Loading...
HomeMy WebLinkAbout90-067197 RESOLUTION NO. 90-067 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA SETTING DRAINAGE AREA FEES WHEREAS, sections 34-91 through 34-195 of the Santa Ana Municipal Code ("SAMC") establishes the authority for the City of establish fees to pay for drainage facilities required to meet drainage needs created by development; and WHEREAS, pursuant to SAMC section 34-194, thirteen such drainage areas have been established within the City of Santa Aha; and WHEREAS, in accordance with SAMC section 34-193, the drainage area fee shall be specified by resolution of the City Council; and WHEREAS, the City Council does now find it necessary to increase the drainage area fees; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS FOLLOWS: 1. In the drainage areas of the City of Santa Aha, the fees charged pursuant to SAMC section 34-193 shall be as follows ~ Drainage Area Fee/Acre I $3665 II 3510 III 3960 IV 2620 V 3935 VI 2920 VII 3370 VIII 2675 IX 2100 X 2870 XI 3480 XII 1330 XIII 1160 199 RESOLUTION NO. 90q]67 PAGE TWO 2. In accordance with SAMC section 34-191, the purpose of the drainage area fee is to provide for drainage facilities required to meet the drainage needs created by subdivision or other development of properties within local drainage areas which increase storm water runoff by coverage of absorption areas and increase demand for protection from storm waters. 3. In accordance with SAMC section 34-192, the use to which the abovesaid fee will be put is the construction, or reimbursement for construction, of drainage facilities within the local drainage area from which the fee was collected. The public facilities to be financed by the fee are identified in Exhibit A, attached hereto and incorporated herein. 4. The fee applies to all types of development projects, including residential, commercial, office, and industrial, which will increase storm water runoff by coverage of absorption areas and increase demand for protection from storm waters. The use of the fee for drainage facilities and the need for such facilities is reasonably related to all types of development projects which have such effects because all such development projects generate storm water run-off or receive the benefit of protection from storm waters provided by such facilities. The restriction of the use of fees to drainage facilities which are within the local drainage areas from which the fees are derived assures that the fees derived from any 9iven development project are used to provide those drainage improvements which most directly address the needs created by such development project. 5. As used hereinafter "project" means proposed construction activity which is subject to the payment of a drainage area fee under SAMC sections 34-191 through 34-195 and as to which construction pursuant to a validly issued building permit has not commenced as of the date of adoption of this resolution. 6. All previous resolutions of the City Council establishing or increasin9 drainage area fees are superseded by this resolution, and fees established by this resolution shall apply to all projects except as otherwise hereinafter provided. RESOLUTION NO. 90-067 PAGE THREE 7. Any project for which a building permit has been issued prior to the adoption of this resolution shall be subject to the drainage area fee which applies to such project immediately prior to the adoption of this resolution unless such building permit expires without commencement of construction. ADOPTED this 4th day of June , 1990. ATTEST: Clerk of the Council 17'dliiel 'H: Yo~g / May o r COUNCILMEMBERS Young Aye Acosta Aye Gri set Aye May Aye McGui gan Aye Norton Aye Pulido ATe APPROVED AS TO FORM: city Attorney 203 EXHIBIT A PROJECT IDENTIFICATION DRAINAGE FEE DRAINAGE ASSESSMENT EM PROJECT TITLE AREA PROJECT LOCATION LIMITS STORM DRAIN C5FS 10 McFadden Jackson to Harbor Blvd. Westerly Construct 45" RCP 2. U-5 3 Edinger RR Tracks to (Reimbursement Grand Ave. to SAUSD) 3 Grand Ave. Edinger to S.P. of SCE Construct 57" RCP Construct 42" RCP 3. F2-5 13 Edinger FO2 Channel to Sullivan Center St. Borchard to Edinger Construct 48" RCP Construct 42" RCP 4. R1 (Phase II) 6 Anahurst Pl. Flower to to Woodland Pl. Woodland Pl. Woodl and P1. Anahurst P1. St. Gertrude Construct 12'x 8'-6" Box Construct 11'x 9' Box 5. R1 (Phase III) 6 Woodland Pl. St. Gertrude Construct 11'x 9' Box St. Andrews Pl. 6. R1 (Remaining) 6 Garnsey St. Camile to Construct 8'6"x 9' Box St. Andrews Pl. Camile St. Ross Ross to Garnsey Civic Center to Camile Construct 7'-l"x 8'6" Box Construct 6'-9" Box S1 (Phase III) 5 Washington Bristol to Flower Flower Washington to Seventeenth Construct 11'x 5'-6" Box Construct 70" RCP 2O5 EXHIBIT A PROJECT IDENTIFICATION DRAINAGE FEE (Pa§e 2 of 2) ,'EM PROJECT TITLE DRAINAGE ASSESSMENT AREA PROJECT LOCATION LIMITS STORM DRAIN 8. F2-4 13 McFadden FO2 Channel to Sullivan 9. F2-1A (Phase I) 13 Raitt Third St. to Fifth St. Construct 54" RCP Construct 57" RCP 10. F2-3A 13 McFadden Raitt to Construct 30" RCP Pacific 11. F2-1 6 Easement N/O First Construct 2 60" RCPs W/O Townsend at Third Third St. Townsend to Pacific Construct 66" RCP 12. U-6 2 Elk Ln. Chestnut Ave. Construct 78" RCP to First 13. Storm Drain 3, 7, Citywide Update 1962 Plan Master Plan 12 14. Harbor Blvd. 9 Sunflower South Coast Dr. Construct 51" RCP Storm Drain