HomeMy WebLinkAbout22H - SCE ELECTRIC METERING
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
CLERK OF COUNCIL USE ONLY:
DECEMBER 20, 2004
TITLE:
CONTRACT AWARD FOR
SOUTHERN CALIFORNIA EDISON
ELECTRIC METERING SERVICE
ENTRANCE INSTALLATION AT
WALNUT PUMPING STA ON
(SP C. N. -12
APPROVED
o As Recommended
o As Amended
o Ordinance on 1 st Reading
o Ordinance on 2nd Reading
o Implementing Resolution
o Set Public Hearing For
CONTINUED TO
FILE NUMBER
RECOMMENDED ACTION
Award a contract to Consolidated Data Controls for the installation of
a Southern California Edison electric metering service entrance at the
Walnut Pumping Station in the amount of $10,427.
DISCUSSION
The Public Works Agency's Water Resources Division is upgrading the
motor control center at the Walnut Pumping Station. To provide space
for the new equipment, the metering switchgear and switchboard were
relocated outside, which required the installation of a new Southern
California Edison electrical metering service entrance. The new
service entrance will be equipped with a transfer switch to allow for
the use of emergency backup power.
The notice inviting bids was advertised on September 29 and October 1,
2004, and bids were solicited. A summary of the bid invitations and
bids received is as follows:
15 Invitations For Bid mailed
2 Invitations For Bid mailed to Santa Ana vendors
3 Bids received
Bids were received, opened on November 3, 2004,
1) . The bid from Consolidated Data Controls
specification.
and evaluated
is responsive
(Exhibit
to the
22H-1
CS. 383
Contract Award for Southern California Edison
Electric Metering Service Entrance
Installation at Walnut Pumping Station
(Spec. No. 04-122)
December 20, 2004
Page 2
FISCAL IMPACT
Funds are available in the Water Utility Water production and Supply
Machinery and Equipment account (account no. 64-574-6641).
R
APPROVED AS TO FUNDS AND ACCOUNTS:
o loma
Execut'Je Director vV
Finan e & Mgmt. Services Agency
22H-2
ABSTRACT OF BIDS
CONTRACT AWARD FOR SCE ELECTRICAL METERING SERVICE
ENTRANCE INSTALLATION AT WALNUT PUMPING STATION
(SPEC. 04-122)
Vendor
Consolidated
Data Controls
Leed
Electric
Location
Anaheim
Norwalk
Labor/
Materials
Price
$ 8,427.00
$13,576.00
Contingency
$ 2,000.00
$ 2,000.00
Tax @ 7.75%
Included
Included
Total
Cost
$10,427.00
$15,576.00
1% Local
Vendor
Preference
N/A
N/A
EXHIBIT 1
22H-3
Digital
Electronic Services
Upland
$37,670.00
$ 2,000.00
Included
$39,670.00
N/A