Loading...
HomeMy WebLinkAbout23A - BROADWAY REHAB & H2O MAIN IMPROVEMENTS REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JUNE 19, 2006 TITLE: APPROVED CONTRACT AWARD FOR BROADWAY REHABILITATION AND WATER MAIN IMPROVEMENTS FROM FIRST STREET TO CIVIC CENTER DRIVE (PROJECT NOS. 05-1705 AND 06- 3199) I ..A/ o As Recommended o As Amended o Ordinance on 1st Reading o Ordinance on 2nd Reading D Implementing Resolution o Set Public Hearing For ilJ;3t2~ CITY MANAGER CONTINUED TO FILE NUMBER J' RECOMMENDED ACTION 1. Award a contract to All American Asphalt, the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $1,499,494 for construction of Broadway rehabilitation and water main improvements from First Street to Civic Center Drive. 2. Approve a Funding Analysis with a total estimated construction cost of $1,874,300. DISCUSSION Broadway between First Street and Civic Center Drive has been identified as a high priority on the City's Pavement Management System (Exhibit 1). The pavement is deteriorating due to weather, age and heavy usage. Some of the adjacent curbs, gutters, sidewalks, and driveway approaches are also in various state of disrepair. The existing water mains were built in the 1950's. This project provides for the construction of new street pavement and the replacement of damaged concrete curbs, gutters, sidewalks, and driveway approaches. Additionally, since the street is being repaved and the water mains are near the end of their useful lifespan, they should also be replaced. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the street. The Notice Inviting Bids was advertised on April 14 and 17, 2006, and bids were opened on May 9, 2006. A summary of the bid invitations mailed, the bids received, and the bid results follows. 23A-1 Broadway Rehabilitation and Water Main Improvements from First Street to Civic Center Drive June 19, 2006 Page 2 Santa Ana Contractors receiving notices: 10 Contractors requesting bidding documents: 16 Bids received: 5 Bids received from Santa Ana Contractors: 1 NAME OF BIDDER CITY BID AMOUNT 1,499,494.00 1,697,969.48 1,842,683.60 1,893,662.25 2,711,552.86 1. All American Asphalt 2. R.J. Noble Company 3. Sequel Contractors, Inc. 4. Palp, Inc. DBA Excel Paving Company 5. Hardy & Harper, Inc. Corona Orange Santa Fe Springs Long Beach Santa Ana A total of five bids were received and all were responsive. The lowest bid was submitted by All American Asphalt for $1,499,494, which is above the Engineer's estimate of $1,106,020. The high bid is attributed to the recent escalation in material costs. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption ER no. 2005-79 was filed for this project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $1,874,300 for the project (Exhibit 2). Funds are available in the Measure M Street Construction Fund (account no. 32-551-6631), the Select Street Construction Fund (account no. 59-551-6631), and the Water Capital Improvement Fund (account no. 66-579-6631). APPROVED AS TO FUNDS AND ACCOUNTS: I . ~~'r {{'/7 r<'- James G. Ross ! Executive Director Public Works Agency '{ Francisco Gutierrez Executive Director Finance & Mgmt. Services Agency 23A-2 PROJECT AREA: ~ SANTA ANA , PW A t , , ft&I: __ CITY COltCl.. AQEN)A DAle JlJE _, 200e l1IIe: C';' ~/. C' C'~ +~ ~ o~ SANTA AN BLVD. 3RD S . FIRST ST. EXHBIT 1 BROADWAY REHABILITATION AND WATER ~ IMPROVEMENTS (PROJECTS 05-1705/06-3199) 23A-3 ~ N.T.8 FUNDING ANALYSIS PROJECT 05-1705 BROADWAY REHABILITATION AND WATER MAIN IMPROVEMENTS FROM FIRST STREET TO CIVIC CENTER DRIVE Construction Contract Contract Administration Inspection and Testing Survey Staking Contingencies $1,499,494 49,857 105,000 70,000 149,949 $1,874,300 TOTAL ESTIMATED CONSTRUCTION COSTS Exhibit 2 23A-4