Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Public Works Agency www.santa-ana.org/pw Item # 17 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report January 21, 2025 TOPIC: Rousselle Street Flood Protection Project AGENDA TITLE Approve an Appropriation Adjustment and Award a Construction Contract to Mike Bubalo Construction Co., Inc. for the Rousselle Street Flood Protection Project (Project No. 23-6627) (Non -General Fund) RECOMMENDED ACTION Approve an appropriation adjustment to recognize $831,000 in prior year fund balance in the Federal Clean Water Protection Fund, Prior Year Carryforward revenue account (No. 05717002-50001) and appropriate the same amount into the Federal Clean Water Protection Enterprise, Improvements Other Than Building expenditure account (No. 05717640-66220). (Requires five affirmative votes.) 2. Approve an amendment to the Fiscal Year 2024-25 Capital Improvement Program to add $831,000 of Federal Clean Water Protection Enterprise funding for the Rousselle Street Flood Protection Project (No. 23-6627). 3. Approve the Project Cost Analysis for a total estimated construction delivery cost of $5,139,259, which includes $4,113,259 for the construction contract, $615,000 for contract administration, inspection, and testing, and $411,000 project contingency for unanticipated unforeseen work. 4. Award a construction contract to Mike Bubalo Construction Co., Inc., the lowest responsible bidder, in the amount of $4,113,259, for construction of the Rousselle Street Flood Protection Project, for a term beginning January 21, 2025 and ending upon project completion, and authorize the City Manager to execute the contract. 5. Determine that, pursuant to the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER-2024-57 was filed with the Orange County Clerk - Recorder for the project. Rousselle Street Flood Protection Project January 21, 2025 Page 2 GOVERNMENT CODE §84308 APPLIES: No DISCUSSION The City experiences significant flooding of roadways during intense rain events, which can have negative impacts on vehicle and pedestrian travel, business operations, and can cause property damage. The City's 2018 Storm Drain Master Plan recommended numerous stormdrain system improvements citywide in order to facilitate storm flows and reduce flooding. The Public Works Agency has successfully sought grant opportunities to fund such projects and was awarded $4,675,000 from the Prop 68 Floodplain, Management, Protection, and Risk Awareness (FMPRA) grant program for the Rousselle Street Flood Protection Project. This project features the upgrade of existing stormdrain infrastructure along Rousselle Street, from Warner Avenue to St. Gertrude Place, which will connect to the newly constructed stormdrain on Warner Avenue (Exhibit 1). The project also includes new drought -tolerant landscaping along the Maple Bike Trail, interpretive signage, asphalt paving, new curb -ramps, new curbs and gutters, striping, and stormwater treatment devices. The goal of the project is to increase the capacity of the City's stormdrain system in the Delhi Channel Watershed to better facilitate storm flows. Public Outreach and Contractor Participation This project was originally advertised for bid on October 22, 2024, with bids due on November 12, 2024. To provide an opportunity for local vendors to submit bids, the City notified 2,615 regional vendors via PlanetBids, many of which are Santa Ana based. Ten vendors requested bidding documents, and a total of ten bids were received. Bids were not received from any Santa Ana contractors. As legally required, a Notice Inviting Bids was advertised in the Orange County Register newspaper on October 23, 2024 and October 30, 2024. The project was also advertised in PlanetBids from October 22, 2024 through November 12, 2024. Bids were received electronically via PlanetBids on November 12, 2024. Bid Results Summary RANK BIDDER'S NAME LOCATION BASE BID 1 Mike Bubalo Construction Co., Inc. Baldwin Park, CA $4,058,259 2 Big Ben Inc. Irvine, CA $4,186,750 3 Beador Construction Company, Costa Mesa, CA $4,479,200 Inc. 4 Mladen Buntich Construction Co., Upland, CA $4,845,009 Inc. Rousselle Street Flood Protection Project January 21, 2025 Page 3 RANK BIDDER'S NAME LOCATION BASE BID 5 Excel Paving Co. Long Beach, CA $4,998,952 5 KEC Engineering Corona, CA $5,013,490 7 Los Angeles Engineering Inc. Covina, CA $5,615,000 8 Griffith Company Brea, CA $6,022,757 9 GMZ Engineering, Inc. Westlake Village, $6,674,824 10 Lonerock, Inc. Irvine, CA $6,848,179 A total of ten bids were received. Mike Bubalo Construction Co., Inc. submitted the lowest responsive base bid in the amount of $4,058,259 (Exhibit 2). As specified in the bid documents, the lowest bid shall be determined by the Base Bid. A Bid Alternative item was also included in the project specifications for additional drought tolerant landscaping along the Maple Bike Trail (Exhibit 3). In the past five years, Mike Bubalo Construction Co., Inc. has not performed any work for the Public Works Agency. Based on the bid analysis and a contractor reference check, staff recommends awarding the construction contract to Mike Bubalo Construction Co., Inc., for the construction of the Rousselle Street Flood Protection Project (Exhibit 4). Proiect Delive To deliver a complete project, in addition to the construction contract, the estimated total project delivery cost includes a budget allocation for construction administration, inspection, and testing. Construction administration and inspection may be performed by either staff or consultants and includes construction management, inspection of the Contractor's work to ensure contract compliance, workmanship and quality, materials testing, and implementation of the labor requirements. Any of the allocated construction administration funds not spent are considered project savings and are returned to the respective fund balance upon close out of the project. As indicated in the Cost Analysis (Exhibit 5) and as summarized in the table below, the estimated total construction delivery cost of the project is $5,139,259. Project Item Total Construction Contract Bid Amount $4,113,259 Construction Administration $328,000 Inspection $205,000 Testing $82,000 Rousselle Street Flood Protection Project January 21, 2025 Page 4 Project Contingencies $411,000 TOTAL CONSTRUCTION DELIVERY COST $5,139,259 ENVIRONMENTAL IMPACT Pursuant to the California Environmental Quality Act (CEQA), the recommended actions are exempt from further review pursuant to Sections 15301(b), 15301(c), and 15302(c) of the CEQA guidelines for projects consisting of the replacement or reconstruction of existing publicly owned utilities, streets, sidewalks, and gutters. The project continues these parameters of the CEQA guidelines and Categorical Exemption Environmental Review No. ER-2024-57 was filed with the Orange County Clerk -Recorder for the project (Exhibit 6). FISCAL IMPACT As indicated in the Cost Analysis, the estimated total construction delivery cost of the project is $5,139,259. All funds are available for expenditure in Fiscal Year 2024-2025. Any remaining balances not expended at the end of the fiscal year will be carried forward into Fiscal Year 2025-2026. The proposed contract authorizes staff a maximum of 10% in contingencies for construction contract change orders. Staff will return to City Council for authorization and appropriation of additional contingency if necessary. With approval of the requested appropriation adjustment, a portion of the accumulated fund balance will be appropriated for spending in the Federal Clean Water Protection Enterprise, Improvements Other Than Building (No. 05717640-66220). The spendable portion of the fund balance is estimated to be $6,957,265 at June 30, 2025, which is sufficient to allow for the recommended appropriation of $831,000. The funds will be budgeted and available for this item in the accounts below. Fiscal Accounting Unit Fund Accounting Unit - Y Year - Account No. Description Account No. Amount (Project No.) Description Original Budget PWA Public Works — Water 2024-25 16417640-66220 Enterprise Quality and Control, $4,675,000 (23-6627) Capital Improvements Other Than Grants Building Appropriation Adjustment Federal Federal Clean Water 2024-25 05717640-66220 Clean Water Protection Enterprise, $831,000 (23-6627) Protection Improvements Other Than Enterprise Building Total $5,506,000 Rousselle Street Flood Protection Project January 21, 2025 Page 5 EXHIBIT(S) 1. Location Map 2. Bid Proposal 3. Project Exhibit 4. Construction Contract 5. Cost Analysis 6. Environmental Documentation 7. FY 2024-25 Capital Improvement Project Worksheet Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency Approved By: Alvaro Nunez, City Manager EXHIBIT 1 L J ARNIf% F1VENUI PROJECT SITE �,A ORA/V \ SANTA ANA �i Project No. 23-6627: x PRousselle Street Flood Protection Project o PUBLICWORKS AGENCY Location Map T � CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: MIKE BUBALO CONSTRUCTION CO,, INC. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all. material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or hump sums) set forth in the following schedule: Item Description Qty Unit Unit Price Amount I Shoring of Open Excavations 1 LS $200,000.00 $ 200,000,00 2 Dewatering 1 LS $ 3o,onaoo $ 30,000.00 3 As -Built Plans 1 LS $5,000 $5,000 4 Clearing and Grubbing 1 LS $ 55,000.00 $ 55, 000.00 5 Unclassified Excavation 526 CY $400.00 $ 210,400.00 6 Asphalt Concrete (ARHM:) 488 TON $ 215.00 $ 104,920.00 7 Asphalt Concrete (HMA) 406 TON $ 250.00 $ 101,500.00 8 CMB or Class 11 Base 300 CY $150 00 $ 45,000.00 9 Cold Mi Iling (2" Max) 23,270 SF $ 3.00 $ 69,810.00 to Curb and Gutter per C.S.A. Std. 1101, A-2-6 690 LF $100.00 $ 69,000.00 11 Curb, Type A-2-6 (Modified) per Sheet DA-02 60 LF $100.00 $ 6,000.00 12 6' Wide Bike Lane (Modified Type A-2- 31.0 SF 8 $ 31,000.00 13 Curb and Gutter per SPPWC Std. 120-3, A3-6 1,080 LF $ 50.00 $ 54,000.00 14 PCC Sidewalk per C.S.A. Std. 1104 690 SF $25.00 $ 17,250.00 15 Fire Access Path, 8" PCC Over Compacted Subgrade, Transition Adjacent Curbs to 3" TTigh 307 SF $ 30.00 $ 9,210.00 16 Curb Ramp per Caitrans Std. A88A, Case A 640 SF $ 50.00 $ 32, 000.00 R-1 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT Item Description Qty Unit Unit Price Amount 17 Modified Curl? Ramp per SPPWC Std. 111-5, Case A Type 6 i4o SF $100.00 $1 000.00 l8 Curb Ramp per Caltrans Std. A88A, Case F 140 SF $100.00 $14,000.00 19 Adjust Water Valve Frame and Cover to Grade per C.S.A. Std, 1410 9 EA $ 2,000.00 $ 18,000.00 20 Adjust Manhole Frame and Cover to Grade per C.S.A. Std. 1201 5 EA $ 2,000.00 $ 10,000.00 21 Interpretive Signage Per Detail G on Sheet QD-01 1 EA $ 5,000.00 $ 5,000.00 22 Drought -Tolerant Landscape -Buffer 1 LS $ 20 000.00 $ 20, 000.00 23 Construction Information Sign 1 EA $10,000.00 $10,000.00 24 Project Acknowledgement Sign (Prop 68 Grant) 1. EA $10,000.00 $10,000.00 8' W x 7H RCB per Caltrans Std, 25 D83A and D83 B with Earthwork per 1,295 LF $ $ Caltrans Std. A62G 1,700.00 2,201,500.00 10' W x 6' H RCB per Caltrans Std. 26 D83A and D83 B with Earthwork per 50 LF $ $ Caltrans Std. A62G 2,600.00 130,000.00 27 5'Transition ,Structure Single RCB to Single RCB per SPPWC Std. 343-2 2 EA $10,000.00 $ 20,000.00 28 5' Transition Structure Single RCB to Single RCP per SPPWC Std, 342-2 I EA $ 60,000.00 $ 60, 000.00 29 Weir, 2' high, per Detail I on Sheet QD- D2 1 LS $10,000,00 $10,000.00 30 Manhole per SPPWC Std. 323-2 Without Reducer S EA $20,000.00 $100,000.00 31 Junction Structure per SPPWC Std. 334- 2, Case 2 3 EA ' 12,000.00 $ 36,000.00 32 18" RCP and Bedding per C.S.A. Std. 1150 5 LF $ 500.00 $ 2,500.00 33 24" RCP and Bedding per C.S.A. Std. 11.50 80 LF $ 600.00 $ 48, 000.00 34 Local Depression per C.S.A. Std. 305 2 EA $1 000 00 $ 2,000.00 35 Catch Basin per SPPWC Std. 300-4 with CPS Unit and Stenciling 2 EA $20,000.00 $40,000.00 36 Monolithic Catch Basin Connection per SPPWC Std. 308-3 1 EA $20,000.00 820,000,00 37 6.5' x 4' Contech Filterra or Approved Equal 2 EA $10,000.00 $ 20,000.00 38 6' x 8' Contech Filterra or Approved. Equal 1 EA $50,000.00 '50,000.00 39 6" PVC Pipe, Appurtenances, and Bedding per C.S.A. Std. 1150 65 1. LF $ 200.00 $13, 000.00 P-2 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT Item Description Qty Unit Unit Price Amount 40 8" Class 350 Ductile Iron Water Main Vertical Offset Per C.S.A. Std. 1413A with Adapters per C.S.A. Std. 1443 80 LF $ 600.00 $ 48,000.00 41 Signing and Striping (Includes Removal of Existing Striping/Pavement Markings) 1 LS $ 20,000.00 S 20,000.00 42 Additional Potholing (As -Needed)' 5 EA $5,000.00 S 25,000.00 43 Tree Removal and Replacement (As - Needed)* 7 EA $ 5,000.00 $ 35,000.00 44 Root Shaving (As -Needed)* 15 EA $ 700.00 110,500.00 45 90-Day Landscape Establishment 1 LS $ 8 000.00 $ 8,000.00 46 Construction Permit 1 LS $17,669 $17,669 Bid Alternates 47 Add -Alt Landscaping l L.S S55,000.00 55,000.00 TOTAL BASE BID $ 4,058,259.00 TOTAL ADD ALTERNATE BID $4 113,259.00 The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. I This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within 200 working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long -lead time items (i.e. Reinforced Concrete Box storm drain, Filterra Units, etc.) in accordance with grant funding requirements. Work shall be completed by December 31, 2025. Refer to the Grant Agreement included in Appendix K. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $3,750 per calendar day. P-3 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT Name of Firm MIKE BUBALO CONSTRUCTION CO., INC. Signature of BIDDER Title President (If an individual, so state, If a firm or co -partnership, state the firm name andsgive the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Dave Sorem, President, Manager Jason Bubalo, Secretary, Treasurer P_4 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT BIDDER'S STATEMENT BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned. BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid. In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct. Name of Firm MIKE BUBALO CONSTRUCTION CO., INC. Signature of BIDDER Title President (If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and. Manager, thereof.) Dave Sorem, President, Manager Jason Subaio, Secretary, Treasurer P-5 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct. Contractor's Name: MIKE BUBALO CONSTRUCTION CO., INC. Business Address: 5102 GAYHURST AVENUE, BALDWIN PARK, CA 91706 Business E-Mail Address: INFO@BUBALO.COM Telephone 626 960-7787 State Contractor's License No. and Class: 771279 A License Expiration Date 11 /30/25 State Dept. of Industrial Relations (DIR) Registration No.: 1000001341 State Dept. of Industrial Relations (DIR) Registration Emotion Date: 06/30/25 Signed: Title: President P-6 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The undersigned certifies that the foregoing is true and correct. Name of Firm MIKE ByCONSTRUCTION CO., INC. Signature of BIDDER�Z�, Title President (if an individual, so state) P-7 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT OWNERSHIP AFFIDAVIT STATE OF CALIFORNIA ) LOS ANGELES COUNTY OF OR90" ) SS: BALOWIN PARK CITY OF WI'&al Ay AA ) DAVE SOREM , being duly sworn, deposes and says: ❑ INDIVIDUAL That he/she is the party making the foregoing proposal: ❑ PARTNERSHIP That he/she is a member of the co -partnership firm designated as: and who has been and is duly vested with the authority to make and execute instruments for the co -partnership by: who constitute the other members of the co -partnership. CORPORATION That he is of MIKE BUBALO CONSTRUCTION CO., INC. President a corporation which is making the foregoing proposal: ❑ JOINT VENTURE That he is of: one of the parties making the foregoing proposal as a joint venture, and the he/she has been and is duly vested with the authority to execute instruments for an on behalf of the parties making said bid who are: that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion to secure any advantage against the City of Santa Ana or any person interested in the proposed c ract, f himself or any other person. Signature of Midder 12th Subscribed and sworn to before me this day of SEE ATTACHED Signature of officer Administering Oath (Notary Public) P-8 of P-20 November 20 24 CALIFORNIA JURAT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfullness, accuracy, or validity of that document. State of California County of Los Angeles Subscribed and sworn to (or affirmed) before me, on this 12 TH , day of NOVEMBER, 2024 by Dave Sorem, proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. ----- I ANTON BRKiC 16my Notary Public - California Los Angeles County Commission M 2499465 Comm. Expires Sep 10, 2028 + (Notary Seal) CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT KNOW ALL PRESENT that, MIKE BUBALO CONSTRUCTION CO., INC. , as BIDDER, and NATIONWIDE MUTUAL INSURANCE COMPANY , as SURETY, are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of TEN PERCENT OF AMOUNT BID Dollars (S 10% ), which is ten percent (10%) of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this 6TH day of NOVEMBER f 2024 BIDDER* CO., INC. - 5102 GAYHURST AVE. BALDWIN PARK, CA 91706; 626-960-7787 SURETY* NATIONWIDE MUTUAL INSU Subscribed and sworn to befor , 20_. Signature: PANY - 534 E. BADILLO ST me Notary Public in and for the County of CA 91723; 626-859-1000 , State of KEVIN VEGA, ATTORNEY -in -FACT this day of * Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative. P-9 of P-20 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfullness, accuracy, or validity of that document. State of California Ss. County of Los Angeles On NOVEMBER 12, 2024 , before me, Anton Brkic, Notary Public, personally appeared Dave Sorem, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. *my ANTON BRNIC Notary Public - CaliforniaLos Angeles County �Commission 9 24994b5 Comm, Expires Sep 10, 2028 on'li)15!�kic, Notary Public (Notary Seal) Power of Attorney KNOW ALL MEN BY THESE PRESENTS THAT: Nationwide Mutual insurance Company, an Ohio corporation hereinafter referred to severally as the "Company' and collectively as "the Companies' does hereby make, constitute and appoint: PHILIP E VEGA, MYRNA F SMITH, KEVIN VEGA, BRITTON CHRISTIANSEN each in their individual capacity, its true and lawful attorney -in -fact, with full power and authority to sign, seal, and execute on its behalf any and all bonds and undertakings, and other obligatory instruments of similar nature, in penalties not exceeding the surn of UNLIMITED and to bind the Company thereby, as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Company; and all acts of said Attorney pursuant to the authority given are hereby ratified and confirmed. This power of attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the board of directors of the Company: "RESOLVED, that the president, or any vice president be, and each hereby is, authorized and empowered to appoint attomeys-in-fact of the Company, and to authorize them to execute and deliver on behalf of the Company any and all bonds, forms, applications, memorandums, undertakings, recognizances, transfers, contracts of indemnity, policies, contracts guaranteeing the fidelity of persons holding positions of public or private trust, and other writings obligatory In nature that the business of the Company may require; and to modify or revoke, with or without cause, any such appointment or authority; provided, however, that the authority granted hereby shall in no way limit the authority of other duly authorized agents to sign and countersign any of said documents on behalf of the Company." 'RESOLVED FURTHER, that such attorneys -in -fact shall have full power and authority to execute and deliver any and all such documents and to bind the Company subject to the terms and limitations of the power of attorney issued to them, and to affix the seal of the Company thereto; provided, however, that said seal shall not be necessary for the validity of any such documents' This power of attorney is signed and sealed under and by the following bylaws duly adopted by the board of directors of the Company. Execution of Instruments. Any vice president, any assistant secretary or any assistant treasurer shall have the power and authority to sign or attest all approved documents, instruments, contracts, or other papers in connection with the operation of the business of the company In addition to the chairman of the board, the chief executive officer, president, treasurer or secretary; provided, however, the signature of any of them may be printed, engraved, or stamped on any approved document, contract, instrument, or other papers of the Company. IN WITNESS WHEREOF, the Company has caused this instrument to be sealed and duly attested by the signature of its officer the 20th day of August, 2021. Antonio C. Albanese, Vice President of Nationwide Mutual Insurance Company ACKNOWLEDGMENT I� STATE OF NEW YORK COUNTY OF NEW YORK: ss ••.�, On this 20th day of August, 2021, before me came the above -named officer for the Company SEAL.`. aforesaid, to me personally known to be the officer described in and who executed the preceding instrument, and he acknowledged the execution of the same, and being by me duly J sworn, deposes and says, that he is the officer of the Company aforesaid, that the seal affixed hereto Is the corporate seal of said Company, and the said corporate seal and his signature were \_�► duly affixed and subscribed to said instrument by the authority and direction of said Company - Stephanie Rubino McArthur . `•!,�� Notary Public. State of New York No. 02MG6270117 QuallrteU In New work Gowry Nolmy P�bk Commission Ex 'res October 19. 2024 My C -.3iw E .— Omber19,202e CERTIFICATE I, Laura B. Guy, Assistant Secretary of the Company, do hereby certify that the foregoing is a full, true and correct copy of the original power of attorney issued by the Company; that the resolution included therein is a true and correct transcript from the minutes of the meetings of the boards of directors and the same has not been revoked or amended in any manner; that said Antonio C. Albanese was on the date of the execution of the foregoing power of attorney the duty elected officer of the Company, and the corporate seal and his signature as officer were duly affixed and subscribed to the said instrument by the authority of said board of directors; and the foregoing power of attorney is still in full force and effect. IN WITNESS WHEREOF, I have hereunto subscribed my name as Assistant Secretary, and affixed the corporate seal of said Company this 6th day of November 2024 Assistant Secretary BDJ 1(08-21)00 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California } ss. County of LOS ANGELES On November6th, 2024 before me, Philip Vega, Notary Public Here Insert Name and Title of the Officer personally appeared Kevin Vega, Attorney -in -Fact Name(s) of Signer(s) PHILIP vEGA Notary Public • Cadfcrnia z i - Los Angeles County f Commission x 2490569 My Comm. Expires clay 31, 2028 who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) istare subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph isjp6e and correct. WITNESS my hand and official of Notary OPTIONAL - Though the information below is not required by law, it may prove valuable to persons relying on the document and and reattachment of this form to another document. Description of Attached Document Title of Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer Title(s): ❑ Partner - ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: ner Number of Pages: signers Name: ❑ Individual ❑ Corporate Officer Title(s): ❑ Partner - O Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Representing: fraudulent removal CA\DD\02000.5011 1\101 51761.2 22 (UPDATED: 01-19) CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT LIST OF SUB -CONTRACTORS Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount: a Streets, highways including bridge projects: %% of the bid or $10,000, whichever is greater o Buildings, parks, or other projects: ''/s% of the bid Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR). BIDDER proposes to subcontract certain portions of the work to the firms listed below: Name tT Name C'h rl 50 C � License #7txp. Z&-iC9 3 License #/Exp. DIR Reg. #/Exp. DIR Reg. #/Exp. boCYi D Location VV 4W-22 1 G1D9-0A.)A G4 92g;if Location Phone ! $( 736 —76Do Phone '53c> Type Of Work �A 1 a(+ 9&,6,. Type Of Work A) A►UG A4A'�r' p1e7 Amount $ 113 S;420,0,eca Amount $ /Slcep Name \Z License #/Exp. DIR Reg. #/Exp. Location pD Oaf- "3 Z750 Q'Vt) �+rG Gay Phone Type Of Work 1RF— (—UM y "J G. Amount $ -go 0 Name License #/Exp. DIR Reg. #/Exp. License # Location Phone Type Of Work Amount $ Signature of Bidder Dave Sorem, President, Manager Name License #/Exp. DIR Reg. #/Exp. License # Location Phone Type Of Work Amount $ Name License #/Exp. DIR Reg. #/Exp. License # _ Location _ Phone Type Of Work Amount $ Please be aware that the PlanetBids website has available the capacity to list subcontractors on line. Please consult with the tech support staff of the website for instructions on how to conduct a online bid. P-10 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER has performed similar work within the past three years. 1. SEE ATTACHED Name and Address of Owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 2. SEE ATTACHED Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 3. SEE ATTACHED Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. NATIONWIDE MUTUAL INSURANCE COMPANY Contractors & Developers Bonding 534 East Badillo Street Covina, CA 91723 626-859-1000 P-1 1 of P-20 Mike Bubalo Construction Co., Inc. CURRENT WORK REFERENCES 1 Agency Los Angeles County Department of Public Works Address 900 S Fremont Ave, Alhambra, CA 91803 Contact Matt Jerge email mjerge@dpw.lacounty.gov phone (626) 458-2593 Project As Needed Flood Maintenance Repairs Original Value $ 5,000,000.00 Current Value $ 1,690,873.00 Type of Work Storm Drain Date Completed CURRENT 2 Agency Sanitation Districts of Los Angeles County Address 1955 Workman Mill Rd, Whittier, CA 90601 Contact Wayne A. Bamossy email WayneBamossy@lacsd.org phone (562) 908-4288 Project As Needed Sewer Potholes Original Value $ 500,000.00 Current Value $ 455,504.00 Type of Work Sewers Date Completed CURRENT 3 Agency City of Montebello Address 1600 W Beverly Blvd, Montebello, CA 90640 Contact James Enriquez email jenriquez@cityofmontebello.com phone (323) 887-1462 Project As Need Repairs and New Construction Original Value Negotiated Current Value $ 587,914.00 Type of Work Sewers and Storm Drain Date Completed CURRENT 4 Agency City of Los Angeles Address 1149 S Broadway, Los Angeles, CA 90015 Contact Hector Hernandez email hector.o.hernandez@lacity.org phone (310)974-0694 Project As Needed Sewer& Storm Drain Repairs Original Value $ 25,000,000.00 Current Value $ 3,934,807.20 Type of Work Sewers and Storm Drain Date Completed CURRENT CITY OF SANTA ANA ype text n. PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT ADDITIONAL REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed similar work in the past five years. 1. SEE ATTACHED Name and Address of Owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 2. SEE ATTACHED Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 3. SEE ATTACHED Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. NATIONWIDE MUTUAL INSURANCE COMPANY Contractors & Developers Bonding 534 East Badillo Street Covina, CA 91723 626-859-1000 P-12 ofP-20 BID PROPOSAL PACKAGE City of Long Beach WD-67-22, Cathodic Protection Improvement of Potable Water Systems Project — Phase 6 (EO-3557) PROJECT NO. 1 Contractor Name MIKE BUBALO CONSTRUCTION CO., INC. Prime: X Sub: Project Name ESR-Workman Ave SWC04860 Project Address 1800 Workman Ave., Los Angeles, CA Date of Completion 02/28/2019 Project Description: Three spot repairs on existing 8" sewer main. One repair was done beneath an 18" high pressure gas main with less than 6" of clearance. Project Owner Information: Owner City of Los Angeles Bureau of Engineering Name of Contact Title Address Phone Number Wesley Luong. P.E. Civil Engineer, Waste Water Conveyance Construction Division 1149 S. Broadway, 6th Floor, Los Angeles, CA 90015 213-485-1187 Email wesley.luong@lacity.org BID PROPOSAL PACKAGE PROJECT Contractor Name MIKE BUBALO CONSTRUCTION CO., INC. Prime: X Sub: Project Name Hornby Avenue Siphon Project Address 27155 Hornby Ave., Santa Clarita, CA 91351 Date of Completion 09/23/2021 Project Description: Investiaate blockaae of sewer siphon crossina the Santa Clara River. Installed bypass oumoina of the siphon. Cleaned out (2) 8 inch DIP siphons and perform spot repairs cusing the blockages. Project Owner Information: Owner Los Angeles County Department of Public Works Name of Contact Teagan Ferdinandsen Title Civil Engineering Assistant Address 900 S. Fremont Ave., Alhambra, CA 91803 Phone Number 626-300-3376 Email TFerdinandsen@dpw.lacounty.gov BID PROPOSAL PACKAGE PROJECT Contractor Name MIKE BUBALO CONSTRUCTION CO., INC. Prime: X Sub: Project Name ESR- Occidental Blvd. SZC13759 Project Address 1342 N Occidental Blvd., Los Angeles, CA Date of Completion 11/21/19 Project Description: Replaced 6" VCP Sewer with 8" VCP for about 150 LF. 100 LF was located in a residential backyard with a steep grade. No equipment was allowed on site and only hand digging was performed. Project Owner Information: Owner Name of Contact Title Address Phone Number City of Los Angeles Belal Tamimi Environmental Engineering Associate 1149 S. Broadway, 6th Floor, Los Angeles, CA 90015 213-847-0296 Email belal.tamimi@lacity.org BID PROPOSAL PACKAGE PROJECT Contractor Name MIKE BUBALO CONSTRUCTION CO., INC. Prime: X Sub: Project Name ESR- Elevado Street SZC13768 Project Address 1566 Elevado St., Los Angeles, CA Date of Completion 3/18/20 Project Description: Replaced 8" Sewer by means of pipe bursting. Work was inside a residentail rear yard and dismantle both upstream and downstream manholes and replace by hand with bricks. No equipment was allowed Work included excavation of a leaching pit. 1149 S. Broadway, 6th Floor, Los Angeles, CA 90015 Project Owner Information: Owner City of Los Angeles Bureau of Engineering Name of Contact Jorge De La Torriente Title Construction Manager Address Phone Number 213-458-5836 Email jorge.delatorriente@lacity.org Mike Bubalo Construction Storm Drain Job History 00-1 Kendall Drive Storm Drain $105,000.00 Owner: City of San Gabriel 425 S. Mission Drive San Gabriel, CA 91778-0130 (626) 308-2800 Engineer., Norris-Repke, Inc., 600 N. Tustin Avenue, Suite 250, Santa Ana, CA 92705-3736 (714)973-2230 Description: 500 feet of 36", 24" & 18" RCP Storm Drain and appurtenant structures Date Completed: 8/00 Percent Completed: 100% Contact.• Douglas Benash, P.E., Senior Civil Engineer (626)308-2800 00-5 Project 9037 Unit 2 Storm Drain $117,720.00 Owner and Engineer. Los Angeles County Department of Public Works Contract Description: 815 feet of 24" RCP Storm Drain Date Completed: 7/00 Percent Completed., 100% Subcontract For.• Andrew Papac & Sons 01-07 21" Street Storm Drain $190,664.00 Owner: City of Manhattan Beach 3621 Bell Avenue Manhattan Beach, CA 90266 (310) 802-5358 Description: 960 of 18" to 48" RCP and appurtenant structures Date Completed: 11/01 Percent Completed: 100% Contact., Ed Kao, Project Engineer City of Manhattan Beach 3621 Bell Avenue Manhattan Beach, CA 90266 (310) 802-5358 01-08 Live Oak Springs Canyon Drain Unit II $2,166,260.00 Owner: Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3144 Description: 890 feet of RCB, 1,400 of 18" to 48" RCP and appurtenant structures Date Completed: 03/02 Percent Completed: 100% Contact: Los Angeles County Department of Public Works Contract Mark Bruschaber, Project Inspector 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3100 02-03 Hermosa Avenue Storm Drain $2,065,020.00 Owner: City of Rancho Cucamonga 10500 Civic Center Drive P.O. Box 807 Rancho Cucamonga, CA 91730 (909) 477-2700 Description: 1,200 feet of Reinforced Concrete Box and Pipe and related structures. Date Completed: 12/02 Percent Completed: 100% Contact.• Richard Carillo, Sr. Inspector City of Rancho Cucamonga 10500 Civic Center Drive P.O. Box 807 Rancho Cucamonga, CA 91730 (909) 477-2700 02-05 Hollyhills Drain Unit 7 $6,998,871.00 Owner: Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3144 Description: 10,438 feet of RGRCP Pipe and related structures (18" 0 to 90" 0) Date Completed. 6/04 Percent Completed: 100% Contact. - Hector Hernandez, Office Engineer Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3100 03-02 Hollyhills Drain Unit 8A $6,878,505.00 Owner: Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3144 Description: 1,423 feet of RC Box Storm Drain and related structures (18" 0 to 108" 0) Date Completed. - OPEN Percent Completed: 100% Contact. - Sam Assoum, Office Engineer Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3197 03-06 20th Street / Walnut Ave. Pollution Trap $409,925.00 Owner: City of Long Beach Public Works, (562)570-6289 333 W. Ocean Blvd. Long Beach, CA 90802 Description: Installation of a 27 foot deep, storm drain pollution trap manhole. Date Completed: 7/04 Percent Completed: 100% contact. - Tony Arevalo, Project Engineer (562)570-6289 333 W. Ocean Blvd. Long Beach, CA 90802 03-09 Linden Avenue Storm Drain $1,202,725.00 Owner: San Bernardino County Flood Control District (909)387-7920 825 East 3rd Street Room 147 San Bernardino, CA 92415-0835 Description: Installation of Reinforced Concrete Box Storm Drain and related structures. Date Completed: 11/05/04 Percent Completed: 100% contact. - John Burrows, Project Engineer (909)387-7920 825 East 3rd Street Room 147 San Bernardino, CA 92415-0835 04-01 Storm Drain Rehab Various Locations $32,360.00 Owner: City of Costa Mesa (562) 868-0511 77 Fair Drive, Room 101, Costa Mesa, California 92626.3 77 Fair Drive Costa Mesa, CA 92626 Subcontract work for R. J. Noble Company Description: Installation and repairs of reinforced concrete pipe storm drain and related structures. Date Completed: 3/04 Percent Completed: 100% Contact: Cara Thomas, Project Foreman R. 1. Noble Company (800)339-0362 PO Box 620 Orange, CA 92856 04-03 Eastvale MDP Line C Storm Drain $1,168,965.00 Owner: D. R. Horton d.b.a. Western Pacific Housing (909)442-6199 16755 Von Karman Avenue, Suite 200 Irvine, CA 92606 Description: Installation of a reinforced storm drain and related structures for Riverside County Transportation Dept. Date Completed: 12/16/04 Percent Completed. 100% contact., Scott Clark, VP of Operations (909)442-6199 16755 Von Karman Avenue, Suite 200 Irvine, CA 92606 04-04 Fairplex Drain, LA County Fairgrounds $ 4,866,502.00 Date Completed: 10/31/05 Owner: Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3144 Description: Percent Completed. 100% Contact., Hector Hernandez, Office Engineer Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3144 04-06 Long Beach Police Station Storm Drain $ 150,860.00 Owner: City of Long Beach Dept. of Public Works 333 W. Ocean Blvd., 91h Floor Long Beach, CA 90802 Description: Date Completed: 12/6/04 Percent Completed: 100% Contact., Tony Arevalo, Project Engineer (562)570-6289 333 W. Ocean Blvd. Long Beach, CA 90802 04-09 Goodrich Rubidoux Strom Drain $ 299,420.00 Date Completed: 11/1/05 Owner: City of Los Angeles 200 N. Spring St., Room 355 City Hall Los Angeles, CA 90012 Description: Date Completed. 1111105 Percent Completed: 100% Contact: City of Los Angeles Board of Public Works 200 N. Spring St., Room 355 City Hall Los Angeles, CA 90012 04-14 Mill Lane Emergency RCB $ 71,000.00 Date Completed: 12/6/04 Owner: Los Angeles County Flood Control District 900 So. Fremont Ave., 8th Floor Alhambra, CA 91803 Description: Mill Ave Storm Drain -San Marino Emergency Repairs Date Completed: 12/6/04 Percent Completed.• 100% Contact: Jaime Engles, Office Engineer Los Angeles County Flood Control District 900 So. Fremont Ave., 8th Floor Alhambra, CA 91803 04-15 Reg Proj. # 1105 $107,000.00 Date Completed: 12/10/04 Owner: Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3197 Description: Date Completed: 12/10/04 Percent Completed: 100% Contact: Los Angeles County Department of Public Works Contract 900 South Freemont Avenue Alhambra, CA 91802-1460 (626) 458-3197 05-07 San Dimas Repairs Award Value: $713,250.00 Final Contract: Progress: 100% Completion Date: Scope: Repairs To San Dimas Dam Owner: Fidelity and Deposit of Maryland/Zurich Surety Contact: 801 No. Brand Blvd, Glendale, CA 91203 Phone: 818-621-1477 Phone: $851,718.01 Completed 9/2006 05-08 Peck Road Channel Award Value: $165,000.00 Final Contract: Progress: 100% Completion Date: Scope: Repairs & Maintenance to Peck Road Channel Owner: City of Industry Contact: Richard Walker 15651 East Strafford Street, City of Industry, CA 91744 Phone: 626-333-0336 Phone: 06-01 LACSD Storm Drain Repair Award Value: $36,230.00 Final Contract: Progress: 100% Completion Date: Scope: Emergency Storm Drain Repairs Owner: Los Angeles County Sanitation District Contact: 1955 Workman Mill Road. Whittier, CA 90607 Phone: (562)699-7411 Phone: 06-04 16t" Street Drain Award Value: $491,840.00 Final Contract: Progress: 100% Completion Date: Scope: Storm Drain Repair Owner: Los Angeles County Dept of Public Works Contact: 900 South Fremont Avenue, Alhambra, CA Phone: (626) 458-3144 Phone: 06-05 Mary Ellen Storm Drain Award Value: $ 385,125.00 Final Contract: Progress: 100% Completion Date: Scope: Storm Drain Repair Owner: Los Angeles County Dept of Public Works Contact: 900 South Fremont Avenue, Alhambra, CA Phone: (626) 458-3144 Phone: $ 143,045.80 Completed 10/2005 $ 36,230.00 Completed 2/2006 $ 509,029.25 Completed 9/2006 91803-1331 $ 435,774.99 Completed 8/2006 91803-1331 06-07 Sun Valley/Tuxford Drain Award Value: $ 3,497690.00 Final Contract: $ 3,725,036.73 Progress: 100% Completion Date: Completed 3/2006 Scope: Storm Drain Owner: Los Angeles County Dept of Public Works Contact: Los Angeles County Dept. of Public Works 900 South Fremont Avenue, Alhambra, CA 91803-1331 Phone: (626) 458-3144 Phone: 06-08 Dockweiler Beach Outlet Award Value: $ 1,096,281.20 Final Contract: $ 1,235,652.03 Progress: 95% Completion Date: In Progress Scope: Storm Drain Outlet to Ocean Owner: Los Angeles County Dept of Public Works Contact: Jimmy Chung New Creation Builders, 17809 Clark Ave., Bellflower. CA 90706 Phone: 562-804-0478 Phone: 06-09 Rosedale Sewer, Water & Storm Drain Installation Award Value: $ 2,888,604.00 Final Contract: $ 3,131,616.71 Progress: 95% Completion Date: In Progress Scope: Sewer Water & Storm Drain Installation Owner: Azusa Land Partners, LLC Contact: Jeff Roulon Azusa Land Partners LLC, 19 Corporate Plaza. Newport Beach, CA 92660 Phone: 949-721-9777 Phone: 06-10 Strawberry Lane Storm Drain Improvements Award Value: $ 580,800.00 Final Contract: $ 694,831.41 Progress: 95% Completion Date: In Progress Scope: Rehabilitate Storm Drains near Strawberry Lane & Dobbin Lane, Rolling Hills Estates by Jacking Owner: City of Rolling Hills Estates Funded Imp to County Drainage Facilities Contact: Lance Grindle, P.E., District Engineer, Road Maintenance Division Los Angeles County Department of Public Works 900 So. Fremont Ave, Alhambra, CA 91803-1331 Phone: (626) 458-3144 Phone: (310) 348-6448 06-12 Marina Beach Water Quality Imp. Award Value: $ 2,399,375.00 Final Contract: $ 2,134,640.02 Progress: 100 % Completion Date: October 2007 Scope: Install new HDPE storm drain to redirect drainage away from public beach. Owner: Los Angeles County Dept. of Public Works Contact: Ali Zadeh, 900 So. Fremont Ave, Alhambra, CA 91803-1331 Phone: (626) 458-3144 Phone: 07-02 Joint Outfall H, Unit 9B, Steel Pipe Replacement Award Value: $ 68,063.88 Final Contract: $ 68,063.88 Progress: 100 % Completion Date: June 2008 Scope: Emergency repairs to an existing sewer structure. Owner: Sanitation District of Los Angeles County Contact: Tommy Sung, 1955 Workman Mill Road, Whittier CA 90607 Phone: (562) 699-7411 Fax: (562) 695-2897 07-04 San Antonio Ave Sewer & Storm Drain Award Value: $ 4,889,250.00 Final Contract: $ 5,184,213.24 Progress: 100 % Completion Date: April 2008 Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90" to 18" and appurtenant structures. Owner: City of Upland Contact: Bob Critchfield, Senior Engineer 460 North Euclid Ave., Upland, CA 91786-4732 Phone: (909) 291-2946 08-02 1It" Street Reconstruction Award Value: $ 3,541,345.00 Final Contract: $ 3,910,111.89 Progress: 100% Completion Date: 12/31/2008 Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90" to 18" and appurtenant structures. Owner: City of Upland Contact: Bob Critchfield, Senior Engineer 460 North Euclid Ave., Upland, CA 91786-4732 Phone: (909) 291-2946 Fax: (909) 291-2946 08-04 Storm Drain Modifications at Pomona Water Reclamation Plant Award Value: $ 103,000.00 Final Contract: $ 103,000.00 Orig. Duration: n/a Total Duration: 1 Month Progress: 100 % Completion Date: July 2008 Scope: Reconstruction of an open grate storm drain trough and modification of an existing manhole. Owner: Sanitation Districts of Los Angeles County Contact: Tommy Sung, 1955 Workman Mill Road, Whittier CA 90607 Phone: (562) 699-7411 Fax: (562) 695-2897 08-06 Beryl Street Storm Drain Improvements Award Value: $ 3,135,950.00 Final Contract: $ 3,318,379.22 Orig. Duration: 175 Cal Days. Total Duration: 175 Progress: 100 % Completion Date: October 2008 Scope: Construct new storm drain consisting of 90", 72" reinforced concrete pipes, catch basins, manholes, and appurtenant structures. Work included installation within paved traffic lanes, storm water pollution control, water and sewer relocations and landscape and hardscape restorations. Owner: City of Rancho Cucamonga, California Contact: Romeo M. David, Associate Engineer 10500 Civic Center Drive, Rancho Cucamonga, CA 91729-0807 Phone: (909) 477-2740 ext. 4070 Fax: (909) 477-2849 08-13 Seven Facilities Storm Drain Award Value: $ 588,339.76 Final Contract: $696,221.33 Orig. Duration: 12 Months Total Duration: 8 months Progress: 100% Completion Date: May 2009 Scope: 2350 cubic yards of debris clean -out in storm drain facilities including the installation of access manholes. Owner: L.A. County Dept of Public Works Contact: Daryl Hamilton 900 S. Fremont Ave. Alhambra, CA 91803 Phone: (626) 458-3122 Fax: (626) 458-2197 08-14 Area 03 MH Access IMP3-54 Award Value: $ 305,500.00 Final Contract: $311,488.00 Orig. Duration: 3 Months Total Duration: 2 Months Progress: 100 % Completion Date: July 2009 Scope: Manhole Access Improvements & Retaining Walls Owner: Orange County Sanitation District Contact: David May 1256 Magnolia Ave., Anaheim, CA 90801 Phone: (714) 593-7845 Fax: 09-01 Project 1225 Unit 2, Storm Drain Ext Award Value: $ 298,659.00 Final Contract: $318,658.75 Orig. Duration: 4 Months Total Duration: 2 Months Progress: 100% Completion Date: December 2009 Scope: Replace 12" Water main and Pressure Regulating Station Owner: L.A. County Dept of Public Works Contact: Johnny Oghoorian 900 S. Fremont Ave. Alhambra, CA 91803 Phone: (626) 458-3122 Fax: (626) 458-2197 09-06 Magnolia Channel Restoration Award Value: $ 1,030,000.00 Final Contract: In Progress Orig. Duration: 9 Months Total Duration: In Progress Progress: 90 % Completion Date: Scope: Detention ponds and stream and channel restoration Owner: Inland Empire Utilities District Contact: Matt Poeske, P.E., 6075 Kimball Avenue, Chino, CA 91710 Phone: (909)993-1600 Fax: (909) 923-0468 10-05 Thompson Creek Award Value: $ 995,000.00 Final Contract: $ 1,028,000.00 Orig. Duration: 6 Months Total Duration: 4 Months Progress: 100 % Completion Date: September 30, 2010 Scope: Design and Build Conversion of Open Channel to Reinforced Concrete Box Owner: Fairplex Contact: Bill Shacklett 1101 W. McKinley, Pomona, CA 91768 Phone: 909-865-4150 Fax: 909-865-6707 10-11 Eaton Canyon Golf Course Storm Drain Award Value: $ 57,500.00 Final Contract: $ 57,500.00 Orig. Duration: 3 Months Total Duration: 3 Months Progress: 100 % Completion Date: 2013 Scope: Remove 30" CMP and Replace it with 30" RCP and Replace Manhole at Riviera Dr Owner: Los Angeles County Dept of Parks and Recreation DC Golf, Doug Colliflower, 1456 E. Mendocino St., Altadena, CA 91001 Contact: David Mesa 433 So. Vermont Ave., Los Angeles, CA 90020 (213)738-2951/fax 213-738-6444 Phone: 626-821-4647 Fax: E Mail: dmesaC)Parks. lacountv.gov CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned tha a 1 a false ce 'fication may subject the certifier to criminal prosecution. Signed State of California County of LOS ANGELES 12th Subscribed and sworn to (or affirmed) before me on this day of November 24, 20_, by Dave Sorem , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me SEE ATTACHED Notary Public Signature Notary Public Seal P-13 of P-20 CALIFORNIA JURAT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfullness, accuracy, or validity of that document. State of California SS. County of Los Angeles Subscribed and sworn to (or affirmed) before me, on this 12 TH , day of NOVEMBER, 2024 by Dave Sorem, proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. ANTON BRKIC v Notary Public - California = Los Angeles County / Commission # 2499465 My Comm. Expires Sep 10, 2028 Anton tic, Notary Public (Notary seal) CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT NON-DISCRIMINATION CERTIFICATE The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows: 1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. P-14 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT 7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Cha r. Signed: Title: President Firm: MIKE BUBALO CONSTRUCTION CO., INC. Date: 11 /12/24 P-15 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall: 1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. 2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards. 3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount a alifornia Apprenticeship Council. Signed: C _ Title: Firm: MIKE BUBALO CONSTRUCTION CO., INC. Date: 11 /12/24 P-16 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is otherwise entitl Signed:c - Title: President Firm: MIKE BUBALO CONSTRUCTION CO., INC. Date: 11 / 12/24 P-17 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT FLEET COMPLIANCE CERTIFICATION Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractor(s) ("Fleet") is true and correct: XThe Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto. The Fleet is exempt from the Regulation under section 2449. 1 (f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto. Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids). The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto. Name of Bidder: M BALO CONSTRUCTION CO., INC. S ignature: Name: Dave Sorem Title: President Date: 11/12/24 P-18 of P-20 2/29/24, 12:31 PM California Air Resources Board: Off -Road Diesel -Fueled Fleets Regulation California Enviroimiental Protection Agency Air Resources Board January 1, 2024 CERTIFICATE OF REPORTED COMPLIANCE OFF -ROAD DIESEL VEHICLE REGULATION is issued to MIKE BUBALO CONSTRUCTION CO. INC. This certificate indicates that the fleet listed above has reported off -road d;csel vehicles to the California Air Resources Board and has certified they are In compliance with title 13 CCR section 2449. All applicable vehicles owned by the individual. company, or agency must be reported and labeled, as specified in bection 2449, with all possible completeness, else this certificate is nufi and void Certificate expires 2/28/2025 r: lack CAil.), a Air IFrxtim�rs Ilnanl Off -road Diesel Fleet ldentifleation 1641 Tn verlly fhr mrtheMid tv of this cerlificste, sneer this rwntber it http:llwww.arb.ca.govldoorslcompRanca_cert4.html https:llssl.arb.ca.govtssidoorstdoors_reporting/permlphp/certificate.php 111 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT FLEET COMPLIANCE CERTIFICATION Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13. California Code of Regulations, Division 3, Chapter 9, effective on January 1. 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractor(s) ("Fleet") is true and correct: The Fleet is subject to the requirements of the Regulation. and the appropriate Certificate(s) of Reported Compliance have been attached hereto. The Fleet is exempt from the Regulation under section 2449. 1 (f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto. Bidder and/or their subcontractor is unable to procure R99 or R 100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids). The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency. as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto. Name of Bidder: All American Asphalt Signature: Name: Edward J. Carlson Title: Vice President Date: / I %l2 /,?`/ P-18 of P-20 IkIr Rasa ital Protection A irces Board 112024 ".PORTED COMPL itEHICLE RF-GUU med to A ILT A CtIMWX A T vV Crry OF SAN'rA ANA PROPOSAL PROJECTNO.: 23-6627 ROUSS1:LLE STRl;FF F1,001) PROTECTION PROJECT I:I,EFT COMPI,IANCI; CI:RTINICATION Bidder hereby acknowledges that they have reviewed the Calilbrnia Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13. Calilornia Codc of Regulations, Division 3, Chaptcr 9, effective on January 1, 2024 (the "Regulation-). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet. and/or that of their subcontractor(s) ("Hect") is true and correct: The l lect is Subject to the requirements of the Regulation, and the appropriate Certificates) of Reported Compliance have been attached hereto. The fleet is exempt from the Regulation under section 2449.1(1)(2), and a signed description of - the subject vehicles, and reasoning f6r exemption has been attached hereto. Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(1)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids). 7'hc I- Icct is exempt from the requirements ol'the Regulation pursuant to section 2449(i)(4) because this Projcet has been deemed an Emergency. as defined under section 2449(c)(I 8). Biddcr shall only operate the exempted vehicles in the emergency situation and records of the cxctnptcd vehicles must be maintained, pursuant to section 2449(i)(4). The Elect does not fall under the Regulation or arc otherwise cxcmpted and a detailed reasoning is attached hereto_ Name of Bidder: Chrisp Company Signature:,`._ Narne: Robert Chrisp Title: PresidenVCEO Datc: 11-12-2024 P-18 of'P-20 ILI Ti uj ct w IL 4 ct B ex VA"! % CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT FLEET COMPLIANCE CERTIFICATION Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractor(s) ("Fleet's is true and correct: The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto. The Fleet is exempt from the Regulation under section 2449, 1 (f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto. Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids). The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto. Name of Bidder: Signature: r hr I Y` � Name: n!^/;' 45eG�Cf� Title: 642a,l--c2' �,a7 Cr' Date: T P-18 of P-20 I A LZ as n n v c e a w 0 o, 8 IV w O ca o w O 5 u Vt l 3 L' Q3 �+ � 6 ro v fu 4-K N �, U p u Q1 T- ? < W L Va U.. T s, �y ro c ra ,a ty cy Ca aj Q. d0 v ` r R `~ oW O a� 15 �E V Z T3 �mya,DmC VCV its ^� U C u v '`- , V T O r L-� V f a a v N � o (n .0 W o tnavua��� = N CC W Q c1Jto p cA Swo CV Nei R U C CD o, o~ Q 0 0 > C C V C v L0 +(-) 'C7 O i W 3:(13 'fuV u C >O �' 0 > cc t_3 L Z o c ro th Q v (Az to A-- av n (7 n' n_ m p r6 v G CD u to Cam-' Y Ou C� [n~�ru O x� v o ro,,, A--'- � aU en L ro v a3 ry i' s u E � o z - K �: L J .� L 0 C ' F' ro V a--. of ......r. .: :. ':......:.::::.-.,..........::... _..-.,�._ `:/PRE CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire: Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No X If the answer is yes, explain the circumstances in the following space. P-19 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA) REQUIREMENTS This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA. The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Sectio - a an the Notice o Inviting Bids. Signed: Title: President Firm: MIKE BUBALO CONSTRUCTION CO., INC. Date: 11 / 12/24 P-20 of P-20 Mike Bubalo Construction Co., Inc. began work under its present organization as a corporation in 1999. Presently we have multiple projects with government agencies. Mike Bubalo, owner, and Dave Sorem, General Manager, have extensive underground construction experience. Mike Bubalo Construction Company has been in business since 1974 as an individual general contractor and performing construction services for Steve Bubalo Construction Co., Inc. prior to incorporation. Mike Bubalo was General Superintendent for Steve Bubalo Construction Co., Inc. whose responsibilities included supervision of construction projects that ranged in cost from $500,000 to $21,000,000. Mike Bubalo has owned and operated his company since 1974. Dave Sorem is General Manager of MBC. Dave was also employed by Steve Bubalo Construction Co. Inc. as Project Manager from 1992 to 1999. His responsibilities included project management, estimating and engineering duties for all construction projects. Prior to employment with Steve Bubalo Construction Co., Inc. Dave Sorem worked for the Los Angeles County Department of Public Works, Design Division from 1982 to 1992 as a Civil Engineer III/Section Head. Brian Rickey is Project Manager for MBC. and his responsibilities include project management and engineering duties for large construction projects. His vast experience comes from his many years working up the ranks (1986-2006) with Los Angeles County Dept. of Public Works. Brad Sorem is Project Coordinator for MBC. His responsibilities include project scheduling, permit review, submittals, loss control and procurement for all construction projects. Anton Brkic is Project Estimator for MBC. Anton was also employed by Steve Bubalo Construction Co. Inc. as Project Coordinator from 1993 to 1999. His responsibilities include project scheduling, permit review, submittals, and estimating. Oscar Camerena is a Job Foreman for MBC. Oscar has had a specialized focus on sewer and storm drain construction for the majority of his career as a laborer. His responsibilities included plan review, subcontractor supervision, and management of the labor, equipment and material procurement for water construction projects John Sarna is a Job Foreman for MBC. John has extensive experience in sewer and storm drain construction over the majority of his career as an operator. His responsibilities included plan review, subcontractor supervision, and management of the labor, equipment and material procurement for construction projects Mike Bubalo Construction Co., Inc. has the unique ability to perform all of the required elements for a successful and prompt emergency repair "in-house". We have the ability to provide civil engineering tasks that include: Shoring design Utility conduit design Value Engineering Underground structure design CPM Scheduling (Primavera) Dewatering & Bypass Design Quality Assurance Plans Site specific safety plans SWPPP Preparation Traffic Control Detour Plans Hydraulic Calculation In addition to these skills, we have assisted utility owners in liaison coordination and permit review. Emergency repairs that might require participation from agencies outside of the Owner's control will benefit from our experience with various federal, state and local agencies. Site Specific Emergency Response Details: • Storm Water Compliance We have in-house staff qualified and experienced in producing site specific SWPPP's that will ensure compliance with permit conditions. • Shoring We have in-house staff qualified and experienced in producing site specific Shoring plans that will ensure compliance with Cal -OSHA. • Hot -Taps and High -Lines If existing water services must be maintained, the existing water mains can be hot -tapped to connect with the new water mains. The existing water services can be maintained with a temporary above ground supply line (high -lines). • Construction Sequencing Schools — night time work to reduce impact on school traffic flow Traffic Control Whenever possible the staging and alignment of the repairs shall be arranged in such a manner as to minimize impacts to traffic congestion and limit the amount of disruption. We provide in house production of stamped traffic control plans. • Utility Conflicts Every effort will be made to locate utilities in advance of construction. We will make every effort to utilize all of the information and coordination resources available with DigAlert-811. Our first order of work will be identifying and contacting all utility owners as soon as practicable. Initiating field meetings to identify conflicts and planned concurrent activities. • Subcontractors MBC self -performs earthwork, bypass pumping, shoring, dewatering, concrete, pipeline assembly, trench installation and equipment procurement and installation. We typically subcontract for rebar fabrication, traffic striping, paving & electrical (SCADA) installation. Mike Bubalo Construction Co., Inc. has a proven record of appropriate business ethics toward subcontractors, including, but not limited to, the following: a. Demonstrated knowledge of and compliance with federal, state and City of Los Angeles laws and regulations pertaining to utilization of subcontractors and business practices toward subcontractors; b. Demonstrated commitment to practices of good faith and fair dealing toward subcontractors; and C. Demonstrated record of satisfactory performance of contractual obligations owing to subcontractors, including timely payment. The following subcontractors have performed satisfactory work on our previous projects: Subcontractor Firm E-nor Innovations Statewide Traffic LnA Concrete All American Asphalt Beard Electric Knowledge of Local Conditions Work Performed Pavement Delineation Traffic Control Maintenance Concrete Structures/Flatwork Asphalt Paving Electrical/SCADA instrumentation Mike Bubalo personnel have extensive first hand experience trenching utilities throughout the entire City of Los Angeles over the past 38 years. Our staff has a working relationship with various local public utilities as well as numerous state and federal authorities. Safety: Overall safety has improved on site over the last two years for our worksites. We have zero (0) hours of lost time reported on OSHA form 300 reports for the last two years and have had a successful voluntary review and inspection of our safety plan and implementation by Cal -OSHA staff. We also have regular satisfactory reviews of our safety procedures from our insurance underwriters. On -Call Project History: MBC's has extensive experience responding to emergency repairs for various public agencies. MBC has encountered many challenges in all forms and manners of damages sustained by storm drain, sewer and waterlines and we have had considerable success and experience in quickly, safely and efficiently repairing broken pipes and damaged structures with our extensive history of work experience in underground utility construction. The majority of the emergencies that we have performed have resulted in positive benefits to the governing agency, the publics' convenience and safety and more efficient system performance. All repairs, modifications and redesigns were completed in-house by MBC staff. Listed below is a partial list of agencies that we have provided on -call services. Inland Empire Utilities District Chino Desalter Authority Orange County Water District Three Valleys Municipal Water District City of Industry City of Rancho Cucamonga City of Upland City of Long Beach City of Anaheim Los Angeles County Department of Public Works Los Angeles County Sanitation District Los Angeles Internal Services Department This partial list is what we have accomplished over the last 13 plus years of providing construction services to agencies of Southern California. We work closely with agencies to solve problems, not create them. From this cooperative effort many agencies request us to perform emergency work when the need arises. On those occasions when we are called out to repair the infrastructure we provide our expertise for repair and reconstruction in the most efficient and equitable manner. APPENDIX A: RESUMES DAVID D. SOREM, P.E. EDUCATION University of Southern California, Los Angeles, CA 8/84 to 5/85, graduate courses, Advanced Steel and Concrete Design California State University of Los Angeles, Los Angeles, CA 4/83 to 12/83, graduate courses, Engineering Application of Computers and Advance Structural Analysis. North Dakota State University, Fargo, ND Bachelor of Science, Civil Engineering, 11/81 Moorhead State University, Moorhead, MN Pre -engineering, 8/77 to 8/80 EXPERIENCE Mike Bubalo Construction Co., Inc. 1/00 to present Manager and Partner of Mike Bubalo Construction Co., Inc. Responsibilities include management, estimating, engineering and general operation of the corporation. Steve Bubalo Construction Co., Inc. 6/92 to 12/99 Project Manager Responsibilities include staff support and estimating for the construction of sewers, storm drains and water lines. Los Angeles County Department of Public Works (formerly Los Angeles County Flood Control District), Alhambra, CA 4/89 to 6/92 Section Head — Design Division, Contracting Section Responsibilities include the supervision of engineering staff for the preparation of plans and specifications for Public Works projects, the review and selection of consultants and negotiating contracts for their engineering services. Additional responsibilities include providing technical assistance to County Counsel and the presentation of projects to County Administration and other agencies. Total construction dollar amount - $90 million. 4/88 to 4/89 Unit Head — Design Division, Contracting Unit Same responsibilities listed above as Section Head. Total construction dollar amount - $20 million. 8/87 to 4/88 Project Engineer — Design Division, Technical Support section Act as the Department's Project Engineer/Manager for the planning and design of drainage and roadway projects. Encompasses instructing and advising Consultants that prepare construction drawings for the Department, Processing change orders and seeing that the overall project is on schedule. Partial list of projects as Project/Manager include: -Lincoln-Pico-Kanter Low Flow Bypass Department's portion ($430,000) -Harbor City Relief Drain ($8,300,000) 11/85 to 8/87 Project Engineer/Civil Engineer 1 — Design Division. Worked both in Structural Analysis Group and Technical Support Section. Same responsibilities as described previously in Project Engineer — Design Division. Technical Support Section with additional tasks of the Structural Analysis Group, which include analysis and preparation of construction drawings and specifications for Public Works projects. Worked as structural consultant to other Divisions and Administration within the Department. Performed structural review of permit submittals from private companies and public agencies. Partial list of projects as Project Engineer include: -Adams Blvd. Drain, Unit 1 and 2 ($6,200,000) -Poplink Drain, Unit 1 ($2,600,00) -Adams Blvd. Drain, Unit 3 ($6,250,000) -No. Torrance Relief Drain Concept Report -Adams Blvd. Drain, Unit 4 Concept Report -Little Tujunga Wash Bridge Stabilizer ($490,000) -White Canyon Road; Phase 1 ($5,300,000) 12/83 to 11/85 Senior Civil Engineering Assistant, promoted to Civil Engineer 1, 2/85 — Design Division, Structural Analysis Group. Same responsibilities as described above for the Structural Analysis Group 7/83 to 12/83 Senior Civil Engineering Assistant — Design Division, Project Design Section Performed design work for flood control projects. Typical assignments consisted of alignment, grading, hydraulic and structural analysis for storm drains, channels, debris basin and other flood control facilities. 2/82 to 7/83 Civil Engineering Assistant, Operation and Maintenance Division. Responsibilities included engineering for the maintenance and repair of dams, debris basins, spreading grounds, channels, and debris disposal areas. Professional Affiliations: 1. American Society of Civil Engineers (ASCE) 2. Construction Institute of American Society of Civil Engineers 3. Engineering Contractors Association (E.C.A.) Board of Directors, Secretary 2010 & 2011, Vice President 2012. President 2013. 4. "Greenbook" Committee of Public Works Standards, Inc. 5. Construction Industry Coalition on Water Quality (CICWQ),Board of Directors 6. Rebuild SoCal Partnership, Board Member 2016-Present, Chairman 2018-2019 Technical Committee Involvement: Standard Specifications for Public Works Construction (Greenbook) New Materials -Underground Precast Reinforced Concrete Box Standard Plans Rewriting Section 306-Underground Conduit Construction Construction Industry Coalition on Water Quality (CICWQ) Low Impact Development (L.I.D.) Cost Estimates for Orange County Public Works LICENSE State of California, RCE No. 38784 K. BRIAN RICKEY, P.E. EDUCATION California State University of Long Beach, Long Beach, CA Bachelor of Science - Civil Engineering (BSCE) 1988 Masters of Science - Civil Engineering (MSCE) 1991 - Construction Management EXPERIENCE Mike Bubalo Construction Co, Inc. — Baldwin Park, CA 8/07- Present Project Manager Responsibilities include project management and engineering of Public Works related projects. Sully Miller Contracting Co. —Anaheim, CA 2/06 to 5/07 Quality Control Director Responsible for all elements of the quality control department including daily oversight and materials testing/certification for construction, AC production, and aggregate crushing business units to ensure conformance with specifications. Also provided technical analyses for materials related issues associated with bid estimating, ongoing construction projects, and material supply contracts. Los Angeles County Department of Public Works 1/03 to 2/06 Section Head/Materials Engineer - Geotechnical & Materials Engineering Division, Materials Engineering Section Responsibilities included the supervision of engineering and technical staff within the materials laboratory, materials analysis, and pavement management work groups including the coordination of services performed for contract cities. The materials laboratory provided quality assurance testing and analysis for rock products, asphalt, concrete, and also geotechnical analysis. Additional responsibilities included representing the Department on all materials related issues related to public works contracts including technical and forensic analyses for County Counsel. 7/02 - 1/03 Assistant Section Head - Construction Division, Contract Inspection II Section Responsibilities included supervision of contract administration and quality assurance inspection staff for Department administered storm drain and water conservation related capital improvement projects. Also provided technical and procedural oversight to meet field conditions and ensure conformance with project plans and specifications. 6/96 - 7/02 Supervising Civil Engineer I/Resident Engineer - Construction Division, Contract Inspection I Section Responsibilities included the supervision of technical staff performing utility coordination, contract administration and contract compliance for the Alameda Street Ports Access Demonstration Projects. Alameda Street projects (Phases I thru 11113, Del Amo Grade Separation, and Sepulveda Grade Separation) Included: (3) grade separations, (6) miles of road reconstruction, traffic signals, storm drains, rail and (2) pump stations - total project value exceeding $100 million. 5/92 — 6/96 Principal Civil Engineering Assistant — Construction Division, Contract Inspection I Section Provided quality assurance inspection for bridge retrofit projects to ensure conformance of materials and construction with plans and specifications. Inspection included the preparation of daily work reports, analysis and processing of change orders, review of monthly pay estimates, claims review, negotiation, and coordinating work with utility agencies, and adjacent businesses. 1/89 to 5/92 Civil Engineering Assistant — Land Development Division, Road Sewer and Water Section Performed engineering review of plans to ensure conformance with County standards in the design of roads associated with land development tracts and parcel maps. 3/86 to 1/89 Student Worker — Land Development Division, Road Sewer and Water Section Responsible for mapping and maintaining wall sheets of tract and parcel maps recorded within Los Angeles County including annexations to cities. PROFESSIONAL AFFILIATIONS Association of Asphalt Paving Technologists (AAPT) American Society of Civil Engineers (ASCE) TECHNICAL COMMITTEE INVOLVEMENT Caltrans Section 39 Rewrite Task Group Rock Products Standard Specifications for Public Works Construction (Greenbook) New Material and Methods — Surface AC Task Force Slurry Seal Task Force: Past Chairman Concrete Ad -Hoc Asphalt Pavement Association (APA) Los Angeles Technical Committee: Past Co -Chairman Rubberized Concrete Committee: Past Co -Chairman LICENSE State of California, RCE No. 54535 Brad Sorem Education California State Polytechnic University Pomona, CA March 2009 to Pomona December 2013 ■ Bachelor of Science, Construction Engineering Technology Work Experience Mike Bubalo Construction Co. Inc. Baldwin Park, CA June 2001 to Present Project Coordinator ■ Laborer 2001 to 2005 ■ Project Coordinator/Project Manager 2005 to Present: responsible for take offs, estimating, coordination with subcontractors and material suppliers, change orders, submittals, permits, safety, project coordination and management, equipment management, air quality compliance, storm water pollution prevention plans, etc. Protect Experience • Dover Drive Trunk Sewer Relief and Domestic Waterline Relocation — Orange County Sanitation District - 2013 o Project Coordinator - Construct 7,200 LF of VCP sewer and relocate 2,400 LF of 8-inch and 6-inch PVC waterline. • Dana Point Town Center Infrastructure Improvements Phase II — South Coast Water District - 2014 o Project Manager — Construct 2,800 LF of 8-inch and 15-inch PVC sewer and 6,500 LF of 8-inch and 10-inch PVC waterline. • Wineville Recycled Waterline Extension Segment B — Inland Empire Utilities Agency - 2014 o Project Coordinator — Construct 12,400 LF of 36-inch CML&C recycled waterline and 9 triple offset butterfly valves. • Newport Ave. 16-Inch Watermain Valve Installation Project — City of Tustin - 2015 o Project Manager — Install three 16-inch gate valves with the use of line stops. • Avenida Palizada Turnout Refurbishment — South Coast Water District - 2015 o Project Manager— Demolish three existing turnout vaults and 10-inch piping and consolidate new turnout and piping into one large vault. • El Camino Real Improvements — Toll Brothers Inc. - 2015 o Project Manager — Construct 5,000 LF of 12-inch recycled waterline, 200 LF of 12-inch potable waterline, 500 LF of 8-inch PVC sewer and 5,200 LF of RCP ranging in size from 12-inches to 48-inches. Also the construction of 34 LF of double 4'x8' RCB and 92 other concrete drainage structures. • Los Cerritos Channel Sub Basin 4 Infiltration - City of Signal Hill — 2016 to 2019 o Assistant Project Manager — Design build project consisting of the construction of 31-acre-foot subterranean storm water infiltration basin, a storm water diversion inlet from the Los Cerritos Channel and two hydrodynamic separators capable of handling a total of 166 cubic feet per second of storm water. • City of Los Angeles Emergency Sewer Repair Program — City of Los Angeles 2017 to Present o Project Manager — Oversight of all tasks relating to emergency sewer repairs within the City of Los Angeles. • City of Los Angeles Emergency Storm Drain Repair Program — City of Los Angeles 2017 to Present o Project Manager — Oversight of all tasks relating to emergency storm drain repairs within the City of Los Angeles. ANTON BRKIC EDUCATION California State Polytechnic University of Pomona, Pomona, CA Bachelor of Arts, Architecture, 8/95 EXPERIENCE Mike Bubalo Construction Co., Inc. 1/00 to present Project Estimator Responsibilities include project management, estimating, engineering and general management of main office and field operations. Steve Bubalo Construction Co., Inc. 4/93 to 10/99 Project Coordinator Responsibilities include project management, estimating, engineering and general management of main office and field operations. Tomislav Gabric & Associates, Architects 6/92 to 4/93 Draftsman Responsibilities include production of plans and specifications for various types of commercial and industrial building designs. Loffredo & Volarich, Insurance Investigators 2/89 to 6/92 Field Agent Responsibilities include sub-rosa investigations, process server, claims investigator, legal research, court records research and retrieval. Operating Engineers, Local 12, Health and Welfare Trust Funds 6/87 to 9/88 File Clerk Responsibilities include mail room duties and archival records research and retrieval. Oscar Camarena, Foreman 2005 to Present Mike Bubalo Construction Co., Inc. 1989 to 2005 Precision Pipeline Duties: Set up and coordinate public works projects. Oversee the installation of water lines, sewer lines, and recycled water lines. Potable water lines installed were from 8 to 48 inches in diameter. Installation of copper house connections, blow off assemblies, air vacuum assemblies and fire hydrants. Installation of valves includes inline gate valves, butterfly valves, check valves, cathodic protection and pressure reducing valves in various sizes. Also have completed hydrostatic testing, chlorination of potable water lines and worked with microbiology laboratories. Recycled water lines installed were from 8 to 60 inches in diameter. Completed the retrofitting and upgrading of existing and new pump stations. Agencies Worked For: Inland Empire Utilities Agency, Eastern Municipal Water District, Central Basin Municipal Water District, City of Seal Beach, City of Anaheim Public Utilities Department, City of Chino Public Works, Los Angeles County Sanitation District, City of Glendora Water Division, City of Covina Public Works, City of Pico Rivera Water Division, City of Ontario Public Works, City of Montclair Public Works and Upper San Gabriel Valley Municipal Water District. John Sarna 2010 to Present - Mike Bubalo Construction Co., Inc. Upper San Gabriel Valley Municipal Water District — City of Industry Phase IIB Recycled Waterline Inland Empire Utilities Agency — Turner Basin 16 inch Reclaimed Waterline Extension Foothill Transit — Parking Structure Fire Line Extension 2006 to 2009 — Surf City Construction Desert Water Authority - 12 inch Mainline Extension and Hydrant Installations Coachella Valley Water — 16 inch Mainline Extension and Hydrant Installations Longs Drug — Fire Line Installations Indio Water — Fantasy Springs 12 inch Bypass and Mainline 1998 to 2006 — JMS Excavating and Grading Arizona Water Co. — Various watermain, hydrants and service connections installed as well as booster pumpstations. Kachina Village Improvement District - Various watermain, hydrants and service connections installed and repairs to existing mainlines. Munds Park Water Co. - Various watermain, hydrants and service connections installed. Prescott Valley Water Co. - Various watermain, hydrants and service connections installed. Williamson Valley Water - Various watermain, hydrants and service connections installed. City of Phoenix - Various watermain, hydrants and service connections installed and booster pumpstation upgrades. 1996 to 1998 — Peter Kiewit Pulliam Airport Waterline Improvements — 12 inch mainline with hydrants and service connections. 1982 to 1996 — MMW Equipment Rentals Various Utility Projects K Educational s . _t Signage : t y qp�+ y ti fi I�ew landscaping New Pavement , �� �� �.�. le S? '•' �'k P F;) kc WO J i r,'} h ' Dwarf Coyote Brusli, � C pep in Oregon Grape SaNTAaNa CITY OF SANTA ANA CONSTRUCTION CONTRACT AGREEMENT PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT This CONSTRUCTION CONTRACT is made and entered into this 21" day of January, 2025 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Mike Bubalo Construction Co., Inc. (hereinafter "CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Rousselle Street Flood Protection Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed Four Million One Hundred Thirteen Thousand Two Hundred Fifty -Nine Dollars and No Cents ($4,113,259.00), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A", and in accordance with Section 2-7.1 of the Greenbook: Standard Specifications for Public Works Construction. The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. Page 1 of 4 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: http://www.santa-ana.org_/t)wa/documents/CWA.pdf 7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attorney's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of any of the obligations under the Contract Documents; Page 2 of 4 (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work of Improvement. (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee. Subcontracts, if any, shall contain a provision making them subject to all of the provisions stipulated in this Construction Contract. With respect to any conflict between such federal requirements and the terms of this Construction Contract and/or the provisions of state law and except as otherwise required under federal law or regulation, the more stringent requirement shall control. [signature page to follow) Page 3 of 4 IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: JENNIFER L. HALL City Clerk SONIA R. CARVALHO City Attorney Icy E NELLESEN Assistant City Attorney RECOMMENDED FOR APPROVAL: Digitally signed by Nabil Sala N a b i I S a h b a Date: 2025.01.06 14:05:46 -08,00, NABIL SABA, PE Executive Director Public Works Agency CITY OF SANTA ANA ALVARO NLNEZ City Manager CONTRACTOR: Mike Bubalo Construction Co., Inc. (�ii NAME: L7 VE TITLE: ltt-> Page 4 of 4 EXHIBIT A CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: MIKE BUBALO CONSTRUCTION CO., INC. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Price Amount 1 Shoring of Open Excavations 1 LS $ 200,000.00 $ 200,000.00 2 Dewatering As -Built Plans 1 LS I $ 30,000.00 $ 30,000.00 3 1 1 LS $5,000 $ 55,000.00 $5,000 $ 55, 000.00 4 Clearing and Grubbing Unclassified Excavation LS 5 526 CY $400.00 $ 210,400.00 6 Asphalt Concrete (ARHM) 488 406 TON $ 215,00 $104,920.00 $ 101, 500.00 7 Asphalt Concrete (HMA) TON $ 250.00 $150.00 8 CMB or Class 1I Base 300 CY $ 45,000.00 $ 69,810.00 9 1 Cold Milling (2" Max) 23,270 SF $ 3.00 Curb and Gutter per C.S.A. Std. 1101, 10 A-2-6 690 LF $100.00 $ 69,000.00 $ 11 ! Curb, Type A-2-6 (Modified) per Sheet 6o LF $100.00 DA-02 SF 6,000.00 G' Wide Bike Lane (Modified Type A-2- l2 8 Curb) Per Sheet DA-02 310 $100.00 _ $ 31,0.00.00 1,080 LF Cutb acid Gutter per SPPWC Std. 120-3, 13 A3-6 $ 50.00 $ 54,000.00 $17,250.00 14 PCC Sidewalk per C.S.A. Std. 1104 690 SF $25.00 Fire Access Path, 8" PCC Over 15 CompacteAl Subgrade, Transition 307 SF $ $ Adjacent Curbs to 3" T-ligh 64• SF' - 30.00 9,210.00 _ 16 I Curb Ramp per Caltrans Std. A88A, Case A $ 50.00 $ 32, 000.00 P-1 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT Item Description Qty Unit Unit Price Amount 17 Modified Curb Ramp per SPPWC Std, 111-5, Case A Type 6 l40 SF $100.00 $14, 000.00 18 Curb Ramp per Caltrans Std. A88A, Case F 140 SF $100.00 $14,000.00 19 Adjust Water Valve Frame and Cover to Grade per C.S.A. Sid. 1410 EA $2,000.00 $18,000.00 20 Adjust Manhole Frame and Cover to Grade per C.S.A. Sid. 1201 5 EA $ 2,000.00 $ 10, 000.00 21 Interpretive Signage Per Detail G on Sheet QD-0I 1 E'� $ 5,000.00 $ 5,000.00 22 Drought -Tolerant Landscape -Buffer 1 LS $ 20,000.00 $ 20,000.00 23 Construction Tnformation Sign 1 EA $ 1 0 000.00 $ 10, 000.00 24 Project Acknowledgement Sign (Prop 68 Grant) 1 EA $10,000.00 $10,000.00 8' W x T H RCB per Caltrans Std. 25 D83A and D83B with Earthwork per Caltrans Sid.A62G 1,295 LF $ 1,700.00 $ 2,201,500.00 10' W x CH RCB per Caltrans Sid. 26 D83A and D83 B with Earthwork per Caltrans Sid. A62G 50 LF $ 2,600.00 $ 130,000.00 27 5' Transition Structure Single RCB to Single RCB per SPPWC Std. 343-2 2 EA $10,000.00 $ 20,000,00 28 5' Transition Structure Single RCB to Single RCP per SPPWC Sid. 342-2 1 EA $ 60,000.00 $ 60,000.00 29 Weir, Thigh, per Detail I on Sheet QD- I Ls $10,000,00 $10,000.00 02 30 Manhole per SPPWC Std. 323-2 Without Reducer 5 EA $20 000.00 $100,000,00 31 Junction Structure per SPPWC Std. 334- 2, Case 2 3 EA ' 12,000.00 $ 36,000.00 32 18" RCP and Bedding per C,S.A. Std. 5 LF $ 500.00 $ 2,500.00 1150 33 24" RCP and Bedding per C.S.A, Sid. 1150 80 LF 600.00 $ 48, 000.00 34 Local Depression per C.S.A. Sid. 305 2 EA $1,000,00 $ 2,000.00 35 Catch Basin per SPPWC Sid. 300-4 with CPS Unit and Stenciling 2 EA $ 20,000.00 $ 40,000.00 36 Monolithic Catch Basin Connection per SPPWC Std. 308-3 l EA $20,000.00 $ 20,000.00 37 6.5' x 4' Contech Filterra or Approved 2 EA $10,000.00 $ 20,000,00 Equal 38 16' x 8' Contech Filterra or Approved Equal 1 EA $ 50,000.00 $ 50,000.00 39 6" PVC Pipe, Appurtenances, and Bedding per C.S.A. Std. 1150 65 LF $ 200.00 $ 13,000.00 P-2 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6627 ROUSSH.I.E STREVT FLOOD PROTECTION CTION 111W.11=C1 Item Description Qtv Unit Unit Price Amount 40 8" Class 350 Ductile Iron %% ater plain Vertical Offset Per C'.S.,\. Sid. 1413A with Adapters per C.S.A. Sid. 144, 80 LF S 600.00 S 48,000.00 41 Signing and Striping(Includes Remmal ot�F,xistim, Striping.Pa\ement Markings) I LS S 20.000.00 S 20,000.00 42 Additional Potholing(As-Needed)"` 5 EA S5,000.00 S25,000.00 - t3 Tree Removal and Replacement (As- Needed)" 7 F:\ S5,000.00 — '35,000.00 -u Root Slim ing(As-Needed)` 15 EA S700.00 S10,500.00 44; 90-Dad Landscape Establishment I LS S$ 000.00 S$ 000.00 46 Construction Permit I LS S17.669 S17.669 Biel Alternates 47 Add -Alt Landscaping I I.S S 55,000.00 ` 55,000.00 TOTAL BASE BID S4,058,259.00 TOTAL ADD ALTERNATE BID I S4,113,259.00 The lowest responsible bidder shall be selected based on the total base bid. The City reserves the riollt to award the Base Bid. and any, all. or none of the add -alternate bid items (ifany). The quantity for this bid item is shown Im bid comparison only. This hid item shall not be subject to the " 25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount fur this item \\ ill be dictated b\ the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordinuk This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIN -IL FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATLD DAMAGES ]'he Undersigned bidder hereb: proposes to complete the VVorlc for the total base bid amount shows above. \%ithin 200 ,ovorklna.days after tile commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed. Contractor shall immediately place order tur lone -lead time items (i.e. Reinforced C'oncrcte Box storm drain. Filterra Units. etc.) in accordance m ith grant funding requirements. Wort: shall be completed by December 3 I. 2025. Refer to the Grant Agreement included in Appendix K. The liquidated damagcs amount. in lieu of the anlOUllt specified ill SUhSeCUon 6-9 of till' Standard Specifications, shall he $3,750 per calendar clay. P-3 of P-20 CITY OF SANTA ANA PROPOSAL PROJECT NO,: 23-6627 ROUSSELLE STREET FLOOD PROTECTION PROJECT Name of Firm MIKE BUBALO CONSTRUCTION CO., INC. Signature of BIDDER Title President (If an individual, so state, If a firm or co -partnership, state the firm naive and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Dave Sorern, President, Manager Jason Bubaio, Secretary, Treasurer P-4 of P-20 COST ANALYSIS CONSTRUCTION OF PROJECT NO. 23-6627: Rousselle Street Flood Protection Project Construction Contract $ 4,113,259 Contract Administration, Inspection and Testing $ 615,000 Contingencies $ 411,000 TOTAL ESTIMATED CONSTRUCTION COSTS $ 5,139,259.00 DW State of Califomia - Department of Fish and Wildlife HE 2024 ENVIRONMENTAL DOCUMENT FILING FEE 1*7 CASH RECEIPT DPW 753.5a (RF-V. WOWS) Previously DFG 753.6a SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY. Print $terl0>rer Save RECEIPT NUMBER: 30 — 07/03/2024 0572 STATE CLEARINGHOUSE NUMBER (ffapplioabfe) LEAD AGENCY LFADAGENCY EMAIL DATE OCPW, DEVELOPMENT SERVICES 07/03/2024 COUNTYISTATE AGENCY OF FILING DOCUMENT NUMBER Clrnnna 12D2485000579 PROJECT ROUSSELLE STREET FLOOD PROTECTION PROJECT PROJECT APPLICANT NAME PROJECT APPLICANT EMAIL PHONE NUMBER CRAIG FOSTER, NPDES MANAGER, CITY OF SANTA (714 ) 647 5659 PROJECT APPLICANT ADDRESS CITY STATE ZIP CODE 20 CIVIC CENTER PLAZA M-36 SANTA ANA CA 92702 PROJECT APPLICANT (Check appropdate box) [a Local Public Agency School District Other Special District State Agency [] Private Entity CHECK APPLICABLE FEES; 0.00 [IEnAronmental Impact Report (EIR) $4,051.26 $ ❑ MitlgaledlNegative Declaration (MND)(ND) $2,918.75 $ 0.00 ❑ Certified Regulatory Program (CRP) document - payment due directly to CDFW $1,377.26 $ 0,00 El Exempt from Fee R Notice of Exemptlon (attach) ❑ CDFW No Effect Determination (attach) ❑ Fee previously paid (attach previously issued cash receipt copy) ❑ Water Right Application or Petition Fee (State Water Resources Control Board only) $850.00 $ 0.00 ❑ County documentary handling fee $ ❑ Other $ PAYMENT METHOD: 0.00 El Cash ❑ Credit ❑ Check El Other TOTAL RECEIVED $ SIGNATURE _ AGENCY OF FILING PRINTED NAME AND TITLE IA NA HERRERA, DEPUTY ORIGINAL- PROJECT APPLICANT COPY-MMAGG COPY-LEADA09NCY COPY -COUNTY CLERK DFW753.5a(Rov.M10112023) ORANGE COUNTY CLERK -RECORDER CEGA FILING COVER SHEET :S-o-�.1 zo - 0572 Recorded in Official Records, Orange County Hu h Clerk -Recorder Illllllli II Illlllllllllllillllllllllllllllllllllllllllllllllllll NO FEE *$ R l7 0 1 5 0 2 b 5 3 1 � 20248500057911:34 am 07/03/24 477 Vitlndx Z01 0.00 60.00 0.OD 0.00 0.00 0.00 0.00 0.00 Complete and attach this form to each CEQA Notice filed with the Cncnly Clerk -Recorder TYPE OR PRINT" CLEARLY Project Title ROUSSELLE STREET FLOOD PROTECTION PROJECT Check Document being Filed: 0 Environmental Impact Report (EIR) 0 Mitigated Negative Declaration (MND) or Negative Declaration (MD) Notice of Exemption (NOE) 0 Other (Please fill in type): FILED JUL a 3 2024 GIONGE COUNTY cLERti RECORDER DERARTMEN7 �Y; C 'H DEPUTY FILED IN THE OFFICE OF THE ORANGE COUNTY CLERK -RECORDER ON July 3, 2024 Posted for 30 days DEPUTY CARINA HERRERA Filing fees are duo nt the time a Notice of DaterminationfExomption is filed with our offfco.For more Information on filing fees and No Effect Determinations, please refer to California Code of Regulations, Title 14, section 753.5. MAYOR Valerie Amozoua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathen Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquoz PUBLIC WORKS AGENCY 20 CNIo center Plaza (M-36) P.O. BOX 1988. Santa Ana, Califomla 92702 (714) 647-5690 s Fax (714) 047-6823 www.santa-arta,org INTERIM CITY MANAGER Alvaro Nuifez CITY ATTORN EY Sonle R. Carvalho CLERK OF THE COUNCIL Jennifer L. Hall NOTICE OF EXEMPTION From the Requirements of the California Environmental Quaiity Act (CEQA) Fee Exemption per California Government Code Section 6103 To: COUNTY CLERK From: City of Santa Ana County of Orange Public Works Agency P.O. Boat 238 20 Civic Center Plaza (M-36) Santa Ana, CA 92702 Santa Ana, CA 92702 Project Title: Rousselle Street Flood Protection Project Project Number(s): 23-6627 Project Location: Roussel Ia Street (Warner Ave to St Gertrude PI) City: Santa Ana County: Orange ER Plumber: ER-2024-57 Project Description: This project consists of the installation of storm utility work, paving, signage, striping, and Irrigation system will be constructed in its place. Applicant Name: Craig roster, NPDES Manager City of Santa Ana Public Works Agency Applicant Address: 20 Civic Center Plaza M-36 Santa Ana, CA 92702 Name of Public Agency Approving Project: City Council Name of Agency Carrying Out Project: Public Works Agency Exempt Status: Date of Approval: 06106/2023 drain system Improvements, drought tolerant landscaping, The existing storm drain will be removed and a larger FILED ❑ Ministerial (Sec. 15268) JUL 0 3 2024 M Declared Emergency (Sec. 15269 (a)) © Emergency Project (Sec, 15269 I;b through e)) ORANGE COUNTY CLERK -RECORDER DI:PARTMEKT �ECORD ❑ General Rule (Sec. 15061(b)(3)1(5)) 13Y: t i DEPUTY ❑ Statutory Exemption: 0 Categorical Exemption: 15301(b), 15501(c), and 15302(c) Reason(s) Why Project is Exempt Prom CEQA: The project will include the replacement of an undersized storm drain line to prevent ongoing flooding issues. The proposed storm drain will be in a similar location and serve the same purpose. The project includes minor alterations (modified landscaping) to existing land. There would not be significant adverse effects to traffic, noise, air quality, or water quality and would be adequately served by required utilities and public services. City Contact: Craig aster Title: NPDES Manager Telephone: (714) 647-5659 Signature: Date: SANTA ANA CITY COUNCIL Valedo Arnezeue Thal Viet Phan Jessie Lopez Banjamlrt Vazquez Phil eaoerra Johnathan Ryan Hernandez David Penaloza Mayor Mayor Pro Tern, ward 1 Ward 3 Ward 2 Ward 4 Ward 6 Ward 6 vamercuarRsnnla-ana.orG tohnnpsanta-ana.ora Easslrlaeazr nts-ene aro kiyaxauaz�}saafe-aaaarta. phacerrnOsanta-ana.t�m Irvanhernandoz(aisnnte-sna.nrn doenalo.30�aanta-ana.ora EXHIBIT 7 PROJECT TITLE: Rousselle Street Flood Protection Project PROJECT CATEGORY: Utility/Drainage/Lighting Improvements Storm Drain/Water Quality LOCATION MAP AGENCY: Public Works CITY OF SANTA ANA FY 24/25CIP CAPITAL IMPROVEMENT PROJECT WORKSHEET PROJECT DESCRIPTION: Design and construction of the Rousselle Street Flood Protection Project. This project features the upgrade of existing City stormdrain on Rousselle Street, from Warner Avenue to St Gertrude Place, and was identified in the City's 2018 Storm Drain Master Plan as one of the top 10 recommended capital projects. PROJECT COSTS Construction PROJECT NEED: The City experiences significant flooding during intense rain events, which has negative impacts on vehicles and pedestrian travel, business operations, and causes property damage. The project will increase the capacity of the City's stormdrain system to reduce flooding and also includes stormwater treatment devices. FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 831,000 - - - - - - TOTAL 831,000 SOURCE OF FUNDS FED CLEAN WATER TOTAL DIVISION: Construction Engineering FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 831,000 - - - - - - 831,000 CONTACT: Craig Foster, NPDES Manager DATE: 21-Jan-2025