Loading...
HomeMy WebLinkAbout89-064RESOLUTION NO. 89-064 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA INCREASING SEWER CONNECTION FEES WHEREAS, section 39-53 of the Santa Ana Municipal Code ("SAMC") requires payment of a fee for sewer connections to pay for the cost of sewer construction; and WHEREAS, said SAMC section 39-53 provides that the amount of the fee is based on an assessment per fixture units, except that in the case of parcels not previously connected to a public sewer the fee for the first occupancy unit benefitted by the sewer connection is based upon the standard cost of construction of a sewer main for a distance equal to the lineal street frontage of the subject parcel; and WHEREAS, in accordance with SAMC section 39-53, the assessment per fixture unit and the standard cost of sewer construction per lineal foot of street frontage is to be specified by resolution of the City Council; and WHEREAS, the city Council does now desire to increase the sewer connection fee; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS FOLLOWS: 1. For ~urposes of SAMC section 39-53, the assessment per fixture unit is set at $28.00 and the standard cost of construction of a main sewer line is sst at $44.00 per lineal foot. 2. The purpose of the fee is to provide for sewers to meet the sanitation needs of the owners and occupants of property in the City. 3. The use to which the above said Fee will be put is the construction, or reimbursement for construction, of sewers. The public facilities to be financed by the Fee are identified in Exhibit A, attached hereto and incorporated herein. 4. The fee applies to all types of development projects, including residential, commercial, office and industrial, which require connection to the public sewer system. The use of the fee for sewers and the need for such facilities is reasonably related to all types of development projects because all such development projects generate sewage and require the protection from sewerage provided by sewers. 5. As used hereinafter "project" means proposed construction activity which is subject to the payment of a sewer RESOLUTION NO. 89-064 PAGE TWO connection fee under SAMC sections 34-191 through 34-195 and as to which construction pursuant to a validly issued building permit has not commenced as of the date of adoption of this resolution. 6. Ail previous resolutions of the city Council establishing or increasing sewer connection fees are superseded by this resolution, and the fees established by this resolution shall apply to all projects, except as otherwise hereinafter provided. 7. Any project for which a building permit has been issued prior to the adoption of this resolution shall be subject to the sewer connection fee which applied to such project immediately prior to the adoption of this resolution unless such building permit expires without commencement of construction. ADOPTED this 3rd day of July , 1989. ATTEST: 'Clerk of the CounCil/ COUNCILMEMBERS: Acosta A~ Griset May aye McGuigan Aye Norton Aye Pulido Aye Young Aye APPROVED AS TO FORM: City Attorney EXHIBIT A PROJECT IDENTIFICATION SEWER CONNECTION FEE NO. PROJECT pROJECT DESCRIPTION 1 2 San Lorenzo Pump Station Maxine Pump Station & & Connecting Sewer 3 Reserve for Emergency Repair 4 Highland Street: Bristol to Flower 5 Richland Street: Bristol to Flower 6 Cubbon Street: Bristol to Shelton 7 Walnut Street: Baker to Flower 8 Pine Street: Baker to Flower 9 Memory Lane: Arnett to Flower 10 Baker Street: 1st to Chestnut 11 Chestnut Street: Halladay to Standard 12 Alley between 3rd & 4th Street: Main to Bush 13 Sullivan Street: 1st to 5th Streets 14 Fifth Street: Sullivan to 200" E/O Hawley Upgrade Pump Station Sewage Capacity Upgrade Pump Station & convert force main to gravity line Emergency repair of sewer lines Upgrade 6" sewer line to 8" sewer line Upgrade 6" sewer line to 8" sewer line Upgrade 6" line to 8" line Upgrade 6" line to 8" line Upgrade 6" line to 8" line Upgrade 15" line to 18" line Upgrade 12" line to 15" line Upgrade 6" line to 8" line Upgrade 6" line to 8" line Upgrade 8" line to 10" line Construct 10" Sewer line 292 EXHIBIT (Page 2 of 15 16 17 18 19 20 21 Segerstrom Avenue: Susan to Harbor Tenth Street: Ross to Flower Tenth Street: Freeman to Flower 15th Street: French to Main civic Center: Poinsettia to Minter Central: Birch to Main Third Street: Raitt to Pacific Upgrade 8" line to 12" line Construct 8" sewer line Construct 8" sewer line Construct 8" sewer line Construct 8" sewer line Construct 15" sewer line Upgrade 6" line to 8" line