HomeMy WebLinkAbout22H - SCE ELECTRIC METERING REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: DECEMBER 20, 2004 TITLE: CONTRACT AWARD FOR SOUTHERN CALIFORNIA EDISON ELECTRIC METERING SERVICE ENTRANCE INSTALLATION AT WALNUT PUMPING STA ON (SP C. N. -12 APPROVED o As Recommended o As Amended o Ordinance on 1 st Reading o Ordinance on 2nd Reading o Implementing Resolution o Set Public Hearing For CONTINUED TO FILE NUMBER RECOMMENDED ACTION Award a contract to Consolidated Data Controls for the installation of a Southern California Edison electric metering service entrance at the Walnut Pumping Station in the amount of $10,427. DISCUSSION The Public Works Agency's Water Resources Division is upgrading the motor control center at the Walnut Pumping Station. To provide space for the new equipment, the metering switchgear and switchboard were relocated outside, which required the installation of a new Southern California Edison electrical metering service entrance. The new service entrance will be equipped with a transfer switch to allow for the use of emergency backup power. The notice inviting bids was advertised on September 29 and October 1, 2004, and bids were solicited. A summary of the bid invitations and bids received is as follows: 15 Invitations For Bid mailed 2 Invitations For Bid mailed to Santa Ana vendors 3 Bids received Bids were received, opened on November 3, 2004, 1) . The bid from Consolidated Data Controls specification. and evaluated is responsive (Exhibit to the 22H-1 CS. 383 Contract Award for Southern California Edison Electric Metering Service Entrance Installation at Walnut Pumping Station (Spec. No. 04-122) December 20, 2004 Page 2 FISCAL IMPACT Funds are available in the Water Utility Water production and Supply Machinery and Equipment account (account no. 64-574-6641). R APPROVED AS TO FUNDS AND ACCOUNTS: o loma Execut'Je Director vV Finan e & Mgmt. Services Agency 22H-2 ABSTRACT OF BIDS CONTRACT AWARD FOR SCE ELECTRICAL METERING SERVICE ENTRANCE INSTALLATION AT WALNUT PUMPING STATION (SPEC. 04-122) Vendor Consolidated Data Controls Leed Electric Location Anaheim Norwalk Labor/ Materials Price $ 8,427.00 $13,576.00 Contingency $ 2,000.00 $ 2,000.00 Tax @ 7.75% Included Included Total Cost $10,427.00 $15,576.00 1% Local Vendor Preference N/A N/A EXHIBIT 1 22H-3 Digital Electronic Services Upland $37,670.00 $ 2,000.00 Included $39,670.00 N/A 22H-4