HomeMy WebLinkAbout97-023 - Home Place Shopping Center Project113
GAS: 5/23/97
RESOLUTION NO. 97- 023
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA ANA CERTIFYING A FINAL
ENVIRONMENTAL IMPACT REPORT FOR THE HOME
PLACE SHOPPING CENTER PROJECT, MAKING
CERTAIN FINDING WITH REGARD TO THE
ENVIRONMENTAL EFFECTS OF THAT PROJECT,
AND ADOPTING A MITIGATION MONITORING
PROGRAM FOR THAT PROJECT.
WHEREAS, the Planning Commission, after duly noticed public
hearing on April 28, 1997, recommended that the City Council
approve the development of the project located at 1935 East
Seventeenth Street (the "Home Place Shopping Center Project"); and
WHEREAS, an environmental impact report (consisting of a
document entitled "Home Place Shopping Center Draft E.I.R., SCH
#19600427," dated February 21, 1997, and a second document entitled
"Home Place Shopping Center Final E.I.R., SCH #93082011," dated
April 23, 1997) (the "E.I.R.") has been prepared for the Home Place
Shopping Center Project; and
WHEREAS, the California Environmental Quality Act and the
State CEQA Guidelines require that, prior to any approval of the
Project, the City Council must make certain certifications and
findings;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SANTA ANA AS FOLLOWS:
1. The City council hereby certifies that the E.I.R. has been
completed in compliance with the California Environmental
Quality Act, and that the E.I.R. has been presented to the City
Council, and that the City Council has reviewed and considered the
information contained in the E.I.R. prior to approving the Home
Place Shopping Center Project.
2. The findings and statements set forth in that certain
"Statement of Compliance with California Environmental Quality Act,
Findings of Fact, and Statement of Overriding Considerations for
the Home Place Shopping Center Project," set forth in Exhibit A,
attached hereto, and that certain "Mitigation/Monitoring Program,"
set forth in Exhibit B, attached hereto, are incorporated herein by
reference as though fully set forth. The city Council hereby
adopts and approves said findings, statements, and program.
114
ADOPTED this ]gth
ATTEST:
COUNCILMEMBERS:
Pulido Aye
Richardson Absent
Espinoza Aye
Franklin Ave
Lutz Aye
McGuigan Aye
Moreno Aye
day of May , 1997.
or
2
115
CERTIFICATE OF ORIGINALITY
State of California
County of Orange
Santa Ana on ,.9'-~/?- q 7
Date: ~'~ 7/~7
I, JANICE C. GUY, Clerk of the Council, do hereby certify the attached Resolution No.
~7-~,,?.~ to be the original resolution adopted by the City Council of the City of
~' CZthZuncil
~of Santa ~a
117
CALIFORNIA ENVIRONMENTAL QUALITY ACT
FINDINGS OF FACTS, AND
STATEMENT OF OVERRIDING CONSIDERATIONS
FOR THE DEVELOPMENT OF THE
HOME PLACE SHOPPING CENTER, EIR NO. 96-02
Prepared for:
The City of Santa 3ma
Planning Division
206 West Fourth Street
Santa Aaa, California 92702
(714) 667-2792
Prepared by:
Phil Martin & Associates
22672 Baltar
Mission Viejo, California 92691
(714) 587-0052
May 5, 1997
118
TABLE OF CONTENTS
I. Introduction ................................................................................................................... 3
H. Description of the Approved Project ............................................................................ 3
m. Alternatives to the Proposed Project ............................................................................ 4
IV. Findings of Fact ............................................................................................................. 4
V. Effects Determined to Be Mitigatable to a Less Than Significant Level ..................... 5
VI. Significant Environmental Effects Which Cannot Be Avoided If the Project Is
Developed ..................................................................................................................... 17
VII. Mitigation Measures for Impacts Considered to Be Less Than Significant .............. 19
VIII. Alternatives to the Proposed Project .......................................................................... 21
IX. Statement of Overriding Considerations .................................................................... 22
CALIFORNIA ENVIRONMENTAL QUALITY ACT
FINDINGS OF FACTS
FOR THE DEVELOPMENT OF THE
HOME PLACE SHOPPING CENTER, EIR NO. 96-02
. 119
I. INTRODUCTION
The California Environmental Quality Act (CEQA) and the State CEQA Guidelines (Guidelines)
provide that:
"No public agency shall approve or cany out a project for which an
Environmental Impact Report (EIR) has been completed and which
identifies one or more significant environmental effects of the project unless
the public agency makes one or more written findings for each of those
significant effects, accompanied by a brief explanation of the rational for each
finding." (CEQA Guidelines Section 15091)
The EIR for the development of the Home Place Shopping Center identified significant effects
which may occur as a result of the proposed development. In accordance with the Guidelines, the
City of Senta Ana (City) hereby adopts the findings in this report as part of the approval of the
development of the Home Place Shopping Center (Project).
The City has prepared an EIR for the proposed Project in accordance with CEQA end the
requirements of the State Guidelines. AS mandated by legislation in the State of California, the
EIR was subject to review end approval by the City of Santa Aha City Council (City Council). At
a public heating held on May 19, 1997, the EIR was certified by the City Council as adequate, in
compliance with the provisions of CEQA. In adopting this Statement of Findings end Facts, the
City Council approves the Project.
The City has developed a Mitigation Monitoring Program to monitor and report the
implementation of the mitigation measures identified for the Project as part of the environmental
review process.
H. DESCRIPTION OF THE APPROVED PROJECT
The primary purpose of the proposed project is to develop a shopping center to serve the needs of
the residents of Santa Aha. The project includes the development of approximately 116,355
square feet of retail use, including an Orchard Hardware Supply store, fast-food restaurant, sit-
down restaurant and other retail uses on 9.48 acres. Surface parking will be provided for
approximately 558 cars. Landscaping will be provided along the project periphery to provide
buffering from adjacent surrounding land uses and improve the aesthetics of the site.
The project is designed to be developed in one phase under ideal leasing conditions. If leasing
conditions dictate, the project may be developed in several phases with phase one scheduled to
begin construction in the summer of 1997 and be completed by December, 1997. The existing
vacant houses on the property will either be relocated or demolished prior to grading for phase
one. The first phase will include construction of the Orchard Hardware Supply building and a fast
food restaurant. Some of the parking spaces and the two project entrances on 17th Street will
120
also be constructed in phase 1. The remaining retail buildings and parking spaces will be
completed in subsequent phases once tenants have been secured,
ALTERNATIVES TO THE PROPOSED PROJECT
A broad range of alternatives were considered including those considered by the project applicant
and the City. The alternatives to the proposed project include, (A) No Project Alternative, (B)
Development Consistent With Existing Zoning, (C) Alterhative Site.
All three project alternatives, (A) No Project Alternative, (B) Development Consistent With
Existing Zoning, (C) Alternative Site, were considered feasible for further evaluation.
Alternative A: No Project Alternative. There would be no development of the Home
Place shopping center with the No Project Alternative. The existing 9.4 acre project site
would remain in its current undeveloped condition except for the two vacant single-family
detached homes on the site.
Alternative B: Development Consistent With Existing Zoning. This project alternative
would allow the development of the project as proposed, however, there would be a
required 65 foot setback from the northerly project boundary to the closest retail building
consistent with the existing zoning. This project alternative would allow the same project
to be developed on the site as the proposed project, however, the retail buildings would
have to be located a minimum of 65 feet from the northern project boundary instead of 30
feet as presently proposed. All other impacts associated with the proposed project would
occur with this project alternative, however, noise, aesthetics and lighting impacts would
be incrementally less with this alternative.
Alternative C evaluated the development of the project at an alternative 9.7 acre site
located at Fourth Street and the Santa Ana Freeway 0-5). This site would require a
general plan amendment from Professional/Administrative Office to General Business
District in order for the project to be developed. Some environmental impacts associated
with development of the proposed project could be reduced with construction at the
alternative site, other environmental issues, such as traffic and utility upgrades could be
greater. However, the main reason this project alternative was considered infeasible is
because the project applicant does not own the alternative project site.
IV. FINDINGS OF FACT
The City Council has reviewed the Final EIR for the proposed Project and has considered the
public record on the Project. The public record for the Project is composed of the following
elements:
· Notice of Preparation, December 12, 1996
· Scoping Meeting, January 16, 1997
Home Place Shopping Center Draft EIR and Technical Appendices (City of Santa Aha,
February 21, 1997).
· Record of the City of Santa Ana Planning Commission public hearings held on March 24,
1997 and April 28, 1997.
· Home Place Shopping Center Final EIR and Response to Comments received on the
Draft EIR (City of Santa Ana, April 23, 1997).
· Mitigation Monitoring Plan (City of Santa Aha, April 23, 1997).
· Record of the City of Santa Aha City Council public hearing held on May 19, 1997.
There are three possible findings under CEQA with respect to the significant effects of a project:
~ Changes or alterations have been required in, or incorporated into, the
project which avoid or substantially lessen the significant environmental
effect identified in the Final EIR.
~ Such changes or alterations are within the responsibility or jurisdiction of
another public agency and not the agency making the finding. Such
changes have been adopted by such other agency or can and should be
adopted by such other agency.
~ Specific economic, social or other considerations make infeasible the
mitigation measures or project alternatives identified in the EIR.
After reviewing the Final EIR and the public record on the Project, the City of Santa Ana hereby
makes the Findings in Sections V, VI, and VII, regarding the significant effects of the proposed
Home Place Shopping Center, pursuant to Section 15091 of the State CEQA Guidelines.
V. EFI~CTS DETERMINED TO BE MITIGATABLE TO A LESS TitAN
SIGNIFICANT LEVEL
LAND USE
Significant Effect
The proposed project will have land use impacts because it is not consistent with the General Plan
and zoning designations for the northerly portion of the site.
Changes or alterations have been required in, or incorporated into, the
project which avoid or substantially lessen the significant environmental
effect identified in the Final EIR.
Based on the analysis in the DEIR there have not been any significant land use impacts identified
with changing the existing land use and zoning designations of the site to allow the development
5
121
of the project. The potential impact would be reduced to a less than significant level through the
implementation of the following mitigation measure:
The project applicant shall obtain a general plan amendment and zone change for the
northerly 65 feet of the property in order to allow development of the project as proposed.
EARTIt RESOURCES
Significant Effect
The project could be exposed to potential geotechnical constraints undetected during the
preliminary geotechnical investigation.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
Although no active or potentially active fault traces are known to cross the project site, there
could be subsurface geotechnical constraints associated with development of the property.
Potential geotechnical impacts would be reduced to a less than significant level through the
implementation of the following mitigation measures:
A detailed geotechnical evaluation, including subsurface exploration and laboratory
testing shall be approved by the City of Santa Ana Planning and Building Agency prior to
issuance of a grading permit or construction permit, whichever is obtained first. The City
shall require, as appropriate, those measures identified in the geotechnical report for
incorporation into the project.
Prior to project construction, existing on-site improvements shall be evaluated and
reconunendations developed by the project geotechnical consultant to mitigate
against identified adverse geotechnical impacts.
Significant Effect
The potential for strong ground motions to occur at the site as a result of earthquakes on one of
the many faults in the region is significant.
Changes or alterations have been required in, or incorporated into, the
project which avoid or substantially lessen the significant environmental
effect identified in the Final EIR.
6
Facts in Support of the Finding
Natural gas lines serving uses on the site could be damaged during earthquakes which could cause
explosions and fires. The potential for natural gas lines being raptured during an earthquake and
causing explosions can be reduced to a less than significant level through the implementation of
the following mitigation measure:
All buildings shall be designed and constructed in'compliance with the Seismic Safety
Element of the City's General Plan and all applicable portions of the Uniform Building
Code and Building and Municipal Code of the Public Works Agency.
New gas lines shall be equipped with automatic shut-offvalves that will be activated in the
event of a major earthquake.
Significant Effect
Heavy equipment and other non-structural features could impact property and people on the site
during periods of groundshaking if not securely fastened.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Sup.non of the Finding
During both proj~ construction and throughout the life of the project heavy equipment could fall
onto people and/or damage buildings if not securely fastened. Potential impacts due to equipment
falling would be reduced to a less than significant level through the implementation of the
following mitigation measure:
All potentially dangerous non-structural features of the project as determined by the
Planning Division shall be tied into structural elements of the building. Heavy equipment
and other potentially hazardous objects shall be secured to floors and/or walls.
HYDROLOGY~RAINAGE
123
Significant Effect
The increased Mn-off generated by the project will decrease the capacity of the existing storm
drain system that serves the site. Based on the preliminary hydrology study prepared for the
project, the existing storm drain system serving the site does not have adequate capacity to handle
the mnoffgenerated by the project.
7
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Finding
The local storm drain system will have to be upgraded in order for the increased amount of runoff
from the site to be adequately carried by the local system. Potential impacts to the local storm
drain system can be reduced to a less than significant level through the implementation of the
following mitigation measure:
Prior to the issuance of a building permit, the applicant shall construct a 48-inch main line
storm drain connecting to Orange County Flood Control District's (OCFCD) Southwest
Tustin Channel (Facility F11) consistent with the City of Santa Ana's Master Plan of
Drainage. The applicant shall connect to the new 48-inch line with a new 24-inch storm
drain lateral from the project site.
Significant Effect
During construction, portions of the site could be exposed to elements which could cause erosion.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
The grading activities associated with the construction of the project will result in soil erosion and
surface water runoffimpacts. The following mitigation measures will minimize hydrology
impacts:
Prior to issuance of Certificate of Occupancy to Orchard Supply Hardware, those pads
and portions of the site not being developed shall be provided interim landscaping as
follows to the satisfaction of the City to minimize dust generation: Retail Buildings 2 and
3 and Pads A and B-turf grass; open space areas, including proposed parking lots-
wildflower mix. The interim landscaping plan shall be approved by the City of Santa Ana
Case Planner and the Landscape Development Associate and be consistent with the
Building Division's set of working drawings (including grading plans prepared by the civil
engineer).
During periods of rainfall or whenever water is used on-site during project grading or
construction, all runoff shall be diverted from areas exposed to construction through the
use ofberms (sand bags), or other such devices, to minimize stormwater contamination
and prevent sediment-filled runoff from being deposited in City or County storm drains.
8
The use of berms and/or sand bags shall be approved by the City Building Department
prior to their use.
Significant Effect
Increased automobile traffic and parking due to the project would result in an increasing
concentration in contaminants in storm water runoff.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Finding
Impacts to storm water runoffwill be reduced by the following mitigation measures:
Parkin8 area maintenance and sweeping shall be conducted a minimum of three times a
week (without the use of water) to reduce the amount of pollutants entering the City of
County storm drain system.
Significant Effect
Both short-term construction impacts and long-term operation impacts from site runoffmay
adversely affect water quality.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
Construction and operation of the proposed project would require the applicant to apply for,
obtain and comply with permits that will reduce the potential impacts to less than significant levels
through the following mitigation measures:
Should any project generated sediment be deposited in either the City and/or County
storm drain system, the project developer shall immediately remove the sediment from the
storm drain system to the satisfaction of the City of Santa Ana Public Works Agency
and/or the County of Orange Flood Control District at his cost.
The project developer shall file a report with the City of Santa Aha Public Works Agency
and the Regional Water Quality Control Board (RWQCB) which complies with the
National Pollution Discharge Elimination System (NPDES) permit for stormwater
discharge, including the full description of the discharge and the demonstration of
compliance with EPA specified effluent limits. The project developer shall comply with
9
125
the guidance and policies of the City Engineer and the RWQCB. The report shall be filed
with the respective agencies prior to the issuance ora grading permit.
The project developer shall prepare a comprehensive, long-term post construction
stormwater management plan, incorporating both structural and non-structural Best
Management Practices (BMP's). The plan shall be approved by the City of Santa Aha
Public Works Agency prior to the issuance ora grading permit.
TRANSPORTATION/CIRCULATION
Significant Effect
There is a lack of adequate ingress/egress driveways for project traffic.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
The project does not have adequate driveway access at this time for project traffic. New
ingress/egress driveways along with proper signage and. signalization will be required. Potential
access impacts from Seventeenth Street i:an be reduced to a less than significant level through the
implementation of the following mitigation measures:
1. The project developer shall construct the project driveways on Seventeenth Street.
The project developer shall modify the traffic signal at the main project driveway on
Seventeenth Street for traffic generated from the proposed site. This signal has not yet
been installed and is a condition of approval of the Gateway Shopping Center Project
(now referred to as the Centre on Seventeenth Project).
Significant Effect
As proposed, the project has a parking code deficiency of 62 spaces.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
The project developer has requested a ten percent parking reduction in the number of parking
spaces required by the zoning code to take into account the sharing of parking spaces by the retail
10
uses. The potential impacts with reduced parking can be reduced to a less than significant level
through the implementation of the following mitigation measure'.
The project applicant shall request approval of a variance for ten percent reduction in
parking.
Am QUALITY
Significant Effect
The project will have short-term air quality impacts during project grading and construction.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
There will be air emissions generated during both project grading and construction that will
impact local air quality. The following mitigation measures will reduce short-term air impacts,
with the exception of nitrogen oxide emissions, to a less than significant levels:
One week prior to the start of grading, the applicant shall contact by mail all residents
immediately adjacent to the site and advise them to keep windows closed in order to
minimize dust intrusion.
The general contractor shall use Iow emission mobile construction equipment, where
feasible.
The general contractor shall water the site and clean equipment morning and evening to
comply with the AQMP Fugitive Dust Measures BCM-03 and BCM-06. The general
contractor shall water the construction site and unpaved haul roads (with use of reclaimed
water or chemical soil binder, where feasible) twice daily.
Construction operations shall include that on-site crews wash off'trucks leaving the site to
comply with the AQMP Fugitive Dust Measure BCM*01.
The general contractor shall apply chemical soil stabilizers according to manufacturer's
specifications to all inactive construction areas (previously graded areas which remain
inactive for 96 hours).
The general contractor shall sweep streets daily if silt is carded over to adjacent public
thoroughfares.
7. Trafl~c speeds on all unpaved road surfaces on-site shall be $ miles per hour or less.
].27
11
128
The general contractor shall suspend grading operations during first and second stage
smog alerts.
The general contractor shall suspend all grading operations when wind speeds (as
instantaneous gusts) exceed 25 miles per hour.
10.
The general contractor shall 11 maintain construction equipment engines by keeping them
properly tuned.
NOISE
Significant Effect
There will be a temporary increase in noise levels due to site grading, equipment operation and
building construction. Residents on the north side of the project will experience shielded noise
levels of 72-81 dBA when equipment is within 50 feet of the north property line.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Finding
Episodes of high noise levels associated with construction activities will not be continuous
throughout the day. The significant effect has been reduced to a level of insignificance by virtue
the following mitigation measures identified in the Final EIR and incorporated into the project:
A construction traffic plan showing locations of equipment staging area and construction
employee parking shall be prepared and approved by the City Planning and Building
Division. All employee construction traffic shall be routed as far as possible fi.om the
residences along the north, northwest and northeast project boundary.
All outdoor construction activities shall be limited to the hours of 7:00 AM to 8:00 PM,
Monday through Saturday. No construction shall be permitted on Sunday or Federal
holidays.
All construction equipment, stationary or mobile, shall be equipped with properly
operating and maintained muffling devices.
Stationary construction equipment shall be placed such that emitted noise is directed away
fi.om residential land uses. Tempora~ noise barriers, enclosures or shrouds shall be
installed, when appropriate, to reduce noise emitted fi.om stationary construction
equipment.
Prior to the issuance ora grading permit, the project applicant shall construct a new 8 foot
high wall along the north property line contiguous to the existing 6 foot wall. The wall
must be solid top to bottom with no opening or decorative cut-outs.
12
Significant Effect
Noise associated with the operation of the trash compactor at the Orchard Supply Hardware store
could potentially impact five residences adjacent to and northeast of the project.
Noise associated with truck deliveries will exceed the allowable nighttime noise criteria of 50 dBA
and may create disturbances to residents. Calculations indicate the City's noise criteria can be met
with the construction of 8 foot screen walls on the north side of the loading docks where delivery
trucks will park and unload materials.
The operation of the rooftop mechanical equipment on each of the three retail buildings near the
north property boundary will not exceed the City of Santa Ana noise standard orS0 dBA at
nighttime periods.
Noise levels associated with outdoor paging used in the garden area of the Orchard Supply
Hardware store, retail buildings 2 and 3 and fast food restaurant at Pad A could impact residents
north and northeast of the site.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Finding
There will be noise impacts during the life of the project due to the operation of mechanical
equipment, truck deliveries and activities normally associated with a shopping center. The
following mitigation measures will reduce long-term noise impacts to less than significant levels
when incorporated into the project:
The screen dock walls shall be a minimum of 8 feet high relative to the loading dock
elevation and the screen dock walls shall be 15 feet longer than the longest proposed
truck.
Speed bumps shall not be allowed along the northern most driveway.
8. Signs shall be posted on-site restricting vehicular speed to 5 MPH.
Signs shall be posted in the loading dock areas prohibiting the use of vehicle horns and
yelling.
Prior to installation and operation of any outdoor paging system for retail buildings 1, 2 or
3, an acoustical study will be prepared to confirm that any resultant noise impact on the
adjacent residential users does not exceed the City's noise criteria threshold of 55 dBA
during daytime periods..
13
130
11. The facade of the west, north and east building elevations of the retail buildings located at
the north end of the site shall be a rough surface to reduce noise reflections.
! 2. All walk-through and mil-up doors shall be closed when not in use.
13.
Ali noise walls shall be standard masonry or concrete block or any other material with a
minimum surface weight of 4 pounds per square foot. No gaps or openings shall be
permitted. All gaps are to be sealed.
14. All delivery truck engines shall be offunless needed to operate refrigeration equipment.
15. All trash compactors shall be shielded by either dock walls or separate enclosures.
16.
In order to mitigate noise from mechanical equipment, parapet walls along the north, east
and west rooftop sides of retail buildings 1, 2 and 3 shall be a minimum of 5 feet. As an
aiternative the parapet walls of less than 5 feet may be considered on a case-by-case basis,
if supporting acoustical analysis demonstrate compliance with the 50 dBA noise standard
for nighttime periods.
17.
No fast food restaurant speaker boxes shall be directed toward the north property
boundary.
18.
For retail buildings 1, 2 and 3, trash pick-up vehicles and vehicles cfa size equal to an SU-
30 truck and larger shall be prohibited form making deliveries between the hours of 10 PM
and 7 AM.
19.
Parking lot sweeping or outdoor clean-up activity behind the from building elevations shall
be limited to the hours of 7:00 AM to midnight.
POLICE PROTECTION
Significant Effect
The development of the project could result in safety impacts to those people that would park in
parking spaces along the northwest and northeast portion of the project in the evening hours.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Finding
The potential safety impacts to employees and patrons parking in parking spaces northwest and
northeast of the retail buildings can be reduced to a less than significant level through the
implementation of the following mitigation measures:
1. No parking shall be allowed along the northern project boundary.
14
131
The project will be required to provide parking area security patrols, but only at such time
a parking spaces are actually striped and available for public use on the west side of retail
building 3 north of the building storefront. Such patrols will be required only during the
hours from sundown until one-half hour after the stores close. Six months at, er
implementation and annually thereafter, this mitigation measure will be reviewed by the
Santa Ana Police Department for possible modifications based upon observations by the
property owner and review of Police Department ~ncident reports.
LIGHT AND GLARE
Significant Effect
The project will significantly increase the mount of light and glare generated from the site due to
parking lot lighting, advertising signs, security and safety lighting alon8 the rear (north side) of the
retail buildings. Depending upon the intensity and amount of shielding of project lighting,
residents adjacent to and north of the site could experience a significant increase in illumination
and lighting from tlie site.
The project will generate additional glare associated with automobiles and building windows.
Glare from the project is not anticipated to significantly impact residents adjacent to the site
because the existing block wall along the project boundary will interrupt glare extending to the
residences.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin_~
The potential impacts with nighttime lighting on the site, especially security lighting along the
northwest, north and northeast sides of retail buildings 1, 2 and 3 could impact those residents
adjacent to the project site. The incorporation of the following mitigation measures will reduce
the potential light and glare impacts to a level of insignificance:
The site plan shall be reviewed by the City Planning and Building Agency and the Police
Department for potential light impacts to those residential units adjacent to and northwest,
north and northeast of the site.
All project lighting shall comply with the City of Santa Aha Security Ordinance.
Lighting in close proximity to the light sensitive residential uses adjacent to the site shall
be directed on-site and shielded from extending directly off-site.
Prior to the issuance of a building permit, the project developer shall prepare a point by
point computerized photometric study showing the light trespass into the adjacent
residential neighborhood. The purpose of this study is to ensure that offsite light impacts
15
to the adjacent residential neighborhood will not exceed 0.2 foot candle. This study shall
be submitted to the City of Santa Ana Police Department, Crime Prevention Sergeant.
To minimize excessive light and glare, building exteriors shall utilize a Iow reflective glass.
Mirrored glass and other highly reflective building materials shall not be utilized on the
exterior of the building.
Exterior building courts and corridor illumination'shall be designed to minimize intrusive
glare at nearby residences. Low level security lights shall be used along driveway
entrances.
All outdoor lighting other than identification signage shall be directed from the perimeter
of the property toward buildings and parking areas utilizing cut-off fixtures.
Plant materials, shade structures and other architectural design features shall be used
where appropriate to decrease reflectivity ofhardseape and light and glare toward adjacent
residences.
AESTHETICS
Significant Effect
The project will aesthetically affect the existing south views of the project site from the second
floor residences adjacent to the project..Open views will be replaced by views of parking lot or
rear of buildings for those residents adjacent to and north, northeast and northwest of the site.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final E1R.
Facts in Support of the Finding
The potential aesthetic impacts with the project can be reduced to a level of insignificance with
incorporation of the following mitigation measures:
The City shall approve a landscaping plan prior to the issuance of building permits. Trees
as determined by City Planning Division staff shall be planted in the landscape area along
the north project boundary to buffer the project from adjacent residents.
Prior to issuance of a grading permit the project applicant shall replace the existing 6 foot
wall along the north project boundary with an 8 foot high wall along the north project
boundary.
16
133
HUMAN HEALTH
Significant Effect
The development of the project could result in existing vectors that may be present on the site to
mitigate to adjacent residential areas at the start of project grading.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of the Findin~
If roof rats and field mice are present on the site they could migrate to surrounding areas at the
start ofproject grading. A successful eradication program can sig~ficantly reduce, or entirely
eliminate any vectoi's on the site that could migrate to surrounding properties. Incorporation of
the following measures will reduce potential impacts to surrounding residents:
The project applicant shall contact the Orange County Vector Control at least two months
prior to the start of grading requesting a site inspection for the presence of vectors.
Should vectors be present, the project applicant shall initiate methods recommended by
the Orange County Vector Cont~'Ol to eliminate or reduce identified vectors.
One week prior to the start ofgradinfi the project applicant shall contact Orange County
Vector Control for a follow-up visit to determine the success of the eradication program.
One week prior to the start of grading the project applicant shall contact by mail all
property owners adjacent to the site. The notice shall state the date grading will begin and
to watch for visible signs of vectors.
SIGNIFICANT ENVIRONMENTAL EFFECTS WHICH CANNOT BE
AVOIDED IF THE PROJECT IS DEVELOPED
AIR QUALITY
Significant Effect
The estimated nitrogen oxide (NOx) emissions generated by construction equipment exceeds the
Significance Emissions Thresholds established by the South Coast Air Quality Management
District (SCAQMD):
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIK
17
134
Facts ill Support of Finding:
The general contractor shall use low emission mobile construction equipment where
feasible.
The general contractor shall maintain construction equipment by keeping them properly
tuned.
Significant Effect
Locally, the potential carbon monoxide (CO) increases due to the project will exceed the
Significance Emission Threshold established by the SCAQMD.
Specific economic, social or other considerations make infeasible the mitigation
measures or project alternatives identified in the EIR.
Facts in Support of the Findin_m
The proposed project would emit 782 pounds per day of CO and the SCAQMD threshold is 550
pounds per day. Mitigation cannot reduce this impact to a level of insignificance.
Significant Effect
The project will contribute to cumulative long-term air quality impacts.
Specific economic, social or other considerations make infeasible the mitigation
measures or project alternatives identified in the EIR.
Facts in Support of the Findin~
There will be air emissions generated during the life of the project that will cumulatively have
unavoidable adverse impacts on regional air quality. Although the following mitigation measures
will lessen long-term impacts, cumulative emissions remain unavoidable and adverse:
1. The project applicant shall use low emission on-site stationan] equipment (e.g., clean
fuels).
2. The project applicant shall implement a Transportation Demand Management Program.
18
TRANSPORTATION/CIRCULATION
Significant Effect
Cumulatively, the project would contribute trips t° the intersection of Tustin Avenue at
Seventeenth Street which will continue to operate at an unacceptable Level of Sen,qce in the PM
peak hour period.
Changes or alterations have been required in, or incorporated into, the project
which avoid or substantially lessen the significant environmental effect identified in
the Final EIR.
Facts in Support of Findin_~:
The significant effect has been substantially lessened, but not a level of insignificance, by virtue of
the following mitightion measures identified in the Final EIR and incorporated into the project:
The project shall participate in the City's Areawide TSIA fee program (currently the fee is
$5.53 per square foot of commercial development, however, the TSIA fee is subject to
change).
The project developer shall implement a Transportation Demand Management (TDIV0
program aimed at reducing singlo occupancy vehicle trips generated to and from the
project site.
VH. MITIGATION MEASURES FOR IMPACTS CONSIDERED TO BE LESS THAN
SIGNIFICANT
This section describes mitigation measures for those effects of the proposed Project which are
considered to be less than significant and that, therefore, are not required under CEQA.
However, these measures improve the Project and are acceptable under CEQA. Findings are not
required for the effects determined to be less than significant.
HISTORIC RESOURCES
Construction of the project will require the removal or demolition of the existing vacant Cox-
Klatt-Wilde house built in 1900. Due to the alterations that have occurred to the house, the house
is not eligible for the National Register of Historic Places. Demolition or relocation of either or
both houses on the site will not result in any significant adverse historical impacts. The
incorporation of the following measures will minimize historical impacts due to the demolition or
relocation of the existing houses on the site.
The property owner shall continue to advertise to the general public the opportunity for
the houses to be sold/relocated until the start of project grading.
The exterior of all three buildings shall be photographed and documented once all
landscaping, vegetation and window security coverings are removed prior to
19
'135
136
demolition or relocation. Black and white photographs of the buildings exterior and
interior shall be submitted to both the City of Santa Aha and the History Room of the
Santa Ana Library for safekeeping.
AESTHETICS
Foot traffic between the project site and the adjacent parcel to the east may result in disturbance
to the landscaping. The following mitigation measure will minimize harm to the landscaping:
The final landscaping plan shall indicate stepping stones, as necessary, on the east property
line to prevent degradation of the landscaping from foot traffic between the Home Place
Shopping Center and the property east of the site.
ENERGY CONSERVA~ON
The adherence to regulatory requirements regarding energy will reduce energy consumption
impacts. The following mitigation measures will help minimize the amount of energy normally
consumed by a shoDping center throughout the life of the project:
The project shall be reviewed by the Energy Services New Construction Department at
Southern California Edison to determine those measures that can be incorporated into a
project to reduce electrical demands. The project developer shall incorporate all measures
into the project as economically feasible as determined by the City Building Division.
2. The project shall meet all applicable State of California Title 24 Energy ~uidelines.
WATER SERVICE
The adherence to City required water conservation measures will reduce water consumption
impacts and fire flow needs by the project. The following mitigation measures will reduce water
service impacts to less than significant:
Water conservation and management techniques shall be incorporated into the design,
construction and operation of the project, including the use of fixtures that use reduced
volumes of water, landscaping irrigation in early morning and evenings hours to reduce
water lost to evaporative and incorporate drought tolerant plant species for new
landscaping.
The City of Santa Arm Fire Department will determine the precise fire flow requirements
from the proposed project during its review of the final project plan. The design and
implementation of any required on-site improvement to provide the fire flow requirement
determined during site plan review shall be borne by the project developer.
WASTEWATER
The Public Works Agency has determined that the project will not adversely impact the existing
sewage system. The following mitigation measure will ensure the wastewater impacts by the
project will be insignificant:
2O
137
Prior to the issuance of building permits, the project sponsor shall obtain all permits and
pay all fees required by the City in order to provide an acceptable level of sewage
treatment service.
SOLID WASTE
The incorporation of all applicable City mandated solid waste reduction requirements will allow
the City to continue to work towards meeting State requirements. Incorporation of the following
measures will ensure the City will continue to mee~ State requirements resulting in insignificant
solid waste hnpacts:
The City shall encourage recycling of materials generated on the site during both project
construction and the life of the project by encouraging contractors to recycle construction
debris when feasible and use recyclable materials for construction.
In accordance with the City's Solid Waste Integrated Management Plan, the project
developer shall prepare and submit a Source Reduction and Recycling Plan to the Public
Works Agebcy and the Planning Division, prior to the issuance of occupancy permits. The
Plan shall document and outline the incorporation of an on-site recycling/conservation
program.
The project developer shall provide a designated area adjacent to refuse containers for
retail buildings 1, 2, and 3 that accommodate separated recyelable material (such as
cardboard and paper) for collection.
VIIL ALTERNATIVES TO THE PROPOSED PROJECT
CEQA Guidelines Section 15126(d) requires a discussion of reasonable alternatives to the
proposed project. The EIR evaluated three alternatives in addition to the proposed project.
It should be noted that other alternatives were not considered or evaluated due to their
inconsistency with the objectives of the project or were deemed infeasible as discussed in Section
[IL
NO PROJECT ALTERNATIVE
Specific economic, social or other considerations make infeasible the
mitigation measures or project alternatives identified in the
Facts in Support of Finding
As compared to the proposed project, there would be no significant unavoidable adverse impacts
with the No Project Alternative as the site would remain undeveloped. Although the No Project
Alternative would not have any environmental impacts, the City would not receive the benefits
associated with the project, including the creation of 100 new full and part-time jobs and
increased revenue due to retail sales tax and property tax.
21
1 3 8 DEVELOPMENT CONSISTENT WITH EXISTING ZONING
Specific economic, social or other considerations make infeasible the
mitigation measures or project alternatives identified in the EIR.
Facts in Support of Findin_~
This project alternative is the same as the proposed project, except this alternative would require
retail buildings 1, 2 and 3 to be constructed a minimum of 65 feet from the northerly property line.
The only difference between this alternative and the proposed project is the 65 foot setback. The
same amount of retail space, uses and parking spaces would be provided with this alternative as
the proposed project. Most of the impacts identified with the proposed project would occur with
this alternative, except for aesthetics, noise and lighting. Since the three retail buildings would be
further from the residences north, northwest and northeast of the project, there would an
incremental reduction in nighttime lighting, noise and aesthetic impacts to adjacent residents with
this alternative because the three retail buildings would be further from the residents. Although
the associated impacts would be incrementally less, [llere were not any significant adverse noise,
light or aesthetic impacts to adjacent residents identified with the proposed project. Therefore,
this alternative would be considered infeasible because it would not eliminate any adverse impacts.
ALTERNATIVE SITE
Specific economic, social or other considerations make infeasible the
mitigation measures or project alternatives identified in the EIR.
Facts in Support of Finding
The alternative site evaluated in the DEIR was a 9.7 acre vacant site located at Fourth Street and
the Santa Ana Freeway. This alternative would reduce or eliminate some of the potential impacts
associated with the proposed project including historical resources since the alternative site would
not require the demolition or relocation of two single-family homes, human health due to the lack
of residential development in the immediate area that may be impacted by vectors on the site, light
and glare and noise impacts since no residential land uses are adjacent to the site. Since the
project applicant does not own the alternative site this alternative, is considered to be
economically infeasible. This alternative is found to be infeasible because it would be located in a
professional office district and not be as accessible to residents in northeast Santa Ans.
IX. STATEMENT OF OVERRIDING CONSIDERATIONS
The City has made a reasonable and good faith effort to mitigate potential impacts resulting from
the development of the proposed project. Changes and alterations to the proposed development
have been adopted which will substantially lessen or avoid significant environmental impacts as
identified in the Draft EIR. Additionally, the City Council has adopted a Mitigated Monitoring
Program for the Home Place Shopping Center which outlines how the mitigation measures
adopted as part of the proposed project will be implemented, monitored and evaluated. The
22
benefits of the proposed project have been balanced against and outweigh the unavoidable adverse
environmental impacts identified in the Dra~ EIR. The City of Santa Aha makes the following
Statement of Overriding Considerations.
The following project-specific and cumulative impacts of the Home Place Shopping Center are
considered significant and unavoidable based on the Drat~ EIR, Final E]R, Mitigation Monitoring
Program and the findings discussed previously:
1. Short-term construction emissions of nitrogen oxide will exceed dally thresholds.
2. Locally, the potential carbon monoxide (CO) increases due to the project will exceed
the carbon monoxide concentration threshold and result in an unavoidable adverse impact.
3. The project will contribute to the cumulative air quality impacts in the Basin.
4. Under cumulative conditions, with the project and assuming a 15% TDM reduction and
cumulative mitigation, the intersection of Tustin Avenue at Seventeenth Street will
continue to'operate at an unacceptable Level of Service F in the PM peak hour.
The City Council, acting pursuant to Section 15093 of the State CEQA Guidelines, hereby finds
that for the reasons set forth below, the economic, social, and other benefits of the project
outweigh the unavoidable air quality and traffic impacts identified in the findings. In making this
finding, the City Council has balanced the benefits of the proposed project against its unavoidable
environmental impacts and has indicated its willingness to accept those risks. In part, the project
will provide the following benefits:
1. Provide more than 100 new full and part-time jobs in the City.
2. Increase retail sales and property tax for the City.
3. Provide a retail center serving the home improvement/hardware needs of'the local
4. Reduce and/or eliminate the need for some city residents to travel to adjacent communities
to shop for products and services that will be available on the site.
5. Enhance the character of the Seventeenth Street corridor and further strengthen the
commercial activity node at the coruer of Seventeenth Street and Tustin Avenue.
6. Provide significant contributions to areawide traffic fees for local road improvements.
139
23
141
FINAL
MITIGATION MONITORING PROGRAM
HOME PLACE SHOPPING CENTER
Prepared For:
THE CITY OF SANTA ANA
206 W. FOURTH STREET
SANTA ANA, CALIFORNIA 92702
(714) 667-2792
Prepared By:
PHIL MARTIN & ASSOCIATES
22672 BALTAR
MISSION VIE JO, CALIFORNIA 92691
(714) 587-0052
STATE CLEARINGHOUSE NO. 19600427
MAY 5, 1997
142
SECTION 1
INTRODUCTION
The State of California Public Resources Code 21086.6 (AB3180) requires that a lead or
responsible agency must adopt a mitigation monitoring or reporting program when approving or
carrying out a project where an environmental document, either an Environmental Impact Report
(EIR) or Mitigated Negative Declaration (MND), has identified measures to reduce potential
adverse environmental impacts to levels that are less than significant. The City of Santa Ana is
the lead agency for the Home Place Shopping Center project, and therefore, is responsible for the
implementation &the mitigation monitoring program. As such, a mitigation monitoring program
(MIVlP) is required to ensure that adopted mitigation measures are successfully implemented.
Section 2 describes the roles of responsible parties in implementing and monitoring the adopted
mitigation measures, and generally describes the MMP procedures.
Section 3 contains the mitigation measures for the project and identifies the timing of the
implememation or verification of each measure, the method of verification, and the party
responsible for verifying that the measure is successfully implemented. The project applicant is
responsible for the implementation of each measure, and the City representative is responsible for
verifying that the measure has been satisfactorily completed through plan check, field inspections,
and/or written evidence submitted to the City by the project applicant or the applicant's agent,
which verifies that the measure has been successfully implemented.
Appendix A contains a sample "compliance verification" form which can be used to report the
project's compliance et' each measure. The City may develop alternative forms for use in
compliance verification.
SECTION 2
PROGRAM MANAGEMENT
The Mitigation Monitoring Program (MMP) for the development of the Home Place Shopping
Cemer project will be in place throughout all phases of the project, including design, construction
and operation. The enforcement of the MMP will be the responsibility of the City of Santa Ana.
The primary City personnel responsible for verifying compliance with the mitigation measures are
listed below, with the Environmental Coordinator of the Planning Division, Planning and Building
Agency having the primary roles of coordinating the compliance verifications of all other parties.
These parties, or designated assignees, are responsible for ensuring that the mitigation measures
are implemented by the project applicam and are vested with the authority to act accordingly.
Plannin_~ and BuildinE A~ency
Planning Division
Building Division
Planning Manager
Environmental Coordinator
Case Planner
Landscape Associate
Inspection Services Manager
Senior Plan Check Engineer
Development Engineering Division
Water Resources Division
Engineering Services Manager
Enterprise Coordinator
Water Resources Manager
Fire Prevention Division
Fire Marshall
Community Services Division
Police Administration
Deputy Cbief
Crime Prevention Sergeant
Community Services Specialists
The Environmental Coordinator or designated assignee will, primarily through plan checks and
field inspections, supervise the design and construction of the project, and will be responsible for
the overall management of the MMP. The above-noted designated "monitors" shall oversee
elements of the MMP and review compliance through the use of compliance verification forms to
be developed by the City and supported by the Environmental Coordinator. A sample of a
compliance verification tbrm is provided in Appendix A. Designated monitors shall ensure
143
144
compliance verification forms are filled out correctly and proper action is being taken on each
measure. Designated monitors are also responsible for filing and updating the verification during
all phases of the project. During the design and construction phases, the designated monitors
from the Planning and Building Agency will determine the need for a measure to be modified and
ensure the use of a mitigation specialist, such as a consulting engineer, if technical expertise
beyond the monitor's abilities is required. Ir'it is found that an adopted mitigation measure is not
being properly implemented, the designated monitors shall require corrective actions to ensure
adequate implementation.
4
SECTION 3
145
MITIGATION MONITORING PROGRAM
The project applicant shall obtain a general plan amendment and zone change for the
northerly 65 feet of the property in order to allow development of the project as proposed.
Timing of Implementation/Verification Prior to issuance of a grading permit
Resolution approved by City Council
Responsible Parties
Planning Division: Case Planner
A detailed geotechnical evaluation, including subsurface exploration and laboratory
testing shall be approved by the City of Santa Ana Planning and Building Agency prior to
issuance of a grading permit or construction permit, whichever is obtained first. The City
shall require, as appropriate, those measures identified in the geotechnical report for
incorporation into the project.
Timing of Implementation/Verification
Prior to issuance of a grading pen'nit or
construction permit, whichever is first.
Grading/Building plan check
Responsible Parties
Building Division: Senior Plan Check
Engineer
Prior to project construction, existing on-site improvements shall be evaluated and
recommendations developed by the project geotechnical consultant to mitigate against
identified adverse geotechnical impacts.
Timing of Impl¢ipentation/Verification
Prior to issuance of a grading permit
or building permits, whichever is
first.
Grading/Building plan check
Responsible Parties
Building Division: Senior Plan Check
Engineer
All buildings shall be designed and constructed in compliance with the Seismic Safety
Element of the City's General Plan and all applicable portions of the Uniform Building
Code and Building and Municipal Code of the City of Santa Ana.
146
Timin_~ of [m.olement ationFVerifi catinn
Prior to issuance ora building permit
Building plan check
Building Division: Senior Plan Check
Engineer
New gas lines shall be equipped with automatic shut-offvalves that will be
activated in the event of a major earthquake.
Timin~ of Implementation/Verification
Prior to issuance of a certificate of
occupancy.
Building plan check
Building Division: Senior Plan Check
Engineer
All potentially dangerous non-structural features of the project as determined by the
Planning Division shall be tied into structural elements of the building. Heavy equipment
and other potentially hazardous objects shall be secured to floors and/or walls.
Timing of Implementation/Verification
Prior to issuance of building permits.
Building plan check and field inspection
Building Division: Senior Plan Check
Engineer; Planning Division: Case
Planner
Prior to the issuance of a building permit, the applicant shall construct a 48-inch main line
storm drain connecting to Orange County Flood Control District (OCFCD) Southwest
Tustin Channel (Facility Fl 1) consistent with the City of Santa Ana's Master Plan of
Drainage. The applicant shall connect to the new 48-inch line with a new 24-inch storm
drain lateral from the project site.
Timing of Implementation/Verification
Prior to completion of Seventeenth
Street improvements.
Grading plan check and final inspection for
Seventeenth Street.
Project applicant; Public Works Agency:
Engineering Services Manager
Prior to issuance of Certificate of Occupancy for Orchard Supply Hardware, those pads
and portions of the site not being developed shall be provided interim landscaping as
follows to the satisfaction of the City to minimize dust generation: Retail Buildings 2 and
6
3 and Pads A and B-turf grass; open space areas, including proposed parking lots-
wildflower mix. The interim landscaping plan shall be approved by the City of Santa Ana
Case Planner and the Landscape Development Associate and be consistent with the
Building Division's set of working drawings (including grading plans prepared by the civil
engineer).
Timing of Implementation/Verification
Prior to issuance of Certificate of Occupancy
for Orchard Supply Hardware.
Grading, building and landscaping plan
check; periodic field inspection during
grading operations
Building Division: Inspection Services
Manager; Planning Division: Landscape
Associate; Case Planner; Environmental
Coordinator
During periods of rainfall or whenever water is used on-site during project grading or
construction, all runoff shall be diverted from areas exposed to construction through the
use ofberms (sand bags), or other such devices, to minimize stormwater contamination
and prevent sediment-filled runoff from being deposited in City or County storm drains.
The use ofberms and/or sand bags shall be approved by the City Building Department
prior to their use.
Timing of Implementation/Verification Condition of grading and building permits.
Grading plan check; field inspection
Public Works Agency: Engineering Services
Manager
Parking area maintenance and sweeping shall be conducted a minimum of three times a
week (without the use of water) to reduce the amount of pollutants entering the City or
County storm drain system.
Timin_a of Implementation/Verification
On-going during all phases of project
construction.
On-site field inspection.
Public Works Agency: Engineering Services
Manager; Water Resources Manager;
Planning Division: Environmental
Coordinator.
Should any project generated sediment be deposited in either the City and/or County
storm drain system, the project developer shall immediately remove the sediment from the
148
storm drain system to the satisfaction of the City of Santa Aha Public Works Agency
and/or the County of Orange Flood Control District at his cost·
Timing of Implementation~rerification On-going during project construction.
On-site field inspection.
Public Works Agency: Engineering Services
Manager; Water Resources Manager
The project developer shall file a report with the City of Santa Aha Public Works
Agency and the Regional Water Quality Control Board (RWQCB) which complies
with the National Pollution Discharge Elimination System (NPDES) permit for
stormwater discharge, including the full description of the discharge and the
demonstration of compliance with EPA specified effluent limits. The project
developer shall comply with the guidance and policies of the City Engineer and the
RWQCB. The report shall be filed with the respective agencies prior to the
issuance of a grading permit.
Timing of Implementation/Verification Prior to issuance of a grading permit.
Method of Verification
Surface drainage and grading plan check.
Regional Water Quality Control Board;
Public Works Agency: Engineering Services
Manager; Water Resources Manager; Project
Developer
The project developer shall prepare a comprehensive, long-term post construction
Stormwater Pollution Prevention Plan (SWPPP), incorporating both structural and non-
structural Best Management Practices 0tMP's). The plan shall be approved by the City of
Santa Aha Public Works Agency prior to the issuance ora grading permit.
Timing of Implementation/Verification Prior to issuance of a grading permit.
Surface drainage and grading plan check
Responsible Parties
Public Works Agency: Engineering Services
Manager; Water Resources Manager
Histnric Resources
The property owner shall continue to advertise to the general public the opportunity for
the houses to be sold/relocated until the start of project grading.
Timing of Implementation/Verification On-going until start of grading.
Method of Verification
Copy of classified advertisement
Project applicant; Planning Division:
Environmental Coordinator
The exterior of all three buildings shall be photographed and documented once all
landscaping, vegetation and window security coverings are removed prior to demolition or
relocation. Black and white photographs of the buildings exterior and interior shall be
submitted to both the Historic Resources Review Committee and the History Room of the
Santa Aha Library for safekeeping.
Timing of Implementation/Verification Prior to issuance of a grading permit.
Visual inspection of photographs at the City
and the Santa Aha Library.
Planning Division: Case Planner;
Environmental Coordinator
The project developer shall construct the project driveways on Seventeenth Street.
Timing of Implementation/Verification
Prior to issuance of a certificate of
occupancy.
Field inspection
Project applicant; Public Works Agency;
Engineering Services Manager
The project developer shall modi~ the traffic signal at the main project driveway on
Seventeenth Street for traffic generated fi.om the proposed site. This signal has not yet
been installed and is a condition of approval of the Gateway Shopping Center Project
(now referred to as the Centre on Seventeenth Project).
Timing of Implementation/Verification
Prior to issuance of certificate of occupancy
for Phase 1.
Field inspection
Project applicant; Public Works Agency:
Engineering Services Manager
The project shall participate in the City's Areawide TSIA fee program (currently the fee is
$5.53 per square-foot of commercial development, however, the TSIA fee is subject to
change).
Timing of Implementation/Verification Prior to issuance &building permits.
Metlm~f_VerificatiQn
Written verification of cancelled checks
9
]:49
150
Timing of Imple~nentation/Verification
Responsible Parties
Responsible Parties Public Works Agency: Engineering
Services Manager
The project developer shall implement a Transportation Demand Management (TDM)
program aimed at reducing single occupancy vehicle trips generated to and from the
project site. The TDM program will be contained in the Covenants, Conditions, and
Restrictions (C.C.& R's) associated with the project.
Condition of certificate of occupancy; on-
going during the life of the project.
Written report to be provided by the project
applicant or representative annually
Project applicant; Public Works Agency:
Engineering Services Manager
The project applicant shall request approval ora variance for ten percent reduction in
parking.
Timing of Implement ation/Verification
Prior to site plan approval
Building plan check
Planning Division: Case Planner;
Environmental Coordinator
One week prior to the start of grading, the applicant shall contact by mail all residents
immediately adjacent to the site and advise them to keep windows closed in order to
minimize dust intrusion.
Timing of Implementation/Verification
Method of Verification
Responsible Parties
Prior to start of grading.
Verification of mailing.
Project applicant; Planning Division: Case
Planner; Environmental Coordinator
Tile general contractor shall use low emission mobile construction equipment, where
feasible.
Timing of Implementation/Verification On-going during project construction
Method of Verification
Visual on-going site inspection during
project construction.
10
Responsible Parties
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
The general contractor shall water the site and clean equipment morning and evening to
comply with the AQMP Fugitive Dust Measures BCM-03 and BCM-06. The general
contractor shall water the construction site and unpaved haul roads (with use of reclaimed
water or chemical soil binder, where feasible) twice dally.
On-going during project construction.
Method of Verification
Visual site inspection.
Responsible Parties
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
Construction operations shall include on-site crews that wash offtrucks leaving the site to
comply with the AQMP Fugitive Dust Measure BCM-01.
Timing of hnplementation/Verification Condition of grading permit issuance
Grading plan check; periodic field
inspections during grading
Responsible Parties
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator.
The general contractor shall apply chemical soil stabilizers according to manufacturer's
specifications to all inactive construction areas (previously graded areas which remain
inactive for 96 hours).
Timing of Implementation/Verification Condition of grading permit issuance
Grading plan check; periodic field
inspections during grading
Responsible Parties
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator.
The general contractor shall sweep streets daily if silt is carded over to adjacent public
thoroughfares.
Timing of Implementation/Verification On-going during project construction.
Method of Verification
Visual inspection.
11
152
10.
Responsible Parties
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator.
Traffic speeds on all unpaved mad surfaces on-site shall be 5 miles per hour or less.
Timing of Implementation/Verification
On-going during project construction.
Visual site inspection.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator.
The general contractor shall suspend grading operations during first and second stage
smog alerts.
Timing of Implementation/Verification On-going during project grading.
Visual on-site inspection.
Responsible Parties
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator.
The general contractor shall suspend all grading operations when wind speeds (as
instantaneous gusts) exceed 25 miles per hour.
Timing oflmplemantation/Verification On-going during project grading.
Visual on-site inspection.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator.
The general contractor shall maintain construction equipmem engines by keeping them
properly tuned.
Timing of Implementation/Verification
Prior to start of grading and on-going
during project grading.
Visual site inspection.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
12
11. The project applicant shall use Iow emission on-site stationary equipment (e.g., clean
12.
N'olse
!.
fuels).
Timing of Implementation/Verification
Responsible Parties
On-going during project construction.
Visual inspections.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
The project applicant shall implement a Transportation Demand Management Program.
Timing of Implementation/Verification
Responsible Parties
Condition of certificate of occupancy; on-
going during the life of the project
Written report to be provided by the project
sponsor or representative annually
Public Works Agency: Engineering Services
Manager; Planning Division: Environmental
Coordinator
A construction traffic plan showing locations of equipment staging area and construction
employee parking shall be prepared and approved by the City Planning and Building
Division. All employee construction traffic shall be routed as far as possible from the
residences along the north, northwest and northeast project boundary.
Timing of Implementation/Verification
Method of Veriftcatkm
Responsible Parties
Prior to issuance of a grading permit.
Grading plan check
Planning Division: Environmental
Coordinator; Public Works Agency:
Engineering Services Manager
All outdoor construction activities shall be limited to the hours of 7:00 AM to 8:00 PM,
Monday through Saturday. No construction shall be permitted on Sunday or Federal
holidays.
Timing of Implementation/Verification
Prior to issuance ora grading permit and
building permits.
Grading/Building plan check and visual
inspection on-going during project
construction.
153
13
154
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
All construction equipment, stationary or mobile, shall be equipped with properly
operating and maintained muffling devices.
Timing of Implementation/Verification Prior to start of grading and building.
Visual inspection initially and on-going
during project construction.
Building Division: Inspection Services
Manager
Stationary construction equipment shall be placed such that emitted noise is directed away
from residential land uses. Temporary noise barriers, enclosures or shrouds shall be
installed, when appropriate, to reduce noise emitted from stationary construction
equipment.
Timing of Implementation/Verification
Prior to issuance of a grading permit and
building permits and on-going during project
construction.
Grading/building plan check and visual on-
going site inspection.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
The screen dock walls shall be a minimum of 8 feet high relative to the loading dock
elevation and the screen dock walls shall be 15 feet longer than the longest proposed
truck.
Timing of Implementation/Verification Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
Prior to issuance ora grading permit the project applicant shall construct a new 8 foot
high wall along the north property line contiguous to the existing 6 foot wall. The wall
must be solid top to bottom with no opening or decorative cut-outs.
Timing of Implementation/Verification Prior to issuance of a grading permit.
14
Grading plan check and field inspections
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
Timing of Implementation/Verification
Speed bumps shall not be allowed along the northern most driveway.
Timing of Implementation/Verification Prior to issuance of a building permit.
· ' Building plan check and field inspection
Responsible Parties Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
Signs shall be posted on-site restricting vehicular speed to 5 MPH.
Prior to issuance ora certificate of
occupancy
Visual site inspection.
Building Division: Inspection Services
Manager; Planning Division: Case Planner;
Environmental Coordinator
Signs shall be posted in the loading dock areas prohibiting the use of vehicle horns and
yelling.
Timing of Implementation/Verification
Prior to issuance of a certificate of
occupancy
Visual site inspection.
Building Division: Inspection Services
Manager; Planning Division: Case Planner;
Environmental Coordinator
Prior to installation and operation of any outdoor paging system for retail buildings 1,2 or
3, an acoustical study will be prepared to confirm that any resultant noise impact on those
adjacent residential users does not exceed the City's noise criteria threshold or 55 dBA
during daytime periods.
Timing of Implementation/Verification
Prior to issuance of a certificate of
occupancy for each retail building and on-
going during building occupancy.
155
15
156
I1.
12.
13.
14.
Building plan check and visual site
inspection.
Building Division: Senior Plan Check
Engineer; Inspection Services Manager;
Planning Division: Case Planner;
Environmental Coordinator
The facade of the west, north and east building elevations of the retail buildings located at
the north end of the site shall be a rough surface to reduce noise reflections.
Timing of Implementation/Verification
Prior to issuance of a building permit.
Building plan check.
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner
All walk-through and roll-up doors shall be closed when not in use.
Timing of Implementation/Verification
Issuance of building permits and on-going
during project occupancy.
Building plan check and visual site
inspection.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
All noise walls shall be standard masonry or concrete block or any other material with a
minimum surface weight of 4 pounds per square font. No gaps or openings shall be
permitted. All gaps are to be sealed.
Timing of Implementation/Verification
Prior to issuance of a grading permit.
Grading plan check and field inspections
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
Timing of Implementation/Verification
All delivery truck engines shall be off unless needed to operate refrigeration equipment.
On-going during project occupancy.
Verification fi.om tenants and visual site
inspection.
16
15.
16.
17.
, 18.
Building Division: Inspection Services
Manager; Planning Division: Environmental
Coordinator
All trash compactors shall be shielded by either dock walls or separate enclosures·
Timin_~ of Implementation/Verification
Prior to issuance cfa building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
In order to mitigate noise from mechanical equipment, parapet walls along the north, east
and west rooftop sides of retail buildings 1, 2 and 3 shall be a minimum of 5 feet· As an
alte~aative, parapet walls of less than 5 feet may be considered on a case-by-case basis, if
supporting acoustical analysis demonstrate compliance with the 50 dBA noise standard for
nighttime periods.
Timing of Implementation/Verification
Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
No fast food restaurant speaker boxes shall be directed toward the north property
boundary.
Timing of Implementation/Verification Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
For retail buildings 1, 2 and 3, trash pick-up vehicles and vehicles cfa size equal to an SU-
30 truck and larger shall be prohibited from making deliveries between the hours of 10 PM
and 7 AM.
Timing of Implementation/V0rification
Prior to issuance of a certificate of
occupancy
Method of Verification
Verification from tenants and field
inspection.
157
17
19.
20.
Building Division: Inspection Services
Manager; Planning Division: Case Planner;
Environmental Coordinator
Parking lot sweeping or outdoor clean up activity in parking areas to the north of the front
building elevations for buildings 1, 2 and 3 shall be limited to the hours of 7 AM to 10
PM.
Timing of Implementation/Verification During project operation
Responsible Parties
Periodic inspection.
Building Division: Inspection Services
Manager; Planning Division: Case Planner;
Environmental Coordinator
Parking lot sweeping or outdoor clean up activity in parking areas to the south of the front
of buildings 1, 2 and 3 shall be limited to the hours of 7:00 AM to midnight.
Timing oflmplementation/Verification During project operation
Periodic inspection.
Building Division: Inspection Services
Manager; Planning Division: Case Planner;
Environmental Coordinator
The project shall be reviewed by the Energy Services New Construction Department at
Southern California Edison to determine those measures that can be incorporated into a
project to reduce electrical demands. The project developer shall incorporate all measures
into the project as economically feasible as determined by the City Building Division.
Timing of Implementation/Verification
Responsible Parties
Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer
The project shall meet all applicable State of California Title 24 Energy guidelines.
Timing of Implementation/Verification
Responsible Parties
Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer
18
159
Public Services and Utilities
Police Protection
1. No parking shall be allowed along the northern project bounda~.
Timing of lmplementationFVerificatinn Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
The project applicant will be required to provide parking area security patrols, but only at
such time as parking spaces are actually striped and available for public use on the west
side of Retail Building 3 north of the building storefront. Such patrols will be required
only during the hours fxom sundown until one-half hour after the stores close. Six months
after implementation and annually thereafter, this mitigation measure will be reviewed by
the Santa Ana Police Department for possible modifications based upon observations by
the property owner and review of Police Department incident reports.
Timing of Implementation/Verification
Prior to issuance of an occupancy permit and
during building occupancy.
Occupancy permit on on-going site
inspection.
Building Division: Senior Plan Check
Engineer; Inspection Services Manager;
Planning Division: Case Planner;
Environmental Coordinator; Police
Department: Community Services Specialist
Water Service
Water conservation and management techniques shall be incorporated into the design,
construction and operation of the project, including the use of fixtures that use reduced
volumes of water, landscaping irrigation in early morning and evening hours to reduce
water lost to evaporative and incorporate drought tolerant plant species for new
landscaping.
Timing of Implementation/Verification Plan check; during construction
Inspection of landscape plan
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
19
Environmental Coordinator; Landscape
Associate
The City of Santa Aaa Fire Department will determine the precise fire flow requirements
fi.om the proposed project during its review of the final project plan. The design and
implementation of any required on-site improvement to provide the fire flow requirement
determined during site plan review shall be borne by the project developer.
Timing of Implementation/Verification Plan check
Review and inspection
Fire Department: Fire Marshall; Public
Works Agency; Water Resources Manager
Wastewater Service
Prior to the issuance of building permits, the project sponsor shall obtain all permits and
pay all fees required by the City in order to provide an acceptable level of sewage
treatment service.
Timing of Implementation/Verification Prior to issuance of a building permit.
Building plan check and cancelled check
Building Division: Senior Plan Check
Engineer; Public Works Agency; Engineering
Services Manager
Solid Waste
The City shall encourage recycling of materials generated on the site during both project
construction and the life of the project by encouraging contractors to recycle construction
debris when feasible and use recyclable materials for construction.
Timing of hnplementation/Verification
Prior to issuance of a building permit on-
going throughout the life of the project.
Building plan check and visual site
inspection.
Public Works Agency: Engineering Services
Manager; Planning Division: Environmental
Coordinator
In accordance with the City's Solid Waste Integrated Management Plan, the project
developer shall prepare and submit a Source Reduction and Recycling Plan to the Public
Works Agency and the Planning Division, prior to the issuance of occupancy permits. The
20
Plan shall document and outline the incorporation of an on-site recycling/conservation
program.
Timing of Implementation/Verification Prior to issuance of certificate of occupancy
· ' Project applicant or representative to submit
a written plan
~ Public Works Agency: Enterprise
Coordinator; Plarming Division:
Environmental Coordinator
The project developer shall provide a designated area adjacent to refuse containers for
Retail buildings 1, 2 and 3 that accommodate separated recyclable material (such as
cardboard and paper) for collection.
Timing of Implementation/Verification
Prior to issuance of a building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
¸2.
The site plan shall be reviewed by the City Planning and Building Agency and the Police
Department for potential light impacts to those residential units adjacent to and northwest,
north and northeast of the site.
Timing of Implementation~rerification Prior to issuance ora building permit.
Building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator; Police
Department: Community Services Specialist
All project lighting shall comply with the City of Santa Ana Security Ordinance.
Lighting in close proximity to the light sensitive residential uses adjacent to the site
shall be directed on-site and shielded from extending directly off-site.
Timing of Implementation/Verification Prior to issuance of occupancy permits.
Architectural and electrical plan check; field
inspections
161
21
162
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
Prior to the issuance ora building permit, the project developer shall prepare a point by
point computerized photometric study showing the light trespass into the adjacent
residential neighborhood. The purpose of this study is to ensure that offset light impacts
to the adjacent residential neighborhood will not exceed 0.2 foot candle. This study shall
be submitted to the City of Santa Ana Police Department, Crime Prevention Sergeant.
Timing of Implementation/Verification Prior to issuance of a building permit.
Building plan check
Responsible Parties
Police Department: Crime Prevention
Sergeant; Planning Division: Case Planner;
Environmental Coordinator
To minimize excessive light and glare, building exteriors shall utilize a low reflective glass.
Mirrored glass and other highly reflective building materials shall not be utilized on the
exterior of the building.
Timing of Implementation/Verification Prior to issuance of a building permit.
Building plan check and field inspection
Building Division: Senior Plan Check
Engineer; Inspection Services Manager;
Planning Division: Case Planner;
Environmental Coordinator
Exterior building courts and corridor illumination shall be designed to minimize intrusive
glare at nearby residences. Low level security lights shall be used along driveway
entrances.
Timing of lmplementationFv'erification Prior to issuance of a building permit.
Building plan check and field inspection
p~esponsible Parties
Building Division: Senior Plan Check
Engineer; Inspection Services Manager;
Planning Division: Case Planner;
Environmental Coordinator
All outdoor lighting other than identification signage shall be directed from the perimeter
of the property toward buildings and parking areas utilizing cut-off fixtures.
Timing of Implementation/Verification Prior to issuance of building permits.
22
Aesthetics
1.
Architectural and electrical plan checks;
visual site verification.
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator; Police
Department: Community Services Specialist
Plant materials, shade structures and other architectural design features shall be used
where appropriate to decrease reflecfivity of hardscape and light and glare toward adjacent
residences.
Timing of lmplementationNerification Prior to issuance of a building permit.
Building plan check
Timing of Implementmion/Verification
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
The City shall approve a landscaping plan prior to the issuance of building permits. Trees
as determined by City Planning Division staff shall be planted in the landscape area along
the north project boundary to buffer the project from adjacent residents.
Prior to issuance of a building permit.
Landscaping and building plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Landscape Associate
Prior to issuance ora grading permit, the project applicant shall construct a new 8 foot
high wall along the north project boundary adjacent to the existing 6 foot high wall.
Timing of Implementation/Verification
Prior to issuance of a grading permit.
Building and grading plan check
Building Division: Senior Plan Check
Engineer; Planning Division: Case Planner;
Environmental Coordinator
The project applicant shall contact the Orange County Vector Control at least two months
prior to the start of grading requesting a site inspection for the presence of vectors.
23
163
Timin~ of Implementation/Verification
Should vectors be present, the project applicant shall initiate methods recommended by
the Orange County Vector Control to eliminate or reduce identified vectors.
Two months prior to issuance ora grading
permit.
Report from O.C. Vector Control of site
inspection.
Planning Division: Case Planner;
Environmental Coordinator
One week prior to the start of grading the project applicant shall contact Orange County
Vector Control for a follow-up visit to determine the success of the eradication program.
Timing of Implementation/Verification
Responsible Parties
Prior to issuance of grading permit
Report from O.C. Vector Control.
Planning Division: Case Planner;
Environmental Coordinator
One week prior to the start of grading the project applicant shall contact by mail all
property owners adjacent to the site. The notice shall state the date grading will begin and
to watch for visible signs of vectors.
Timing of Implementation/Verification One week prior to start of grading.
Proof of mailing.
Planning Division: Case Planner;
Environmental Coordinator
24
165
APPENDIX A
VERIFICATION FORM
166
Home Place Shopping Center Mitigation Monitoring Program
Sample Compliance Verification Form
Impact Issue (e.g., aesthetics, air quality):
Location: Onsite
Project Phase: Design
Mitigation Measure #:
Offsite Administrative
Grading/Construction .Operation
Description of Activity/Method of Implementation:
Disposition
Comments/Revisions:
Mitigation measure for the above-noted project phase has been
implemented. No future action is required.
Mitigation measure for the above-noted project phase is not fully
implemented. Further action is required. (Please explain below).
The mitigation measure for the above-noted project phase is not in
compliance. Further action is required. (Please explain below).
Completed by: Name:
Title:
Date:
Approved by: Name:
Title:
Date: