HomeMy WebLinkAbout88-050· BY: ORD/RE O
? - - 8'7
RESOLUTION NO. 88-50
REL :mb(14)
6/15/88
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA ANA SETTING SEWER CONNEC-
TION FEES
WHEREAS, section 39-53 of the Santa Ana Municipal
Code ("SAMC") requires payment of a fee for sewer connections
to pay for the cost of sewer construction; and
WHEREAS, said SAMC section 39-53 provides that the
amount of the fee is based on an assessment per fixture units,
except that in the case of parcels not previously connected to
a public sewer the fee for the first occupancy unit benefitted
by the sewer connection is based upon the standard cost of
construction of a sewer main for a distance equal to the lineal
street frontage of the subject parcel; and
WHEREAS, in accordance with SAMC section 39-53, the
assessment per fixture unit and the standard cost of sewer
construction per lineal foot of street frontage is to be speci-
fied by resolution of the City Council; and
WHEREAS, the City Council does now find it necessary
to increase the sewer connection fee;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF SANTA ANA AS FOLLOWS:
1. For purposes of SAMC section 39-53, the assess-
ment per fixture unit is set at $26.00 and the standard cost
of construction of a main sewer line is set at $42.00 per lineal
foot.
2. The purpose of the fee is to provide for sewers
to meet the sanitation needs of the owners and occupants of
property in the City.
3. The use to which the abovesaid Fee will be put
is the construction, or reimbursement for construction, of
sewers. The public facilities to be financed by the Fee are
identified in Exhibit A, attached hereto and incorporated herein.
4. The fee applies to all types of development pro-
jects, including residential, commercial, office and industrial,
which require connection to the public sewer system. The use
of the fee for sewers and the need for such facilities is
reasonably related to all types of development projects because
all such development projects generate sewage and require the
protection from sewage provided by sewers.
5. As used hereinafter "project" means proposed
construction activity which is subject to the payment of a
sewer connection fee under SAMC sections 34-191 through 34-195
and as to which construction pursuant to a validly issued
335
336
RESOLUTION NO. 88-50
PAGE TWO
building permit has not commenced as of the date of adoption
of this resolution.
6. Ail previous resolutions of the City Council
establishing or increasing sewer connection fees are superseded
by this resolution, and the fees established by this resolution
shall apply to all projects, except as otherwise hereinafter
provided.
7. Any project for which a building permit has
been issued prior to the adoption of this resolution shall be
subject to the sewer connection fee which applied to such project
immediately prior to the adoption of this resolution unless
such building permit expires without commencement of construction.
ADOPTED this 5th day of July , 1988.
ATTEST .'
COUNCILMEMBERS:
Young A.¥e
McGuigan A.¥e
Hart Absent
M ay Aye
Acosta Ave
Pulido Ave
Griset Aye
APPROVED AS TO FORM:
~er
City Attor-~ey
5
6
7
8
9
10
11
12
13
14
15
16
~' 17
18
2O
21
22
23
EXHIBIT A
PROJECT IDENTIPICATION
SEWER CONNECTION FEE
PROJECT
San Lorenzo Pump Station
Maxine Pump Station &
Connecting Sewer
3rd St: Bristol to Flewer
6th St: Bristol to Flower
Reserve for Emergency Repair
Highland St: Bristol to Flower
Richland St: Bristol to Flower
Cubbon St: Bristol to Flower
Walnut St: Baker to Flower
Pine St: Baker to Flower
Memory Lane: Arnett to Flower
Baker St: 1st to Chestnut
Chestnut St:Halladay to Standard
Alley bet. 3rd & 4th St:
Main to Bush
Sullivan St: 1st to 5th Streets
Fifth St: Sullivan to 200'
E/O Hawley
Segerstrcm Ave: Susan to Harbor
Tenth Street:
Tenth Street:
15th Street:
Rosa to Flower
Freeman to Flower
French to Main
Civic Center:Poinsettia to Minter
Central: Birch to Main
Third Street: Raitt to Pacific
PROJECT DESCRIPTION
Upgrade Pump Station Sewage Capacity
Upgrade Pump Station Sewage Capacity &
convert force main to gravity line
Upgrade 6" sewer line to 8" sewer line
Upgrade 6' sewer line to 10" & 8" sewer
lines
Emergency repair of sewer lines
Upgrade
Upgrade
Upgrade
Upgrade
Upgrade
Upgrade
Upgrade
Upgrade
6" sewer line to 8" sewer line
6" sewer line to 8" sewer line
6" line to S" line
6" line to 8" line
6" line to 8" line
15" line to 18" line
12" line to 15" line
6" line,to 8" line
Upgrade 6" line to 8" line
Upgrade 8" line to 10" lien
Construct 10" Sewer line
Upgrade 8" line to 12" line
Conetruet 8" sewer Line
Construct 8" sewer line
Construct 8" sewer line
Construct 8" sewer line
Construct 15" sewer line
Upgrade 6" line to 8" line
337