 -
Master Service Agreement
Serviced by Blueviolet/Lanmor Services.
EXHIBIT 1
- 2 -
Table of Contents
Introduction………………………………………………………………………………… 3
Service Overview…………………………………………………………………………..3
Business Hours and Response times...……………………………………………………..3
Pricing…………………………………………………………………………………….....4
Payment Terms……………………………………………………………………………..4
Service Request Process……………………………………………………………………4
Escalation Procedures………………………………………………………………………5
Blueviolet/Lanmor Contacts………………………………………………………………5
City of Santa Ana Contacts…………………………………………………..………….5
Replacement Parts.………………………………………………………..…………6
Training……………………………………………………………………………………...6
Approval Signatures………………………….……………………………………..………6
- 3 -
Introduction
1. This Master Service Agreement (MSA) is between the City of Santa Ana
and Blue Violet/Blueviolet/Lanmor Services (Blueviolet/Lanmor)
2. Blueviolet/Lanmor will provide City of Santa Ana installation and/or
equipment maintenance as identified in this MSA.
3. Blueviolet/Lanmor will use this MSA as a guide to insure standards are
followed during the installation and maintenance of City of Santa Ana
systems and equipment.
4. Blueviolet/Lanmor can provide burglary/fire monitoring for all sites that have
been visited to ensure proper installation and all zones verified
- 4 -
Service Overview
1. In California Blueviolet/Lanmor will use Blueviolet/Lanmor Technicians,
partner companies and subcontractors to provide the services as
requested by City of Santa Ana:
a) Maintenance service on existing burglary, access control and
intercom systems.
b) Installation of new burglary, access control systems,
intercom components and/or peripheral equipment
c) Burglary as agreed as defined in this agreement.
d) Project work in accordance with:
1. Statement of Work (SOW) agreed upon by both parties.
2. Service quote provided by Blueviolet/Lanmor and
accepted by City of Santa Ana.
3. Change Order requests for material changes to an
original quote or SOW and will be agreed upon by both
parties.
4. Documentation for the completed project as required and
appropriate.
2. Blueviolet/Lanmor warrants and represents that:
1. the person executing this MSA on its behalf is an agent
and/or an employee of Blueviolet/Lanmor and is
authorized to execute this MSA and act on behalf of
Blueviolet/Lanmor with respect to this MSA.
2. its employees, representatives, and others entering on
City of Santa Ana’ premises in the performance of
services under this MSA or in connection therewith,
shall at all times comply with any and all applicable
federal, state, county, and local laws, ordinances,
statutes, executive orders, rules, and regulations,
including but expressly not limited to those relating to
labor relations, fair employment practices, pay rates,
working conditions, safety and health, immigration
status and rights to obtain employment legally in the
United States.
3. its equipment and services provided under this MSA
shall be of good quality, and such equipment shall be
free of material defects, merchantable, and fit for the
particular purpose for which City of Santa Ana is
purchasing it.
4. Its equipment and services provided under this MSA
shall conform with the description and specifications set
forth in this MSA and any SOW.
_________________________________________________
- 5 -
Business Hours/Response Times
1. Blueviolet/Lanmors’ Regular Service hours are 7:00 a.m. to 4:00 p.m.
Monday – Friday, excluding holidays. Regular service requests will be
responded to on the next business day if the request is received by 2:00
pm.
(Holidays observed by Blueviolet/Lanmor are: New Year’s Day, President’s
Day, Martin Luther King Day, Good Friday, Memorial Day, Fourth of July,
Labor Day, Thanksgiving Day, Day After Thanksgiving and Christmas Day.)
2. At the specific request of City of Santa Ana, Blueviolet/Lanmor will provide
After Hours service for work required to be done outside the regular service
hours and will be billed at the After Hours rate.
3. Blueviolet/Lanmor will provide Emergency Service at the specific request of
City of Santa Ana only. Emergency Service may be billed at the After Hours
rate if the work is done in the After Hours time frame.
4. Upon mutual agreement of installation projects, specific dates and times
will be scheduled per that agreement. All service calls will be assessed a
$65.00 trip fee per call. If Blueviolet/Lanmor has multiple calls for a City of
Santa Ana site, then only one trip charge will apply.
Pricing
1. Service work and installation costs will be set as follows unless otherwise
agreed upon in a SOW or Quote:
a. Regular Service Rate
For all work performed during Regular Service Hours,
Blueviolet/Lanmor will charge an hourly rate of $210.00/hour including
travel time to the job site rounded to the nearest quarter hour for travel
time above 15 minutes. All service calls will be assessed at a $65.00
trip fee per call. If Blueviolet/Lanmor has multiple calls for other
customers in the same locale the trip charge will be waived.
Blueviolet/Lanmor will invoice according to the most recently provided
sub-contractor pricing for areas in which Blueviolet/Lanmors’ partners
are needed to complete work.
b. After hours and Emergency Service Rate
Blueviolet/Lanmor will bill at 1.5 times the “Regular Service” rate
including travel time to the job site rounded to the nearest quarter
hour for travel time above 15 minutes. Blueviolet/Lanmor will invoice
according to the most recently provided sub-contractor pricing for
areas in which Blueviolet/Lanmors’ partners are needed to complete
work
2. Monitoring of Alarms
Blueviolet/Lanmor now has the Monitoring contract for Burglary systems,
which is outlined in a separate Monitoring agreement.
- 6 -
Payment Terms
1. Terms
Invoices will be e-mailed to Nadia Orozco norozco5@santa-ana.org and
Phil Neff pneff@santa-ana.org, and cc: City Accounting email:_____________________ completion of
work. Each invoice will include a copy of the service ticket and details of labor hours, materials used,
shipping fees and travel time on the invoice(s). The terms will be Net 30 days. After 30 days late fees
may be assessed and any undisputed charges will accrue interest at the rate of one percent (5%) per
month. If any invoice becomes 60 days past due, Blueviolet/Lanmor reserves the right to suspend
service until the account is brought current. Blueviolet/Lanmor is responsible for timely invoicing for
work completed or materials delivered. Any invoices that are received by City of Santa Ana past 90
days of services will need to be reviewed by City of Santa Ana before payment may be made.
Service Request Process
1. City of Santa Ana receives service request calls from their end user.
2. If a call to Blueviolet/Lanmor is placed by a City of Santa Ana Employee
that is not listed on the City of Santa Ana Contact list, they will be
instructed by Blueviolet/Lanmor to Contact the City of Santa Ana
Facilities department for service.
3. City of Santa Ana will trouble shoot the issue and transmit a ticket if
necessary, to Blueviolet/Lanmor via e-mail, voicemail or by submitting an
online service ticket at www.Blueviolet/Lanmor.com or
Blueviolet/Lanmors’ Dispatch Center at service@Blueviolet/Lanmor.com
4. Service requests will include a Site Location Name, Address and Site Phone
Number. The service request will include a priority level of service, Emergency
Service or Regular Service. Blueviolet/Lanmors’ Dispatch Center will create a
ticket including a ticket number and will email City of Santa Ana with this
information and an ETA of service and will then dispatch a service technician.
5. When a ticket is completed, Blueviolet/Lanmors’ Dispatch Center will
generate a closeout e-mail notifying City of Santa Ana the status of
the service ticket.
6. Blueviolet/Lanmor will include a detailed statement of work performed on the
invoice
and a copy of the signed Service slip along with the invoice.
7. All Quotes requested by City of Santa Ana are considered time sensitive
and will be responded to in a timely manner by Blueviolet/Lanmor.
8. Installation scheduling of new installations will be coordinated by City of
Santa Ana and Blueviolet/Lanmor, which will include the dates and
times for the installation.
Escalation Procedures
1. Blueviolet/Lanmor is responsible for the escalation of daily service
Procedures and calls. Note: Periodically Blueviolet/Lanmor may accept
large projects or experience wide-spread client system outages that
require many of their resources to be fully utilized. Blueviolet/Lanmor will
notify City of Santa Ana within 24 hours of such a potential disruption to
regular service that response times may vary. In any case,
Blueviolet/Lanmor will make reasonable best efforts to continue to meet
regular response times.
2. Ongoing quality of work performed and Personnel issues will be
escalated to Blueviolet/Lanmors’ Sales Manager or Managers.
- 7 -
Blueviolet/Lanmor
Contacts
Blueviolet/Lanmor After Hours Dispatch Center (automated
call-center) After Hours (888) 445-9922
Courtland Russell – Service Coordinator
Office: 623-869-6864
x 1101
Cellular: 623-810-6871
Kip Cunningham – President
Office: 623-869-6864 x 1102
Cellular: 623-606-3519
Jordan Cunningham – Operations Manager
Office: 623-869-6864 x 2117
Cellular: 602-376-9328
Richard Carson – Account Manager
Office: 602-342-8822
Cellular: 480-915-3445
City of Santa Ana Contacts
Phil Neff – IT Department Administrator
Main Line: 714-719-2526
Email: PNeff@santa-ana.org
Nadia Orozco – Management Aide
Main Line: 714-647-3534
Cellular:
Email: norozco5@santa-ana.org
Account Meetings
Q
u
a
t
Blueviolet/Lanmor Services will meet quarterly to review the results of all service
calls and address any Preventative Maintenance service and review the
report of any items that need to be addressed. In addition, Blueviolet/Lanmor
Services will review all outstanding service tickets and all closed service
during the previous quarter. A follow up quarterly meeting document will be
provided to the City of Santa Ana within a week of quarterly review
summarizing all items reviewed in the quarterly meeting.
- 8 -
Training
1. End user Training will be performed by Blueviolet/Lanmor
Technicians unless otherwise requested by City of Santa
Ana.
2. Blueviolet/Lanmor will provide phone support for City of Santa Ana IT
and Facilities Management on newly installed Burglary and Access
Control systems.
- 9 -
Service Agreement Billable Annual Services
AMAG SSA
• SSA Contract Dates 1/1/2024* – 9/30/2025
Pricing (excluding any and all applicable taxes)……………………………………….$ 5,654.16
*Current SSA expired, price includes making SSA current and extending into 2025
Alarm Monitoring Annual Price
Pricing (excluding any and all applicable taxes)……………………………………….$ 780.00
Duress Button Testing Monitoring Annual Price
Pricing (excluding any and all applicable taxes)……………………………………….$ 2,423.90
Duress Buttons and AMAG Check Up Scope of Service
• Test the functionality of all duress buttons
• Program Alarm system to be in test mode
• Physically Test every duress button
• Log test in System Surveyor
• Review Log File from Alarm Monitoring center and confirm duress notification for each
device
• Note and issues with physical buttons and key releases
• Note any battery warnings
• Review AMAG Symmetry Logs for potential issues or error logs that have problems
• Back up the AMAG Database
• Create a log report with actions performed during the maintenance and document.
The customer is responsible for all database backups on any of the systems being maintained as part
of this agreement. Database backups are strongly encouraged, and Blueviolet/Lanmor Services will
work with the City of Santa Ana’s IT department for best practices with backing up an AMAG system.
Backup should be maintained offsite of at all possible.
OWNER TO PROVIDE:
• The City of Santa Ana’s IT department is to provide VPN remote access to
Blueviolet/Lanmor Services. This will allow Blueviolet/Lanmor Services the ability
to remotely diagnose issues and be better prepared when arriving onsite.
- 10
-
Service Agreement Billable Non Repeatable Services
City Santa Ana Discovery Access Control and Alarm Devices
Pricing (excluding any and all applicable taxes)……………………………………….$ 11,982.20
City of Santa Ana Main Library Commissioning and Programming
Pricing (excluding any and all applicable taxes)……………………………………….$ 19,734.96
City of Santa Ana New Hope Library Commissioning and Programming
Pricing (excluding any and all applicable taxes)……………………………………….$ 12,287.63
City agrees to pay, and BlueViolet agrees to accept as total payment for its services for City, the
rates and charges identified herein. The total amount authorized during the term of this
Agreement, including any extension periods, shall not exceed $208,195.00.
-11
-
Addendum: ADDITIONAL PROVISIONS TO BE ADDED
1.INDEMNIFICATION. Blueviolet/Lanmor hereby agrees to indemnify and save harmless City of Santa
Ana, its City Council, officers, officials, employees, volunteers, and agents from and against all liability
claims and demands on account of injury to persons, including death resulting therefrom, losses,
damages, expenses (including attorney’s fees), claims, demands, payment recoveries, judgments and
damage to property arising out of or caused in any manner by Blueviolet/Lanmors’ performance or the
failure to perform any work under this MSA by Blueviolet/Lanmor, Blueviolet/Lanmors’ products or
services, and Blueviolet/Lanmors’ employees, representatives, or agents. Blueviolet/Lanmor shall, at
its own expense, defend any and all actions at law brought against City of Santa Ana, its City Council,
2.officers, officials, employees, volunteers, and agents based thereon, shall pay all attorney’s fees and
all other expenses, and shall promptly discharge any judgments arising therefrom.
Blueviolet/Lanmors’ responsibility for damage to property or injury or death of persons includes,
without limitation upon the generality thereof, damage, injury or death caused in whole or in part by
any machine, tools, or equipment belonging to or furnished by City of Santa Ana and used by
Blueviolet/Lanmor or its subcontractors in the performance of this MSA, or caused by actions of any
employee, representative, or agent of City of Santa Ana while such person is acting under the
direction or control of Blueviolet/Lanmor or its subcontractors and in its behalf carrying out for it any
services to be performed under this MSA.
3.EMPLOYMENT PRACTICES
a.Blueviolet/Lanmor warrants that its employees, representatives, and others entering on City of
Santa Ana’ premises in the performance of services or in connection therewith, shall at all
times comply with any and all applicable federal, state, county, and local laws, ordinances,
statutes, executive orders, rules, and regulations, including but expressly not limited to those
relating to labor relations, fair employment practices, pay rates, working conditions, safety and
health, immigration status and rights to obtain employment legally in the United States.
b.Blueviolet/Lanmor agrees that all work performed by or at the direction of Blueviolet/Lanmor
hereunder shall be performed in compliance with the requirements of the Occupational Safety
and Health Act (OSHA) of 1970, as amended.
c.Blueviolet/Lanmor is an equal opportunity employer and Blueviolet/Lanmor agrees to hold City
of Santa Ana and their directors, officers, representatives and employees free and harmless of
and from, and defend and indemnify them against any and all claims or suits which may be
brought about in the matter of racial, sexual, and or any other type of discrimination with
regards to the employees of the Blueviolet/Lanmor.
d.Nothing contained in this MSA or otherwise shall be interpreted to create or establish any joint
employee relationship by and between City of Santa Ana and Blueviolet/Lanmor. All services
herein provided for shall be done and performed by Blueviolet/Lanmor and under the sole
supervision, direction and control of Blueviolet/Lanmor as an independent contractor. City of
Santa Ana shall look to Blueviolet/Lanmor for results only and shall have no right at any time
to direct or supervise Blueviolet/Lanmor or Blueviolet/Lanmor’s servants or employees in the
performance of Services or as to the manner, means and method by which Services are
performed. All workers furnished by Blueviolet/Lanmor pursuant to this MSA and all
representatives of Blueviolet/Lanmor shall be and remain the agents or employees of
Blueviolet/Lanmor or of Blueviolet/Lanmor’s subcontractor at all times and shall not at any time
or for any purpose whatsoever be employees or agents of City of Santa Ana.
-12
-
4.TERM
a.The term of this MSA (“Term”) shall commence on October 1, 2024 and continue for a three (3)
year period, with the option for the City to extend this Agreement by one (1), two (2) year
period upon a writing by the City Manager and City Attorney, unless canceled pursuant to
subsection (b) below.
b.City of Santa Ana shall have the right to cancel this MSA without cause by providing Blueviolet/
Lanmor thirty (30) days prior written notice.
5.INSURANCE
a.Additional Insured. City of Santa Ana, Its City Council, Affiliates, Employees, Agents and/or
Assignees shall be named as additional insured on Blueviolet/Lanmors’ policies for liability
insurance required hereunder and such liability policies shall be endorsed to make such
insurance primary to any liability insurance carried by City of Santa Ana or owner.
b.Waiver of Subrogation/Rights of Recovery. Blueviolet/Lanmors and its insurance carrier(s)
agree to waive all rights of subrogation/recovery against City, its City Council, officers, officials,
employees, and agents for losses paid under the terms of any policy arising from work
performed under this Agreement.
c.Certificates. Blueviolet/Lanmor shall furnish certificates of insurance evidencing the insurance
required hereunder and upon request shall furnish true copies of the actual policies. Each
certificate shall provide that thirty (30) days prior written notice shall be given to City of Santa
Ana in the event of cancellation or material change in the policies. In order to avoid delays in
commencing work, certificates and/or copies of policies shall be sent electronically to
norozco5@santa-ana.org.
d.Insurance Coverage. Blueviolet/Lanmor must maintain the following minimum insurance over
the duration of this MSA:
e.Worker's Compensation. Worker's Compensation and employer liability insurance, which shall
comply with the statutory requirements of the State of California or any other state where
services are performed and shall apply to all persons employed by Blueviolet/Lanmor.
f.Commercial General Liability Insurance. Commercial general liability insurance from a carrier
with a minimum Best rating of A (IX), including product liability (if applicable), contractual
liability and automobile liability with the following limits:
i.General bodily injury of not less than $2,000,000 for death or injury to one person and
$2,000,000 for death or injury to more than one person, and automobile bodily injury
liability of not less than 1,000,000 for death or injury to one person and $2,000,000 for
death or injury to more than one person, in any one occurrence.
ii.Property damage liability with limits of not less than $2,000,000 for general and
contractual liability and not less than $2,000,000 in relation to automobile liability for
property damage arising from any one occurrence.
6.GENERAL PROVISIONS
a.This MSA shall be deemed to have been executed by all parties and delivered to all parties
within the State of California, and the rights and obligations of the parties hereto shall be
construed and enforced in accordance with, and governed by, the substantive laws of the State
of California, without reference to conflict or choice of laws principles.
b.Any litigation arising out of or relating to this MSA shall be commenced and maintained in
-13
-
federal or state courts having subject matter jurisdiction located within the cities of Santa Ana,
Orange County, California, and not elsewhere. The parties hereby consent to personal
jurisdiction within Orange County, California, for the purpose of such litigation.
c.This MSA, and any SOWs executed pursuant to this MSA, constitutes the entire agreement
and understanding of the parties. This MSA or any term hereof may be changed, waived,
discharged or terminated only by an agreement in writing signed by the party again st whom
such change, waiver, discharge or termination is sought to be enforced.
d.Notices. Any notices necessary or provided for herein shall be sent to the parties by first class
United States registered or certified mail, postage prepaid, return receipt requested or hand -
delivered (including without limitation by overnight courier service) at the followin g addresses
or at such other address as a party may designate in writing:
To City of Santa Ana:
City of Santa Ana
Facilities Services
20 Civic Center Plaza,
Santa Ana, CA 92701
Attn: City Manager
To Blueviolet/Lanmor: Services
2058 W. Rose Garden Lane
Phoenix, AZ 85027
Attn: Kip Cunningham
e.If any one or more provisions contained in this MSA shall, for any reason, be held to be
invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceability
shall not affect any other provision of this MSA to the greatest exte nt practicable, but this MSA
shall be construed as if such invalid, illegal, or unenforceable provision had never been
contained herein.
f.No failure or delay by any party in exercising any right, power or privilege hereunder will
operate as a waiver thereof, nor will any single or partial exercise thereof preclude any other
or further exercise thereof or the exercise of any right, power or privilege. The rights and
remedies herein provided shall be cumulative and not exclusive of any rights or remedies
provided by law or equity.
---end of addenda---
-14
-
Approval Signatures
ATTEST:
Jennifer L. Hall
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: ____________________________
Jonathan Martinez
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
Nabil Saba
Executive Director
Public Works Agency
CITY OF SANTA ANA
Alvaro Nuñez
City Manager
Kip Cunningham
BLUEVIOLET NETWORKS
Nabil Saba Digitally signed by Nabil Saba
Date: 2024.09.19 08:42:32
-07'00'
Proposal # P-9585
The human connection between you and your technology.
Sep 19, 2024
Richard Carson
Aftermarket Account Representative
2058 W Rose Garden Ln
Phoenix, AZ 85027
RCarson@Lanmor.com
(719)332-9315
Nadia Orozco
Management Aide
City of Santa Ana
Public Works Agency - Parks, Fleet, & Facilities Services
20 Civic Center Plaza M-11
Santa Ana, CA 92701
norozco5@santa-ana.org
SCOPE OF WORK SUMMARY:
Blueviolet/Lanmor Services is being requested to provide a full review of the existing AMAG Symmetry access control system. This
process will detail all of the components currently installed throughout the City residing on the virtual AMAG Symmetry server.
Blueviolet/Lanmor Services will provide a detailed scope of work section sections based on the breakdown of the project. The
following is the list of scopes being presented in this proposal:
-Provide onsite technicians for up to 3 days.
-Site walk all buildings with access control
-Identify/Confirm all Panel locations
-Identify /Confirm all Door locations
-Identify/Confirm Wiring locations
-Identify/Confirm all Duress Buttons and Wireless Receivers
-Document all AMAG Panels with AMAG Programming Sheets (see attached example)
-Document Panels, Readers, Power Supplies and wire paths with System Surveyo r
-Provide Reports in both hard copy and PDF to client as documentation to the system.
PRICING SUMMARY:
Pricing (excluding any and all applicable taxes and excluding permits not clearly included or outlined in this
proposal)………………………………………………………………..………………..$ 11,982.20 Initial
Proposal # P-9585
The human connection between you and your technology.
Project Details
The City of Santa Ana is looking to purchase a service agreement for the ongoing servicing and repair of the AMAG
Symmetry Access Control system installed at the City of Santa Ana City Hall complex. This proposal is to provide a detail
site survey of the existing AMAG Symmetry system currently in pace with the City of Santa Ana. The site survey will
include the following processes.
Serviceable Locations Included in this Services Agreement:
City of Santa Ana City Hall
20 Civic Center Plaza
Santa Ana, CA 92701
City of Santa Ana Ross Annex
20 Civic Center Plaza
Santa Ana, CA 92701
City of Santa Ana Parking Structure
20 Civic Center Plaza
Santa Ana, CA 92701
City of Santa Ana Council Chamber
20 Civic Center Plaza
Santa Ana, CA 92701
City of Santa Ana 801 Building
801 N Flower St
Santa Ana, CA 92703
City of Santa Ana City Yard
220 S Daisy Ave
Santa Ana, CA 92703
Site Survey Process:
AMAG Controllers
• Identify/Confirm all AMAG Controllers
• Document location in System Surveyor
• Document Pictures in System Surveyor
• Document panel configuration in with AMAG Programming spreadsheet
Proposal # P-9585
The human connection between you and your technology.
AMAG Card Readers
• Identify/Confirm all AMAG Card Readers
• Document location in System Surveyor
• Document Pictures in System Surveyor
• Document Card Reader configuration in with AMAG Programming spreadsheet
. Power Supplies
• Identify/Confirm all Power Supplies
• Document location in System Surveyor
• Document Pictures in System Surveyor
• Document Battery Installation dates if available on batteries in System Surveyor
. Wire Runs
• Identify/Confirm all access control wiring at each panel
• Identify any wiring already completed, but not terminated and connected to door
• Document locations with wiring and no doors in System Surveyor
AMAG Duress Buttons and Wireless Receivers
• Identify/Confirm all AMAG Duress Buttons and wireless receivers
• Document location in System Surveyor
• Document Pictures in System Surveyor
• Document duress buttons configuration in with AMAG Programming spreadsheet
.
2N Intercom and Main Station
• Identify/Confirm all 2N Intercoms and Base Stations
• Document location in System Surveyor
• Document Pictures in System Surveyor
The customer is responsible for all database backups on any of the systems being maintained as part of this
agreement. Database backups are strongly encouraged, and Blueviolet/Lanmor Services will work with • The
City of Santa Ana’s IT department for best practices with backing up an AMAG system. Backup should be
maintained offsite of at all possible.
OWNER TO PROVIDE:
• The City of Santa Ana’s IT department is to provide VPN remote access to
Blueviolet/Lanmor Services. This will allow Blueviolet/Lanmor Services the ability to
remotely diagnose issues and be better prepared when arriving onsite.
Proposal # P-9585
The human connection between you and your technology.
RELEVANT EXPERIENCE
Blueviolet/Lanmor Services performs small security system installations such as a single card reader installation all the
way to corporate security deployments that involve installations in multiple states across the nation. Lanmor has installed
many access controls, CCTV, and alarm systems at/for various local healthcare organizations and have become their
preferred security vendor.
On a larger scale; we are currently working in conjunction with Sandia Laboratories and the Global Threat Reduction
Initiative team to upgrade the security systems at locations across the nation, which contain high levels of radioactive
material. We are also working with APS, a regional utility, to upgrade their security systems at multiple power plants and
substation locations to new federal regulations.
With our vast experience and knowledge, I am completely confident that we can meet and exceed your expectations!
CLARIFICATION(S)
1) Client to provide: 110vac power as well as (1) high speed internet line at the new control panel location.
2) Standard manufacturer’s lead times are listed below. Lead times are subject to change due to broken machinery,
seasonal ebbs & flows, weather and other unforeseen circumstances outside of Lanmor’s control. These lead
times are based on the return of all approved submittals and all answered questions. Lead times below are
accurate at the time of this proposal and may vary by the time the project is awarded and submittals approved.
Lanmor will not be responsible for missed schedule dates for reasons outside of our control.
2.1. Hollow Metal Frames 3-5 weeks.
Hollow Metal Doors 4-6 weeks.
Wood Doors 10-12 weeks.
Hardware 4-6 weeks.
3) Breaking apart ANY QUOTE will create a delay in material AND a cost add to project.
4) Upon approval of submittals, Blueviolet/Lanmor Services assumes no liability for changes, mistakes, or additions
which were not noted/redlined on the submittals. By approving the submittals, the approver acknowledges that all
is correct on the submittals unless otherwise noted/redlined. (if applicable). All other changes must be agreed to
in writing and executed by both parties.
5) Custom ordered materials (those that cannot be returned) must be paid for prior to Blueviolet/Lanmor Services
processing the order. The frames (and/or the doors) are (or are not) custom and require prepayment.
6) Unless otherwise noted on this proposal; the warranty period is one year for materials and ninety days for labor
from Blueviolet/Lanmor Services’ substantial completion of the project. Notice of a warranty claim must be
received by Blueviolet/Lanmor Services within the warranty period. The exclusive remedy under the warranty is
Blueviolet/Lanmor Services’ obligation to repair or replace any defective work, or at its election, compensate the
Owner or Contractor for the diminished value caused by Blueviolet/Lanmor Services’ work.
Proposal # P-9585
The human connection between you and your technology.
PROJECT MANAGEMENT
Upon being awarded this project, Lanmor will immediately assign a project manager to oversee this project from
beginning to end. It will be requested by Lanmor to have a “project kick-off” meeting in which all Contractor/Owner and
Lanmor staff involved will meet to introduce each other and to go over scheduling, requirements, and other details of this
project (can be completed via phone conference). The Lanmor project manager will supply the Contractor/Owner
representative all the necessary documentation as described in the deliverables and will be the first point of contact for
anything concerning this project.
EXCLUSIONS (unless specifically included above)
• Cutting, patching, and painting of existing walls.
• Grouting, caulking, Glazing or provisioning of any glass for Storefront entrances.
• Disconnect, reconnect, or relocation of plumbing, electrical, HVAC or other services.
• Painting and finishing of unfinished doors and frames.
• Framing, rough carpentry, and drywall required.
• Master keying of cylinders to existing key systems.
• Installation of customer furnished materials.
• Required building permits and authority having jurisdiction approval.
• Work scheduled after hours or weekends.
• Expedited shipping charges / Acceleration of installation schedule.
• Delay not directly caused by Blueviolet/Lanmor Services.
• Changes in scope, terms and conditions or schedule not covered in pricing.
• No back charges against Blueviolet/Lanmor Services without providing 72 hour written notice and an
opportunity to cure.
• Work area containment.
• 110v electrical.
• Extra costs of return trips are required due to inadequate preparation of the opening(s) prior to
installation. All openings must be ready for install.
• Permits of any kind.
• Any Lifts needed due to ceiling heights.
• Conduit and Raceways for necessary for connectivity.
REFERENCES
1. APS – Robert Griffith, Manager of Security Infrastructure, (602) 809-2306
2. Maricopa Integrated Health System – Michael Gallante, Chief of Security, (602) 509-5014
3. Transperfect – Wallace Michaelson, Director Infrastructure & Technology, (602) 281-0742
4. Sandia National Laboratories – Melanie Florez, Project Manager, (505) 845-0011
Proposal # P-9585
The human connection between you and your technology.
WARRANTY
Blueviolet/Lanmor Services warranties all product and software for a period of one year from partial and or complete
system activation. Labor for a period of 90 days from partial and or complete system activation. Notice of a warranty
claim must be received by Blueviolet/Lanmor Services within the warranty period. The exclusive remedy under the
warranty is Blueviolet/Lanmor Services’ obligation to repair or replace any defective work, or at its election, compensate
the Owner or Contractor for the diminished value caused by Blueviolet/Lanmor Services’ work.
TERMS & CONDITIONS
If accepted, all prior or contemporaneous negotiations or agreements are merged into this Proposal. No future agreements
supersede or modifies this Proposal unless such future agreement expressly modifies one or more particular term of this
Proposal and such modification is in writing and executed by both parties. This quotation is good for 30 days from the
date listed at the top of this proposal. Conditional upon buyers’ credit, 50% of the contract amount will be due with the
acceptance of this agreement and prior to any material being purchased and the issuance of the customers purchase order.
The remaining will be due 30 days from the date of our invoice(s).
Accepted by: Title: Date:
____________________________________ _________________________________ __________________
Proposal # P-9586
The human connection between you and your technology.
Sep 18, 2024
Richard Carson
Aftermarket Account Representative
2058 W Rose Garden Ln
Phoenix, AZ 85027
RCarson@Lanmor.com
(719)332-9315
Nadia Orozco
Management Aide
City of Santa Ana
Public Works Agency - Parks, Fleet, & Facilities Services
20 Civic Center Plaza M-11
Santa Ana, CA 92701
norozco5@santa-ana.org
SCOPE OF WORK SUMMARY:
Blueviolet/Blueviolet/Lanmor Services is being requested to program the new Library AMAG Symmetry access control panels, card
readers and duress buttons. This is for the new Main Library remodel project. The panels, card readers, duress buttons and wiring
will all be completed by a third-party contractor and electrical sub.
The work is to be performed at the following location:
• 26 Civic Center Plaza, Santa Ana, CA 92701
Blueviolet/Blueviolet/Lanmor Services will provide a detailed scope of work section sections based on the breakdown of the
project. The following is the list of scopes being presented in this proposal:
- Connect AMAG Panels to the City Network
- Program Panels on City network and follow City Naming Schemes with panel ID’s
- Program Card Readers and follow City Schemes with Card Reader id’s
- Program Duress Buttons and follow City Schemes with Card Reader id’s
- Provide onsite technicians for up to 4 days.
- Document all AMAG Panels with AMAG Programming Sheets (see attached example)
- Document Panels, Readers, Power Supplies and wire paths with System Surveyo r
- Provide Reports in both hard copy and PDF to client as documentation to the system.
PRICING SUMMARY:
Pricing (excluding any and all applicable taxes and excluding permits not clearly included or outlined in this
proposal)………………………………………………………………..………………..$ 19,734.96 Initial
Proposal # P-9586
The human connection between you and your technology.
Project Details
Job Details
AMAG Software
Blueviolet/Blueviolet/Lanmor Services will utilizing the existing instance of the AMAG Symmetry software on the client
supplied and configured virtual server. Blueviolet/Lanmor Services will require remote access to this system during the
installation phase of the project. Blueviolet/Lanmor Services would request ongoing remote access to best handle
support issues after the initial project installation. This can be managed by the City’s IT department.
Blueviolet/Lanmor Services will install One AMAG client on a City provided computer at the Library facility. The AMAG
software client will be supplied by others.
Site Locations
The following locations are being converted to the new AMAG access control system:
- City of Santa Ana Library
See the attached project door schedule for details on each reader location . It is the responsibility of the contract and
electrical sub contractor to provide details of the AMAG door controllers, card reader, duress buttons and door release
devices. If this is not provided, Lanmor Service will provide a change order for additional time to identify these areas and
confirm locations based on construction drawings and be billed as time and materials.
Door Controllers
Blueviolet/Lanmor Services will be programming the new AMAG Door controllers. Lanmor service will follow the naming
schemes currently in place with the City of Santa Ana at the City Hall locations.
Elevator Controllers
Blueviolet/Lanmor Services will be programming elevator controllers for the elevator bank. Blueviolet/Lanmor Services
will handle the controller programming and setup, which will be confirmed by a walk with the elevator company, Risk
Management and Building Facilities and IT department.
Elevator controller Exclusions/Elevator Company, Contractor and Electrical Sub Contractor responsibilities:
- Elevator company to supply wire and wire run /conduit to the elevator controller. This connection will require a
pair of wires per floor being controlled by the elevator controller.
- Elevator company to provide the wires from the elevator cab via the traveler path to the cab. Blueviolet/Lanmor
Services will need the following to each of the elevator cabs:
o 2 Pair Non-Shielded
o 1 Pair Shielded
- Elevator company to provide location for the mounting of the card reader in each cab.
- Elevator company to provide technician support during the initial installation process and the commissioning
process of the system.
- If elevator personnel are not available for the required onsite time, Blueviolet/Lanmor Services will provide a
change order to handle additional labor and travel time.
- All wiring and connections are to be in place prior to the configuration and programming of the AMAG elevator
control panel.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Proposal # P-9586
The human connection between you and your technology.
Power Supplies
Blueviolet/Lanmor Services will be utilizing new power supplies at each of the controller locations. Which will include new
batteries for battery backup. All connections to the power supplies will already be completed and tested prior to the start
of programming the AMAG controllers.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Readers
Blueviolet/Lanmor Services will be programming new readers in the City’s AMAG Symmetry system. Lanmor service will
follow the naming schemes currently in place with the City of Santa Ana at the City Hall locations.
All connections to the card readers will already be completed and tested prior to the start of programming the AMAG
controllers.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
.
Cabling
Blueviolet/Lanmor Services will be utilizing cabling provided and installed by others. The contractor is responsible for
providing wire details and wire run locations to Lanmor prior to the beginning of programming. All wires will need to
properly be labelled at each controller.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Training
Blueviolet/Lanmor Services will not be providing any training with this project. Blueviolet/Lanmor Services will provide all
programming sheets with door names for the City to handle the AMAG Symmetry programming door schedules and
assigning groups. The City will be responsible for adding the library employees into the system as well.
Networking Requirements
Blueviolet/Lanmor Services will require the City of Santa Ana IT’s department to provide data connections for each of the
new door controller locations. These have been labeled on the attached maps. Blueviolet/Lanmor Services will utilize the
existing cable runs to the security switches.
The IT department is responsible for providing the IP address mapping for each door controller. It is Lanmor Service’s
responsibility to provide the IT department with the MAC addresses for each new controller prior to the beginning of the
installation. Blueviolet/Lanmor Services will configure the door controllers, which will allow the IT department to map the
correct IP address to each device. The City’s IT department will have the final approval on all IDF room connections. It is
the responsibility of the customer to confirm IDF connections via the attached drawings. Any changes to the IDF locations
after the acceptance of the project may require a change order for addition labor to increase the wire runs.
Blueviolet/Lanmor Services has been provided with the contact information for Mike Fetner (mfetner@santa-ana.org) and
Greg Dunham (gdunham@santa-ana.org) as points of contacts with all IT related questions.
Proposal # P-9586
The human connection between you and your technology.
Door Programming Process
Prior to programming the new doors to new system, Blueviolet/Lanmor Services will test and ensure that the new doors
are operational and perform the basic access control operations.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Duress Buttons Programming
Blueviolet/Lanmor Services will be programming the new duress buttons to operate and notify local authorities. Prior to
programming the duress buttons to the new system, Blueviolet/Lanmor Services will test and ensure that the existing
alarm panel is able to provide signals to the monitoring center and all wiring from the AMAG A/O boards have been
connected and the associated alarm panel replays. The contractor is responsible for providing these details to
Blueviolet/Lanmor Services prior to the start of programming.
Blueviolet/Lanmor Services will need to be added to the alarm programming contact list which will allow Blueviolet/Lanmor
Services the ability to program commission this process.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Proposal # P-9586
The human connection between you and your technology.
Project Commissioning
New Door Operation Commissioning process:
• Confirm new reader is programmed in access control system
• Confirm new Status contact functionality
o Closed Status
o Open Status
o Forced Open Status
• Request for Exit
o Confirm Request for exit functionality
▪ Exit door and check AMAG log for valid functionality
• Card Reader
o Confirm card read of a valid credential
o Confirm negative card read of invalid credentials
• Locking Hardware
o Confirm mechanical operation of new locks
o Confirm electrical operation of lock with valid card read
o Confirm manual override with key operation
• Power Connection
o Confirm hinge or armored cable is properly installed and functioning
• Customers sign off
New Duress Button Commissioning process:
• Confirm new duress button is programmed in access control system
• Confirm duress buttons signals AMAG system
• Confirm Duress buttons signal local authorities
• Confirm Key reset works
New Door Controller Commissioning process:
• Confirm new controller is programmed in access control system
• Label all wires and Card reader ports
• Label New Controller with proper AMAG Chain naming scheme
• Document with pictures of Controller Installation location
• Batteries
o Label Batteries with installation date
o Load test batteries and label with install date
• Label Enclosure with proper naming scheme and enclosure contents
• Document with pictures of Controller Installation location
• Customers sign off
Proposal # P-9586
The human connection between you and your technology.
Fire Connection
This proposal does not include any fire alarm tie ins to the existing fire alarm system
.Project Management Included
Information distribution assistance, notification support, project scheduling, training coordination, onsite live support and
follow up cut over to Blueviolet/Blueviolet/Lanmor Services service department.
OWNER TO PROVIDE:
• The City of Santa Ana’s IT department is to provide VPN remote access to
Blueviolet/Blueviolet/Lanmor Services. This will allow Blueviolet/Blueviolet/Lanmor
Services the ability to remotely diagnose issues and be better prepared when arriving
onsite.
Proposal # P-9586
The human connection between you and your technology.
RELEVANT EXPERIENCE
Blueviolet/Blueviolet/Lanmor Services performs small security system installations such as a single card reader
installation all the way to corporate security deployments that involve installations in multiple states across the nation.
Lanmor has installed many access controls, CCTV, and alarm systems at/for various local healthcare organizations and
have become their preferred security vendor.
On a larger scale; we are currently working in conjunction with Sandia Laboratories and the Global Threat Reduction
Initiative team to upgrade the security systems at locations across the nation, which contain high levels of radioactive
material. We are also working with APS, a regional utility, to upgrade their security systems at multiple power plants and
substation locations to new federal regulations.
With our vast experience and knowledge, I am completely confident that we can meet and exceed your expectations!
CLARIFICATION(S)
1) Client to provide: 110vac power as well as (1) high speed internet line at the new control panel location.
2) Standard manufacturer’s lead times are listed below. Lead times are subject to change due to broken machinery,
seasonal ebbs & flows, weather and other unforeseen circumstances outside of Lanmor’s control. These lead
times are based on the return of all approved submittals and all answered questions. Lead times below are
accurate at the time of this proposal and may vary by the time the project is awarded and submittals approved.
Lanmor will not be responsible for missed schedule dates for reasons outside of our control.
2.1. Hollow Metal Frames 3-5 weeks.
Hollow Metal Doors 4-6 weeks.
Wood Doors 10-12 weeks.
Hardware 4-6 weeks.
3) Breaking apart ANY QUOTE will create a delay in material AND a cost add to project.
4) Upon approval of submittals, Blueviolet/Blueviolet/Lanmor Services assumes no liability for changes, mistakes,
or additions which were not noted/redlined on the submittals. By approving the submittals, the approver
acknowledges that all is correct on the submittals unless otherwise noted/redlined. (if applicable). All other
changes must be agreed to in writing and executed by both parties.
5) Custom ordered materials (those that cannot be returned) must be paid for prior to Blueviolet/Blueviolet/Lanmor
Services processing the order. The frames (and/or the doors) are (or are not) custom and require prepayment.
6) Unless otherwise noted on this proposal; the warranty period is one year for materials and ninety days for labor
from Blueviolet/Blueviolet/Lanmor Services’ substantial completion of the project. Notice of a warranty claim
must be received by Blueviolet/Blueviolet/Lanmor Services within the warranty period. The exclusive remedy
under the warranty is Blueviolet/Blueviolet/Lanmor Services’ obligation to repair or replace any defective work,
or at its election, compensate the Owner or Contractor for the diminished value caused by
Blueviolet/Blueviolet/Lanmor Services’ work.
Proposal # P-9586
The human connection between you and your technology.
PROJECT MANAGEMENT
Upon being awarded this project, Lanmor will immediately assign a project manager to oversee this project from
beginning to end. It will be requested by Lanmor to have a “project kick-off” meeting in which all Contractor/Owner and
Lanmor staff involved will meet to introduce each other and to go over scheduling, requirements, and other details of this
project (can be completed via phone conference). The Lanmor project manager will supply the Contractor/Owner
representative all the necessary documentation as described in the deliverables and will be the first point of contact for
anything concerning this project.
EXCLUSIONS (unless specifically included above)
• Cutting, patching, and painting of existing walls.
• Grouting, caulking, Glazing or provisioning of any glass for Storefront entrances.
• Disconnect, reconnect, or relocation of plumbing, electrical, HVAC or other services.
• Painting and finishing of unfinished doors and frames.
• Framing, rough carpentry, and drywall required.
• Master keying of cylinders to existing key systems.
• Installation of customer furnished materials.
• Required building permits and authority having jurisdiction approval.
• Work scheduled after hours or weekends.
• Expedited shipping charges / Acceleration of installation schedule.
• Delay not directly caused by Blueviolet/Blueviolet/Lanmor Services.
• Changes in scope, terms and conditions or schedule not covered in pricing.
• No back charges against Blueviolet/Blueviolet/Lanmor Services without providing 72 hour written notice
and an opportunity to cure.
• Work area containment.
• 110v electrical.
• Extra costs of return trips are required due to inadequate preparation of the opening(s) prior to
installation. All openings must be ready for install.
• Permits of any kind.
• Any Lifts needed due to ceiling heights.
• Conduit and Raceways for necessary for connectivity.
REFERENCES
1. APS – Robert Griffith, Manager of Security Infrastructure, (602) 809-2306
2. Maricopa Integrated Health System – Michael Gallante, Chief of Security, (602) 509-5014
3. Transperfect – Wallace Michaelson, Director Infrastructure & Technology, (602) 281-0742
4. Sandia National Laboratories – Melanie Florez, Project Manager, (505) 845-0011
WARRANTY
Blueviolet/Blueviolet/Lanmor Services warranties all product and software for a period of one year from partial and or
complete system activation. Labor for a period of 90 days from partial and or complete system activation. Notice of a
warranty claim must be received by Blueviolet/Blueviolet/Lanmor Services within the warranty period. The exclusive
remedy under the warranty is Blueviolet/Blueviolet/Lanmor Services’ obligation to repair or replace any defective work,
Proposal # P-9586
The human connection between you and your technology.
or at its election, compensate the Owner or Contractor for the diminished value caused by Blueviolet/Blueviolet/Lanmor
Services’ work.
TERMS & CONDITIONS
If accepted, all prior or contemporaneous negotiations or agreements are merged into this Proposal. No future agreements
supersede or modifies this Proposal unless such future agreement expressly modifies one or more particular term of this
Proposal and such modification is in writing and executed by both parties. This quotation is good for 30 days from the
date listed at the top of this proposal. Conditional upon buyers’ credit, 50% of the contract amount will be due with the
acceptance of this agreement and prior to any material being purchased and the issuance of the customers purchase order.
The remaining will be due 30 days from the date of our invoice(s).
Accepted by: Title: Date:
____________________________________ _________________________________ __________________
Proposal # P-9587
The human connection between you and your technology.
Sep 18, 2024
Richard Carson
Aftermarket Account Representative
2058 W Rose Garden Ln
Phoenix, AZ 85027
RCarson@Lanmor.com
(719)332-9315
Nadia Orozco
Management Aide
City of Santa Ana
Public Works Agency - Parks, Fleet, & Facilities Services
20 Civic Center Plaza M-11
Santa Ana, CA 92701
norozco5@santa-ana.org
SCOPE OF WORK SUMMARY:
Blueviolet/Lanmor Services is being requested to program the Newhope Library AMAG Symmetry access control panels, card readers
and duress buttons. This is for the Newhope Library remodel project. The panels, card readers, duress buttons and wiring will all be
completed by a third-party contractor and electrical sub.
The work is to be performed at the following location:
• 122 N Newhope St, Santa Ana, CA 92703
Blueviolet/Lanmor Services will provide a detailed scope of work section sections based on the breakdown of the project. The
following is the list of scopes being presented in this proposal:
- Connect AMAG Panels to the City Network
- Program Panels on City network and follow City Naming Schemes with panel ID’s
- Program Card Readers and follow City Schemes with Card Reader id’s
- Program Duress Buttons and follow City Schemes with Card Reader id’s
- Provide onsite technicians for up to 4 days.
- Document all AMAG Panels with AMAG Programming Sheets (see attached example)
- Document Panels, Readers, Power Supplies and wire paths with System Surveyo r
- Provide Reports in both hard copy and PDF to client as documentation to the system.
PRICING SUMMARY:
Pricing (excluding any and all applicable taxes and excluding permits not clearly included or outlined in this
proposal)………………………………………………………………..………………..$ 12,287.63 Initial
Proposal # P-9587
The human connection between you and your technology.
Project Details
Job Details
AMAG Software
Blueviolet/Lanmor Services will utilizing the existing instance of the AMAG Symmetry software on the client supplied and
configured virtual server. Blueviolet/Lanmor Services will require remote access to this system during the installation
phase of the project. Blueviolet/Lanmor Services would request ongoing remote access to best handle support issues
after the initial project installation. This can be managed by the City’s IT department.
Blueviolet/Lanmor Services will install One AMAG client on a City provided computer at the Library facility. The AMAG
software client will be supplied by others.
Site Locations
The following locations are being converted to the new AMAG access control system:
- City of Santa Ana Library
See the attached project door schedule for details on each reader location . It is the responsibility of the contract and
electrical sub contractor to provide details of the AMAG door controllers, card reader, duress buttons and door release
devices. If this is not provided, Lanmor Service will provide a change order for additional time to identify these areas and
confirm locations based on construction drawings and be billed as time and materials.
Door Controllers
Blueviolet/Lanmor Services will be programming the new AMAG Door controllers. Lanmor service will follow the naming
schemes currently in place with the City of Santa Ana at the City Hall locations.
Power Supplies
Blueviolet/Lanmor Services will be utilizing new power supplies at each of the controller locations. Which will include new
batteries for battery backup. All connections to the power supplies will already be completed and tested prior to the start
of programming the AMAG controllers.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Readers
Blueviolet/Lanmor Services will be programming new readers in the City’s AMAG Symmetry system. Lanmor service will
follow the naming schemes currently in place with the City of Santa Ana at the City Hall locations.
All connections to the card readers will already be completed and tested prior to the start of programming the AMAG
controllers.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
.
Cabling
Blueviolet/Lanmor Services will be utilizing cabling provided and installed by others. The contractor is responsible for
providing wire details and wire run locations to Lanmor prior to the beginning of programming. All wires will need to
properly be labelled at each controller.
Proposal # P-9587
The human connection between you and your technology.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Training
Blueviolet/Lanmor Services will not be providing any training with this project. Blueviolet/Lanmor Services will provide all
programming sheets with door names for the City to handle the AMAG Symmetry programming door schedules and
assigning groups. The City will be responsible for adding the library employees into the system as well.
Networking Requirements
Blueviolet/Lanmor Services will require the City of Santa Ana IT’s department to provide data connections for each of the
new door controller locations. These have been labeled on the attached maps. Blueviolet/Lanmor Services will utilize the
existing cable runs to the security switches.
The IT department is responsible for providing the IP address mapping for each door controller. It is Lanmor Service’s
responsibility to provide the IT department with the MAC addresses for each new controller prior to the beginning of the
installation. Blueviolet/Lanmor Services will configure the door controllers, which will allow the IT department to map the
correct IP address to each device. The City’s IT department will have the final approval on all IDF room connections. It is
the responsibility of the customer to confirm IDF connections via the attached drawings. Any changes to the IDF locations
after the acceptance of the project may require a change order for addition labor to increase the wire runs.
Blueviolet/Lanmor Services has been provided with the contact information for Mike Fetner (mfetner@santa-ana.org) and
Greg Dunham (gdunham@santa-ana.org) as points of contacts with all IT related questions.
Door Programming Process
Prior to programming the new doors to new system, Blueviolet/Lanmor Services will test and ensure that the new doors
are operational and perform the basic access control operations.
If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a
change order to handle the additional work. This will be handled with a change order at time and materials billing.
Duress Buttons Programming
Plans do not show any duress buttons for the location. If this is added, Blueviolet/Lanmor Services can provide a change
order to cover the duress button programming and commissioning.
Proposal # P-9587
The human connection between you and your technology.
Project Commissioning
New Door Operation Commissioning process:
• Confirm new reader is programmed in access control system
• Confirm new Status contact functionality
o Closed Status
o Open Status
o Forced Open Status
• Request for Exit
o Confirm Request for exit functionality
▪ Exit door and check AMAG log for valid functionality
• Card Reader
o Confirm card read of a valid credential
o Confirm negative card read of invalid credentials
• Locking Hardware
o Confirm mechanical operation of new locks
o Confirm electrical operation of lock with valid card read
o Confirm manual override with key operation
• Power Connection
o Confirm hinge or armored cable is properly installed and functioning
• Customers sign off
New Door Controller Commissioning process:
• Confirm new controller is programmed in access control system
• Label all wires and Card reader ports
• Label New Controller with proper AMAG Chain naming scheme
• Document with pictures of Controller Installation location
• Batteries
o Label Batteries with installation date
o Load test batteries and label with install date
• Label Enclosure with proper naming scheme and enclosure contents
• Document with pictures of Controller Installation location
• Customers sign off
Proposal # P-9587
The human connection between you and your technology.
Fire Connection
This proposal does not include any fire alarm tie ins to the existing fire alarm system
.Project Management Included
Information distribution assistance, notification support, project scheduling, training coordination, onsite live support and
follow up cut over to Blueviolet/Lanmor Services service department.
OWNER TO PROVIDE:
• The City of Santa Ana’s IT department is to provide VPN remote access to
Blueviolet/Lanmor Services. This will allow Blueviolet/Lanmor Services the ability to
remotely diagnose issues and be better prepared when arriving onsite.
Proposal # P-9587
The human connection between you and your technology.
RELEVANT EXPERIENCE
Blueviolet/Lanmor Services performs small security system installations such as a single card reader installation all the
way to corporate security deployments that involve installations in multiple states across the nation. Lanmor has installed
many access controls, CCTV, and alarm systems at/for various local healthcare organizations and have become their
preferred security vendor.
On a larger scale; we are currently working in conjunction with Sandia Laboratories and the Global Threat Reduction
Initiative team to upgrade the security systems at locations across the nation, which contain high levels of radioactive
material. We are also working with APS, a regional utility, to upgrade their security systems at multiple power plants and
substation locations to new federal regulations.
With our vast experience and knowledge, I am completely confident that we can meet and exceed your expectations!
CLARIFICATION(S)
1) Client to provide: 110vac power as well as (1) high speed internet line at the new control panel location.
2) Standard manufacturer’s lead times are listed below. Lead times are subject to change due to broken machinery,
seasonal ebbs & flows, weather and other unforeseen circumstances outside of Lanmor’s control. These lead
times are based on the return of all approved submittals and all answered questions. Lead times below are
accurate at the time of this proposal and may vary by the time the project is awarded and submittals approved.
Lanmor will not be responsible for missed schedule dates for reasons outside of our control.
2.1. Hollow Metal Frames 3-5 weeks.
Hollow Metal Doors 4-6 weeks.
Wood Doors 10-12 weeks.
Hardware 4-6 weeks.
3) Breaking apart ANY QUOTE will create a delay in material AND a cost add to project.
4) Upon approval of submittals, Blueviolet/Lanmor Services assumes no liability for changes, mistakes, or additions
which were not noted/redlined on the submittals. By approving the submittals, the approver acknowledges that all
is correct on the submittals unless otherwise noted/redlined. (if applicable). All other changes must be agreed to
in writing and executed by both parties.
5) Custom ordered materials (those that cannot be returned) must be paid for prior to Blueviolet/Lanmor Services
processing the order. The frames (and/or the doors) are (or are not) custom and require prepayment.
6) Unless otherwise noted on this proposal; the warranty period is one year for materials and ninety days for labor
from Blueviolet/Lanmor Services’ substantial completion of the project. Notice of a warranty claim must be
received by Blueviolet/Lanmor Services within the warranty period. The exclusive remedy under the warranty is
Blueviolet/Lanmor Services’ obligation to repair or replace any defective work, or at its election, compensate the
Owner or Contractor for the diminished value caused by Blueviolet/Lanmor Services’ work.
Proposal # P-9587
The human connection between you and your technology.
PROJECT MANAGEMENT
Upon being awarded this project, Lanmor will immediately assign a project manager to oversee this project from
beginning to end. It will be requested by Lanmor to have a “project kick-off” meeting in which all Contractor/Owner and
Lanmor staff involved will meet to introduce each other and to go over scheduling, requirements, and other details of this
project (can be completed via phone conference). The Lanmor project manager will supply the Contractor/Owner
representative all the necessary documentation as described in the deliverables and will be the first point of contact for
anything concerning this project.
EXCLUSIONS (unless specifically included above)
• Cutting, patching, and painting of existing walls.
• Grouting, caulking, Glazing or provisioning of any glass for Storefront entrances.
• Disconnect, reconnect, or relocation of plumbing, electrical, HVAC or other services.
• Painting and finishing of unfinished doors and frames.
• Framing, rough carpentry, and drywall required.
• Master keying of cylinders to existing key systems.
• Installation of customer furnished materials.
• Required building permits and authority having jurisdiction approval.
• Work scheduled after hours or weekends.
• Expedited shipping charges / Acceleration of installation schedule.
• Delay not directly caused by Blueviolet/Lanmor Services.
• Changes in scope, terms and conditions or schedule not covered in pricing.
• No back charges against Blueviolet/Lanmor Services without providing 72 hour written notice and an
opportunity to cure.
• Work area containment.
• 110v electrical.
• Extra costs of return trips are required due to inadequate preparation of the opening(s) prior to
installation. All openings must be ready for install.
• Permits of any kind.
• Any Lifts needed due to ceiling heights.
• Conduit and Raceways for necessary for connectivity.
REFERENCES
Proposal # P-9587
The human connection between you and your technology.
1. APS – Robert Griffith, Manager of Security Infrastructure, (602) 809-2306
2. Maricopa Integrated Health System – Michael Gallante, Chief of Security, (602) 509-5014
3. Transperfect – Wallace Michaelson, Director Infrastructure & Technology, (602) 281-0742
4. Sandia National Laboratories – Melanie Florez, Project Manager, (505) 845-0011
WARRANTY
Blueviolet/Lanmor Services warranties all product and software for a period of one year from partial and or complete
system activation. Labor for a period of 90 days from partial and or complete system activation. Notice of a warranty
claim must be received by Blueviolet/Lanmor Services within the warranty period. The exclusive remedy under the
warranty is Blueviolet/Lanmor Services’ obligation to repair or replace any defective work, or at its election, compensate
the Owner or Contractor for the diminished value caused by Blueviolet/Lanmor Services’ work.
TERMS & CONDITIONS
If accepted, all prior or contemporaneous negotiations or agreements are merged into this Proposal. No future agreements
supersede or modifies this Proposal unless such future agreement expressly modifies one or more particular term of this
Proposal and such modification is in writing and executed by both parties. This quotation is good for 30 days from the
date listed at the top of this proposal. Conditional upon buyers’ credit, 50% of the contract amount will be due with the
acceptance of this agreement and prior to any material being purchased and the issuance of the customers purchase order.
The remaining will be due 30 days from the date of our invoice(s).
Accepted by: Title: Date:
____________________________________ _________________________________ __________________
Programming Loading Sheet for AMAG
Expansion Boards Panel Types
Customer Name M2150 8 DC M2150 8 DBC
Site Location Name M2150 4 DC M2150 4 DBC
Site Address M2150 2 DC M2150 2 DBC
Panel Type M2150 DBU
Panel Serial Number EN-1DBC
Panel Mac Address Qty EN-2DBC
Panel Firmware
Are there Wim Modules for Weigand
Panel Location
Panel Address
Panel IP Address
Panel Subnet
Panel Gateway
Qty
Are there any onboard AC 8/4 Input Modules No
Are there any Onboard OC 4/8 Ouput Modules No
Control Panel 8DBC, 4DBC, 2 DBC, Circle One
Board Address Reader Number Chain,
Controller, Board, Port
X.X.X.X
Reader
Model /
Part
Number
Does reader
have keypad,
biometric or
NA
Door Contact (Y/N)REX
(Y/N)
Shunt on REX
(Y/N)
Unlock on REX
(Y/N)
Lock Type
(strike/EL/CB/
Maglock)
Unlock on Fire
Release
(Y/N)
Bypass Connected
Bypass Relay #,
Chain,
Controller,
Board, Port
X.X.X.X-BYP
Onboard
Input Board
INPT OUTPUT
#, Chain,
Controller,
Board, Port
X.X.X.X
Device Type: Panic,
Door Contact,
Motion sensor,
Unlock Button,
Control Relay
Name
Reader Name:__.__.__.1 939S Blue tooth Y Y Y N EL No Input __.__.__.1
Reader Name:__.__.__.2 939S Blue tooth Y Y Y N EL No Input __.__.__.2
Reader Name:__.__.__.3 939S Blue tooth Y Y Y N EL No Input __.__.__.3
Reader Name:__.__.__.4 RP40 NO Y Y Y N EL No Input __.__.__.4
Reader Name:__.__.__.5 RP40 NO Y Y Y N EL No Input __.__.__.5
Reader Name:__.__.__.6 RP40 NO Y Y Y N EL No Input __.__.__.6
Reader Name:__.__.__.7 RP40 NO Y Y Y N EL No Input __.__.__.7
Reader Name:__.__.__.8 RP40 NO Y Y Y N EL No Input __.__.__.8
Output __.__.__.1
Output __.__.__.2
Output __.__.__.3
Output __.__.__.4
Expansion Boards 8DC, 4 DC 2 DC
Board Address Reader Number Chain,
Controller, Board, Port
X.X.X.X
Reader
Model /
Part
Number
Does reader
have keypad,
biometric or
NA
Door Contact (Y/N)REX
(Y/N)
Shunt on REX
(Y/N)
Unlock on REX
(Y/N)
Lock Type
(strike/EL/CB/
Maglock)
Unlock on Fire
Release
(Y/N)
Bypass Connected
Bypass Relay #,
Chain,
Controller,
Board, Port
X.X.X.X-BYP
Onboard
Input Board
INPT OUTPUT
#, Chain,
Controller,
Board, Port
X.X.X.X
Device Type: Panic,
Door Contact,
Motion sensor,
Unlock Button,
Control Relay
Name
Reader Name:__.__.__.1 RP40 NO Y Y Y N EL No Input __.__.__.1
Reader Name:__.__.__.2 RP40 NO Y Y Y N EL No Input __.__.__.2
Reader Name:__.__.__.3 RP40 NO Y Y Y N EL No Input __.__.__.3
Reader Name:__.__.__.4 RP40 NO Y Y Y N EL No Input __.__.__.4
Reader Name:__.__.__.5 RP40 NO Y Y Y N EL No Input __.__.__.5
Reader Name:__.__.__.6 RP40 NO Y Y Y N EL No Input __.__.__.6
Reader Name:__.__.__.7 RP40 NO Y Y Y N EL No Input __.__.__.7
Reader Name:__.__.__.8 RP40 NO Y Y Y N EL No Input __.__.__.8
Output __.__.__.1
Output __.__.__.2
Output __.__.__.3
Customer Administrator Name
Customer Administrator Phone Number
Local Customer Contact Name
Local Customer Contact Phone Number
Down stream Door Controllers, Expansion
M2150 8DC
M2150 4DC
M2150 2DC
AC 24/4 Input Board
OC 4/24 Output Board
WIEGAND
Weigand or Current
Loop Reader
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
WIEGAND
Weigand or Current
Loop Reader
WIEGAND
WIEGAND
WIEGAND
WIEGAND
July 21st, 2024
CITY OF SANTA ANA ACCESS CONTROL UPGRADE
Santa Ana, CA
SURVEYS
City of Santa Ana Access Control Upgrade-
Survey- Library 1s... | +2 surveys
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 1/8
TABLE OF CONTENTS
CONTENTS
City of Santa Ana Access Control Upgrade-Survey- Library 1st Floor 3
BILL OF MATERIALS 3
LAYOUT 4
City of Santa Ana Access Control Upgrade-Survey- Library Basement 5
BILL OF MATERIALS 5
LAYOUT 6
City of Santa Ana Access Control Upgrade-Survey-Library 2nd Floor 7
BILL OF MATERIALS 7
LAYOUT 8
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
2/8
BILL OF MATERIALS - City of Santa Ana Access Control
Upgrade-Survey- Library 1st Floor
MAKE MODEL#ACCESSORIES QUANTITY
Access Control 18
Card Reader 13
----------13
Panic Button 5
----------5
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
3/8
LAYOUT - City of Santa Ana Access Control Upgrade-Survey-
Library 1st Floor
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 RDR-001PB-001PB-002PB-003PB-004RDR-002RDR-003RDR-004RDR-005RDR-006RDR-007RDR-008RDR-009RDR-010RDR-011RDR-012RDR-013PB-005 Access Control Card Reader 13 Panic Button 5
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
4/8
BILL OF MATERIALS - City of Santa Ana Access Control
Upgrade-Survey- Library Basement
MAKE MODEL#ACCESSORIES QUANTITY
Access Control 3
Card Reader 3
----------3
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
5/8
LAYOUT - City of Santa Ana Access Control Upgrade-Survey-
Library Basement
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 RDR-001RDR-002RDR-003 Access Control Card Reader 3
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
6/8
BILL OF MATERIALS - City of Santa Ana Access Control
Upgrade-Survey-Library 2nd Floor
MAKE MODEL#ACCESSORIES QUANTITY
Access Control 6
Card Reader 6
----------6
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
7/8
LAYOUT - City of Santa Ana Access Control Upgrade-Survey-
Library 2nd Floor
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 RDR-001RDR-002RDR-003RDR-004RDR-005RDR-006 Access Control Card Reader 6
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
8/8
July 21st, 2024
CITY OF SANTA ANA ACCESS CONTROL UPGRADE
Santa Ana, CA
SURVEY
City of Santa Ana Access Control Upgrade-
Survey-Newhope Lib...
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 1/4
TABLE OF CONTENTS
CONTENTS
City of Santa Ana Access Control Upgrade-Survey-Newhope Library 3
BILL OF MATERIALS 3
LAYOUT 4
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
2/4
BILL OF MATERIALS - City of Santa Ana Access Control
Upgrade-Survey-Newhope Library
MAKE MODEL#ACCESSORIES QUANTITY
Access Control 7
Card Reader 7
----------7
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
3/4
LAYOUT - City of Santa Ana Access Control Upgrade-Survey-
Newhope Library
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024 RDR-001RDR-002RDR-003RDR-004RDR-005RDR-006RDR-007 Access Control Card Reader 7
Prepared by: A Division of The Cook & Boardman Gro…July 21st, 2024
City of Santa Ana Access Control UpgradeCity of Santa Ana Access Control Upgrade
4/4