Loading...
HomeMy WebLinkAbout22A - ASPHALT STREET MAINTENANCE REQUEST FOR COUNCIL ACTION ~ ..,~ CITY COUNCIL MEETING DATE: MARCH 20, 2006 TITLE: CLERK OF COUNCIL USE ONLY: CONTRACT AMENDMENTS FOR ASPHALT STREET MAINTENANCE AND ASPHALT POTHOLE REPAIR AND SIDEWALK MAINTENANCE (SPEC. NOS.04-010 AND 04-046) APPROVED o As Recommended o As Amended o Ordinance on 1 st Reading o Ordinance on 2nd Reading o Implementing Resolution o Set Public Hearing For a~/a- CONTINUED TO FILE NUMBER CITY MANAGER RECOMMENDED ACTION 1. Amend the contract with Hardy and Harper, Inc. for asphalt street maintenance by $330,000 for a total not to exceed $656,910. 2. Amend the contract with Hardy and Harper, Inc. for asphalt pothole repairs and sidewalk maintenance by $200,000 for a total not to exceed $525,000. DISCUSSION The Public Works Agency's Maintenance Services Division is responsible for maintaining the street and sidewalks of Santa Ana. In order to do so, contracts for annual asphalt street maintenance, pothole repair and sidewalk maintenance are required. Services provided under the asphalt street maintenance contract include the excavation and cold milling of existing roadways, the installation of pavement reinforcement fabric, construction of asphalt concrete pavement, and crack sealing. Services provided under the pothole repair and sidewalk maintenance contract include the repair of all potholes a minimum of six inches wide and one inch deep, and the repair of damaged pavement areas not exceeding 25 sq. ft. in diameter and two inches in depth with an asphalt overlay. Sidewalk maintenance provided includes sidewalk ramping and sidewalk offset grinding, which are used to reduce risks to pedestrian traffic. In addition, the asphalt street maintenance contract provides for repair of pavement affected by water system maintenance. This includes the repair of water and sewer line trenches and the adjustment of manhole and water valve covers to the new street surface level. 22A-1 CS 383 Contract Amendments for Asphalt Street Maintenance and Asphalt Pothole Repair and Sidewalk Maintenance (Spec Nos. 04-010 and 04-046) March 20, 2006 Page 2 On July 5, 2005, the City Council renewed the contracts with Hardy & Harper, Inc., a Santa Ana vendor, for a one -year period. Recently, funds from Proposition 42 have become available for use by the Maintenance Services Division for street maintenance. The funds will be added to the Hardy & Harper contracts to allow additional street maintenance to be performed during the contract terms. Also, Water Resources funds will be added to the street maintenance contract to cover the costs associated with water and sewer line trench repairs and manhole and water valve cover adjustments. FISCAL IMPACT Funds are available in the Public Works Traffic Congestion Improvement Other Than Building and the Water Utility Water Maintenance Other Contractual Services accounts (account nos. 6 63 1 and 64 - 5 7 5 - 62 91) . Relief System 28-552- APPROVED AS TO FUNDS & ACCOUNTS: <,tAM c:z I James G. Ross ( Executi ve Director , / ~Ublic Works Agency JGR/WO/04-010A.9 & 04-046-A.9:uc rl~~- . '!"&1-Francisco Gutierrez ~ -U Executlve Dlrector Finance & Mgmt. Services Agency 22A-2