Loading...
HomeMy WebLinkAbout2001-059 - Sewer Service FeeRESOLUTION NO. 2001-059 A RESOLUTION OF THE CITY COUNCIL OF THE CiTY OF SANTA ANA SETTING THE AMOUNT OF THE SEWER SERVICE FEE ESTABLISHED PURSUANT TO SECTION 39-55 OF THE SANTA ANA MUNICIPAL CODE AND ADDING SAID FEE TO THE MISCELLANEOUS FEE SCHEDULE bk:8/27/01 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS FOLLOWS: Section 1. The City Council of the City of Santa Ana hereby finds, determines and declares as follows: On May 21, 2001 the City Council was presented, at a study session, with evidence demonstrating that large portions of the City's sewerage system, located in no one area but citywide, is of sufficient age that it is need of additional and extraordinary repair and replacement. The City currently does not levy a fee or charge for the service of transporting sewerage. This service is a commodity in that the more water a water customer consumes the greater the sewerage that the customer generates. The City's Charter and State law, including but not limited to Government Code section 54340 et seq., provide that the City may establish reasonable charges and fees for the service the City provides in transporting sewerage to the Orange County publicly owned treatment works and related infrastructure. A fee for this service would not duplicate any existing fee, charge, levy or other toll currently collected by the City or any public agency, and would be distinct and separate from any current or future (i) sewer standby or availability charge or assessment, (ii)special benefit assessment of special tax imposed pursuant to state or local law, (iii) sewer connection charge or sewer capacity charge paid in connection with or as a condition of approving an application for sewer service, or (iv) any mitigation fee imposed on new development pursuant to state law (Government Code § 66000 et seq.) or local law. This fee would not be charged, because no sewerage service is being provided, to raw land, vacant property (i.e., where no water service is being provided), to a customer who is consuming no water, to a water customer Resolution No, 2001-059 Page 1 of 7 who is directly connected to a county owned sewer, or to a water customer whose only water consumption is for fire service or irrigation. The moneys collected by such a service fee would be placed into a fund that would be used only to repair, replace and pen~orm preventative maintenance on city owned sewer mains or sewer trunk lines, and associated costs. In addition, in a change to current policy, the City could use such funds to repair and replace that portion of the sewer customer's lateral that lies within the public right of way when necessary. No moneys from this fund would go to the city's general fund. The money collected by the sewer service fee has been conservatively set; the fee will not pay for all the costs of the program which are estimated to be almost $3.6 million per year. Exhibit A to this resolution, showing the estimated costs of the program is attached hereto as Exhibit A and incorporated herein by this reference as though fully set forth. The fee established by this resolution is estimated to collect $2.3 million per year. The Council recognizes and understands that not all potable water consumed by a water utility customer is discharged into the city-owned sewer system and facilities. A small percentage is consumed or is used for irrigation. In establishing this fee, the Council recognizes and understands that it could reach the same fee by setting a higher fee and then discounting the fee by ten or twenty percent to make up for water consumed or used for irrigation. Of course, those water utility customers whose water is used exclusively for irrigation or fire service are exempt from this sewer service fee if there water usage is separately metered. The City Council incorporates herein, as though fully set forth, the Request For Council Action accompanying this resolution, and all background information and studies presented to the City Council at the September 4, 2001 meeting, the City Council study sessions leading up to adoption of the 2001-2001 budget, and the May 21, 2001 City Council study session. Section 2. The City Council hereby establishes the following sewer service A sewer service fee for water utility customers of $0.12 per water unit is hereby established. No water utility customer shall be assessed a sewer service fee for that amount of water usage which exceeds 4,167 units in a single month (or 8,333 units in a two-month billing period). For any person who receives potable water service from a municipal water provider other than the City or from a private water provider, and who Resolution No. 2001-059 Page 2 of 7 discharges into the city-owned sewer system and facilities, the sewer service fee shall be $0.12 per water unit, if the City is able to determine the metered water usage of the person. If not, then the Executive Director of Public Works or designee shall set a sewer service fee of $2.40 per month per single family home, and fees for other uses accordingly. Do The City shall commence collecting this sewer service fee on November 1, 2001 or as soon thereafter as is practicable in the opinion of the Executive Director of Finance. No sewer service fee shall be levied against a water utility customer or person exempt pursuant to Code section 33-59.3. Section 3. Beginning July 1, 2002, at the commencement of each fiscal year, this sewer service fee shall annually be increased by an amount equal to the change since the last increase in the Consumer Price Index For All Urban Consumers ("CPI-U") for the Los Angeles-Riverside-Orange County region. Should a proposed CPI-U increase for any fiscal year not accurately reflect the increase in the City's costs to undertake the program set forth in this Resolution, then the Executive Director of the Public Works Agency, or designee is directed to place before the City Council a proposal to either (a) not increase the sewer service fee by the full change in the CPI-U, or (b) increase the sewer service fee by more than the change in the CPi-U. Section4. This Resolution shall take effect upon the effective date of Ordinance No. NS-2479, and the Clerk of the Council shall attest to and certify the vote adopting this Resolution. Should said Ordinance not be adopted, or should said Ordinance not become effective, this Resolution shall be deemed null and void and of no further effect. Sec~tion~5. That without further action of the City Council this sewer service fee shall be incorporated into the City's Miscellaneous Fee Schedule. ADOPTED this 4th day of SePtember. 2001. Resolution No. 2001-059 Page 3 of 7 APPROVED AS TO FORM: Joseph W. Fletcher, City Attorney /Chie~/Assistaht City Attorney AYES: NOES: ABSTAIN: Councilmembers: Bist, Franklin, McGuigan, Pulido, Solorio (53 Councilmembers: Christy (1) Councilmembers: None NOT PRESENT:Councilmembers: Alvarez {'1) CERTIFICATE OF ATTESTATION AND ORIGINALITY I, PATRICIA E. HEALY, Clerk of the Council, do hereby attest to and certify the attached Resolution No, 2001-059 to be the original resolution aaopted by the City Council of the City of Santa Ana on September 4, 2001. Date: Resolution No. 2001-059 Page 4 of 7 EXHIBIT A NEW SEWER ENTERPRISE PROGRAM COST ANALYSIS STAFF COSTS Staff required to implement the proposed program are as follows: Associate engineer ................................. - $86,000 (B step) Assistant Engineer .................................. - $64,000 (B step) Intern ...................................................... - $13,000 (A step) Consulting services ................................ - $130,000 Total annual staff cost ............................. = $293,000 OVERHEAD COSTS Overhead costs include office supplies, equipment rental, insurance, strategic plan, indirect costs, Treasury customer services charges, and PW admin charges. Using the Water Administration and Engineering budget, these charges would pre-rate to the following: Office supplies ........................................ = $20,000 Equipment rental ..................................... = $15,000 Insurance ............................................... = $86,300 Information Systems Strategic Plan ........ = $81,200 Indirect costs ........................................... = $66,000 Public Works admin charges .................. = $76,000 Treasury customer services charges ...... = $101.700 Total ........................................................ = $446.200 SEWER VIDEO PROGRAM Video all sewer mains in system every 25 years. 450 miles / 25 years = 18 miles per year = 95,040 feet per year. 95,040 feet per year = at $0.70 per foot = $66,530, use $67.000 per year. Resolution No. 2001-059 Page 5 of 7 EMERGENCY SEWER LATERAL REPLACEMENTS Current requests for sewer lateral repairs/replacements are approximately 50 per year. City would retain a contractor to provide emergency replacements, estimated cost is $4,500 per lateral on an individual basis. 50 laterals per year x $4,500 per lateral = $225.000 per year. SEWER MAIN REPLACEMENTS Assume 450 miles of sewer main, 8,000 manholes, 45,000 laterals. If all facilities are assumed to have a life expectancy of 100 years, the annual replacement schedule would be as follows: 4.5 miles of sewer main. 80 manholes. 400 sewer laterals (Total will actually be 450, but 50 are replaced under emergency basis). Assumptions: · Majority (90%) of sewer replacement will be 8". · Average sewer lateral is 4" in size and 30 feet in length. Estimated construction costs (including design and administration): · 8" sewer main = $70 per lineal foot. · Replace lateral = $1,500 each. · Replace manhole = $3,800 each. Annual program construction costs: 4.5 miles of new mains .......................... = $1,663,200 400 laterals ............................................. = $600,000 80 manholes ........................................... = $304,000 Total ........................................................ = $2,567,200 Resolution No. 2001-059 Page 6 of 7 TOTAL PROGRAM COSTS Construction ............................................ = $2,567,200 Staff ........................................................ = $293,000 Overhead costs ....................................... = $446,200 Videotaping ............................................. = $67,000 Emergency lateral replacements ............ = $225,000 Total program costs ............................... = $3,598,400 Resolution No. 2001-059 Page 7 of 7