Loading...
HomeMy WebLinkAbout23B - DYER ROAD REHABILITATIONREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: ~A.R¥ 20, 2004 TITLE: APPROVED CONTRACT AWARD FOR DYER ROAD REHABILITATION BETWEENFLOWER AND MAIN STREETS (PROJECT 1772) ~IT{Y M~NAGER ECOMMENDED ACTION 1. Award a contract to Orion Contracting, Inc., bidder, in accordance with unit bid prices in $398,630.50. [] As Recommended [] As Amended [] Ordinance on 1~t Reading [] Ordinance on 2nd Reading [] Implementing Resolution [] Set Public Hearing For CONTINUED TO FILE NUMBER the lowest responsible the estimated amount of 2. Approve a Funding Analysis with a total estimated construction cost of $498,300. DISCUSSION The segment of Dyer Road between Flower and Main Streets has been identified as a high priority in the City's Pavement Management System (Exhibit 1). The pavement is deteriorating due to weather, age and heavy usage. Some of the adjacent curbs, gutters, sidewalks, cross gutters, driveway approaches and wheelchair ramps are also in various states of disrepair and require replacement. This project provides for construction of new street pavement, replacement of damaged curbs, gutters, sidewalks, cross gutters, driveway approaches and wheelchair ramps. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the street. The Notice Inviting Bids was advertised on November 21 and 22, 2003 and bids were opened on December 16, 2003. A summary of the bid invitations mailed, the bids received, and the bid results follows: Page 29 23.B. Project 1772, Dyer Road Rehabilitation Between Flower and Main Streets January 20, 2004 Page 2 Santa Aha Contractors receiving notices: Contractors requesting bidding documents: Bids received: Bids received from Santa Ana Contractors: 10 17 7 1 NAME OF BIDDER CITY BID AMOUNT 1. Orion Contracting, Inc. 2. Ail American Asphalt 3. Hardy & Harper, Inc. 4. Palp Inc., DBA Excel Paving 5. Elite Bobcat, Inc. 6. Sequel Contractors, Inc. 7. R.J. Noble Company San Clemente Corona Santa Ana Long Beach Corona Santa Fe Springs Orange $398,630 $405,000 $444,852 $463,814 $483,300 $497,244 $541,765 5O 00 77 3O 6O 85 70 A total of seven bids were received and all were responsive. The lowest bid was submitted by Orion Contracting, Inc. for $398,630.50, which is below the Engineer's estimate of $430,000. ENVIRONMENTAL, IMPACT Environmental Review No. ER 2003-87 has been completed and a categorical Exemption has been filed for the Project pursuant to the California Environmental Quality Act. FISCAL IMPACT The Funding Analysis shows a total estimated construction cost of $498,300 for the project (Exhibit 2). Funds are available in the Select Street Construction Fund (account no. 59-551-6631) and the Measure M Street Construction Fund (account no. 32-551-6631). James G{' Ross ~/ Executive Director Public Works Agency APPROVED AS TO FUNDS AND ACCOUNTS: Executiv4~ Director Finance & Mgmt. Services Agency K:\Construction\RFCA-draft\1772 01-20-04 90WD 23.B. Page 30 / / ANA P~A CiTY CoU~L TAle: EXHIBIT 1 PROJECT 1772: DYER ROAD REHABILITATION BETWEEN FLOWER AND MAIN STREETS FUNDINGANALYSIS PROJECT 1772 DYER ROAD REHABILITATION BETWEEN FLOWER AND MAIN STREETS Construction Contract Contract Administration Inspection and Testing Survey Staking Contingencies $398,630 7,907 32,500 19,400 39,863 TOTAL ESTIMATED CONSTRUCTION COSTS $498,300 Exhibit 2 23.B. Page 32 Page 33 23.B. 23.B, Page 34 Page 35 23.B.