A-2007-034
COOPERATIVE AGREEMENT NO. C- 6-0692
BETWEEN
ORANGE COUNTY TRANSPORTATION AUTHORITY
AND
CITY OF SANTA ANA
FOR
CITY-INITIATED TRANSIT EXTENSIONS TO METROLlNK
THIS AGREEMENT is made and entered into this
day of
*
200;\', by and between the Orange County Transportation Authority, 550 South Main Street, P.O.
Box 14184, Orange, California 92863-1584, a public corporation of the State of California
(hereinafter referred to as "AUTHORITY"), acting on behalf of the Orange County Local
Transportation Authority, and the City of Santa Ana, 20 Civic Center Plaza, Santa Ana, California,
92701, a municipal corporation and charter city duly organized and existing under the constitution
and laws of the State of California (hereinafter referred to as "CITY").
RECITALS:
WHEREAS, AUTHORITY considers its railroad lines linking Los Angeles and San Diego
Counties and the Inland Empire to be the core of Orange County's future rail transit system; and
WHEREAS, CITY and AUTHORITY wish to work as partners to develop a community-based
transit vision that increases use of Metrolink by Santa Ana residents, visitors, and/or employees; and
WHEREAS, the funds allocated through this program must comply with the 1990 Measure M
ordinance which states in part that the intent is to provide matching funds to encourage development
of extensions to major activity centers and providing access between the primary rail system and
employment centers; and
WHEREAS, CITY is encouraged to enter into written agreements with other cities to
collaborate in some or all facets of a planning and needs assessment to support this vision; and
Page 1 of 13
AGREEMENT C-6-0692
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
WHEREAS, Measure M funds have been designated for cities to study ways to accomplish
this; and
WHEREAS, CITY will develop a proposed Project Concept (further defined hereunder) which
will factor in, among other elements, community interests and desires; and
WHEREAS, the AUTHORITY's Board of Directors on February 27, 2006, allocated Measure
M funds to a program designed to enable cities that wish to develop a local transit vision including
defined enhancements and transit extensions to Metrolink that work best with their local
community's short and long-term priorities (hereinafter referred to as "GO LOCAL Step 1 "); and
WHEREAS, CITY has completed the GO LOCAL Step 1 Project Concept form, and
AUTHORITY has found such concept acceptable; and
WHEREAS, CITY, upon AUTHORITY's execution of this Agreement, will pursue the Project
Concept; and
NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and CITY as
follows:
ARTICLE 1. COMPLETE AGREEMENT
This Agreement, including all exhibits and documents incorporated herein and made
applicable by reference, constitutes the complete and exclusive statement of the terms and
conditions of the agreement between AUTHORITY and CITY concerning the GO LOCAL Step 1
work and supersedes all prior representations, understandings and communications between the
parties. The invalidity in whole or part of any term or condition of this Agreement shall not affect the
validity of the other terms or conditions.
ARTICLE 2. SCOPE
A. This Agreement specifies the procedures that AUTHORITY and CITY will follow in
connection with the GO LOCAL Step 1 work to be performed. CITY agrees to provide all services
identified in Project Concept, identified herein as Exhibit A to this Agreement. Both AUTHORITY
and CITY agree that each will cooperate and coordinate with the other in all activities covered by this
Page 2 of 13
AGREEMENT C-6-0692
1
2
3
4
5
6
Agreement and any other supplemental agreements.
B. AUTHORITY's failure to insist upon CITY's performance of any terms or conditions of
this Agreement shall not be construed as a waiver or relinquishment of AUTHORITY's right to such
performance or to future performance of such terms or conditions and CITY's obligation in respect to
performance shall continue in full force and effect.
C. Changes to any portion of this Agreement shall not be binding upon AUTHORITY unless
confirmed in writing by an authorized representative of AUTHORITY by way of a written amendment to
this Agreement and issued in accordance with the provisions of this Agreement.
ARTICLE 3. RESPONSIBILlTES OF AUTHORITY
AUTHORITY agrees to the following responsibilities for the GO LOCAL Step 1 work:
A. Pavment- AUTHORITY shall pay CITY the amount identified in Article 5. PAYMENT,
for the GO LOCAL Step 1 work within 30 days of receipt of acceptable invoice. Funds will not be
distributed to CITY if AUTHORITY has not accepted CITY's Project Concept. CITY may resubmit an
amended Project Concept for review by AUTHORITY. AUTHORITY has the sole and exclusive right
to accept or reject any Project Concept.
B. Should CITY not complete the services identified in Exhibit A, or does not meet the
terms and conditions of this Agreement, the CITY will return to AUTHORITY all monies funded to the
CITY within sixty (60) days of AUTHORITY's written demand.
C. Additional Fundinq- Funding beyond what has been identified in Article 5.
PAYMENT, shall be pursuant to a competitive process for projects initiated by AUTHORITY at a
date to be determined. AUTHORITY does not guarantee that CITY will be selected to advance to
the any future step in the GO LOCAL process.
ARTICLE 4. RESPONSIBILITIES OF CITY
CITY agrees to the following responsibilities for GO LOCAL Step 1 work:
A. Lead Aqencv- CITY will act as the lead agency for the GO LOCAL Step 1 work.
However, CITY may designate pursuant to a written partnership letter of agreement that another city
7
8
91
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Page 3 of 13
AGREEMENT C-6-0692
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
participating in the GO LOCAL program is serving as lead agency. AUTHORITY shall be provided a
copy of this letter within ten (10) days after the agreement has been executed.
S. Third Party Partnershios- CITY is encouraged to collaborate with and enter into written
agreements with adjacent cities to advance the project consistent with the Project Concept. CITY shall
deliver to AUTHORITY a copy of each executed agreement within ten (10) days of execution.
C. Proiect Reoortinq- Within six months from the receipt of funds, CITY shall submit to
AUTHORITY a progress report similar to that detailed in Exhibit S, entitled "GO LOCAL Initial
Progress Report," attached to and, by this reference, incorporated in and made part of this
Agreement. CITY shall be required to produce a final written report of its findings,
recommendations, and next steps according to a mutually agreed upon date, but no later than the
completion date of this Agreement. The Final Report will include the elements described in Exhibit
C, entitled "GO LOCAL Project Concept Final Report Outline." Exhibit C is attached to and, by this
reference, incorporated in and made part of this Agreement.
D. Use Of Fundinq- CITY shall use funding provided by AUTHORITY exclusively for the
services identified in Exhibit A. All funding released to CITY shall be spent in accordance with Local
Transportation Ordinance Number 2: The Revised Orange County Traffic Improvement and Growth
Management Ordinance. If CITY fails to develop and/or pursue the Project Concept in accordance
with said Ordinance, or the CITY uses the Funds to support or facilitate acquisition of property
through eminent domain or as matching funds to implement land development, all monies funded to
the CITY shall be returned to AUTHORITY within sixty (60) days of AUTHORITY's written demand.
AUTHORITY shall have sole discretion in determining whether the Project Concept has been
developed and/or pursued in accordance with said Ordinance. AUTHORITY may terminate this
Agreement, in whole or part, if the AUTHORITY determines in its sole discretion that CITY has
utilized funds in a manner leading to use of eminent domain powers. Upon AUTHORITY's
determination and written request, CITY shall return all monies in accordance with this Article.
/
Page 4 of 13
AGREEMENT C-6-Q692
1
2
3
4
5
6
7
E. Third Partv Work- CITY shall deliver to AUTHORITY a copy of each executed
agreement and scope of work for services to be performed by third parties in fulfillment of the Project
Concept within thirty (30) days after the agreement has been executed.
F. Conduct- CITY shall conduct all of its activities in association with GO LOCAL Step 1
in a good and competent and professional manner and in compliance with all applicable federal,
state and local rules and regulations.
G. Modelinq-CITY shall utilize existing AUTHORITY modeling resuits to ensure that
project results are compatible with AUTHORITY planning efforts. AUTHORITY shall make modeling
available.
ARTICLE 5. PAYMENT
A. For CITY's full and complete performance of its obligations under this Agreement and
subject to the maximum cumulative payment obligation provisions set forth in this Agreement,
AUTHORITY shall pay CITY the not to exceed lump sum amount of One Hundred Thousand Dollars
($100,000.00) within thirty (30) days after execution of this Agreement and upon receipt of
acceptable invoice.
B. As a supplement to the Final Report, CITY shall submit to AUTHORITY a Project
Expenditures Certification, as detailed in Exhibit D, which is attached to this Agreement, and
incorporated by reference, for work performed under this Agreement. The Certification shall include,
but not be limited to, period of performance, actuai expenses; classification, hours and rates of in-
house personnel, vendors, contractors, for work performed exclusively for the GO LOCAL Step 1
phase. Additionally, CITY may be required to submit this information to the AUTHORITY at any time
during the performance of this Agreement. CITY will be required to submit to AUTHORITY all
information requested within thirty (30) days from AUTHORITY's request.
I
I
I
8 i
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Page 5 of 13
AGREEMENT C-6-0692
1
2
3
4
5
6
ARTICLE 6. MAXIMUM OBLIGATION
Notwithstanding any provisions of this Agreement to the contrary, AUTHORITY and CITY
agree that AUTHORITY's maximum cumulative payment obligation hereunder (including CITY's
direct and indirect costs) shall be One Hundred Thousand Dollars ($100,000.00) which shall include
all amounts payable incurred solely for the purposes of the GO LOCAL Step 1 work.
ARTICLE 7. AUDIT AND INSPECTION
CITY shall maintain a complete set of records in accordance with generally accepted
accounting principles and in accordance with Local Transportation Ordinance Number 2: The
Revised Traffic Improvement and Growth Management Ordinance. The original records shall be
maintained within the CITY limits. Upon reasonable notice, CITY shall permit the authorized
representatives of the AUTHORITY to inspect and audit all work, materials, payroll, books, accounts
and other data and records of CITY for a period of not less than four (4) years after final payment, or
until anyon-going audit is completed whichever is longer. For purposes of audit, the date of
completion of this Agreement shall be the date of AUTHORITY's payment for CITY's final billing (so
noted on the invoice) under this Agreement. AUTHORITY shall also have the right to reproduce any
documents related to this Agreement by whatever means necessary.
ARTICLE 8. INDEMNIFICATION
CITY shall indemnify, defend and hold harmless AUTHORITY, its officers, directors,
employees and agents from and against any and all claims (including attorney's fees and reasonable
expenses for litigation or settlement) for any loss or damages, bodily injuries, including death,
worker's compensation subrogation claims, damage to or loss of use of property caused by the
negligent acts, omissions or willful misconduct by CITY, its officers, directors, employees or agents
in connection with or arising out of the performance of this Agreement.
/
/
/
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Page 6 of 13
21
22
23
24
25
26
AGREEMENT C-6-0692
1
ARTICLE 9. ADDITIONAL PROVISIONS:
2
The AUTHORITY and CITY agree to the following mutual responsibilities:
3
A.
Term of Aareement- This Agreement shall continue in full force and effect through
4
December 31, 2007, unless terminated by mutual written consent by both Parties. The term of this
Agreement may only be extended upon mutual written agreement by both Parties.
5
6
B.
Termination- The AUTHORITY may terminate this Agreement for its convenience any
7
time, in whole or part, by giving CITY written notice thereof.
8.
C.
Modifications- This Agreement may be amended in writing at any time by the mutual
9
consent of both Parties. No amendment shall have any force or effect unless executed in writing by
10 i
both AUTHORITY and CITY.
11
D.
Leaal Authoritv- AUTHORITY and CITY hereto warrant that they are duly authorized
12 ,
I
to execute this Agreement on behalf of said Parties and that, by so executing this Agreement, the
Parties hereto are formally bound to the provisions of this Agreement.
13
14
E.
Notices- Any notices, requests or demands made between the parties pursuant to
15.
this Agreement are to be directed as followed:
16
To CITY:
To AUTHORITY:
17'
City of Santa Ana
20 Civic Center Plaza (M-21)
Orange County Transportation Authority
550 South Main Street
18
19
P. O. Box 14184
20 ,
Santa Ana, CA 92701
Orange, CA 92863-1584
ATTENTION: James Ross,
Attention: Kathleen Murphy-Perez,
Public Works Agency Executive Director
Section Manager, Capital Projects
(714/647-6954), jross@ci.santa-ana.ca.us
(714/560-5743); kperez@octa.net
c: Paul Taylor, Executive Director,
Development Division
/
Page 7 of 13
AGREEMENT C-6-0692
1
2
3
4
5
6
7
8
9
10
11
12
13
14
I
15
16
17
18
19
20
21
22
23
24
25
26
F. Severabilitv- If any term, provision, covenant or condition of this Agreement is held to
be invalid, void or otherwise unenforceable, to any extent, by any court of competent jurisdiction, the
remainder to this Agreement shall not be affected thereby, and each term, provision, covenant or
condition of this Agreement shall be valid and enforceable to the fullest extent permitted by iaw.
G. Counterparts of Aoreement- This Agreement may be executed and delivered in any
number of counterparts, each of which, when executed and delivered shall be deemed an original
and all of which together shall constitute the same agreement. Facsimile signatures will be
permitted.
H. Force Maieure- Either Party shall be excused from performing its obligations under this
Agreement during the time and to the extent that it is prevented from performing by an unforeseeable
cause beyond its control, including but not limited to: any incidence of fire, flood; acts of God;
commandeering of material, products, plants or facilities by the federal, state or local government;
national fuel shortage; or a material act or omission by the other party; when satisfactory evidence of
such cause is presented to the other Party, and provided further that such nonperformance is
unforeseeable, beyond the control and is not due to the fault or negligence of the Party not performing.
I. Assionment- Neither this Agreement, nor any of a Party's rights, obligations, duties, or
authority hereunder may be assigned in whole or in part by either Party without the prior written consent
of the other Party. Any such attempt of assignment shall be deemed void and of no force and effect.
Consent to one assignment shall not be deemed consent to any subsequent assignment, nor the
waiver of any right to consent to such subsequent assignment.
J. Oblioations Complv with Law- Nothing herein shall be deemed nor construed to
authorize or require any Party to issue bonds, notes or other evidences of indebtedness under terms, in
amounts, or for purposes other than as authorized by iocal, State or Federal law.
K. Governino Law- The laws of the State of California and applicable Federal, State, local
laws, regulations and guidelines shall govern hereunder.
I
Page 8 of 13
AGREEMENT C-6-0692
I This Agreement shall be made effective upon execution by both parties.
2 IN WITNESS WHEREOF, the parties hereto have caused this Agreement No. C-6-0692 to be
10
11
12
13
14
IS
16
17
18
19
20
21
22
23
24
25
3 executed on the date first above written.
4
CITY SANTA ANA
~
City Manager
5
6
7
8
ATTEST:
By: (l,,~.I~
(:Y'Patricia E. Healy
Clerk of the Council
9
APPROVED AS TO FORM:
Joseph W. Fletcher
City Attorney
By: ~'.:-- C. ~
By: Lisa E. Storc
Assistant City Attorney
Dated:
ORANGE COUNTY TRANSPORTATION AUTHORITY
By:
Arthur T. Leahy
Chief Executive Officer
APPROVED AS TO FORM:
By:
Kennard R. Smart, r.
General Counsel
APPROVAL RECOMMENDED:
By:
Paul Taylor, Executive Director
Development Division
Dated:
Page 9 of 13
AGREEMENT C-6.0692
EXHIBIT A
PROJECT CONCEPT
To qualify for funds your city project must focus on assessing ways to provide transit
connections to Metrolink. Complete the Project Concept, and return with the Cooperative
AQreement.
A. Study Type
Project Concept assessments can cover or study any of the following topics. Please review
the descriptions below and indicate the type of analysis you expect to perform by placing an (x)
next to one (or more) of the following:
X Needs Assessments
What are the transit needs? Identify populations, congestion areas, etc.
Coordinating Transit and Land Use
How can a transit project support your city's land use planning policies/projects and vice
versa?
X Route Planning
Existing data has identified activity centers, populations or congestion hot spots which
warrant transit service. What are possible routes and types of transit?
Public policy /public support
Does the community support transit as evidenced by land use designations and the
commitment of local stakeholders?
X Project Concepts
Does the city have one or more general transit concepts which it would like to explore
more fully in a detailed technical analysis?
Make your own case
Is there a concept that addresses a need in your city that you would like the Board of
Directors to consider? Is this need consistent with the Measure M requirements that
funds be spent on transit-related purposes to extend the reach of Metrolink?
B. Project Overview
Please include a 250 to 300 word overview of your Project Concept.
C. Partners
Please attach any letters of agreements which identify other jurisdictions participating in this
Project Concept and your respective roles (see Checklist on Website).
Revised 9/19/2006
Page 10 of 13
AGREEMENT C-6"()692
EXHIBIT B
PROJECT CONCEPT
SIX-MONTH PROGRESS REPORT
City/Date:
Prepared By
A. Project Overview Progress Report
Please include a 200-300 word description of progress to date. To the extent possible, you
should describe what you are working on, your methodology, key staff and/or stakeholders,
and any preliminary results.
B. Project Resources
Please indicate all that apply:
. We've been utilizing consultants
(Name(s):
. We've been doing some or all
of the work in-house
. We have partnerships with:
(Include if not listed in Exhibit A)
C. Financial Report
Percentage of funding Committed
Expended
We foresee obstacles to completion with funding. No_ Yes_
If yes, please explain in attachment:
Return to: Jeanne Spinner-LaMar, Manager, Local Initiative
550 South Main Street
P.O. Box 14184
Orange, CA 92863.1584
Prepared 4/30/06
Page 11 of 13
,,,,,';;..,C -__ , _ ~~:
'~ ' ~ GO LOCAL ~~: .
~ '?
~*:~ , ~ ~ - ~!; ~~2~tfu:
AGREEMENT C-6-0692
EXHIBIT C
PROJECT CONCEPT
FINAL REPORT OUTLINE
At the conclusion of Project Concept work, all cities will submit a Final Report within
days utilizing the outline below. Sections Five and Six below will constitute your
proposal for the next phase of work.
1.
Summary of Project
(1 page)
(1 page)
(1 page)
2.
Study Questions
3.
Methodology Used
4. Results (3-5 pages)
Report against the Evaluation Criteria, i.e. financial considerations,
community factors, transportation benefit.
5. Findings (4-5 pages)
Your analysis of the results
6. Next Steps (5-7 pages)
Identify:
. what you wish to do next,
. the methods you would use,
. the staff, resources, and time you would need;
. what you would expect to determine, and
. the budget, your agency contribution, any partnerships and their
contributions.
Return to: Jeanne Spinner-La Mar, Manager, Local Initiatives
550 South Main Street
P.O. Box 14184
Orange, CA 92863-1584
Prepared 4130106
Page 12 of 13
AGREEMENT C-6-0692
EXHIBIT 0
PROJECT CONCEPT
Project Expenditures Certification
SAMPLE
Consultant
Contract
Number
In-house
Labor
Total hours charged to
project x fully burdened
houri rate
500 hours x $85/hr
ABC
001
Sr.
Planner
Admin
Ass!.
100 x $25/hr
TOTAL
addA&B
XYZ
002
100,000
I hereby certify that the above is a true and correct statement of the work performed and costs
incurred on the Project Concept.
Date
Signed
Title
Return to: Jeanne Spinner-LaMar, Manager, Local Initiative
550 South Main Street
P.O. Box 14184
Orange, CA 92863-1584
Page 13 of 13
Prepared 4/30/06
Councilmember Benavides abstained from participation in this matter due to
receipt of a campaign contribution
Motion: Take matter off agenda
MOTION: Alvarez
SECOND: Bustamante
YOTE:
AYES:
Alvarez, Benavides, Bustamante, Martinez,
Pulido, Tinajero (6)
NOES: None (0)
ABSTAIN: None (0)
ABSENT: Sarmiento (1) .
CONSENT CALENDAR
Mayor Pulido announced the following modifications to the Consent Calendar:
. Councilmember Benavides abstained on Item 11.C.
. Mayor Pro Tem Bustamante voted "no" on Item 11.0.
Motion: Approve staff recommendations on the following Consent Calendar
items.
MOTION: Sarmiento
SECOND: Alvarez
YOTE:
AYES:
Alvarez, Benavides, Bustamante, Martinez,
Pulido, Sarmiento, Tinajero (7)
NOES: None (0)
ABSTAIN: None (0)
ABSENT: None (0)
Items removed for separate action or modified are highlighted. Separate actions show
the actual vote. Items without votes are adopted as part of the consent motion.
MINUTES
Motion: Approve minutes. (Items 10.A. -10.B.)
10A REGULAR MEETING MINUTES OF JANUARY 16,2007
10.B. ADJOURNED REGULAR MEETING OF JANUARY 16, 2007
CITY COUNCIL MINUTES
3
FEBRUARY 5, 2007
25.G. AGMT 2007-030 - FUEL MANAGEMENT SYSTEM UPGRADE (SPEC. NO.
06-172) - With Orpak USA, Inc., in the amount not to exceed $51,959.70-
Finance & Management SeNices Agency
25.H. AGMT 2007-031- FIRE ALARM SYSTEMS MAINTENANCE - Execute a
renewal with Simplex Grinnell LP, for a one-year period in the amount not to
exceed $45,500 - Finance & Management SeNices Agency
25.1. AGMT 2007-032 - MEMORANDUM OF UNDERSTANDING - With the
Firemen's Benevolent Association - Personnel SeNices Agency
Glen Stroud
25.J. AGMT 2007-033 - MOBILE AD-HOC NETWORK - With Global Mesh
Technologies in an amount not to exceed $350,000 - Police Department
25.K. AGMTS - CITY OF SANTA ANA REGIONAL TRANSPORTATION CENTER
CITY-INITIATED TRANSIT EXTENSIONS TO METROLlNK STUDIES
PROJECT 06-2502 - Public Works Agency
Continued from the October 16, 2006 City Council Meeting by a vote of 6-0
(Solorio absent); November 20, 2006 City Council Meeting by a vote of 7-0;
January 16, 2007 City Council meeting by a vote 017-0
Motion: 1. Direct the City Attorney to prepare and authorize the City Manager
and Clerk of the Council to execute a cooperative agreement
AGMT 2007-034 - With the Orange County Transportation Authority in
an amount not to exceed $100,000 to conduct the City of Santa Ana
Regional Transportation Center City-Initiated Transit Extensions to
Metrolink Studies - Public Works Agency
2. Direct the City Attorney to prepare and authorize the City Manager
and Clerk of the Council to execute an amendment to an
agreement.
AGMT 2007-035 - Execute an amendment with Parsons Brinckerhoff in
an amount not to exceed $100,000 to conduct the City-Initiated Transit
Extensions to Metrolink Studies - Public Works Agency
3. Approve an appropriation adjustment. (Requires five affirmative
votes)
APPROPRIATION ADJUSTMENT NO. 07-070 - Recognizing $100,000
in unanticipated Measure M Transit funds and appropriate the same
amount to the City-Initiated Transit Extensions to Metrolink Studies
project account, Project No. 06-2502
CITY COUNCIL MINUTES
13
FEBRUARY 5, 2007
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
CLERK OF COUNCIL USE ONLY:
FEBRUARY 5, 2007
TITLE
APPROVED
AGREEMENTS FOR CITY OF SANTA
ANA REGIONAL TRANSPORTATION
CENTER CITY-INITIATED TRANSIT
EXTENSIONS TO KETROLINK
STUDIES PROJ~ 06-2502
o As Recommended
o As Amended
o Ordinance on 1" Reading
o Ordinance on 2'" Reading
o Implementing Resolution
o Set Public Hearing For
CONTINUED TO
FILE NUMBER
ECOMMENDED ACTION
1. Direct the City AttoESeY to prepare and authorize the City Manager
and Clerk of the Council to execute a cooperative agreement with the
Orange County Transportation Authority in an amount not to exceed
$100,000 to conduct the City of Santa Ana Regional Transportation
Center City-Initiated Transit Extensions to Metrolink Studies.
2. Direct the City Attorney to prepare and authorize the City Manager
and Clerk of the Council to execute an amendment to the agreement
with Parsons Brinckerhoff in an amount not to exceed $100,000 to
conduct the City-Initiated Transit Extensions to Metrolink Studies.
3. Approve an appropriation adjustment recognizing $100,000 in
unanticipated Measure M Transit funds in account no. 32-01-5053, and
appropriate the same amount to the City-Initiated Transit Extensions
to Metrolink Studies project account no. 32-551-6631, project no.
06-2502.
DISCUSSION
On October 14, 2005, the OCTA Board of Directors approved a package of
projects as a substitute for the Centerline Project that would satisfy
the air quality goals established for rapid transit projects. The Board
also approved a five-year program of rapid transit projects using the
existing Metro1ink commuter rail corridor as the backbone of the Orange
County's transit system. Additionally, on February 27, 2006, the aCTA
Board approved a four-step process for City-Initiated Transit Extensions
to Metrolink, now known as the Go Local program as shown below:
25K-1
RTC Metrolink Extension Studies
February 5, 2007
Page 2 of 3
· Step one allocates up to a total of $3.4 million for cities to
develop a local transit vision and conduct initial planning. All
cities are eligible to receive $100,000 grants, once they execute a
cooperative agreement with aCTA.
· Step two is scheduled to commence in the first quarter of 2008 and
makes available the remainder of $30 million on a competitive basis
to further develop the most promising projects.
· Step three is planned to coincide with the availability of renewed
Measure M funds, proj ects may move into proj ect development and
implementation, and the major projects will presumably advance into
a federally funded preliminary engineering effort.
· Step four focuses resources on transforming the Metrolink stations
into major multi-modal transportation centers.
Parsons Brinckerhoff (PB) has been working with City staff and has
recently completed the Santa Ana Transit Master Plan (Exhibit 1). In
Step one of the Go Local Program PB will be studying in more detail the
transit feeder alignment concepts derived from the Transit Master Plan.
The four transit feeder service alignments currently under consideration
will connect the Santa Ana Regional Transportation Center (SARTC) with
the Civic Center and Downtown area, Main Place, Bowers Museum District
and the South Coast Metro Area. In addition options to extend this
service to the proposed Bus Rapid Transit (BRT) service along Harbor
Boulevard via the former Pacific Electric (PE) Right-of-way, 17th Street
Bristol Street and Edinger Avenue, and the John Wayne Airport via
Sunflower Avenue, Bear Street and Interstate 405 will be considered.
Staff recommends that the City execute the cooperative agreement with
aCTA to receive an additional $100,000 to study the transit feeder
alignment concepts described above. Staff also recommends that the City
execute an amendment to the agreement with PB to provide consultant
support services to conduct the Metrolink extension studies that will
meet the various Federal transit agencies' guidelines. This will enable
Santa Ana to complete Step one of the Go Local Program and have a
project (s) ready for submittal for Step two which makes available $30
million for further development of the most promising projects.
As stated previously, the additional $100,000 will be used for consultant
services to complete Step one of the Go Local program. The amended
contract is estimated at total contract amount not-to-exceed $254,000.
25K-2
RTC Metrolink Extension Studies
February 5, 2007
Page 3 of 3
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Upon approval of the appropriation adjustment, funds available in Measure
M Transit Funds (account no. 32-01-5053) will be appropriated to the
City-Initiated.Metrolink Extension Studies project account (account no.
32-551-6631, project no. 06-2502).
APPROVED AS TO FUNDS AND ACCOUNTS:
'~~}.}Jf
~ James G. Ross
r-' Executive Director
public Works Agency
~1\t"\""l':,""r'J ~~~.>
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
it/
25K-3
\k
~'''.'''r.
~...--... '.-"~''''-
"" I
--~ !
~
,
-- .
I J
, ..1
,
J.,
SANTA ANA
t PWA ..
, ,
PLIBUCWOFIKSIoGl:IICY
City Council
Agenda Date
Februarv 5. 2007
fg '---'
Ai.. Alignm.nt I !
Ali9nment 2
i Alignment 3
Alignments 4A/B i
I .. . Extension
Option,
I - BRT Rou,"5
City Boundary
,
.',
.....
....
""'_.'.
,.. . ..J....
MAIN I
P.LAC~E I
CITY
. . PlACE
. .
o~~~\. .
CENTER t.,
;
j
1
......
,
!
L/
.,
'" .;
''''''.......,-..... .,
BOWERS
MUSEUM
f
~..-
"
\
<~
I{
\
,
r
,
I
i
;
l;
i
,
!
,
,
,.
\1
l
--.--
~
.
.-
~ ......._~--...
~ ...-
Metro/ink Extension AugnmsN
Concepts - Santa Ana Pocus .~.rea
SARTC CITY-INITIATED TRANSIT
EXTENSION TO METROLlNK
~t1t~4
CHECKLIST FOR PROCESSING
AGREEMENTS AND AMENDMENTS
Z"'-".
"
, "
l~.il
" 2.'0
TO: CLERK OF THE COUNCIL OFFICE
FROM: DEPT.: -n~fr"lJ;1 /r,e-A FF,c j;'1t'(
CONTACTPERSON:J-4W) 6fo1A/JJoUU-o
j
MAIL STOP: M '.c-. ".'1J
EXT.: aO~
AGREEMENT NUMBER (if amendmeng N
AMENDMENT NUMBER (if applicable): 0 1ST
o 2ND
o 3RD
o
COUNCIL APPROVAL DATE:
~-~-o7
AMOUNT: pg OVER $25,000' (A)
NAME OF CONSULTANT: #-
TERM OF AGREEMENT: EFFECTIVE DATE:
o UNDER $25,000' (N)
I Jl6K..
.1/ ';'6/0 7
TERMINATION DATE:
III j 0 f:
INSURANCE REQUIRED: ~ NO (Provide City Attomey Office approval)
DYES
o AUTO 0 CGL (Commercial General Liability)
o PROFESSIONAL LIABILITY 0 WORKERS COMPENSATION
(INSURANCE APPROVAL REQUIRED BY CAO PRIOR TO SUBMITTING TO COTC)
SIGNATURES REQUIRED:
o VENDOR D AGENCY (UNDER $25,000*)
;!;;.t CITYATTORNE,Y ~ ,OTHER CJc..-r~. 'fdGfJ.
COMMENTS: ~~ /~" 7L~ ,(~ ' ~ ^
FOR CLERK OFFICE ~NL Y:
~ PROCESS
o DO NOT PROCESS
o MISSING CONTACT/PROJECT MANAGER INFORMATION
o MISSING SIGNATURES
o NEEDS COUNCIL APPROVAL
o OTHER
. Charter amendment effective December 21, 2006 for City Manager contract authority increase.