Loading...
HomeMy WebLinkAbout23B - NEWHOPE STREET IMPROVEREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JANUARY 5, 2004 TITLE: COI~T~(ACT AWARD FOR NEWHOPE STREET IMPROVEMENTS (PROJECT NOS. 1911, 2608, AND 04-3506) APPROVED [] As Recommended [] As Amended [] Ordinance on 1~t Reading [] Ordinance on 2"d Reading [] Implementing Resolution [] Set Public Hearing For CONTINUEDTO FILE NUMBER 1. Award a contract to Ail American Asphalt, the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $2,409,409. 2. Approve a Funding Analysis with a total estimated construction cost of $3,011,700. DISCUSSION This segment of Newhope Street from Edinger Avenue to Seventeenth Street has been identified as a high priority on the City's Pavement Management System (Exhibit 1). The pavement is deteriorating due to weather, age and heavy usage. Some of the adjacent curbs, gutters, sidewalks and driveway approaches are also in various states of disrepair and require replacement. In addition, this project entails signal modifications at Kent Avenue, as well as sewer improvements at Fifth Street. This project provides for construction of new street pavement, replacement of damaged concrete curbs, gutters, sidewalks, cross gutters, driveway approaches and wheelchair ramps. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the street. The Notice Inviting Bids was advertised on November 14 and 15, 2003 and bids were opened on December 5, 2003. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 12 Contractors requesting bidding documents: 12 Bids received: 4 Bids received from Santa Aha Contractors: 0 Page 27 23.B. Newhope Street Improvements Project Nos. 1911, 2608 and 04-3506 January 5, 2004 Page 2 NAME OF BIDDER CITY BID AMOUNT 1. Ail American Asphalt 2. R.J. Noble Company 3. Palp. Inc. DBA Excel Paving Company 4. Sequel Contractors Inc. Corona Orange Long Beach Santa Fe Springs 2,409,409.00 2,572,162.00 2,580,226.00 2,616,984.50 A total of four bids were received and all were responsive. The lowest bid was submitted by All American Asphalt for $2,409,409 which is below the Engineer's estimate of $2,730,000. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project is exempt from further review. Categorical Exemption No. 2003-95 will be filed for this project. FISCA~ IMPACT The Funding Analysis shows a total estimated construction cost of $3,011,700 for the project (Exhibit 2). Funds are available in the Select Street Construction Fund (account no. 59-551-6631) and the Measure M Street Construction Fund (account no. 32-551-6631). Executive Director Public Works Agency K: \Construction\RFCA-draft\1911 120 WD APPROVED AS TO FUNDS AND ACCOUNTS: uti; Financ~ Director Mgmt. Services Agency 23.B. Page 28 HAZARD AVE. I [- :~r""-~ WESTMINSTER AVE. 1ST ST. -- MCFADDEN AVE. - ' PROJECT LIMITS Z ~ EDINGER AVE. htT. B SANTA ANA CITY COUNCIL AGENDA DATE: dANUARY 5, 2004 Trlle: PROJECT NOS. 1911, 2608 AND 04-3506 NEWHOPE STREET IMPROVEMENTS FUNDING~NALYSIS PROJECT NOS. 1911, 2608 ~LND 04-3506 NEWHOPE STREET IMPROVEMENTS Construction Contract Contract Administration Inspection and Testing Survey Staking Contingencies $2,409,409 $ 61,351 $ 180,000 $ 120,000 $ 240,940 TOTAL ESTIMATED CONSTRUCTION COSTS $~,011,700 Exhibit 2 23.B. Page 30 Page 31 23.B. 23=B= Page 32 ~ o o o ~ o ~ ~ o o ~ o ~ o ~ o ~ o o o ~ ~ Page 33 23.B. 23.B. Page 34