HomeMy WebLinkAbout90-065RESOLUTION NO. 90-065
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA ANA INCREASING SEWER
CONNECTION FEES
WHEREAS, section 39-53 of the Santa Ana Municipal Code ("SAMC")
requires payment of a fee for sewer connections to pay for the cost of sewer
construction; and
WHEREAS, said SAMC section 39-53 provides that the amount of the
fee is based on an assessment per fixture units, except that in the case of
parcels not previously connected to a public sewer the fee for the first
occupancy unit benefitted by the sewer connection is based upon the standard
cost of construction of a sewer main for a distance equal to the lineal street
frontage of the subject parcel; and
WHEREAS, in accordance with SAMC section 39-53, the assessment per
fixture unit and the standard cost of sewer construction per lineal foot of
street frontage is to be specified by resolution of the City Council; and
WHEREAS, the City Council does now desire to increase the sewer
connection fee;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SANTA ANA AS FOLLOWS:
1. For purposes of SAMC section 39-53, the assessment per fixture
unit is set at $48.00.
2. The purpose of the fee is to provide for sewers to meet the
sanitation needs of the owners and occupants of property in the City.
3. The use to which the above said Fee will be put is the
construction, or reimbursement for construction, of sewers. The public
facilities to be financed by the Fee are identified in Exhibit A, attached
hereto and incorporated herein.
4. The fee applies to all types of development projects,
including residential, commercial, office and industrial, which require
connection to the public sewer system. The use of the fee for sewers and the
need for such facilities is reasonably related to all types of development
projects because all such development projects generate sewage and require the
protection from sewerage provided by sewers.
RESOLUTION NO. 90- 065
PAGE TWO
5. AS used hereinafter "project" means proposed construction
activity which is subject to the payment of a sewer connection fee under SAMC
sections 34-191 through 34-195 and as to which construction pursuant to a
validly issues building permit has not commenced as of the date of adoption of
this resolution.
6. All previous resolutions of the City Council establishing or
increasing sewer connection fees are superseded by this resolution, and the
fees established by this resolution shall apply to all projects, except as
otherwise hereinafter provided.
7. Any project for which a building permit has been issued prior
to the adoption of this resolution shall be subject to the sewer connection
fee which applies to such project immediately prior to the adoption of this
resolution unless such building permit expires without commencement of
construction.
ADOPTED this 4th day of June , 1990.
ATTEST:
ffa~fice C. Guy ~
Clerk of the Council
D~iel H.
Mayo r
COUNCILMEMBERS
Young Aye
Acosta Aye
Griset Aye
May Aye
McGuigan Aye
Norton Aye
Pulido Aye
APPROVED AS TO FORM:
City Attorney
191
EXHIBIT A
PROJECT IDENTIFICATION SEWER CONNECTION FEE
NO.
Project Description
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Washington St.,
Clinton to Jackson
Baker St.,
1st to Chestnut
9th St.
3rd - 4th alley,
French to Main
Manhole replacements
Master Plan Study
Fifth St. at English St.
Shelton St.,
Richland to McFadden
Shelton St.,
north of Edinger
McFadden,
Standard to Cedar
Grand Ave.,
4th St. to 6th St.
6th St. west of Hawley
13. Mountainview
14. Kent, Toland to Newhope
15.
16.
17.
Borchard,
Fairview to Sullivan
Orange, north of McFadden
Huron at Lavern
Replace 10" line with 15" line
Line replacement
Raitt to Bristol, pipeline rehab.
Replace 6' line with 8" line
Replace bad section of line
Replace 8" line with 10" line
Replace broken line
Line replacement or repair
Line replacement or repair
Line replacement and upsizing
(Exist. 6")
Line investigation and repair
Line investigation and repair
or replacement
Replace with 15" line
Investigate and replace or repair
Investigate and repair or replace