HomeMy WebLinkAbout89-063283
RESOLUTION NO. 89-063
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA ANA SETTING DRAINAGE AREA
FEES
WHEREAS, sections 34-91 through 34-195 of the Santa A~a
Municipal Code ("SAMC") establishes the authority for the City to
establish fees to pay for drainage facilities required to meet
drainage needs created by development; and
WHEREAS, pursuant to SAMC section 34-194, thirteen such
drainage areas have been established within the City of Santa Ana;
and
WHEREAS, in accordance with SAMC section 34-193, the
drainage area fee shall be specified by resolution of the City
council; and
WHEREAS, the City Council does now find it necessary to
increase the drainage area fees;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SANTA ANA AS FOLLOWS:
1. In the drainage areas of the city of Santa Ana, the
fees charged pursuant to SAMC section 34-193 shall be as follows:
Drainage
Area Fee/Acre
I $3425
II 3280
III 3700
IV 2450
V 3675
VI 2730
VII 3150
VIII 2500
IX 1965
X 2680
XI 3250
XII 1240
XIII 1080
RESOLUTION NO. 89-063
PAGE TWO
2. In accordance with SAMC section 34-191, the purpose
of the drainage area fee is to provide for drainage facilities
required to meet the drainage needs created by subdivision or other
development of properties within local drainage areas which
increase storm water runoff by coverage of absorption areas and
increase demand for protection from storm waters.
3. In accordance with SAMC section 34-192, the use to
which the abovesaid fee will be put is the construction, or
reimbursement for construction, of drainage facilities within the
local drainage area from which the fee was collected. The pubic
facilities to be financed by the fee are identified in Exhibit A,
attached hereto and incorporated herein.
4. The fee applies to all types of development
projects, including residential, commercial, office, and
industrial, which will increase storm water runoff by coverage of
absorption areas and increase demand for protection from storm
waters. The use of the fee for drainage facilities and the need
for such facilities is reasonably related to all types of
development projects which have such effects because all such
development projects generate storm water run-off or receive the
benefit of protection from storm waters provided by such
facilities. The restriction of the use of fees to drainage
facilities which are within the local drainage areas from which the
fees are derived assures that the fees derived from any given
development project are used to provide those drainage improvements
which most directly address the needs created by such development
project.
5. As used hereinafter "project" means proposed
construction activity which is subject to the payment of a drainage
area fee under SAMC sections 34-191 through 34-195 and as to which
construction pursuant to a validly issued building permit has not
commenced as of the date of adoption of this resolution.
6. Ail previous resolutions of the City Council
establishing or increasing drainage area fees are superseded by
this resolution, and fees established by this resolution shall
apply to all projects except as otherwise hereinafter provided.
RESOLUTION NO. 89-89-063
PAGE THREE
7. Any project for which a building permit has been
issued prior to the adoption of this resolution shall be subject
to the drainage area fee which applied to such project immediately
prior to the adoption of this resolution unless such building
permit expires without commencement of construction.
ADOPTED this 3rd day of ..
, 1989.
ATTEST:
~_~ice C. Guy /~'
ClRrk of the Councl~l~
Mayor
COUNCILMEMBERS:
Acosta Ave
Griset Ave
May Ave
McGuigan Awe
Norton Ave
Pulido Ave
Young ^ye
APPROVED AS TO FORM:
City Attorney
286
EXHIBIT "A"
Drainage
Area
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
Present
Fee/Acre
$3260
3140
3525
2335
3500
2600
3000
2380
1870
2550
3095
1180
1030
Proposed
Fee/Acre
$3425
3280
3700
2450
3675
2730
3150
2500
1965
2680
3250
1240
1080
EXH'r B'r T ~.
DRAINAGE
PROJECT ASSESSMENT PROJECT
ITEM TITLE AREA LOCATION LIMITS
STORM DRAIN
1. C5FS 10 McFadden
Jackson to
Harbor Blvd.
Westerly
Construct 45" RCP
2. U-5 3 Edinger RR Tracks to
(Reimbursement Grand Ave.
to SAUSD)
3 Grand Ave. Edinger to
S.P. of SCE
Construct 57" RCP
Construct 42" RCP
3. F2-5
13 Edingsr F02 Channel
to Sullivan
Center St.
Borchard to
Edinger
Construct 48" RCP
Construct 42" RCP
4. Ri (PhaseII) 6 Anahurst Pl. Flower to Construct 12'x8'
to Woodland Pl. Woodland Pl. -6" Box
Woodland Pl. Anahurst Pl. Construct ll'x9'
St. Gertrude Box
5. R1 (PhaseIII) 6 Woodland Pl. St. Gertrude Construct llx9'
St. Andrews Pl. Box
6. Ri (Remaining) 6 Garnsey St. Camile to Construct 8'6"x
St. Andrews Pl. 9' Box
Camile St. Ross to Construct 7'-l"x
Garnsey 8'6" Box
Ross civic Center Construct 6'-9"x
to Camile Box
7. Sl (Phase III) 5 Washington Bristol to Construct ll'x
Flower 5'-6" Box
Flower Washington to Construct70" RCP
Seventeenth
288
EXHIBIT
(Page 2 of
8. F2-4 13 McFadden F02 Channel Construct 54" RCP
to Sullivan
9. F2-1A (Phase I)13 Raitt Third St. to Constln/ct 57" RCP
Fifth St.
10. F2-3A 13 McFadden Raitt to Construct 30" RCP
Pacific
11. F2-1 6 Easement N/O First Construct 2
W/O Townsend 60" RCP's
at Third
Third St. Townsend to Construct 66" RCP
Pacific
12. U-6 2 Elk Ln. Chestnut Ave Construct 78" RCP
to First